CN204570896U - A kind of mud-dumping yard overflow well derrick - Google Patents

A kind of mud-dumping yard overflow well derrick Download PDF

Info

Publication number
CN204570896U
CN204570896U CN201520182509.2U CN201520182509U CN204570896U CN 204570896 U CN204570896 U CN 204570896U CN 201520182509 U CN201520182509 U CN 201520182509U CN 204570896 U CN204570896 U CN 204570896U
Authority
CN
China
Prior art keywords
column
mud
overflow well
gate sheet
dumping yard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520182509.2U
Other languages
Chinese (zh)
Inventor
于金玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU HYDRAULIC ENGINEERING CONSTRUCTION Co Ltd
Original Assignee
JIANGSU HYDRAULIC ENGINEERING CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HYDRAULIC ENGINEERING CONSTRUCTION Co Ltd filed Critical JIANGSU HYDRAULIC ENGINEERING CONSTRUCTION Co Ltd
Priority to CN201520182509.2U priority Critical patent/CN204570896U/en
Application granted granted Critical
Publication of CN204570896U publication Critical patent/CN204570896U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a kind of mud-dumping yard overflow well derrick in water conservancy equipment field, comprise the column of four distributions that are square, each column is made up of two channel-section steels, wherein the outside portion of secondary channel-section steel is welded on the outer bottom of major trough steel, be oppositely arranged between two between major trough steel on four root posts, and be connected through gate sheet each other, be oppositely arranged between two between secondary channel-section steel on four root posts, and be connected through gate sheet each other, in the utility model, each column bears the horizontal force of gate sheet, and Self-stabilised post passes to another column by the special gate sheet laid, thus maintenance equilibrium of forces, the change past, independently column bore two-way horizontal power is overall derrick force structure, make structure more compact with economy, construct convenient simultaneously, can be used in the construction of mud-dumping yard overflow well.

Description

A kind of mud-dumping yard overflow well derrick
Technical field
The utility model relates to a kind of overflow well, particularly a kind of overflow well derrick.
Background technology
Adopting strand suction or bucket-wheel suction dredger to implement dredging to river course, is one not only economy but also rational construction method.It efficiently solves the contradiction that dry river construction method and shipping, irrigation, flood discharge etc. produce, the huge benefit for social creativity.Due to strand suction or bucket-wheel suction dredger dredging, that the dredge pump utilizing dredge boat to configure combines with mud pipe and to carry (volume ratio that original soil body volume accounts in muddy water mixture is generally 10-20%) muddy water mixture, to mud-dumping yard or spoil area throwing, in mixture, soil particle is after mud-dumping yard precipitates completely, remaining water outwards must discharge from the withdrawal nozzle arranged, to guarantee that the volume of the soil body is deposited in mud-dumping yard or spoil area.This process is continuous print operation.
Through facts have proved for many years, the use safety of mud-dumping yard cofferdam, withdrawal nozzle, the turbidity of withdrawal nozzle remained water discharge and the influence degree to surrounding enviroment, also exist inseparable relation with the design of withdrawal nozzle, construction form.Especially, along with the develop rapidly of Chinese national economy, today that land resources is increasingly in short supply.A medium-sized dredging works is by the high 3 meters of calculating of mud-dumping yard side piling in the past, and required mud-dumping yard land used is hundreds of mu thousands of mu at most at least.For making full use of limited land resources, mud-dumping yard plan spoir height is all significantly improved than before, and part dredging works spoir height has reached 7 meters.The increase of spoir height, virtually produce huge prestige association to the use safety of mud-dumping yard cofferdam, withdrawal nozzle, conventional unlimited wide top overflow weir (or adjustable unlimited overflow weir) withdrawal nozzle structural shape of making over is subject to serious challenge.
Water-break pattern conventional in prior art is the adjustable overflow well formula of framed bent.Framed bent adjustable overflow well formula has heavy few muscle brick to mix derrick geometry and light-duty steel derrick geometry.Due to the few muscle brick mix structure of heavy type not recuperability, environment is easily impacted, fabrication cycle is long, requires the shortcomings such as height, current less use to bearing capacity of foundation soil, traffic route.
Utility model content
The purpose of this utility model is to provide a kind of mud-dumping yard overflow well derrick, and its structure is simple, and it is convenient to reclaim, and constructs convenient.
The purpose of this utility model is achieved in that a kind of mud-dumping yard overflow well derrick, comprise the column of four distributions that are square, each column is made up of two channel-section steels, wherein the outside portion of secondary channel-section steel is welded on the outer bottom of major trough steel, be oppositely arranged between two between major trough steel on four root posts, and be connected through gate sheet each other, be oppositely arranged between two between the secondary channel-section steel on four root posts, and be connected through gate sheet each other.
During the utility model construction and installation, first the utility model welding processing in factory building is completed, be transported to job site again, only simple lifting tool need be used to sling to correct position by the utility model, bottom it and top is fixed and can be completed construction, compared with prior art, the beneficial effects of the utility model are: in the utility model, each column bears the horizontal force of gate sheet, and Self-stabilised post passes to another column by the special gate sheet laid, thus maintenance equilibrium of forces, ensureing under certain rigidity condition, column only plays the effect of power transmission, now, gate sheet is by bidirectional force effect, namely the axial load that the evenly distributed load of horizontal direction liquid and column pass to gate sheet is born, changing that in the past independently column bore two-way horizontal power is overall derrick force structure, makes structure more compact with economy, constructs convenient simultaneously.The utility model can be used in the construction of mud-dumping yard overflow well.
Convenient in order to make the utility model be welded, structure is more stable, and the end face of described secondary channel-section steel is mutually concordant with major trough steel sidepiece.
In order to strengthen reliability when the utility model uses, be also connected with diagonal angle bridging stiffener between described four root posts, described diagonal angle bridging stiffener is bolted the top at column.
In order to strengthen the stability of this apparatus structure, between described four root posts, be connected with connection beam, described connection beam be bolted from bottom to top layout level on column.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the utility model center pillar structure schematic diagram.
Wherein, 1 major trough steel, bottom 1a, 1b sidepiece, 2 secondary channel-section steels, 2a sidepiece, 2b end face, 3 gate sheets, 4 diagonal angle bridging stiffeners, 5 connection beam.
Detailed description of the invention
A kind of mud-dumping yard overflow well derrick as Figure 1-3, comprise the column of four distributions that are square, each column is made up of two channel-section steels, wherein the outside portion 2a of secondary channel-section steel 2 is welded on the outer bottom 1a of major trough steel 1, be oppositely arranged between two between major trough steel 1 on four root posts, and be connected through gate sheet 3 each other, be oppositely arranged between two between secondary channel-section steel 2 on four root posts, and be connected through gate sheet 3 each other, the end face 2b of secondary channel-section steel 2 is concordant with major trough steel 1 sidepiece 1b phase, between four root posts, top is also connected with diagonal angle bridging stiffener 4, connection beam 5 is arranged in derrick stem height direction, diagonal angle bridging stiffener 4 and connection beam 5 are bolted and are connected on column, ensure derrick integral rigidity.
During the utility model construction and installation, first the utility model welding processing in factory building is completed, be transported to job site again, simple suspender only need be used to be sling by each for the utility model component to install by regulation operation to correct position, first, complete the connection of each upright post basic, and carry out the steady job of each column; Then from bottom to top install connection beam 5, then install diagonal angle bridging stiffener 4, finally from top to bottom firm attachment bolt, can complete construction, and the diagonal angle bridging stiffener 4 and the column connection beam 5 that are arranged on column top enhance reliability of structure.
The utility model is not limited to above-described embodiment; on the basis of technical scheme disclosed in the utility model; those skilled in the art is according to disclosed technology contents; do not need performing creative labour just can make some to some technical characteristics wherein to replace and distortion, these are replaced and are out of shape all in protection domain of the present utility model.

Claims (4)

1. a mud-dumping yard overflow well derrick, it is characterized in that, comprise the column of four distributions that are square, each column is made up of two channel-section steels, wherein the outside portion of secondary channel-section steel is welded on the outer bottom of major trough steel, is oppositely arranged between two between the major trough steel on four root posts, and is connected through gate sheet each other, be oppositely arranged between two between secondary channel-section steel on four root posts, and be connected through gate sheet each other.
2. a kind of mud-dumping yard overflow well derrick according to claim 1, is characterized in that, the end face of described secondary channel-section steel is mutually concordant with major trough steel sidepiece.
3. a kind of mud-dumping yard overflow well derrick according to claim 1 and 2, is characterized in that, be also connected with diagonal angle bridging stiffener between described four root posts, and described diagonal angle bridging stiffener is bolted the top at column.
4. a kind of mud-dumping yard overflow well derrick according to claim 1 and 2, is characterized in that, be connected with connection beam between described four root posts, described connection beam be bolted from bottom to top layout level on column.
CN201520182509.2U 2015-03-30 2015-03-30 A kind of mud-dumping yard overflow well derrick Expired - Fee Related CN204570896U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520182509.2U CN204570896U (en) 2015-03-30 2015-03-30 A kind of mud-dumping yard overflow well derrick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520182509.2U CN204570896U (en) 2015-03-30 2015-03-30 A kind of mud-dumping yard overflow well derrick

Publications (1)

Publication Number Publication Date
CN204570896U true CN204570896U (en) 2015-08-19

Family

ID=53863558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520182509.2U Expired - Fee Related CN204570896U (en) 2015-03-30 2015-03-30 A kind of mud-dumping yard overflow well derrick

Country Status (1)

Country Link
CN (1) CN204570896U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356086A (en) * 2018-11-21 2019-02-19 安徽省交通航务工程有限公司 Two bors d's oeuveres channel steel upright post formula water-break well and assembling type steel structure water-break system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356086A (en) * 2018-11-21 2019-02-19 安徽省交通航务工程有限公司 Two bors d's oeuveres channel steel upright post formula water-break well and assembling type steel structure water-break system

Similar Documents

Publication Publication Date Title
CN102182163A (en) Assembled type debris flow silt dam and construction method thereof
CN204753354U (en) Cover worker's board landing stage
CN102677592B (en) Method for erecting deepwater steel trestle and platform on exposed bedrock in shallow sea
CN102561404B (en) Steel reinforced concrete column type joint and construction method of underground diaphragm wall using same
CN204676584U (en) A kind of high stake truss-like offshore wind turbine foundation structure
CN106088120B (en) A kind of cofferdam decentralization construction method
CN201933485U (en) Z-shaped cold blending plate pile
CN204570896U (en) A kind of mud-dumping yard overflow well derrick
CN201713761U (en) Hollow and closed type steel caisson cofferdam
CN108750014A (en) The support anchor structure and construction method of a kind of floating on water photovoltaic plant suitable for high water-level amplitude
CN203742622U (en) Seep-proof component for constructing bearing structure
CN206784421U (en) The support meanss of foundation ditch tower crane
CN206418464U (en) A kind of Bailey bracket support system
CN103726505B (en) Offshore wind plant wind turbine foundation
CN202865812U (en) Flow-isolating structure of ship-lock approach channels
CN105804111B (en) A kind of Length discrepancy leg offshore wind farm jacket basis and its construction method
CN204570637U (en) A kind of mud-dumping yard overflow system
CN204282390U (en) For the steel concrete-steel structure mixing gravity type foundation of offshore wind farm
CN204125935U (en) A kind of micropore castinplace pile being applicable to solar photovoltaic bracket basis
CN204662629U (en) A kind of overflow well derrick
CN203768940U (en) Angle steel tower foundation of overhead power transmission line
CN206736872U (en) Large hydropower station water inlet scour gallery
CN207092045U (en) The stage apparatus of marine pile connection construction
CN206815278U (en) A kind of assembled integral revetment structure on soft soil foundation
CN203530921U (en) Water-permeable pile foundation spur dike

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150819

Termination date: 20200330

CF01 Termination of patent right due to non-payment of annual fee