CN204753354U - Cover worker's board landing stage - Google Patents

Cover worker's board landing stage Download PDF

Info

Publication number
CN204753354U
CN204753354U CN201520403175.7U CN201520403175U CN204753354U CN 204753354 U CN204753354 U CN 204753354U CN 201520403175 U CN201520403175 U CN 201520403175U CN 204753354 U CN204753354 U CN 204753354U
Authority
CN
China
Prior art keywords
longeron
crossbeam
steel
bolt
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520403175.7U
Other languages
Chinese (zh)
Inventor
张庆国
岳嫣
王宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Zizhu hi tech equipment Co., Ltd
Original Assignee
Lioaning Zizhu Pile Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lioaning Zizhu Pile Foundation Engineering Co Ltd filed Critical Lioaning Zizhu Pile Foundation Engineering Co Ltd
Priority to CN201520403175.7U priority Critical patent/CN204753354U/en
Application granted granted Critical
Publication of CN204753354U publication Critical patent/CN204753354U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a cover worker's board landing stage, including many steel -pipe piles, many pile bolck crossbeams, many longerons and decking, steel -pipe pile and transom bolt are fixed, steel -pipe pile pile bolck solder termination board, and the crossbeam shaped steel fulcrum department parallel welded connection board in flange plate both sides, many longerons are laid to end board and connecting plate bolted connection on the crossbeam, adopt bolted connection between crossbeam and the longeron, adopt gusset bolted connection between the longeron, and the longeron connects the strong point all to set up in crossbeam top surface center department, lays on the longeron to cover worker's board as the decking, and it is spacing that the limit baffle that covers worker's board bottom surface follows the longeron edge. The utility model discloses pontic building height is little, and stability and intensity are high, erect the simple installation, construction period is short, with the reduction of the more traditional bei leiqiao of steel volume, save engineering cost. To the engineering that the time limit for a project is urgent, more there is the using value.

Description

A kind of furrow closing board trestle
Technical field
The utility model relates to Construction of Steel Structure trestle application, particularly a kind of furrow closing board trestle.
Background technology
Steel trestle is mainly used in water Steel Sheet Pile coffering; Fishing wharf construction project; The interim overhead crossing engineering of rivers, irrigation canals and ditches; Subgrade road surface temporary construction engineering, and the engineering such as pipeline, track, road surface landslide, landslide of the road that needs temporarily to resume traffic.
Conventional steel trestle is based on steel pipe pile, and the beret truss that adopts, as spandrel girder, it lays shaped steel secondary beam more, then spreads steel plate as bridge deck.This type of steel trestle intensity is higher, but laying process relative complex, meanwhile, owing to adopting steel plate to do bridge deck, must lay the shaped steel secondary beam comparatively gathered under steel plate, to prevent steel plate amount of deflection excessive, so steel using amount is comparatively large, and beret truss cost is higher.
Summary of the invention
Technical problem to be solved in the utility model overcomes the deficiencies in the prior art, provides a kind of furrow closing board trestle, and erection simple installation, the construction period is short, and construction costs is low.
For achieving the above object, the utility model realizes by the following technical solutions:
A kind of furrow closing board trestle, comprises many steel pipe piles, many piles head piece, many longerons and bridge deck; Steel pipe pile and transom bolt are fixed, steel pipe pile stake top solder end plate, frange plate both sides, crossbeam shaped steel fulcrum place are parallel is welded to connect plate, end plate is connected with junction plate bolt, crossbeam is laid many longerons, with bolts between crossbeam and longeron, gusset bolt is adopted to connect between longeron, longeron spreading place is all arranged on crossbeam end face center, longeron is laid furrow closing board as bridge deck, and the postive stop baffle of furrow closing board bottom surface is spacing along longeron edge.
Horizontal support and bearing diagonal is provided with between described steel pipe pile, bearing diagonal intersects mutually, be connected with the bearing rib bolt be welded on steel pipe pile, wherein one is split type, be connected at center bolt with another root bearing diagonal by support and connection plate, the bolt hole on bearing rib and support and connection plate is strip hole.
Compared with prior art, the beneficial effects of the utility model are:
(1) pontic building height is little, stability and intensity high;
(2) set up simple installation, the construction period is short;
(3) the more traditional Bailey bridge of steel using amount reduces, and saves construction costs.
(4) for the engineering that the duration is urgent, more using value is had.
Accompanying drawing explanation
Fig. 1 is longitudinal facade structures schematic diagram of the present utility model.
Fig. 2 is horizontal facade structures schematic diagram of the present utility model.
Fig. 3 is crossbeam and steel pipe pile syndeton schematic diagram.
Fig. 4 is that steel pipe pile supports schematic diagram.
Fig. 5 is furrow closing board and the spacing schematic diagram of longeron.
In figure: 1-steel pipe pile 2-crossbeam 3-longeron 4-furrow closing board 5-railing 6-end plate 7-junction plate 8-gusset 9-horizontal support 10-bearing diagonal 11-support and connection plate 12-bearing rib 13-postive stop baffle
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is further illustrated:
As Figure 1-Figure 2, a kind of furrow closing board trestle, comprises many steel pipe piles 1, many piles head piece 2, many longerons 3 and bridge deck; Steel pipe pile 1 and crossbeam 2 bolt are fixed, crossbeam 2 is laid hot-rolled steel section longeron 3, horizontal spacing 2 meters, at crossbeam top surveying and locating, determine longeron accurate location, with bolts between crossbeam 2 and longeron 3, girder space is 2 meters, longeron strengthens gusset every 3 meters of both sides welding, and longeron joint adopts gusset bolt to connect, and longeron 3 spreading place is all arranged on crossbeam 2 end face center.Longeron 3 is laid furrow closing board 4 as bridge deck, furrow closing board 4 is of a size of 2000*750mm, and laterally lay along steel trestle, furrow closing board 4 both sides are provided with railing 5.
As shown in Figure 3, steel pipe pile 1 top solder end plate 6, bottom wing listrium both sides, crossbeam 2 shaped steel fulcrum place are parallel is welded to connect plate 7, and end plate 6 is connected with junction plate 7 bolt, is provided with vertical gusset 8 between crossbeam 2 shaped steel top flange plate and junction plate 7.
As shown in Figure 4, horizontal support 9 and bearing diagonal 10 is provided with between steel pipe pile 1, bearing diagonal intersects mutually, be connected with bearing rib 12 bolt be welded on steel pipe pile, wherein one is split type, be connected at center bolt with another root bearing diagonal by support and connection plate 11, the bolt hole on bearing rib 12 and support and connection plate 11 is strip hole.
As shown in Figure 5, be provided with postive stop baffle 13 bottom furrow closing board 4, the postive stop baffle 13 of furrow closing board bottom surface is spacing along longeron 3 edge.Furrow closing board displacement when vehicle travels can be solved.
Be only general principle of the present utility model above, not impose any restrictions the utility model, every foundation the utility model carries out equivalent variations and modification to it, all within the category of the art of this patent protection scheme.

Claims (2)

1. a furrow closing board trestle, comprises many steel pipe piles, many piles head piece, many longerons and bridge deck; It is characterized in that, steel pipe pile and transom bolt are fixed, steel pipe pile stake top solder end plate, frange plate both sides, crossbeam shaped steel fulcrum place are parallel is welded to connect plate, and end plate is connected with junction plate bolt, crossbeam is laid many longerons, with bolts between crossbeam and longeron, adopt gusset bolt to connect between longeron, longeron spreading place is all arranged on crossbeam end face center, longeron is laid furrow closing board as bridge deck, the postive stop baffle of furrow closing board bottom surface is spacing along longeron edge.
2. a kind of furrow closing board trestle according to claim 1, it is characterized in that, horizontal support and bearing diagonal is provided with between described steel pipe pile, bearing diagonal intersects mutually, be connected with the bearing rib bolt be welded on steel pipe pile, wherein one is split type, is connected with another root bearing diagonal by support and connection plate at center bolt, and the bolt hole on bearing rib and support and connection plate is strip hole.
CN201520403175.7U 2015-06-11 2015-06-11 Cover worker's board landing stage Active CN204753354U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520403175.7U CN204753354U (en) 2015-06-11 2015-06-11 Cover worker's board landing stage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520403175.7U CN204753354U (en) 2015-06-11 2015-06-11 Cover worker's board landing stage

Publications (1)

Publication Number Publication Date
CN204753354U true CN204753354U (en) 2015-11-11

Family

ID=54468080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520403175.7U Active CN204753354U (en) 2015-06-11 2015-06-11 Cover worker's board landing stage

Country Status (1)

Country Link
CN (1) CN204753354U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105803945A (en) * 2016-03-25 2016-07-27 孟书芳 a bridge frame
CN106930179A (en) * 2017-04-28 2017-07-07 茌平信发华宇氧化铝有限公司 A kind of top car device of high-efficiency environment friendly purifying vehicle
CN106978777A (en) * 2017-05-22 2017-07-25 中铁第五勘察设计院集团有限公司 A kind of make-shift bridge device
CN108222010A (en) * 2018-03-20 2018-06-29 南京市测绘勘察研究院股份有限公司 A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled and construction method
CN108625276A (en) * 2018-07-24 2018-10-09 中铁七局集团第二工程有限公司 A kind of assembled steel and concrete combination beam trestle and construction method
CN110485261A (en) * 2019-09-17 2019-11-22 马鞍山瑞马钢构材料有限公司 A kind of novel pavement trestle plate and its system
CN111663431A (en) * 2020-06-01 2020-09-15 中交二公局第三工程有限公司 Assembled shock-absorbing temporary plank road structure
CN113305483A (en) * 2021-04-29 2021-08-27 金川集团股份有限公司 Adjustable supporting device for pipe bridge machining
CN113718628A (en) * 2021-10-09 2021-11-30 安徽省路桥工程集团有限责任公司 Four-point positioning-based bolted steel pipe pile trestle and construction method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105803945A (en) * 2016-03-25 2016-07-27 孟书芳 a bridge frame
CN106930179A (en) * 2017-04-28 2017-07-07 茌平信发华宇氧化铝有限公司 A kind of top car device of high-efficiency environment friendly purifying vehicle
CN106978777A (en) * 2017-05-22 2017-07-25 中铁第五勘察设计院集团有限公司 A kind of make-shift bridge device
CN108222010A (en) * 2018-03-20 2018-06-29 南京市测绘勘察研究院股份有限公司 A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled and construction method
CN108625276A (en) * 2018-07-24 2018-10-09 中铁七局集团第二工程有限公司 A kind of assembled steel and concrete combination beam trestle and construction method
CN110485261A (en) * 2019-09-17 2019-11-22 马鞍山瑞马钢构材料有限公司 A kind of novel pavement trestle plate and its system
CN111663431A (en) * 2020-06-01 2020-09-15 中交二公局第三工程有限公司 Assembled shock-absorbing temporary plank road structure
CN113305483A (en) * 2021-04-29 2021-08-27 金川集团股份有限公司 Adjustable supporting device for pipe bridge machining
CN113718628A (en) * 2021-10-09 2021-11-30 安徽省路桥工程集团有限责任公司 Four-point positioning-based bolted steel pipe pile trestle and construction method

Similar Documents

Publication Publication Date Title
CN204753354U (en) Cover worker's board landing stage
CN205205635U (en) Stride footpath bailey frame steel suspension bridge structure greatly
CN203222738U (en) Steel pipe latticed column temporary buttress supporting device
CN106978777A (en) A kind of make-shift bridge device
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
CN201671638U (en) Karst tunnel equipped with water stop strip
CN203684102U (en) Prefabricated girder support system erected at the junction span of the ramp bridge and the main line bridge
CN202401386U (en) Cable bridge for frame bridge
CN208136705U (en) A kind of make-shift bridge device
CN205712111U (en) One is applicable to subway work moving concrete material distributing machine under small space
CN211113215U (en) A design support frame for T roof beam erects
CN205742125U (en) A kind of work platform for boring
CN211735477U (en) A tower crane foundation structure for bridge tower construction
CN204401462U (en) For the support of pier prestressed cap beam with extra length Construction Supporting System in water
CN208479078U (en) The cable duct bank gantry safeguard structure of anti-pavement excavation
CN203373671U (en) Hanging basket walking rail with small curve radius
CN203429557U (en) Anchor pole back beam applied to underpass bridge jacking construction
CN203923923U (en) High pier steel truss girder sets up gate-type lifting station
CN103643695B (en) A kind of prefabricated fish belly type nested type wing plate basis
CN103453219B (en) Cable crosses the river crane span structure
CN210216415U (en) Positioning device for bridge pile foundation steel casing in deepwater and rapid stream area
CN208685457U (en) Cast-in-place box beam bracket device
CN208717919U (en) A kind of foundation pit support structure based on reverse method
CN206736743U (en) Lay the easy structure of mountable steel bridge
CN204325896U (en) A kind of Novel gallery bridge support system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Double tower village 114000 Anshan city of Liaoning Province Qianshan Ningyuan town

Patentee after: Liaoning Zizhu hi tech equipment Co., Ltd

Address before: Double tower village 114000 Anshan city of Liaoning Province Qianshan Ningyuan town

Patentee before: LIAONING ZIZHU PILE FOUNDATION ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder