CN204626650U - A kind of Z-shaped steel work lift-up device - Google Patents
A kind of Z-shaped steel work lift-up device Download PDFInfo
- Publication number
- CN204626650U CN204626650U CN201520335879.5U CN201520335879U CN204626650U CN 204626650 U CN204626650 U CN 204626650U CN 201520335879 U CN201520335879 U CN 201520335879U CN 204626650 U CN204626650 U CN 204626650U
- Authority
- CN
- China
- Prior art keywords
- jacking
- jack
- force transmission
- pressure
- face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model discloses a kind of Z-shaped steel work lift-up device, comprise many cover jack and with jack one to one for by jack force transmission to the Force transmission parts treating jacking component, each Force transmission parts has a jacking face and pressure-bearing position, often overlapping jack is positioned at below corresponding jacking face, the top of jack is just to jacking face, for supporting, the pressure-bearing position of all Force transmission partses treats that the different parts of jacking component will be jointly will treat that jacking member supports is unsettled.When this device uses, workman only need regulate jack piston height in working platform face, avoids work high above the ground, improves efficiency, ensure that safety.This device is few with material, it is simple, lightweight to make, cost is low, can use by turnaround cycle.This device is to place not requirement, and installation jacking is quick.
Description
Technical field
The utility model relates to the interim lift-up device of a kind of construction, is specifically related to a kind of Z-shaped steel work lift-up device, belongs to technical field of buildings.
Background technology
At present, construction site often relates to the interim transhipment of component, and transhipment coordinates tower crane to complete by the Flat Car for Transshipment usually, and then ground component lifting certain altitude is put on the Flat Car for Transshipment by tower crane.Which is comparatively strong to the dependence of tower crane, has the following disadvantages: 1, every platform tower crane has the maximum working radius of oneself, for exceeding the region of tower crane work range without facilitating effective solution.2, the installation of tower crane is cumbersome, and has certain requirement to place.3, because every platform tower crane has the biggest lifting capacity of oneself, for the component exceeding the biggest lifting capacity, separate unit tower crane cannot complete, two tower cranes now can be adopted to close the solution of hanging, so not only cumbersome, and two tower cranes lift by crane simultaneously, higher to the requirement of construction plant.For this reason, common way member segments is transported according to separate unit tower crane biggest lifting capacity scope, and can increase Site Welding workload like this, weldquality is wayward.4, because tower crane belongs to work high above the ground, its safety, professional requirement are higher.Therefore how efficiently transporting component fast at construction site is a problem anxious to be resolved.
Summary of the invention
For prior art tower crane above shortcomings in building operations component is transported temporarily, the purpose of this utility model is to provide a kind of Z-shaped steel work lift-up device for the efficient rapid transport component of construction site, this installation cost is low, to place not requirement substantially, be applicable to the place of various needs component transhipment.
For achieving the above object, the technical solution of the utility model is achieved like this:
A kind of Z-shaped steel work lift-up device, comprise many cover jack and with jack one to one for by jack force transmission to the Force transmission parts treating jacking component, each Force transmission parts has a jacking face and pressure-bearing position, often overlapping jack is positioned at below corresponding jacking face, the top of jack is just to jacking face, for supporting, the pressure-bearing position of all Force transmission partses treats that the different parts of jacking component will be jointly will treat that jacking member supports is unsettled.
Further, described Force transmission parts is Z-shaped, the horizontal flaps that Z-shaped Force transmission parts is bent to form round about by vertical supporting plate and the upper and lower two ends of vertical supporting plate is formed, the horizontal flaps soffit of upper end forms described jacking face, the horizontal flaps of lower end forms described pressure-bearing position, the horizontal flaps outboard end upwards bent grooving edge of lower end, horizontal flaps and the groove of vertical supporting plate, lower end form pressure tank along three, and pressure tank carries out spacing for the support zone treating jacking component.
Preferably, also comprise two bqusters matched with each pressure tank, two bqusters are respectively used to wedging two pressure-bearing cell wall and treat between jacking component, to prevent from treating that jacking component occurred level in pressure tank moves.
Compared to existing technology, the utility model has following beneficial effect:
1, when this device uses, workman only need regulate jack piston height in working platform face, avoids work high above the ground, improves efficiency, ensure that safety.
2, this device few with material, make simple, lightweight, cost is low, can turnaround cycle use.
3, this device is to place not requirement, and installation jacking is quick.
Accompanying drawing explanation
Fig. 1-the utility model structural representation.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
See Fig. 1, upper as can be seen from figure, the utility model Z-shaped steel work lift-up device, comprise many cover jack 1 and with jack one to one for by jack force transmission to the Force transmission parts 2 treating jacking component, each Force transmission parts 2 has a jacking face 21 and pressure-bearing position 22.Often overlapping jack 1 is positioned at below corresponding jacking face 21, and the top of jack is just to jacking face 21, and described jack 1 alternative mechanical formula or fluid pressure type, specification is selected according to steel structure member weight.For supporting, the pressure-bearing position 22 of all Force transmission partses treats that the different parts of jacking component 4 will be jointly will treat that jacking member supports is unsettled.
Particularly, described Force transmission parts 2 becomes roughly in Z-shaped by steel plate bending, the horizontal flaps that Z-shaped Force transmission parts is bent to form round about by vertical supporting plate 23 and the upper and lower two ends of vertical supporting plate is formed, the horizontal flaps soffit of upper end forms described jacking face 21, the horizontal flaps outboard end of upper end is bent to form safety screen 24 downwards, to prevent jack unstability.The horizontal flaps of lower end forms described pressure-bearing position 22, the horizontal flaps outboard end of lower end upwards bent grooving along 25, the horizontal flaps of vertical supporting plate 23, lower end and groove form pressure tank 26 along 25 threes, pressure tank 26 carries out spacing for the support zone treating jacking component, namely treats that the support zone of jacking component is positioned at pressure tank and drops on the horizontal flaps of lower end.
For preventing moving when jacking component is in jacking, this lift-up device also comprises two bqusters 3 matched with each pressure tank 26, described bquster 3 is auxiliary accessories, two bqusters 3 are respectively used to wedging two pressure-bearing cell wall and treat between jacking component, to prevent from treating that jacking component occurred level in pressure tank moves.
When the utility model is applied at the construction field (site), need first this lift-up device to be installed, namely first according to treating the design feature of jacking component and the tricks of weight determination jack 1 and Force transmission parts 2, the distance of Force transmission parts 2 is determined according to the width of jacking steel component or depth of section.Then will treat that jacking component wherein needs the position supported to lift unsettled in a place, Force transmission parts pressure-bearing position can be put into by flying height, is according to said method encased inside all Force transmission parts 2 pressure-bearing positions under treating jacking member supports position; After Force transmission parts 2 is laid and put in place, then lay jack 1 and bquster 3.Namely jacking is started after all component placement put in place, by jack by (this height is a little more than flatcar height) after component jacking to needs height, then being moved to by flatcar treats below jacking component, jack is declined, make to treat that jacking component slowly falls and finally supported by flatcar, now can take out jack and Force transmission parts, finally by the Flat Car for Transshipment by component transhipment after lifting.If need the component that treat below jacking component to take out, now until jacking component jacking under can taking out during surface member, replace flatcar support to treat jacking component with sleeper, then put down jack and Force transmission parts.
Above embodiment only illustrates the technical solution of the utility model and unrestricted, although be described in detail utility model scheme with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can modify to the technical solution of the utility model or equivalent replacement, and not departing from aim and the scope of technical solutions of the utility model, it all should be encompassed in right of the present utility model.
Claims (3)
1. a Z-shaped steel work lift-up device, it is characterized in that: comprise many cover jack and with jack one to one for by jack force transmission to the Force transmission parts treating jacking component, each Force transmission parts has a jacking face and pressure-bearing position, often overlapping jack is positioned at below corresponding jacking face, the top of jack is just to jacking face, for supporting, the pressure-bearing position of all Force transmission partses treats that the different parts of jacking component will be jointly will treat that jacking member supports is unsettled.
2. a kind of Z-shaped steel work lift-up device according to claim 1, it is characterized in that: described Force transmission parts is Z-shaped, the horizontal flaps that Z-shaped Force transmission parts is bent to form round about by vertical supporting plate and the upper and lower two ends of vertical supporting plate is formed, the horizontal flaps soffit of upper end forms described jacking face, the horizontal flaps of lower end forms described pressure-bearing position, the horizontal flaps outboard end upwards bent grooving edge of lower end, vertical supporting plate, horizontal flaps and the groove of lower end form pressure tank along three, pressure tank carries out spacing for the support zone treating jacking component.
3. a kind of Z-shaped steel work lift-up device according to claim 1, it is characterized in that: also comprise two bqusters matched with each pressure tank, two bqusters are respectively used to wedging two pressure-bearing cell wall and treat between jacking component, to prevent from treating that jacking component occurred level in pressure tank moves.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520335879.5U CN204626650U (en) | 2015-05-22 | 2015-05-22 | A kind of Z-shaped steel work lift-up device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520335879.5U CN204626650U (en) | 2015-05-22 | 2015-05-22 | A kind of Z-shaped steel work lift-up device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204626650U true CN204626650U (en) | 2015-09-09 |
Family
ID=54045693
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520335879.5U Expired - Fee Related CN204626650U (en) | 2015-05-22 | 2015-05-22 | A kind of Z-shaped steel work lift-up device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204626650U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107825045A (en) * | 2017-12-04 | 2018-03-23 | 千里马工程机械再制造有限公司 | A kind of chassis of dredging machine Plastic renovation equipment |
-
2015
- 2015-05-22 CN CN201520335879.5U patent/CN204626650U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107825045A (en) * | 2017-12-04 | 2018-03-23 | 千里马工程机械再制造有限公司 | A kind of chassis of dredging machine Plastic renovation equipment |
CN107825045B (en) * | 2017-12-04 | 2024-03-29 | 千里马工程机械再制造有限公司 | Shaping and repairing equipment for chassis of excavator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204401997U (en) | A kind of suspension type ceiling construction scaffold | |
CN205990213U (en) | A kind of liftable fixed platform | |
CN103603504A (en) | Method of hoisting super high-rise building electrochemical large-diameter rises along with progress of main structure | |
CN209815484U (en) | Hoist device is used in building engineering construction | |
CN106006425A (en) | Method of hoisting and transporting large-sized equipment arranged in underground machine rooms of super high-rise buildings | |
CN205348727U (en) | A promote formula operation platform for in shaft | |
CN104627849B (en) | Hoisting equipment and hoisting method for hoisting inner courtyard pipeline | |
CN103967263B (en) | Hydraulic automatic jumping discharging platform | |
CN104179342A (en) | Hanging cage and construction method thereof for mounting profiled steel sheets on steel structural workshop wall surface | |
CN204626650U (en) | A kind of Z-shaped steel work lift-up device | |
CN202689488U (en) | Movable building scaffold | |
CN203946812U (en) | A kind of for the removable column type hoisting frame of shurry pump | |
CN101818563B (en) | Jack-up integral lifting mobile platform and using method | |
CN203947758U (en) | Novel hydraulic automatic climbing discharging platform | |
CN202850049U (en) | Main transformer oil seepage pool | |
CN102777048A (en) | Vertical transportation device | |
CN203097281U (en) | Nuclear power station double-layer containment vessel hydraulic creeping formwork | |
CN203359889U (en) | Wall plate lifting and installation integrated operation platform | |
CN204139567U (en) | Aerial work platform | |
CN206203763U (en) | Self-driving floor hanging apparatus | |
CN105155427A (en) | Construction method for laying suspension bridge catwalk | |
CN205688820U (en) | A kind of installation system of high-rise building large area cell cube curtain wall block | |
CN105804087A (en) | Installation method for steel structure below large deep foundation pit supporting beam | |
CN204919565U (en) | Steel platform of use is demolishd in shoring of trench | |
CN203960753U (en) | A kind of erecting device of prefabricated bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150909 Termination date: 20160522 |