A kind of fixed working platform without scaffold construction elevator Download PDFInfo
- Publication number
- CN204626921U CN204626921U CN201520306176.XU CN201520306176U CN204626921U CN 204626921 U CN204626921 U CN 204626921U CN 201520306176 U CN201520306176 U CN 201520306176U CN 204626921 U CN204626921 U CN 204626921U
- Authority
- CN
- China
- Prior art keywords
- load
- bearing
- fixed
- auxiliary support
- pole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
本实用新型涉及电梯施工技术领域,具体为一种无脚手架施工电梯的固定式工作平台,包括两根与井道混凝土墙壁固定连接的承重梁,每根承重梁上均固定连接有同样用于与井道混凝土墙壁固定连接的呈竖直向上延伸状的承重立杆,两根承重梁位于井道内的端头之间固定连接有承重横杆,承重横杆上在靠近两个端部的位置上固定有呈竖直向上延伸状的辅助支撑立杆,承重立杆的高度大于辅助支撑立杆的高度,辅助支撑立杆在竖直方向上的上端和中端分别与承重立杆之间均连接有防护栏铁链,两根辅助支撑立杆的上端之间也连接有防护栏铁链,两根承重梁上铺设有踏板,结构牢固稳定、拆装方便、使用寿命长且安全防护效果好。
The utility model relates to the technical field of elevator construction, in particular to a fixed working platform for a construction elevator without scaffolding, comprising two load-bearing beams fixedly connected with the concrete wall of the well, and each load-bearing beam is fixedly connected with the same for the concrete wall of the well. A load-bearing vertical rod that is fixedly connected and extends vertically upwards. A load-bearing cross bar is fixedly connected between the ends of the two load-bearing beams located in the hoistway. An auxiliary support pole extending straight upwards, the height of the load-bearing pole is greater than the height of the auxiliary support pole, and the upper and middle ends of the auxiliary support pole in the vertical direction are respectively connected with the load-bearing pole. Chains, the upper ends of the two auxiliary support poles are also connected with guardrail iron chains, and the two load-bearing beams are covered with pedals. The structure is firm and stable, easy to disassemble, long service life and good safety protection effect.
Description
技术领域 technical field
本实用新型涉及电梯施工技术领域,具体为一种无脚手架施工电梯的固定式工作平台。The utility model relates to the technical field of elevator construction, in particular to a fixed working platform for a scaffold-free construction elevator.
背景技术 Background technique
电梯安装采用无脚手架施工方法已逐步普及,而安全是重中之重,那么如果在顶层进行起吊对重架、钢丝绳悬挂及对重块放置作业时,由于整个井道都是空的,没有额外的立足点,所以作为作业人员站立的稳固的施工平台起到了关键性的作用,没有脚手架,我们面临着一个如何安全有效地在顶层进行对重架的起吊工作、对重钢丝绳悬挂工作及对重块的放置工作的紧要问题,所以必须解决在前述工作时施工人员站立位置的安全可靠性保证,从而制作能满足电梯无脚手架施工时在顶层进行起吊对重架、钢丝绳悬挂及对重块放置作业时的专用施工工作平台是迫切的。The construction method without scaffolding has been gradually popularized for elevator installation, and safety is the top priority. If the lifting of the counterweight frame, wire rope suspension and placement of counterweights are performed on the top floor, since the entire shaft is empty, there is no additional foothold, so as a stable construction platform for operators to stand on, it plays a key role. Without scaffolding, we are faced with a problem of how to safely and effectively carry out the lifting work of the counterweight frame, the suspension work of the counterweight wire rope and the counterweight block on the top floor. Therefore, it is necessary to solve the safety and reliability guarantee of the standing position of the construction personnel during the aforementioned work, so that the production can meet the lifting counterweight frame, wire rope suspension and counterweight placement work on the top floor when the elevator has no scaffolding construction. A dedicated construction work platform is urgent.
实用新型内容 Utility model content
本实用新型的一个目的是提供一种结构牢固稳定、拆装方便、使用寿命长且安全防护效果好的无脚手架施工电梯的固定式工作平台。One purpose of the utility model is to provide a fixed working platform with a firm and stable structure, convenient disassembly and assembly, long service life and good safety protection effect without scaffolding construction elevator.
本实用新型的上述技术目的是通过以下技术方案得以实现的:一种无脚手架施工电梯的固定式工作平台,包括两根平行排列的与井道混凝土墙壁位于层门口两个底脚处的部位固定连接的承重梁,每根所述承重梁上均固定连接有用于与井道混凝土墙壁位于层门口靠井道外侧的部位固定连接的呈竖直向上延伸状的承重立杆,两根所述承重梁位于井道内的端头之间固定连接有承重横杆,所述承重横杆上在靠近两个端部的位置上固定有呈竖直向上延伸状的辅助支撑立杆,所述承重立杆的高度大于辅助支撑立杆的高度,所述辅助支撑立杆在竖直方向上的上端和中端分别与承重立杆之间均连接有防护栏铁链,两根所述辅助支撑立杆的上端之间也连接有防护栏铁链,两根所述承重梁上铺设有踏板。The above-mentioned technical purpose of the utility model is achieved through the following technical solutions: a fixed working platform for construction elevators without scaffolding, which includes two parallel fixed connections with the shaft concrete wall at the two feet of the floor door Each of the load-bearing beams is fixedly connected with a vertically upwardly extending load-bearing pole for fixed connection with the concrete wall of the well at the outer side of the well at the floor door, and the two load-bearing beams are located in the well. A load-bearing cross bar is fixedly connected between the ends, and an auxiliary support pole extending vertically upwards is fixed on the load-bearing cross bar near the two ends, and the height of the load-bearing pole is greater than that of the auxiliary support The height of the pole, the upper and middle ends of the auxiliary support pole in the vertical direction are respectively connected with a guardrail iron chain with the load-bearing pole, and the upper ends of the two auxiliary support poles are also connected Iron chains for guardrails are arranged, and pedals are laid on the two load-bearing beams.
上述技术方案中,整个平台结构一般是安装在楼层的顶层位于井道层门的位置,可以省去脚手架的使用的,该整体结构牢固稳定,拆装较为方便,与井道墙壁靠层门位置固定连接的承重梁和承重立杆的结合固定连接作用,使得整体的载荷能力更强,稳定性更好,并且承重梁可以很好地延伸到井道内,配合承重横杆、承重立杆以及防护栏铁链的连接作用,整体性更好,载荷能力更强,更加安全可靠,从而能够极大程度上避免了由于施工人员在顶层进行相应作业时由于站立施工平台的坍塌而造成人员伤亡的安全事故,防护栏铁链还进一步提高安全防护效果,使用寿命更长,可以长期循环利用。In the above technical solution, the entire platform structure is generally installed on the top floor of the floor at the position of the landing door of the hoistway, which can save the use of scaffolding. The overall structure is firm and stable, and it is easy to disassemble and assemble. It is fixedly connected with the wall of the hoistway near the landing door. The combined fixed connection of the load-bearing beam and the load-bearing pole makes the overall load capacity stronger and better in stability, and the load-bearing beam can be well extended into the hoistway, with the load-bearing cross bar, load-bearing pole and guardrail iron The connection function of the chain has better integrity, stronger load capacity, and is safer and more reliable, which can largely avoid the safety accidents of casualties caused by the collapse of the standing construction platform when the construction personnel are performing corresponding operations on the top floor. The iron chain of the guardrail further improves the safety protection effect, has a longer service life, and can be recycled for a long time.
作为对本实用新型的优选,承重横杆上在靠近两个端部的位置上还固定有二次保护固定环,所述二次保护固定环上连接有两头均具有吊钩的吊杆,所述二次保护固定环与所述吊杆的其中一个吊钩吊接连接而该吊杆的另一个吊钩吊接在用于安装在井道内壁上的固定支架上,所述固定支架上设有供所述吊钩吊接的吊孔。该优选起到二次保护的作用,将工作平台的稳定性进一步提高,固定支架可以采用现有的三脚支架等,在上面开设有相应的固定孔,通过膨胀螺栓等于井道内壁可进行安装固定,进一步避免了由于施工人员在顶层进行相应作业时由于站立施工平台的坍塌而造成人员伤亡的安全事故。As a preference for the present utility model, a secondary protection fixing ring is also fixed on the load-bearing crossbar near the two ends, and the secondary protection fixing ring is connected with a suspender with hooks at both ends. The secondary protection fixing ring is connected to one of the hooks of the suspender while the other hook of the suspender is connected to the fixed bracket for installation on the inner wall of the hoistway, and the fixed bracket is provided with a The lifting hole for the hanging hook. This optimization plays the role of secondary protection, and further improves the stability of the working platform. The fixing bracket can adopt the existing tripod bracket, etc., and has corresponding fixing holes on it, and can be installed and fixed by expansion bolts equal to the inner wall of the well. Further avoid the safety accidents of casualties caused by the collapse of the standing construction platform when the construction workers carry out corresponding operations on the top floor.
作为对本实用新型的优选,承重梁靠近承重横杆的部位上固定有辅助加强柱,所述辅助加强柱与承重立杆之间安装有由辅助加强柱向承重立杆方向向上倾斜的斜拉杆。提高结构的强度和稳定性,起到更好的安全保护作用。As a preference for the utility model, an auxiliary reinforcement column is fixed on the load-bearing beam near the load-bearing cross bar, and a diagonal tie rod is installed between the auxiliary reinforcement column and the load-bearing vertical bar, and the auxiliary reinforcement column is inclined upward toward the load-bearing vertical bar. Improve the strength and stability of the structure and play a better role in safety protection.
作为对本实用新型的优选,两根承重梁之间、两根辅助支撑立杆之间、辅助支撑立杆和承重立杆之间均安装有护脚板。防止施工工具等掉落造成的安全隐患,同时提高结构强度和稳定性,有对施工人员进一步加强了安全防护作用。As an optimization of the utility model, toe guards are installed between two load-bearing beams, between two auxiliary support uprights, between the auxiliary support uprights and the load-bearing uprights. Prevent safety hazards caused by falling construction tools, etc., while improving structural strength and stability, and further strengthen the safety protection effect on construction personnel.
作为对本实用新型的优选,辅助支撑立杆与承重立杆之间连接有的两条防护栏铁链均呈水平设置,且其中一条的位置高于另一条的位置,两根所述辅助支撑立杆位于低于其中位置较低的防护栏铁链的部位之间连接有内防护横杆,两根承重立杆位于高于其中位置较高的防护栏铁链的部位之间连接有外防护横杆。提高结构的强度和稳定性,起到更好的安全保护作用。As a preference for the present utility model, the two guardrail iron chains connected between the auxiliary support pole and the load-bearing pole are horizontally arranged, and one of them is positioned higher than the other, and the two auxiliary support poles An inner protective cross bar is connected between the poles located lower than the lower guardrail iron chain, and an outer protective cross bar is connected between the two load-bearing vertical poles located higher than the higher guardrail iron chain. pole. Improve the strength and stability of the structure and play a better role in safety protection.
作为对本实用新型的优选,外防护横杆上固定有加强警示板。一方面加强结构强度,另外可以在上面设置一些警示标志或者标语等进行警示作用。As a preference for the utility model, a reinforced warning plate is fixed on the outer protective cross bar. On the one hand, it strengthens the structural strength, and on the other hand, some warning signs or slogans can be set on it for warning.
作为对本实用新型的优选,承重梁包括与井道混凝土墙壁贴合固定的主承载板以及与所述主承载板上下两侧一体连接且垂直于所述主承载板的加强侧承载板,所述主承载板上开设有用于与井道混凝土墙壁固定连接的安装孔。通过膨胀螺栓经过安装孔可强有力地安装到墙壁上,保证工作平台的牢固稳定。As a preference for the present utility model, the load-bearing beam includes a main bearing plate that is fitted and fixed to the concrete wall of the hoistway, and a reinforced side bearing plate that is integrally connected with the upper and lower sides of the main bearing plate and is perpendicular to the main bearing plate. Mounting holes for fixed connection with the concrete wall of the hoistway are provided on the bearing plate. The expansion bolts can be firmly installed on the wall through the installation holes to ensure the firmness and stability of the working platform.
作为对本实用新型的优选,承重立杆包括与井道混凝土墙壁贴合固定的主立板以及与所述主立板左右两侧一体连接且垂直于所述主立板的加强侧立板,所述主立板上开设有用于与井道混凝土墙壁固定连接的安装孔,其中一侧的加强侧立板与承重梁的主承载板固定连接,所述加强侧立板和所述主承载板上开设有相对应的连接孔。通过膨胀螺栓经过安装孔可强有力地安装到墙壁上,通过连接孔以及连接用的螺栓等可以将承重立杆和承重梁进一步固定连接,进一步保证工作平台的结构强度和稳定性。As a preference for the present utility model, the load-bearing pole includes a main vertical plate that is fixed to the shaft concrete wall and a reinforced side vertical plate integrally connected with the left and right sides of the main vertical plate and perpendicular to the main vertical plate. The main vertical plate is provided with installation holes for fixed connection with the concrete wall of the hoistway, and the reinforced side vertical plate on one side is fixedly connected with the main load-bearing plate of the load-bearing beam. The reinforced side vertical plate and the main load-bearing plate are provided with corresponding connecting holes. The expansion bolts can be firmly installed on the wall through the installation holes, and the load-bearing poles and load-bearing beams can be further fixed and connected through the connection holes and bolts for connection, so as to further ensure the structural strength and stability of the working platform.
作为对本实用新型的优选,承重立杆的高度为辅助支撑立杆的高度的1.2倍-2倍。优化结构的受力分布,提高结构的稳定性和使用的安全性。As a preference for the present utility model, the height of the load-bearing pole is 1.2 times to 2 times the height of the auxiliary support pole. Optimize the stress distribution of the structure, improve the stability of the structure and the safety of use.
作为对本实用新型的优选,踏板为铝合金防滑踏板且上面具有防滑花纹。提高施工人员在上面进行施工时的安全性。As a preference for the utility model, the pedal is an aluminum alloy anti-skid pedal with an anti-skid pattern on it. Improve the safety of construction workers when they are working on it.
本实用新型的有益效果:整体结构牢固稳定,拆装较为方便,载荷能力更强,稳定性更好,整体性更好,更加安全可靠,从而能够极大程度上避免了由于施工人员在顶层进行相应作业时由于站立施工平台的坍塌而造成人员伤亡的安全事故或者施工工具掉落带来的安全隐患等,安全防护效果更好,使用寿命更长,可以长期循环利用。The beneficial effects of the utility model: the overall structure is firm and stable, the disassembly and assembly are more convenient, the load capacity is stronger, the stability is better, the integrity is better, and it is safer and more reliable, thereby greatly avoiding The safety accidents caused by the collapse of the standing construction platform during the corresponding operation or the safety hazards caused by the falling of construction tools, etc., have better safety protection effects, longer service life, and can be recycled for a long time.
附图说明 Description of drawings
图1是本实用新型实施例的立体结构示意图。Fig. 1 is a three-dimensional structure diagram of an embodiment of the utility model.
图中:1、承重梁,2、承重立杆,9、承重横杆,5、辅助支撑立杆,10、防护栏铁链,11、踏板,4、二次保护固定环,41、吊钩,42、吊杆,43、固定支架,30、辅助加强柱,3、斜拉杆,7、护脚板,61、内防护横杆,62、外防护横杆,620、加强警示板,11、主承载板,12、加强侧承载板,13、安装孔,21、主立板,22、加强侧立板,1122、连接孔。In the figure: 1. load-bearing beam, 2. load-bearing pole, 9. load-bearing cross bar, 5. auxiliary support pole, 10. guardrail iron chain, 11. pedal, 4. secondary protection fixing ring, 41. hook , 42, suspender, 43, fixed bracket, 30, auxiliary reinforcement column, 3, diagonal stay rod, 7, toe guard, 61, inner protective cross bar, 62, outer protective cross bar, 620, reinforced warning board, 11, main Bearing plate, 12, reinforced side bearing plate, 13, mounting hole, 21, main vertical plate, 22, reinforced side vertical plate, 1122, connecting hole.
具体实施方式 Detailed ways
以下具体实施例仅仅是对本实用新型的解释,其并不是对本实用新型的限制,本领域技术人员在阅读完本说明书后可以根据需要对本实施例做出没有创造性贡献的修改,但只要在本实用新型的权利要求范围内都受到专利法的保护。The following specific examples are only explanations of the utility model, and it is not a limitation of the utility model. Those skilled in the art can make modifications without creative contribution to the present embodiment as required after reading this description, but as long as they are within the utility model All new claims are protected by patent law.
实施例,如图1所示,一种无脚手架施工电梯的固定式工作平台,包括两根平行排列的与井道混凝土墙壁位于层门口两个底脚处的部位固定连接的承重梁1,每根所述承重梁1上均固定连接有用于与井道混凝土墙壁位于层门口靠井道外侧的部位固定连接的呈竖直向上延伸状的承重立杆2,两根所述承重梁1位于井道内的端头之间固定连接有承重横杆9,所述承重横杆9上在靠近两个端部的位置上固定有呈竖直向上延伸状的辅助支撑立杆5,所述承重立杆2的高度大于辅助支撑立杆5的高度,所述辅助支撑立杆5在竖直方向上的上端和中端分别与承重立杆2之间均连接有防护栏铁链10,两根所述辅助支撑立杆5的上端之间也连接有防护栏铁链10,两根所述承重梁1上铺设有踏板11。Embodiment, as shown in Fig. 1, a fixed working platform of a construction elevator without scaffolding, comprising two load-bearing beams 1 arranged in parallel and fixedly connected with the concrete wall of the shaft at the two footings of the landing door, each The load-bearing beams 1 are fixedly connected with the vertically upwardly extending load-bearing poles 2 for fixed connection with the concrete wall of the hoistway at the outer side of the hoistway at the floor door. A load-bearing crossbar 9 is fixedly connected between the heads, and an auxiliary support pole 5 extending vertically upwards is fixed on the load-bearing crossbar 9 near the two ends. The height of the load-bearing pole 2 is Greater than the height of the auxiliary support pole 5, the upper and middle ends of the auxiliary support pole 5 in the vertical direction are respectively connected with the load-bearing pole 2 with guardrail iron chains 10, and the two auxiliary support poles Guardrail iron chains 10 are also connected between the upper ends of the rods 5 , and pedals 11 are laid on the two load-bearing beams 1 .
承重横杆9上在靠近两个端部的位置上还固定有二次保护固定环4,所述二次保护固定环4上连接有两头均具有吊钩41的吊杆42,所述二次保护固定环4与所述吊杆42的其中一个吊钩41吊接连接而该吊杆42的另一个吊钩吊接在用于安装在井道内壁上的固定支架43上,所述固定支架43上设有供所述吊钩41吊接的吊孔。On the load-bearing cross bar 9, a secondary protection fixing ring 4 is also fixed near the two ends, and the secondary protection fixing ring 4 is connected with a suspension rod 42 with hooks 41 at both ends. The protection fixing ring 4 is suspended and connected with one of the suspension hooks 41 of the suspension rod 42 and the other suspension hook of the suspension rod 42 is suspended on the fixed bracket 43 for being installed on the inner wall of the hoistway, and the fixed bracket 43 There are hanging holes for the hook 41 to hang on.
承重梁1靠近承重横杆9的部位上固定有辅助加强柱30,所述辅助加强柱30与承重立杆2之间安装有由辅助加强柱30向承重立杆2方向向上倾斜的斜拉杆3。两根承重梁1之间、两根辅助支撑立杆5之间、辅助支撑立杆5和承重立杆2之间均安装有护脚板7。辅助支撑立杆5与承重立杆2之间连接有的两条防护栏铁链10均呈水平设置,且其中一条的位置高于另一条的位置,两根所述辅助支撑立杆5位于低于其中位置较低的防护栏铁链10的部位之间连接有内防护横杆61,两根承重立杆2位于高于其中位置较高的防护栏铁链10的部位之间连接有外防护横杆62。外防护横杆62上固定有加强警示板620。An auxiliary reinforcement column 30 is fixed on the load-bearing beam 1 close to the load-bearing cross bar 9, and a diagonal tie rod 3 is installed between the auxiliary reinforcement column 30 and the load-bearing vertical bar 2, which is inclined upward from the auxiliary reinforcement column 30 to the load-bearing vertical bar 2. . A toe guard 7 is installed between the two load-bearing beams 1, between the two auxiliary support uprights 5, between the auxiliary support uprights 5 and the load-bearing uprights 2. The two guardrail iron chains 10 connected between the auxiliary support pole 5 and the load-bearing pole 2 are all arranged horizontally, and one of them is positioned higher than the other, and the two auxiliary support poles 5 are located at a lower level. An inner protective bar 61 is connected between the positions of the guardrail iron chains 10 at a lower position, and an outer protective bar 61 is connected between the positions of the two load-bearing uprights 2 that are higher than the guardrail iron chains 10 at a higher position. Crossbar 62. A reinforced warning plate 620 is fixed on the outer protective cross bar 62 .
承重梁1包括与井道混凝土墙壁贴合固定的主承载板11以及与所述主承载板11上下两侧一体连接且垂直于所述主承载板11的加强侧承载板12,所述主承载板11上开设有用于与井道混凝土墙壁固定连接的安装孔13。承重立杆2包括与井道混凝土墙壁贴合固定的主立板21以及与所述主立板21左右两侧一体连接且垂直于所述主立板21的加强侧立板22,所述主立板21上开设有用于与井道混凝土墙壁固定连接的安装孔13,其中一侧的加强侧立板22与承重梁1的主承载板11固定连接,所述加强侧立板22和所述主承载板11上开设有相对应的连接孔1122。The load-bearing beam 1 includes a main bearing plate 11 that is fitted and fixed to the concrete wall of the hoistway, and a reinforced side bearing plate 12 that is integrally connected with the upper and lower sides of the main bearing plate 11 and is perpendicular to the main bearing plate 11. 11 is provided with the installation hole 13 that is used to be fixedly connected with the well concrete wall. The load-bearing pole 2 includes a main vertical plate 21 that is fixed to the shaft concrete wall and a reinforced side vertical plate 22 that is integrally connected with the left and right sides of the main vertical plate 21 and is perpendicular to the main vertical plate 21. A mounting hole 13 for fixed connection with the concrete wall of the hoistway is opened on the plate 21, and the reinforced side vertical plate 22 on one side is fixedly connected with the main load-bearing plate 11 of the load-bearing beam 1, and the reinforced side vertical plate 22 and the main load-bearing Corresponding connecting holes 1122 are defined on the board 11 .
承重立杆2的高度为辅助支撑立杆5的高度的1.2倍-2倍。踏板11为铝合金防滑踏板且上面具有防滑花纹。The height of the load-bearing pole 2 is 1.2 times-2 times the height of the auxiliary support pole 5. Pedal 11 is an aluminum alloy non-slip pedal and has anti-skid pattern above.
上述的各个组件除了踏板11均可以采用钢铁材质制得,上述的一体连接方式可以采用现有的焊接或者一体成型或者整体折弯工艺等实现。All the above-mentioned components except the pedal 11 can be made of steel, and the above-mentioned integrated connection can be realized by using existing welding or integral forming or integral bending processes.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520306176.XU CN204626921U (en) | 2015-05-13 | 2015-05-13 | A kind of fixed working platform without scaffold construction elevator |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520306176.XU CN204626921U (en) | 2015-05-13 | 2015-05-13 | A kind of fixed working platform without scaffold construction elevator |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204626921U true CN204626921U (en) | 2015-09-09 |
Family
ID=54045961
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520306176.XU Expired - Fee Related CN204626921U (en) | 2015-05-13 | 2015-05-13 | A kind of fixed working platform without scaffold construction elevator |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204626921U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107522062A (en) * | 2017-10-17 | 2017-12-29 | 上海市浦东新区建设(集团)有限公司 | A kind of installation construction method for elevator |
| WO2018219758A1 (en) | 2017-06-02 | 2018-12-06 | Inventio Ag | Movable platform for assembling lift equipment |
| CN112554533A (en) * | 2021-01-06 | 2021-03-26 | 上海爱登堡电梯(宜昌)有限公司 | Adjustable elevator scaffold-free mounting platform |
| CN113428755A (en) * | 2021-07-09 | 2021-09-24 | 成都瑞普柯隆科技有限责任公司 | Elevator shaft internal operation method and elevator shaft top layer platform device |
| CN113682921A (en) * | 2021-08-24 | 2021-11-23 | 崔晓江 | Simple hoistway platform |
| US11518651B2 (en) | 2017-06-02 | 2022-12-06 | Inventio Ag | Additional platform for a working platform |
-
2015
- 2015-05-13 CN CN201520306176.XU patent/CN204626921U/en not_active Expired - Fee Related
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2018219758A1 (en) | 2017-06-02 | 2018-12-06 | Inventio Ag | Movable platform for assembling lift equipment |
| CN110869569A (en) * | 2017-06-02 | 2020-03-06 | 因温特奥股份公司 | Platform for assembling elevator equipment |
| CN110869569B (en) * | 2017-06-02 | 2022-04-26 | 因温特奥股份公司 | Platform for assembling elevator equipment |
| US11518651B2 (en) | 2017-06-02 | 2022-12-06 | Inventio Ag | Additional platform for a working platform |
| US11598106B2 (en) | 2017-06-02 | 2023-03-07 | Inventio Ag | Platform for assembling elevator equipment |
| CN107522062A (en) * | 2017-10-17 | 2017-12-29 | 上海市浦东新区建设(集团)有限公司 | A kind of installation construction method for elevator |
| CN112554533A (en) * | 2021-01-06 | 2021-03-26 | 上海爱登堡电梯(宜昌)有限公司 | Adjustable elevator scaffold-free mounting platform |
| CN113428755A (en) * | 2021-07-09 | 2021-09-24 | 成都瑞普柯隆科技有限责任公司 | Elevator shaft internal operation method and elevator shaft top layer platform device |
| CN113682921A (en) * | 2021-08-24 | 2021-11-23 | 崔晓江 | Simple hoistway platform |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204626921U (en) | A kind of fixed working platform without scaffold construction elevator | |
| CN103206074B (en) | Elevator shaft template construction method, platform and support | |
| CN205476401U (en) | Elevator well type steel protection construction platform | |
| CN102444271B (en) | Suspended scaffolding | |
| CN209780193U (en) | Suspension type scaffold | |
| CN202370234U (en) | Tool type elevator hoistway construction platform | |
| CN213836318U (en) | Bridge floor wet joint hangs mould structure | |
| CN202324574U (en) | Lifting scaffold with simple and convenient operations | |
| CN208151865U (en) | A kind of introversion formula steel case arch bridge integrally promotes simulation Lift-on/Lift-off System | |
| CN106522541B (en) | A kind of template suspension centre spandrel girder of steel platform and the hanging method of template system | |
| CN211621238U (en) | Safety protection cage for steel bar operation in bridge pier column turning formwork construction | |
| CN206267031U (en) | A kind of solid pier climbing support of bridge construction | |
| CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space | |
| CN207079898U (en) | Outer hanging basket structure | |
| CN112627045A (en) | Hang basket template scissors cat ladder | |
| CN205711761U (en) | A kind of Novel hanging basket of convenience and safety | |
| CN105060124B (en) | Intra-frame portal crane system and hoisting use method thereof | |
| CN217299872U (en) | Shaft hydraulic comprehensive distribution platform | |
| CN210420883U (en) | Bridge construction crossbeam construction operation platform | |
| CN209339010U (en) | Walking bridge facing side hanging basket structure | |
| CN204038917U (en) | Detachable external hanging type operating platform | |
| CN211499699U (en) | Ladder-climbing type operation rack for hanging cage | |
| CN209210183U (en) | fixed system | |
| CN208122299U (en) | A kind of concrete of crossing soars aloft beam from climbing monoblock type tub system | |
| CN210507161U (en) | A new type of external-mounted anti-collision guardrail construction trolley |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150909 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |