CN204691379U - Large-scale inverted cone water tower construction equipment - Google Patents

Large-scale inverted cone water tower construction equipment Download PDF

Info

Publication number
CN204691379U
CN204691379U CN201520386791.6U CN201520386791U CN204691379U CN 204691379 U CN204691379 U CN 204691379U CN 201520386791 U CN201520386791 U CN 201520386791U CN 204691379 U CN204691379 U CN 204691379U
Authority
CN
China
Prior art keywords
water tank
derrick
water tower
water
inverted cone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520386791.6U
Other languages
Chinese (zh)
Inventor
杨贵柏
马会军
宋少华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN201520386791.6U priority Critical patent/CN204691379U/en
Application granted granted Critical
Publication of CN204691379U publication Critical patent/CN204691379U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of large-scale inverted cone water tower construction equipment, relate to technical field of building construction, solve the problem that the form of construction work of existing large-scale inverted cone water tower is long in time limit.The technical scheme adopted is: large-scale inverted cone water tower construction equipment, comprise derrick, shell body slip-form platform, water tank prefabricated platform, protection canopy, derrick vertically stands on the outside building water tower stack shell position, shell body slip-form stage+module in the top of the stack shell of water tower yet to be built, and is connected with derrick by lift-type upper deck aisle; Being not less than around tank height place at stack shell and setting up protection canopy, is water tank prefabricated platform below protection canopy, and protection canopy at least can all cover water tank prefabricated platform by the vertical direction.Stack shell construction and water tank are constructed and are synchronously carried out, and shorten the duration, build single water tower and can save a month duration; Shell body slip-form construction uses same derrick to carry raw material with water tank prefabricated construction, avoids secondary and sets up prefabricated water tank transportation system, saved construction material and labour.

Description

Large-scale inverted cone water tower construction equipment
Technical field
The utility model relates to technical field of building construction, particularly relates to a kind of large-scale inverted cone water tower construction equipment.
Background technology
Large-scale inverted cone water tower comprises tower body and water tank, builds form by steel bar concrete, is steel mill's hot rolling, the requisite engineering ingredient of line of production technology such as cold rolling.
Existing large-scale inverted cone water tower conventional construction method is: set up derrick, build stack shell by slipform process, after stack shell overall height sliding formwork completes, remove original derrick; In water tank, again set up derrick and transportation system outside ring beam again, around the one week prefabricated water tank in inverted cone water tower stack shell bottom, water tank is prefabricated completes also maintenance 28 days, reaches after requirement be promoted to stack shell top again until water tank concrete strength.Due to stack shell and the water tank separately construction of large-scale inverted cone water tower, need respective erection construction equipment, so there is long in time limit, that cost is high shortcoming.
Utility model content
The utility model provides a kind of large-scale inverted cone water tower construction equipment, solves the problem of the construction period length of existing large-scale inverted cone water tower.
The technical scheme that the utility model solves the employing of its technical problem is: large-scale inverted cone water tower construction equipment, comprise derrick, shell body slip-form platform, water tank prefabricated platform, protection canopy, described derrick vertically stands on the outside building water tower stack shell position, described shell body slip-form stage+module is in the top of the stack shell of water tower yet to be built, and be connected with described derrick by lift-type upper deck aisle, one end of described upper deck aisle is installed on described derrick;
The bottom of the stack shell in built water tower built by described water tank prefabricated platform, and water tank prefabricated platform by scaffold support, and is connected with described derrick by water tank passageway, and the one end in described water tank passageway is fixedly installed on derrick;
Described protection canopy is built above water tank prefabricated platform, and protection canopy at least can cover whole water tank prefabricated platform by the vertical direction, and protects the height of canopy to be not less than the height of water tank.
Further, build a circle brick pier building around water tower stack shell position, water-tower water tank yet to be built is formed on this brick pier in advance.So that carry out promoting and lifting after water tank is shaped.
Further, the derrick above described upper deck aisle is installed concrete suspension bucket, the discharge port of upper concrete suspension bucket extends to shell body slip-form platform, and upper concrete suspension bucket can be up and down and fixing on derrick; The lower concrete suspension bucket of fixed installation on derrick above described water tank prefabricated platform, the discharge port of lower concrete suspension bucket extends in water tank or on water tank prefabricated platform.
Further, described derrick is diplopore derrick.Diplopore derrick can realize carrying out separately transport to constructor and concrete, improves the safety of transport.
Further, around described water tank prefabricated platform, set up many root posts, be not less than tank height place at stack shell and embedded part is set, between each root post and described embedded part, crossbeam is installed, re-lay sheet material above crossbeam as protection canopy.
Further, described column is the steel pipe of internal diameter 60mm, thick 3.5mm, and described crossbeam is the steel pipe of internal diameter 48mm, thick 3.5mm, and described sheet material is steel plate.
The beneficial effects of the utility model are:
The first, protect canopy that water tower stack shell can be avoided to construct on the impact of water tank construction, shell body slip-form construction is synchronously carried out with water tank prefabricated construction, effectively shortens the duration, improves benefit; Build the duration that single water tower can be saved one month.
The second, shell body slip-form construction uses same derrick to carry raw material with water tank prefabricated construction, and avoiding existing form of construction work needs secondary to set up the derrick transportation system of prefabricated water tank, has saved a large amount of construction materials and labour.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the utility model water tower shell body slip-form and the prefabricated synchronous construction of water tank;
Fig. 2 is that the utility model water tower stack shell and water tank have been constructed and water tank carried out to the schematic diagram of erection & lift.
Be labeled as in figure: brick pier 1, scaffold 2, column 3, sheet material 4, embedded part 5, stack shell 6, derrick 7, cage 8, upper deck aisle 9, shell body slip-form platform 10, crossbeam 11, upper concrete suspension bucket 12, water tank 13, water tank passageway 14, water tank prefabricated platform 15, lifting arm 16, lifter board 17, lower concrete suspension bucket 18.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1; the large-scale inverted cone water tower construction equipment of the utility model comprises derrick 7, shell body slip-form platform 10, water tank prefabricated platform 15, protection canopy; derrick 7 vertically stands on the outside building water tower stack shell 6 position; derrick 7 is simultaneously for shell body slip-form construction and the material delivery of water tank 13 prefabricated construction, so the erection position of derrick 7 is greater than the radius of water tank 13 to the distance of stack shell 6.Existing common derrick selected by derrick 7, preferably adopts diplopore derrick, and diplopore derrick can realize carrying out separately transport to constructor and concrete, and personnel and the different cage 8 of construction material transport, and improve the safety of transport.
Shell body slip-form platform 10 is installed on the top of the stack shell 6 of water tower yet to be built, and is connected with described derrick 7 by lift-type upper deck aisle 9, and one end of described upper deck aisle 9 is installed on described derrick 7.Concrete suspension bucket 12 installed by derrick 7 above upper deck aisle 9, and the discharge port of upper concrete suspension bucket 12 extends to shell body slip-form platform 10, and upper concrete suspension bucket 12 can be up and down and fixing on derrick 7.
The bottom of the stack shell 6 in built water tower built by water tank prefabricated platform 15, water tank prefabricated platform 15 is supported by bracing or strutting arrangement, such as by 2 supports that scaffold erecting, water tank prefabricated platform 15 is connected with described derrick 7 by water tank passageway 14, and the one end in described water tank passageway 14 is fixedly installed on derrick 7.Derrick 7 above water tank prefabricated platform 15 also fixedly mounts lower concrete suspension bucket 18, and the discharge port of lower concrete suspension bucket 18 extends in water tank 13 or on water tank prefabricated platform 15.
Shell body slip-form construction is synchronously carried out with water tank 13 prefabricated construction, in order to ensure the safety of water tank prefabricated construction, protection canopy is built above water tank prefabricated platform 15, protection canopy at least can all cover whole water tank prefabricated platform 15 by the vertical direction, such as protection canopy is built and become circular, and the diameter of circular protection canopy is greater than the diameter of water tank prefabricated platform 15; For the ease of carrying out the prefabricated construction of water tank 13 smoothly below protection canopy, the height preferably suitable height higher than water tank 13 of protection canopy; Carry out water tank 13 prefabricated construction below protection canopy, above protection canopy, carry out shell body slip-form construction, and shell body slip-form construction is synchronously carried out, to save the duration with water tank 13 prefabricated construction.
Protection canopy can be set up independent of stack shell 6.In order to improve the steadiness of protection canopy; save the material building protection canopy; be not less than water tank 13 At The Height at stack shell 6 and embedded part 5 is set; outside water tank 13 yet to be built, set up many root posts 3 simultaneously; between each root post 3 and described embedded part 5, crossbeam 11 is installed, lays sheet material 4 above crossbeam 11 as protection canopy.Column 3 can select the steel pipe of internal diameter 60mm, thick 3.5mm, and crossbeam 11 can select the steel pipe of internal diameter 48mm, thick 3.5mm, and sheet material can select steel plate.
For the ease of the lifting after the prefabricated shaping of water tank 13, build a circle brick pier 1 around bottom stack shell 6, water tank 13 is formed on this brick pier 1 in advance.After stack shell 6 and water tank 13 maintenance complete, water tank 13 is also fixing to the top of stack shell 6 by water tank hoisting along lifting arm 16 by the hydraulic lifting system on lifter board 17, as shown in Figure 2.
Large-scale inverted cone water tower construction equipment makes stack shell 6 and the prefabricated synchronous construction of water tank, and shared source material delivery system, not only save the duration, and avoid secondary to set up the source material delivery system of prefabricated water tank 13, save a large amount of construction materials and labour, reduce engineering cost.

Claims (6)

1. large-scale inverted cone water tower construction equipment, it is characterized in that: comprise derrick (7), shell body slip-form platform (10), water tank prefabricated platform (15), protection canopy, described derrick (7) vertically stands on the outside building water tower stack shell (6) position, described shell body slip-form platform (10) is installed on the top of the stack shell (6) of water tower yet to be built, and be connected with described derrick (7) by lift-type upper deck aisle (9), one end of described upper deck aisle (9) is installed on described derrick (7);
Described water tank prefabricated platform (15) builds the bottom of the stack shell (6) in built water tower, water tank prefabricated platform (15) is supported by scaffold (2), and be connected with described derrick (7) by water tank passageway (14), one end of described water tank passageway (14) is fixedly installed on derrick (7);
Described protection canopy is built in water tank prefabricated platform (15) top, and protection canopy at least can cover whole water tank prefabricated platform (15) by the vertical direction, and protects the height of canopy to be not less than the height of water tank (13).
2. large-scale inverted cone water tower construction equipment as claimed in claim 1, it is characterized in that: build a circle brick pier (1) building around water tower stack shell (6) position, water-tower water tank yet to be built (13) is formed on this brick pier (1) in advance.
3. large-scale inverted cone water tower construction equipment as claimed in claim 1, it is characterized in that: concrete suspension bucket (12) installed by the derrick (7) of described upper deck aisle (9) top, the discharge port of upper concrete suspension bucket (12) extends to shell body slip-form platform (10), and upper concrete suspension bucket (12) can be up and down and fixing on derrick (7); The lower concrete suspension bucket (18) of the upper fixed installation of derrick (7) of described water tank prefabricated platform (15) top, the discharge port of lower concrete suspension bucket (18) extends in water tank (13) or on water tank prefabricated platform (15).
4. large-scale inverted cone water tower construction equipment as claimed in claim 1, is characterized in that: described derrick (7) is diplopore derrick.
5. large-scale inverted cone water tower construction equipment as claimed in claim 1; it is characterized in that: described water tank prefabricated platform (15) sets up many root posts (3) around; be not less than water tank (13) At The Height at stack shell (6) and embedded part (5) is set; install crossbeam (11) between each root post (3) and described embedded part (5), crossbeam (11) top re-lays sheet material (4) as protection canopy.
6. large-scale inverted cone water tower construction equipment as claimed in claim 5, it is characterized in that: described column (3) is internal diameter 60mm, the steel pipe of thick 3.5mm, described crossbeam (11) is internal diameter 48mm, the steel pipe of thick 3.5mm, and described sheet material (4) is steel plate.
CN201520386791.6U 2015-06-08 2015-06-08 Large-scale inverted cone water tower construction equipment Active CN204691379U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520386791.6U CN204691379U (en) 2015-06-08 2015-06-08 Large-scale inverted cone water tower construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520386791.6U CN204691379U (en) 2015-06-08 2015-06-08 Large-scale inverted cone water tower construction equipment

Publications (1)

Publication Number Publication Date
CN204691379U true CN204691379U (en) 2015-10-07

Family

ID=54231685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520386791.6U Active CN204691379U (en) 2015-06-08 2015-06-08 Large-scale inverted cone water tower construction equipment

Country Status (1)

Country Link
CN (1) CN204691379U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104847160A (en) * 2015-06-08 2015-08-19 中国十九冶集团有限公司 Method and device for constructing large reversed conical shell water towers

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104847160A (en) * 2015-06-08 2015-08-19 中国十九冶集团有限公司 Method and device for constructing large reversed conical shell water towers
CN104847160B (en) * 2015-06-08 2017-02-22 中国十九冶集团有限公司 Method and device for constructing large reversed conical shell water towers

Similar Documents

Publication Publication Date Title
WO2020238984A1 (en) Vehicle-group-based apparatus for large-height lifting and shifting of bridge, and implementation method therefor
CN108019076B (en) Construction method of large-diameter reinforced concrete silo and device for conical shell construction
CN101575911B (en) Top-down decreasing-formwork formwork system and construction method
CN105649325B (en) The adjustable tripod support system of assembly concrete shear wall structure and method
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN105484502A (en) Combination installation method for steel structure roofing purlins and support bars of industrial factory building
CN108868161B (en) Staggered construction method for external attachment landing type tower crane of super high-rise building structure
CN103104090B (en) Silo concrete whole slip template
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN204691379U (en) Large-scale inverted cone water tower construction equipment
CN102493353B (en) Method for hoisting large equipment in bridge construction and pier top lifting frame
CN102277900B (en) Sectional-stacking jacking mounting method of vase-shaped space steel structure
CN210684499U (en) Hydraulic jacking device for pier column
CN104060836A (en) Lifting and installation method of high curved-surface net racks
CN204850469U (en) Commercial mansion system that builds
CN103924653A (en) Framework type drainage well and construction method thereof
CN203782863U (en) Frame type draining well
CN105781159A (en) Construction process for reinforced concrete coal hopper of power plant main building
CN103031892A (en) Steel truss brace and manufacturing method for steel truss platform
CN207194487U (en) Piping lane engineering construction ceiling
CN104847160A (en) Method and device for constructing large reversed conical shell water towers
CN209854576U (en) Trolley for construction of cover plate culvert or channel
CN207794764U (en) A kind of liftable communication iron tower
CN104594631B (en) The construction technology of sliding form apparatus traction operation platform construction granulation tower spraying layer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant