CN204552172U - Assembly type is encorbelmented interim processing plant - Google Patents
Assembly type is encorbelmented interim processing plant Download PDFInfo
- Publication number
- CN204552172U CN204552172U CN201420856917.7U CN201420856917U CN204552172U CN 204552172 U CN204552172 U CN 204552172U CN 201420856917 U CN201420856917 U CN 201420856917U CN 204552172 U CN204552172 U CN 204552172U
- Authority
- CN
- China
- Prior art keywords
- shaped steel
- steel column
- processing plant
- cantilever shalving
- assembly type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a kind of assembly type to encorbelment interim processing plant, comprise pre-embedded bolt and shaped steel column in concrete foundation, shaped steel column is bolted in concrete foundation; The both sides, upper end of shaped steel column are symmetrically connected with cantilever shalving by anchor slab and bolt; Shaped steel keel are fixedly connected on the upside of cantilever shalving by anchor slab; Shaped steel keel lay color steel watt, gutter is set in middle position, shaped steel column upper end.Economic benefit of the present utility model and social benefit are: by the mode of assembling, improve the construction speed of interim processing plant, improve its number of turnover; By cantilevered structure, be conducive to the operation of workman, improve work task efficiency, embody the enforcement of site safety civilization, achieve the popularization of " green construction ", be conducive to the extensive promotion and application of enterprise in charge of construction.
Description
Technical field
The utility model relates to technical field of building construction, is specifically related to a kind of assembly type and encorbelments interim processing plant.
Background technology
At present, the interim processing plant that existing building job site uses, the following problem of ubiquity: 1, adopt steel pipe to set up, vertical pole ' s span is less temporarily, operative's inconvenience (material turnover workshop is very inconvenient); 2, safety factor is low, and unsightly; 3, the processing plant adopting steel pipe to set up, dismounting is inconvenient, can not have enough to meet the need use.
Utility model content
The purpose of this utility model is to improve interim processing plant construction speed, being convenient to operative, improving workman's operating efficiency, improving safety factor, improving job site security civilization, advocating the policy of country's " green engineering, green construction ", saving construction cost.
The technical solution of the utility model: a kind of assembly type is encorbelmented interim processing plant, and comprise pre-embedded bolt and shaped steel column in concrete foundation, wherein, at least one pair of shaped steel column is bolted in concrete foundation; Be symmetrically connected with cantilever shalving in the both sides, upper end of each shaped steel column by anchor slab and bolt, cantilever shalving outside top height is greater than inside top height; In middle position, shaped steel column upper end, gutter is set; Shaped steel keel are fixedly connected on the upside of cantilever shalving by anchor slab; Shaped steel keel lay color steel watt, and the color steel in both sides watt tilts to middle part and inclined-plane extended line is arranged in gutter.In shaped steel column upper end, shaped steel pull bar is vertically set; The top of pull bar and the outer end of cantilever shalving are carried out stretch-draw by oblique pull wire rope and are tightened, and guarantee the safety of cantilever end; Cantilever shalving top and surrounding arrange safeguard structure.The upper end of described safeguard structure is provided with protection backing plate.
Economic benefit of the present utility model and social benefit are: by the mode of assembling, improve the construction speed of interim processing plant, improve its number of turnover; By cantilevered structure, be conducive to the operation of workman, improve work task efficiency, embody the enforcement of site safety civilization, achieve the popularization of " green construction ", be conducive to the extensive promotion and application of enterprise in charge of construction.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the side structure schematic diagram of Fig. 1;
Fig. 3 is Fig. 1 Shaped Steel column schematic diagram;
Fig. 4 is cantilever construction schematic diagram in Fig. 1.
In figure, label 1 is concrete foundation, and 2 is pre-embedded bolt, and 3 is shaped steel column, and 4 is cantilever shalving, and 5 is color steel watt, and 6 is safeguard structure, and 7 is shaped steel pull bar, and 8 is oblique pull wire rope, and 9 is gutter, and 10 is anchor slab.
Detailed description of the invention
See Fig. 1-Fig. 4, by pre-embedded bolt 2 in concrete foundation 1, shaped steel column 3 is bolted in concrete foundation 1, and many group shaped steel columns 3 are spaced apart.
Shaped steel column 3 carries out bolt by anchor slab 10 with cantilever shalving 4 be connected.
Shaped steel keel carry out bolt by anchor slab 10 with cantilever shalving 4 and are connected.
Shaped steel keel are laid color steel watts 5.
Shaped steel column 3 upper end, middle position, workshop arranges color steel watt 5 gutters 9; Cantilever shalving 4 outside top height is greater than inside top height, ensures that rainwater flows into gutter 9 smoothly.
Processing plant top and surrounding arrange safeguard structure 6.The upper end of safeguard structure 6 is provided with protection backing plate.
In shaped steel column 3 upper end, shaped steel pull bar 7 is set; The top of shaped steel pull bar 7 and the outer end of cantilever shalving 4 are carried out stretch-draw by oblique pull wire rope 8 and are tightened, and guarantee the safety of cantilever end.
Claims (4)
1. assembly type is encorbelmented an interim processing plant, and comprise pre-embedded bolt in concrete foundation, shaped steel column, is characterized in that: at least one pair of shaped steel column is bolted in concrete foundation; Be symmetrically connected with cantilever shalving in the both sides, upper end of each shaped steel column by anchor slab and bolt, cantilever shalving outside top height is greater than inside top height; In middle position, shaped steel column upper end, gutter is set; Shaped steel keel are fixedly connected on the upside of cantilever shalving by anchor slab; Shaped steel keel lay color steel watt, and the color steel in both sides watt tilts to middle part and inclined-plane extended line is arranged in gutter.
2. assembly type according to claim 1 is encorbelmented interim processing plant, it is characterized in that: vertically arrange shaped steel pull bar in shaped steel column upper end; The top of shaped steel pull bar and the outer end of cantilever shalving are carried out stretch-draw by oblique pull wire rope and are tightened.
3. assembly type according to claim 1 is encorbelmented interim processing plant, it is characterized in that: cantilever shalving top and surrounding arrange safeguard structure.
4. assembly type according to claim 3 is encorbelmented interim processing plant, it is characterized in that: the upper end of described safeguard structure is provided with protection backing plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420856917.7U CN204552172U (en) | 2014-12-30 | 2014-12-30 | Assembly type is encorbelmented interim processing plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420856917.7U CN204552172U (en) | 2014-12-30 | 2014-12-30 | Assembly type is encorbelmented interim processing plant |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204552172U true CN204552172U (en) | 2015-08-12 |
Family
ID=53827301
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420856917.7U Expired - Fee Related CN204552172U (en) | 2014-12-30 | 2014-12-30 | Assembly type is encorbelmented interim processing plant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204552172U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113530191A (en) * | 2021-07-30 | 2021-10-22 | 中国电建集团河南工程有限公司 | Method for installing diagonal steel cable of long cantilever platform |
-
2014
- 2014-12-30 CN CN201420856917.7U patent/CN204552172U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113530191A (en) * | 2021-07-30 | 2021-10-22 | 中国电建集团河南工程有限公司 | Method for installing diagonal steel cable of long cantilever platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204552130U (en) | One is telescopic faces bound defence rail | |
CN202831643U (en) | Combined type concrete chute | |
CN204552172U (en) | Assembly type is encorbelmented interim processing plant | |
CN202127223U (en) | Novel composite material cable channel cover plate | |
CN206972259U (en) | A kind of movable guard rail of hydraulic pressure inverted arch trestle | |
CN204418510U (en) | Floor support plate steel bar girder structure | |
CN103552911B (en) | A kind of movable boom hoisting and the construction installation method of use thereof | |
CN202324567U (en) | Moving type large-scale operation platform | |
CN202899159U (en) | Outer hanging type construction elevator foundation | |
CN206616765U (en) | Large span is without depending on huge bandy truss pull bar | |
CN202017342U (en) | Block traction drawing die for slope concrete pouring | |
CN110056190A (en) | A kind of two-part slab thickness control sealing up screw | |
CN206418861U (en) | A kind of switch base for facing skirt shield and multiduty skirt of facing are protected | |
CN204873680U (en) | Portable portable building lifting machine device | |
CN203213022U (en) | Mobile temporary prestress tensioning anchor block | |
CN204781520U (en) | Detachable die block steel bar truss building carrier plate | |
CN204282609U (en) | A kind of separate type precast truss frame floor support plate | |
CN202440851U (en) | Structure for supporting construction elevator foundation on basement top plate | |
CN208396133U (en) | A kind of combined hollow grillage structure | |
CN203393721U (en) | Inner support main purlin component | |
CN207277864U (en) | A kind of concrete temporary support moulding bed for large-scale steel structure assembly | |
CN208235587U (en) | A kind of large-span deep foundation pit underground power house rack assembling construction platform | |
CN203346780U (en) | Arch skew block stiff skeleton | |
CN202214967U (en) | Portable column construction hanging frame | |
CN104453045A (en) | Separate prefabricated truss frame floor bearing plate and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 450000 Shangxian Street, Longzihu Wisdom Island, Zhengdong New District, Zhengzhou City, Henan Province Patentee after: Zhengzhou Yijian Group Co.,Ltd. Address before: 450000, No. 91, Bauhinia Road, Zhengzhou City, Henan Province Patentee before: ZHENGZHOU NO.1 CONSTRUCTION ENGINEERING GROUP Co.,Ltd. |
|
CP03 | Change of name, title or address | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150812 Termination date: 20201230 |
|
CF01 | Termination of patent right due to non-payment of annual fee |