CN206736872U - Large hydropower station water inlet scour gallery - Google Patents

Large hydropower station water inlet scour gallery Download PDF

Info

Publication number
CN206736872U
CN206736872U CN201720583207.5U CN201720583207U CN206736872U CN 206736872 U CN206736872 U CN 206736872U CN 201720583207 U CN201720583207 U CN 201720583207U CN 206736872 U CN206736872 U CN 206736872U
Authority
CN
China
Prior art keywords
scour gallery
gate
scour
gallery
generating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720583207.5U
Other languages
Chinese (zh)
Inventor
王仁坤
苟芳蓉
杨怀德
童建文
刘民怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201720583207.5U priority Critical patent/CN206736872U/en
Application granted granted Critical
Publication of CN206736872U publication Critical patent/CN206736872U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Barrages (AREA)

Abstract

The utility model discloses a kind of large hydropower station water inlet scour gallery, it is related to hydroelectric project design field, Sediment Siltation is easily produced before solving generating irrigating gate, causes to generate electricity and quote underfed, wear-out failure of the silt to generating set, the problem of bringing potential safety hazard to engineering.The technical solution adopted in the utility model is:Large hydropower station water inlet scour gallery, including multiple generating irrigating gates, generating irrigating gate forms fabricated structure, the bottom of each generating irrigating gate sets scour gallery respectively, each bar scour gallery is respectively connecting to sand surfing Main Corridor road, the water inlet of each bar scour gallery sets scour gallery gate respectively, and the downstream of scour gallery gate sets passage, and scour gallery and sand surfing Main Corridor road are arranged in the underplate concrete of generating irrigating gate.Lift scour gallery gate sand surfing when there is Sediment Siltation, efficiently solve Sediment Siltation problem before generating irrigating gate, ensure the safe operation of generating diversion quality and factory building.

Description

Large hydropower station water inlet scour gallery
Technical field
Hydroelectric project design field is the utility model is related to, specifically a kind of large hydropower station water inlet scour gallery.
Background technology
In hydroelectric project, because powerplant intakes are the necessary buildings of diversion and power.Large hydropower station reference flow is big, Ensure that engineering safety generates electricity, normal operation is primary goal.
Existing large hydropower station irrigating gate design is as shown in figure 1, in large-scale power station generating irrigating gate opening position, reservoir river When bed line is higher, in the case that reservoir depth is relatively shallower, Sediment Siltation is easily produced before generating irrigating gate, so causes to generate electricity Underfed, and wear-out failure of the silt to generating set are quoted, generating diversion quality is reduced and threatens the safety fortune of factory building OK, potential safety hazard is brought to engineering.
Utility model content
The utility model provides a kind of large hydropower station water inlet scour gallery, and mud is easily produced before solving generating irrigating gate Sand alluvial, cause to generate electricity and quote underfed, wear-out failure of the silt to generating set, asking for potential safety hazard is brought to engineering Topic.
Technical scheme is used by the utility model solves its technical problem:Large hydropower station water inlet scour gallery, Including multiple generating irrigating gates, generating irrigating gate forms fabricated structure, and the bottom of each generating irrigating gate sets sand surfing respectively Gallery, each bar scour gallery are respectively connecting to sand surfing Main Corridor road, and the water inlet of each bar scour gallery sets scour gallery respectively Gate, the downstream of scour gallery gate set passage, and scour gallery and sand surfing Main Corridor road are arranged in generating irrigating gate In underplate concrete.
It is further:Main Corridor road gate is set on the sand surfing Main Corridor road, and Main Corridor road gate is located at any sand surfing corridor The downstream in road.
It is further:The cross section of scour gallery at the scour gallery gate is rectangular;Main Corridor road gate The cross section in the sand surfing Main Corridor road at place is rectangular.
It is further:The sand surfing Main Corridor road incrementally increases in connection scour gallery part along the diameter of water (flow) direction.
It is further:Linkage section between the scour gallery and sand surfing Main Corridor road is curved.
It is further:Copper sheet sealing and rubber water-proof are respectively provided with the inside of the scour gallery, sand surfing Main Corridor road.
The beneficial effects of the utility model are:The generating irrigating gate bottom of large hydropower station sets scour gallery, when there is mud Lift scour gallery gate sand surfing during sand alluvial, efficiently solve Sediment Siltation problem before generating irrigating gate, ensure that generating is drawn The safe operation of water quality and factory building.
Brief description of the drawings
Fig. 1 is existing large hydropower station irrigating gate profilograph.
Fig. 2 is the utility model large hydropower station water inlet scour gallery layout drawing.
Fig. 3 is A-A profiles in Fig. 2.
Fig. 4 is B-B profiles in Fig. 2.
Parts, position and numbering in figure:Generating irrigating gate 1, scour gallery 2, sand surfing Main Corridor road 3, scour gallery gate 4th, passage 5, underplate concrete 6, Main Corridor road gate 7, copper sheet sealing 8, rubber water-proof 9, trash rack 10.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in figs. 2 to 4, the utility model large hydropower station water inlet scour gallery, including multiple generating irrigating gates 1, Generating irrigating gate 1 forms fabricated structure, and the bottom of each generating irrigating gate 1 sets scour gallery 2, each bar scour gallery respectively 2 are respectively connecting to sand surfing Main Corridor road 3.Scour gallery 2 and sand surfing Main Corridor road 3 are arranged in the underplate concrete 6 of generating irrigating gate 1 In.
Such as Fig. 2, scour gallery 2 is four, and four scour gallerys 2 are parallel to each other, and with the axis direction of sand surfing Main Corridor road 3 Angle be 92 °.The water inlet of each bar scour gallery 2 sets scour gallery gate 4, the downstream of scour gallery gate 4 respectively Side sets passage 5.Such as Fig. 3, passage 5 is arranged at the upstream side of the trash rack 10 of generating irrigating gate 1, the diameter of passage 5 For 50mm, scour gallery gate 4 is arranged at the upstream side of passage 5.The cross section of scour gallery 2 at scour gallery gate 4 Rectangular, this section of scour gallery 2 is gate bay.Gate bay upstream side is the water inlet of scour gallery 2, and water inlet is in open-like shape, Such as Fig. 2;The downstream of gate bay is the changeover portion that square tube becomes pipe.Linkage section between scour gallery 2 and sand surfing Main Corridor road 3 is in Arc.
Main Corridor road gate 7 is set on sand surfing Main Corridor road 3, and Main Corridor road gate 7 is located at the downstream of any scour gallery 2. The cross section in the sand surfing Main Corridor road 3 at Main Corridor road gate 7 is rectangular.So the sand surfing Main Corridor road 3 at Main Corridor road gate 7 is lock Gate segment, the upstream side of the gate bay set the changeover portion of pipe change square tube.
Due to the changes in flow rate in sand surfing Main Corridor road 3, sand surfing Main Corridor road 3 is connecting the part of scour gallery 2 along water (flow) direction Diameter incrementally increases.Such as Fig. 2, sand surfing Main Corridor road 3 is 330mm in one section of maximum gauge of first scour gallery 2 of connection, even One section of maximum gauge for connecing second scour gallery 2 is 360mm, connects one section of maximum gauge of the 3rd scour gallery 2 For 400mm.Scour gallery 2, the inner side of sand surfing Main Corridor road 3 are respectively provided with copper sheet sealing 8 and rubber water-proof 9.Such as Fig. 4, sand surfing Main Corridor road 3 Inner side sets copper sheet sealing 8 and rubber water-proof 9.
Scour gallery 2 efficiently solves Sediment Siltation problem before generating irrigating gate 1, it is ensured that generating diversion quality and factory The safe operation in room.

Claims (6)

1. large hydropower station water inlet scour gallery, including multiple generating irrigating gates (1), generating irrigating gate (1) forms combined type Structure, it is characterised in that:The bottom of each generating irrigating gate (1) sets scour gallery (2), each bar scour gallery (2) point respectively Sand surfing Main Corridor road (3) is not connected to, and the water inlet of each bar scour gallery (2) sets scour gallery gate (4), sand surfing corridor respectively The downstream of road gate (4) sets passage (5), and scour gallery (2) and sand surfing Main Corridor road (3) are arranged in generating irrigating gate (1) in underplate concrete (6).
2. large hydropower station water inlet scour gallery as claimed in claim 1, it is characterised in that:The sand surfing Main Corridor road (3) Upper setting Main Corridor road gate (7), and Main Corridor road gate (7) is located at the downstream of any scour gallery (2).
3. large hydropower station water inlet scour gallery as claimed in claim 2, it is characterised in that:The scour gallery gate (4) cross section of the scour gallery (2) at place is rectangular;The cross section in the sand surfing Main Corridor road (3) at the Main Corridor road gate (7) place is in Rectangle.
4. large hydropower station water inlet scour gallery as claimed in claim 1, it is characterised in that:The sand surfing Main Corridor road (3) Partly incrementally increased in connection scour gallery (2) along the diameter of water (flow) direction.
5. large hydropower station water inlet scour gallery as claimed in claim 1, it is characterised in that:The scour gallery (2) and Linkage section between sand surfing Main Corridor road (3) is curved.
6. large hydropower station water inlet scour gallery as claimed in claim 1, it is characterised in that:The scour gallery (2), punching Copper sheet sealing (8) and rubber water-proof (9) are respectively provided with the inside of husky Main Corridor road (3).
CN201720583207.5U 2017-05-23 2017-05-23 Large hydropower station water inlet scour gallery Active CN206736872U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720583207.5U CN206736872U (en) 2017-05-23 2017-05-23 Large hydropower station water inlet scour gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720583207.5U CN206736872U (en) 2017-05-23 2017-05-23 Large hydropower station water inlet scour gallery

Publications (1)

Publication Number Publication Date
CN206736872U true CN206736872U (en) 2017-12-12

Family

ID=60567907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720583207.5U Active CN206736872U (en) 2017-05-23 2017-05-23 Large hydropower station water inlet scour gallery

Country Status (1)

Country Link
CN (1) CN206736872U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322289A (en) * 2018-11-23 2019-02-12 黄河勘测规划设计有限公司 The desilting works of intake of hydropower station
CN114182698A (en) * 2021-11-18 2022-03-15 上海勘测设计研究院有限公司 Continuous sand flushing type desilting basin structure and overhauling operation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322289A (en) * 2018-11-23 2019-02-12 黄河勘测规划设计有限公司 The desilting works of intake of hydropower station
CN114182698A (en) * 2021-11-18 2022-03-15 上海勘测设计研究院有限公司 Continuous sand flushing type desilting basin structure and overhauling operation method thereof

Similar Documents

Publication Publication Date Title
CN105155484B (en) By the method that the reconstruction of temporary diversion hole is permanent release floodwatering facility
CN206736872U (en) Large hydropower station water inlet scour gallery
CN103510493A (en) Low overflow dam cave depot type hydropower station
CN201785733U (en) Spillway chute structure
CN202323895U (en) Tail water channel structure for stepped hydro-junction
CN103114553B (en) Earth and rockfill dam piping burst field test method
CN206090779U (en) Municipal administration water supply and drainage pipeline connection structure
CN204825802U (en) Compound line type overflow weir
CN101139829A (en) Flow guiding engineering for river gate dam and spillway
CN204039979U (en) A kind of spilled water hole plugging device
CN207392155U (en) A kind of water conservancy and hydropower gate defroster
DE102012007565B4 (en) Process of holistic water optimization for flood prevention using a pipe pump system
CN204174590U (en) For two dam, road structures of absorption basin
CN204691255U (en) Diaphragm wall
CN206721845U (en) A kind of diversion tunnel
CN104110014B (en) Floating body flap valve
CN204386616U (en) A kind of device of seat earth grouting and reinforcing secondary sleeve pipe
CN204343255U (en) Structure of canal system hydraulic engineering through high-fall valley
CN210396745U (en) Pumped storage chamber suitable for TBM construction
CN204000796U (en) Power station in river channel's structure
CN204570896U (en) A kind of mud-dumping yard overflow well derrick
CN105019414A (en) Composite lock chamber structure for narrow water intake of mountain hydropower project
CN203821325U (en) Closure building on open and deep soft foundation river
CN104120683B (en) A kind of spilled water hole plugging device and method for blocking
CN206887894U (en) Check dam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant