A kind of roof prism subassembly bonding device to be processed
Technical field
The utility model belongs to processing device for optical glasses technical field, is specifically related to a kind of roof prism subassembly bonding device to be processed.
Background technology
The machining precision of traditional optics due to its its precision of design cause not high, and face toward development and the raising of optics, machining precision also strides forward towards level second, roof prism under the effect of traditional handicraft because it adopts the mode of optical cement, by on workpiece conglutinate loading block to be added, and green paint is set at gap place prevents from adding man-hour with this, unstable phenomenon is bonded because external environment changes the optical cement caused, when prior art makes roof prism Die and mould plate to be processed, not only process time is long but also due to bonding insecure and to remove green paint cumbersome, make manufacture craft inefficiency and the cycle long, therefore one is needed to shorten the production cycle, the roof prism can enhanced productivity again subassembly bonding device to be processed.
Utility model content
Technical problem to be solved in the utility model is for adding the bonding device to be processed adopted man-hour in prior art for small-sized roof prism, low and the drawback that the cycle is long due to production efficiency, and a kind of structure provided is simple and can shorten the roof prism subassembly bonding device to be processed that the production cycle enhances productivity.
Technical scheme adopted to achieve these goals is: a kind of roof prism subassembly bonding device to be processed, comprise the sealing of surrounding and front portion arranges air-dry frame and the combination loading structure of opening, described air-dry frame top arranges warming lamp and electric fan, described warming lamp is connected with controller respectively with electric fan, described air-dry frame sidewall adopts glass-mirror, described combination loading structure comprises backing plate and support board, described support board arranges roof prism, and described support board is arranged on backing plate.
Described roof prism is bonded on support board by pure water.
Described support board is bonded on backing plate by the mode of optical cement, arranges white paint protective seam between described support board and backing plate.
The quantity of described warming lamp is three, and the quantity of described electric fan is two.
The utility model adopts the sealing of surrounding and front portion arranges the air-dry frame of opening, opposing seal can be kept and stable subenvironment, on air-dry frame top, warming lamp and electric fan are set, local can be realized provide high temperature with the air circulated fast thus accelerate dry speed, glass-mirror is set at air-dry frame sidewall and can realizes heat integration utilization, reduce energy dissipation; Adopt roof prism be first bonded on support board by pure water, and be placed in air-dry frame carry out drying process, after determining drying; By support board by optical cement and backing plate glued together, and smear white paint at optical cement gap place, and then put into air-dry frame or after directly smearing on air-dry frame, carry out drying and process; Taken on operated implement by subassembly after determining drying and process, its stability in process of subassembly of the utility model making is very good after tested, within machining precision can be reached 2 seconds.
The glue mode adopted is discharged by the air of two smooth contact surfaces by pure water, then through modes such as super-dries, water is evaporated, make two surface of contact without air, thus combine more firm, ensure that machining precision, and the white paint rate of drying adopted is very fast and easy in follow-up removing, adopt paint solvent to be removed, save a large amount of time, make the Production Time of 14 hours originally be compressed to present 1.2 hours, decrease more than 90%, be worthy to be popularized and application.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described further:
Fig. 1 is the utility model plan structure schematic diagram;
Fig. 2 is the utility model side structure schematic diagram;
Fig. 3 is the partial structurtes schematic diagram of the utility model combination loading structure.
Embodiment
As Figure 1-3: embodiment one: a kind of roof prism subassembly bonding device to be processed, comprise the sealing of surrounding and front portion arranges air-dry frame 1 and the combination loading structure of opening, described air-dry frame 1 top arranges warming lamp 6 and electric fan 5, described warming lamp 6 is connected with controller 3 respectively with electric fan 5, described air-dry frame sidewall 2 adopts glass-mirror, described combination loading structure comprises backing plate 4 and support board 8, described support board 8 arranges roof prism 9, and described support board 8 is arranged on backing plate 4.
Described roof prism 9 is bonded on support board 8 by pure water.
Described support board 8 is bonded on backing plate 4 by the mode of optical cement, arranges white paint protective seam 7 between described support board 8 and backing plate 4.
The quantity of described warming lamp 6 is three, and the quantity of described electric fan 5 is two.
The utility model adopts the sealing of surrounding and front portion arranges the air-dry frame of opening, opposing seal can be kept and stable subenvironment, on air-dry frame top, warming lamp and electric fan are set, local can be realized provide high temperature with the air circulated fast thus accelerate dry speed, glass-mirror is set at air-dry frame sidewall and can realizes heat integration utilization, reduce energy dissipation; Adopt roof prism be first bonded on support board by pure water, and be placed in air-dry frame carry out drying process, after determining drying; By support board by optical cement and backing plate glued together, and smear white paint at optical cement gap place, and then put into air-dry frame or after directly smearing on air-dry frame, carry out drying and process; Taken on operated implement by subassembly after determining drying and process, its stability in process of subassembly of the utility model making is very good after tested, within machining precision can be reached 2 seconds.
The glue mode adopted is discharged by the air of two smooth contact surfaces by pure water, then through modes such as super-dries, water is evaporated, make two surface of contact without air, thus combine more firm, ensure that machining precision, and the white paint rate of drying adopted is very fast and easy in follow-up removing, adopt paint solvent to be removed, save a large amount of time, make the Production Time of 14 hours originally be compressed to present 1.2 hours, decrease more than 90%, be worthy to be popularized and application.