CN204570611U - A kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement - Google Patents

A kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement Download PDF

Info

Publication number
CN204570611U
CN204570611U CN201520233526.4U CN201520233526U CN204570611U CN 204570611 U CN204570611 U CN 204570611U CN 201520233526 U CN201520233526 U CN 201520233526U CN 204570611 U CN204570611 U CN 204570611U
Authority
CN
China
Prior art keywords
geosynthetics
tailwater channel
foundation
power plant
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520233526.4U
Other languages
Chinese (zh)
Inventor
张合作
罗光其
程瑞林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201520233526.4U priority Critical patent/CN204570611U/en
Application granted granted Critical
Publication of CN204570611U publication Critical patent/CN204570611U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement, comprise covering layer basis, tailwater channel base plate and basement foundation, on covering layer basis, geosynthetics is provided with in the below of tailwater channel base plate, geosynthetics has filled hardcore bed, the utility model arranges the geosynthetics of more than layer at Riverbed surface of base, welding technology is adopted to connect between geosynthetics, and fill hardcore bed on geosynthetics surface and tamp, better can solve foundation settlement and be out of shape the concrete cracking caused, convenient construction simultaneously, economic advantages are obvious.

Description

A kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement
Technical field
The utility model patent relates to a kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement, belongs to Hydraulic and Hydro-Power Engineering technical field of foundation treatment.
Background technology
At present, on many rivers in China western part, riverbed composition is mainly sand boulder and cobble deposit, Riverbed thickness is generally 10m ~ 60m, the orographic condition of part power station incorporation engineering and flow condition, usually factory building is arranged in bank or position, riverbed, for meeting base fixed and requirement for bearing capacity, main building basis is generally placed in basement foundation, and tailwater channel foundation main will be positioned on the basis of covering layer or covering layer and basement rock mixing.And if according to tectal thickness, the method process such as displacement, pile foundation are adopted for covering layer foundation main, to prevent foundation uneven settlement, but existing this treatment technology consume long in time limit, invest high, and the problem of differential settlement can't be solved completely for pile foundation.
Utility model content
The purpose of this utility model is: the soft malleability and the reinforcement effects that utilize geosynthetics, with the concentrated force disperseing load and differential settlement to produce, reach reinforcement effects, the sedimentation and deformation of better adaptation basement foundation is large, the feature of differential settlement, effectively slow down or avoid the tailwater channel bottom slab crack because basement foundation sedimentation and deformation causes, the utility model by arranging geosynthetics between tailwater channel base plate and basement foundation, geosynthetics is high-strength pulling-resisting band, there is coarse embossing on surface, by the toughness of geotextile and intensity and basement foundation or the anchoring of tailwater channel underplate concrete, mutual welding technology connects, transform the deformation condition of basement foundation as same level, better can solve the concrete cracking that basement foundation sedimentation and deformation causes, convenient construction simultaneously, economic advantages are obvious.
The utility model is achieved in that a kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement, comprise covering layer basis, tailwater channel base plate and basement foundation, on covering layer basis, be provided with geosynthetics in the below of tailwater channel base plate, geosynthetics has filled hardcore bed.
Described geosynthetics is Plastics Geogrids, steel plastic geogrid, glass fiber or polyester fiber.
Described geosynthetics termination is connected with basement foundation, and position, geosynthetics termination anchors into basement foundation inside and is not less than 1m.
Described geosynthetics termination is connected with the concrete on tailwater channel base plate, and position, geosynthetics termination anchors into tailwater channel underplate concrete inside and is not less than 1m.
1 ~ 3 layer of geosynthetics is provided with between tailwater channel base plate and covering layer basis.
Owing to have employed technique scheme, compared with prior art, the utility model arranges the geosynthetics of more than layer at Riverbed surface of base, welding technology is adopted to connect between geosynthetics, and fill hardcore bed on geosynthetics surface and tamp, better can solve foundation settlement and be out of shape the concrete cracking caused, simultaneously convenient construction, economic advantages are obvious.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the syndeton schematic diagram of geosynthetics of the present utility model and basement foundation;
Fig. 3 is the structural representation that geosynthetics of the present utility model is connected with tailwater channel underplate concrete;
Description of reference numerals: 1-geosynthetics, 2-tailwater channel base plate, 3-hardcore bed, 4-covering layer basis, 5-basement foundation.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail, but not as to restriction of the present utility model.
Embodiment of the present utility model: a kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement, comprise covering layer basis 4, tailwater channel base plate 2 and basement foundation 5, on covering layer basis 4, be provided with geosynthetics 1 in the below of tailwater channel base plate 2, geosynthetics 1 filled hardcore bed 3.
Described geosynthetics 1 is Plastics Geogrids, steel plastic geogrid, glass fiber or polyester fiber, and the parameters such as the durability of material and tension meet industry standard.
Described geosynthetics 1 termination is connected with basement foundation 5, and position, geosynthetics 1 termination anchors into basement foundation 5 inside and is not less than 1m.
Described geosynthetics 1 termination is connected with the concrete on tailwater channel base plate 2, and position, geosynthetics 1 termination anchors into tailwater channel base plate 2 inside concrete and is not less than 1m.
1 ~ 3 layer of geosynthetics 1 is provided with between tailwater channel base plate 2 and covering layer basis 4.
The utility model prevents differential settlement structure from mainly arranging the geosynthetics of more than 1 layer at Riverbed surface of base, welding technology is adopted to connect between geosynthetics, ensure that at position, termination holder Buddhist nun lid synthetic materials anchors into basement foundation or tailwater channel underplate concrete inside is not less than 1m, to ensure the snap-in force at anchoring position.
Structure technology of the present utility model is applicable to institute's power plant building tailwater channel and is placed on the mixed base of all standing layer basis or covering layer and basement foundation, and the geosynthetics that it adopts arranges that the number of plies is specifically determined according to tectal composition and thickness.

Claims (5)

1. prevent and treat the structure of power plant building tailwater channel foundation uneven settlement for one kind, comprise covering layer basis (4), tailwater channel base plate (2) and basement foundation (5), it is characterized in that: on covering layer basis (4), be provided with geosynthetics (1) in the below of tailwater channel base plate (2), geosynthetics (1) filled hardcore bed (3).
2. the structure of control power plant building according to claim 1 tailwater channel foundation uneven settlement, is characterized in that: described geosynthetics (1) is Plastics Geogrids, steel plastic geogrid, glass fiber or polyester fiber.
3. the structure of control power plant building according to claim 1 tailwater channel foundation uneven settlement, it is characterized in that: described geosynthetics (1) termination is connected with basement foundation (5), geosynthetics (1) position, termination anchors into basement foundation (5) inside and is not less than 1m.
4. the structure of control power plant building according to claim 1 tailwater channel foundation uneven settlement, it is characterized in that: described geosynthetics (1) termination is connected with the concrete on tailwater channel base plate (2), geosynthetics (1) position, termination anchors into tailwater channel base plate (2) inside concrete and is not less than 1m.
5. the structure of control power plant building according to claim 1 tailwater channel foundation uneven settlement, is characterized in that: between tailwater channel base plate (2) and covering layer basis (4), be provided with 1 ~ 3 layer of geosynthetics (1).
CN201520233526.4U 2015-04-17 2015-04-17 A kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement Active CN204570611U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520233526.4U CN204570611U (en) 2015-04-17 2015-04-17 A kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520233526.4U CN204570611U (en) 2015-04-17 2015-04-17 A kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement

Publications (1)

Publication Number Publication Date
CN204570611U true CN204570611U (en) 2015-08-19

Family

ID=53863275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520233526.4U Active CN204570611U (en) 2015-04-17 2015-04-17 A kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement

Country Status (1)

Country Link
CN (1) CN204570611U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105002860A (en) * 2015-04-17 2015-10-28 中国电建集团贵阳勘测设计研究院有限公司 Method and structure for preventing and treating differential settlement of tail water channel foundation of power plant room

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105002860A (en) * 2015-04-17 2015-10-28 中国电建集团贵阳勘测设计研究院有限公司 Method and structure for preventing and treating differential settlement of tail water channel foundation of power plant room

Similar Documents

Publication Publication Date Title
CN104131555B (en) A kind of outsourcing water penetration concrete reinforced pipe crushed stone grouting pile and construction method thereof
CN103422511B (en) A kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation
CN100439600C (en) Treatment method of newly built high way railway engineering soft foundation
CN102465524B (en) Double radial mesh-cage sand-gravel pile and construction technology thereof
CN203546678U (en) Asphalt concrete core-wall rockfill dam structure
CN202830649U (en) Micro-disturbance disease treatment structure of deformation of existing high-speed railway embankment
CN205742201U (en) A kind of grouting pipeline device and tapered shaped pile
CN204570611U (en) A kind of structure of preventing and treating power plant building tailwater channel foundation uneven settlement
CN205024710U (en) Adopt raft foundation structure of anti prestressed anchorage of floating cable
CN204326032U (en) A kind of concrete dam internal drainage gallery structure
CN104790404B (en) A kind of dam foundation high-pressure grouting structure and grouting method
CN106544987B (en) A kind of anti-seepage of channels construction method storing flooded wetland
CN205223770U (en) Crowded close stake of rubble adds muscle roadbed structure
CN105780737B (en) A kind of super-high rockfill dam structure and its construction method for being applicable Hydraulic and Hydro-Power Engineering
CN101349051B (en) Saline soil area combined drain system and forced ramming foundation treating method thereof
CN103306278B (en) Method for processing soft soil foundation with environment-friendly light pile
CN207828910U (en) A kind of novel double-layer geomembrane anti-seepage structure
CN101967834A (en) Pulp concentration pool underground base structure with anti-floating function
CN204626732U (en) A kind of precast reinforced concrete construction superposed beam antipriming
CN115492057A (en) Concrete core rock-fill dam structure body and construction method
CN204590034U (en) A kind of dam foundation high pressure grouting structure
CN210262945U (en) Cemented sand gravel buttress dam structure
CN105002860A (en) Method and structure for preventing and treating differential settlement of tail water channel foundation of power plant room
CN210636388U (en) Composite drainage structure of homogeneous earth dam
CN203373737U (en) Multi-branch pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant