CN204570611U - A kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement - Google Patents
A kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement Download PDFInfo
- Publication number
- CN204570611U CN204570611U CN201520233526.4U CN201520233526U CN204570611U CN 204570611 U CN204570611 U CN 204570611U CN 201520233526 U CN201520233526 U CN 201520233526U CN 204570611 U CN204570611 U CN 204570611U
- Authority
- CN
- China
- Prior art keywords
- geosynthetics
- tailwater channel
- foundation
- power plant
- base plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement, comprise covering layer basis, tailwater channel base plate and basement foundation, on covering layer basis, geosynthetics is provided with in the below of tailwater channel base plate, geosynthetics has filled hardcore bed, the utility model arranges the geosynthetics of more than layer at Riverbed surface of base, welding technology is adopted to connect between geosynthetics, and fill hardcore bed on geosynthetics surface and tamp, better can solve foundation settlement and be out of shape the concrete cracking caused, convenient construction simultaneously, economic advantages are obvious.
Description
Technical field
The utility model patent relates to a kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement, belongs to Hydraulic and Hydro-Power Engineering technical field of foundation treatment.
Background technology
At present, on many rivers in China western part, riverbed composition is mainly sand boulder and cobble deposit, Riverbed thickness is generally 10m ~ 60m, the orographic condition of part power station incorporation engineering and flow condition, usually factory building is arranged in bank or position, riverbed, for meeting base fixed and requirement for bearing capacity, main building basis is generally placed in basement foundation, and tailwater channel foundation main will be positioned on the basis of covering layer or covering layer and basement rock mixing.And if according to tectal thickness, the method process such as displacement, pile foundation are adopted for covering layer foundation main, to prevent foundation uneven settlement, but existing this treatment technology consume long in time limit, invest high, and the problem of differential settlement can't be solved completely for pile foundation.
Utility model content
The purpose of this utility model is: the soft malleability and the reinforcement effects that utilize geosynthetics, with the concentrated force disperseing load and differential settlement to produce, reach reinforcement effects, the sedimentation and deformation of better adaptation basement foundation is large, the feature of differential settlement, effectively slow down or avoid the tailwater channel bottom slab crack because basement foundation sedimentation and deformation causes, the utility model by arranging geosynthetics between tailwater channel base plate and basement foundation, geosynthetics is high-strength pulling-resisting band, there is coarse embossing on surface, by the toughness of geotextile and intensity and basement foundation or the anchoring of tailwater channel underplate concrete, mutual welding technology connects, transform the deformation condition of basement foundation as same level, better can solve the concrete cracking that basement foundation sedimentation and deformation causes, convenient construction simultaneously, economic advantages are obvious.
The utility model is achieved in that a kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement, comprise covering layer basis, tailwater channel base plate and basement foundation, on covering layer basis, be provided with geosynthetics in the below of tailwater channel base plate, geosynthetics has filled hardcore bed.
Described geosynthetics is Plastics Geogrids, steel plastic geogrid, glass fiber or polyester fiber.
Described geosynthetics termination is connected with basement foundation, and position, geosynthetics termination anchors into basement foundation inside and is not less than 1m.
Described geosynthetics termination is connected with the concrete on tailwater channel base plate, and position, geosynthetics termination anchors into tailwater channel underplate concrete inside and is not less than 1m.
1 ~ 3 layer of geosynthetics is provided with between tailwater channel base plate and covering layer basis.
Owing to have employed technique scheme, compared with prior art, the utility model arranges the geosynthetics of more than layer at Riverbed surface of base, welding technology is adopted to connect between geosynthetics, and fill hardcore bed on geosynthetics surface and tamp, better can solve foundation settlement and be out of shape the concrete cracking caused, simultaneously convenient construction, economic advantages are obvious.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the syndeton schematic diagram of geosynthetics of the present utility model and basement foundation;
Fig. 3 is the structural representation that geosynthetics of the present utility model is connected with tailwater channel underplate concrete;
Description of reference numerals: 1-geosynthetics, 2-tailwater channel base plate, 3-hardcore bed, 4-covering layer basis, 5-basement foundation.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail, but not as to restriction of the present utility model.
Embodiment of the present utility model: a kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement, comprise covering layer basis 4, tailwater channel base plate 2 and basement foundation 5, on covering layer basis 4, be provided with geosynthetics 1 in the below of tailwater channel base plate 2, geosynthetics 1 filled hardcore bed 3.
Described geosynthetics 1 is Plastics Geogrids, steel plastic geogrid, glass fiber or polyester fiber, and the parameters such as the durability of material and tension meet industry standard.
Described geosynthetics 1 termination is connected with basement foundation 5, and position, geosynthetics 1 termination anchors into basement foundation 5 inside and is not less than 1m.
Described geosynthetics 1 termination is connected with the concrete on tailwater channel base plate 2, and position, geosynthetics 1 termination anchors into tailwater channel base plate 2 inside concrete and is not less than 1m.
1 ~ 3 layer of geosynthetics 1 is provided with between tailwater channel base plate 2 and covering layer basis 4.
The utility model prevents differential settlement structure from mainly arranging the geosynthetics of more than 1 layer at Riverbed surface of base, welding technology is adopted to connect between geosynthetics, ensure that at position, termination holder Buddhist nun lid synthetic materials anchors into basement foundation or tailwater channel underplate concrete inside is not less than 1m, to ensure the snap-in force at anchoring position.
Structure technology of the present utility model is applicable to institute's power plant building tailwater channel and is placed on the mixed base of all standing layer basis or covering layer and basement foundation, and the geosynthetics that it adopts arranges that the number of plies is specifically determined according to tectal composition and thickness.
Claims (5)
1. prevent and treat the structure of power plant building tailwater channel foundation uneven settlement for one kind, comprise covering layer basis (4), tailwater channel base plate (2) and basement foundation (5), it is characterized in that: on covering layer basis (4), be provided with geosynthetics (1) in the below of tailwater channel base plate (2), geosynthetics (1) filled hardcore bed (3).
2. the structure of control power plant building according to claim 1 tailwater channel foundation uneven settlement, is characterized in that: described geosynthetics (1) is Plastics Geogrids, steel plastic geogrid, glass fiber or polyester fiber.
3. the structure of control power plant building according to claim 1 tailwater channel foundation uneven settlement, it is characterized in that: described geosynthetics (1) termination is connected with basement foundation (5), geosynthetics (1) position, termination anchors into basement foundation (5) inside and is not less than 1m.
4. the structure of control power plant building according to claim 1 tailwater channel foundation uneven settlement, it is characterized in that: described geosynthetics (1) termination is connected with the concrete on tailwater channel base plate (2), geosynthetics (1) position, termination anchors into tailwater channel base plate (2) inside concrete and is not less than 1m.
5. the structure of control power plant building according to claim 1 tailwater channel foundation uneven settlement, is characterized in that: between tailwater channel base plate (2) and covering layer basis (4), be provided with 1 ~ 3 layer of geosynthetics (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520233526.4U CN204570611U (en) | 2015-04-17 | 2015-04-17 | A kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520233526.4U CN204570611U (en) | 2015-04-17 | 2015-04-17 | A kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204570611U true CN204570611U (en) | 2015-08-19 |
Family
ID=53863275
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520233526.4U Active CN204570611U (en) | 2015-04-17 | 2015-04-17 | A kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204570611U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105002860A (en) * | 2015-04-17 | 2015-10-28 | 中国电建集团贵阳勘测设计研究院有限公司 | Method and structure for preventing and treating differential settlement of tail water channel foundation of power plant room |
-
2015
- 2015-04-17 CN CN201520233526.4U patent/CN204570611U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105002860A (en) * | 2015-04-17 | 2015-10-28 | 中国电建集团贵阳勘测设计研究院有限公司 | Method and structure for preventing and treating differential settlement of tail water channel foundation of power plant room |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104131555B (en) | A kind of outsourcing water penetration concrete reinforced pipe crushed stone grouting pile and construction method thereof | |
CN103422511B (en) | A kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation | |
CN100439600C (en) | Treatment method of newly built high way railway engineering soft foundation | |
CN102465524B (en) | Double radial mesh-cage sand-gravel pile and construction technology thereof | |
CN203546678U (en) | Asphalt concrete core-wall rockfill dam structure | |
CN202830649U (en) | Micro-disturbance disease treatment structure of deformation of existing high-speed railway embankment | |
CN205742201U (en) | A kind of grouting pipeline device and tapered shaped pile | |
CN204570611U (en) | A kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement | |
CN205024710U (en) | Adopt raft foundation structure of anti prestressed anchorage of floating cable | |
CN204326032U (en) | A kind of concrete dam internal drainage gallery structure | |
CN104790404B (en) | A kind of dam foundation high-pressure grouting structure and grouting method | |
CN106544987B (en) | A kind of anti-seepage of channels construction method storing flooded wetland | |
CN205223770U (en) | Crowded close stake of rubble adds muscle roadbed structure | |
CN105780737B (en) | A kind of super-high rockfill dam structure and its construction method for being applicable Hydraulic and Hydro-Power Engineering | |
CN101349051B (en) | Saline soil area combined drain system and forced ramming foundation treating method thereof | |
CN103306278B (en) | Method for processing soft soil foundation with environment-friendly light pile | |
CN207828910U (en) | A kind of novel double-layer geomembrane anti-seepage structure | |
CN101967834A (en) | Pulp concentration pool underground base structure with anti-floating function | |
CN204626732U (en) | A kind of precast reinforced concrete construction superposed beam antipriming | |
CN115492057A (en) | Concrete core rock-fill dam structure body and construction method | |
CN204590034U (en) | A kind of dam foundation high pressure grouting structure | |
CN210262945U (en) | Cemented sand gravel buttress dam structure | |
CN105002860A (en) | Method and structure for preventing and treating differential settlement of tail water channel foundation of power plant room | |
CN210636388U (en) | Composite drainage structure of homogeneous earth dam | |
CN203373737U (en) | Multi-branch pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |