CN207277864U - A kind of concrete temporary support moulding bed for large-scale steel structure assembly - Google Patents
A kind of concrete temporary support moulding bed for large-scale steel structure assembly Download PDFInfo
- Publication number
- CN207277864U CN207277864U CN201721318584.2U CN201721318584U CN207277864U CN 207277864 U CN207277864 U CN 207277864U CN 201721318584 U CN201721318584 U CN 201721318584U CN 207277864 U CN207277864 U CN 207277864U
- Authority
- CN
- China
- Prior art keywords
- concrete
- basement
- temporary support
- spacer bar
- moulding bed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 26
- 239000010959 steel Substances 0.000 title claims abstract description 26
- 238000000465 moulding Methods 0.000 title claims abstract description 14
- 125000006850 spacer group Chemical group 0.000 claims abstract description 19
- 238000010276 construction Methods 0.000 abstract description 9
- 241001310793 Podium Species 0.000 abstract description 8
- 210000003205 muscle Anatomy 0.000 abstract description 6
- 238000003466 welding Methods 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000000969 carrier Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
A kind of concrete temporary support moulding bed for large-scale steel structure assembly, top plate (1) including basement, the lower face of top plate (1) pours the frame column (2) of basement, vertical spacer bar (3) is inserted with frame column (2), expose above top plate (1) and pour and the opposite concrete stub (4) of frame column (2) in the upper end of spacer bar (3), steel plate (5) is mounted with the top of concrete stub (4), steel plate (5) is weldingly fixed on the top of spacer bar (3).It carries out extension as the stress bearing in the concrete temporary support moulding bed of steel structure assembling platform using basement original structure column; both vertical applied force muscle of the vertical applied force muscle of basement structure column as top podium structural column had been protected; meet rational force way again; degree of safety is improved, facilitates construction.
Description
Technical field:
The technical field of building is the utility model is related to, is mixed more specifically to a kind of assembled for large-scale steel structure
Solidifying soil temporary support moulding bed.
Background technology:
The building of market, parking lot, popular resorts etc. is generally equipped with podium at present, its podium refers in skyscraper
Outside main body drop shadow spread, the building height being connected with skyscraper is no more than 24 meters of auxiliary building, is mainly used for business and public affairs
Service altogether.And the construction platform for using large-scale steel structure assembly is generally required in the process of construction of podium;It constructs flat
Platform generally sets corresponding support jig to be supported, and traditional support jig is generally the support carriers of welded steel, and
Construction platform is generally site welding assembly, and traditional support jig is more heavy in itself, although the support to construction platform
Intensity is big, but carries more inconvenience, using more inconvenient during the welding assembly of construction platform.
Utility model content:
The purpose of the utility model is to solve the deficiencies of the prior art, and provides a kind of assembled for large-scale steel structure
Concrete temporary support moulding bed, it can protect the vertical applied force muscle of basement structure column as top podium structural column it is vertical by
Power muscle, and meet rational force way, degree of safety is improved, facilitates construction.
The technology solution of the utility model is as follows:
A kind of concrete temporary support moulding bed for large-scale steel structure assembly, includes the top plate of basement, under top plate
End face pours the frame column of basement, and vertical spacer bar is inserted with frame column, and top plate is exposed in the upper end of spacer bar
Upper surface and pour the concrete stub opposite with frame column, be mounted with steel plate at the top of concrete stub, steel plate welding
It is fixed on the top of spacer bar.
Preferably, the cross section of the frame column is identical with the shape of cross section of concrete stub, the support in frame column
Reinforcing bar is equipped with more.
Preferably, the height of the concrete stub is 1.2~1.6m.
The beneficial effects of the utility model are:
1st, it carries out extending the concrete temporary support tire as steel structure assembling platform using basement original structure column
Stress bearing in frame, had both protected vertical applied force muscle of the vertical applied force muscle of basement structure column as top podium structural column,
Meet rational force way again, improve degree of safety, facilitate construction.
2nd, the support jig that it is used is highly moderate, easy to the welding during work assembly and spraying operation.
Brief description of the drawings:
Fig. 1 is the structure diagram of the utility model;
In figure:1st, top plate;2nd, frame column;3rd, spacer bar;4th, concrete stub;5th, steel plate;6th, platform for lining.
Embodiment:
Embodiment:As shown in Figure 1, a kind of concrete temporary support moulding bed for large-scale steel structure assembly, including underground
The top plate 1 of room, the lower face of top plate 1 pour the frame column 2 of basement, vertical spacer bar 3 are inserted with frame column 2,
Expose the upper surface of top plate 1 and pour the concrete stub 4 opposite with frame column 2, concrete stub in the upper end of spacer bar 3
4 top is mounted with steel plate 5, and steel plate 5 is weldingly fixed on the top of spacer bar 3.
Preferably, the cross section of the frame column 2 is identical with the shape of cross section of concrete stub 4, the branch in frame column 2
Support reinforcing bar 3 and be equipped with more.
Preferably, the height of the concrete stub 4 is 1.2~1.6m.
Operation principle:The utility model is the concrete temporary support moulding bed for large-scale steel structure assembly, it uses existing
The concrete stub 4 that field pours replaces the support jig of traditional steel construction, and extension work is carried out using basement original structure column
For the stress bearing in the concrete temporary support moulding bed of steel structure assembling platform, the spacer bar of basement structure column had both been protected
3 spacer bar 3 as top podium structural column, and weld platform for lining 6 after the completion of assembly, by cutting off spacer bar
3 upper end, the lifting installation of platform for lining 6, then the concrete removal of concrete stub 4, retains the branch in its concrete stub 4
Reinforcing bar 3 is supportted, and the pouring using low-grade concrete C20 of concrete stub 4, low-grade concrete are easy to later stage dismounting;
It is subject to the guarantor of concrete stub 4 when its spacer bar 3 is located at 1 upper strata of top plate when as temporary support moulding bed at the same time
Protect, the spacer bar 3 on its 1 upper strata of top plate is used as the main reinforcement of top podium structural column after dismantling concrete stub 4.
The embodiment rather than limits the present invention the utility model is illustrated.Any this area
Technical staff can modify the embodiment under the spirit and scope without prejudice to the utility model, therefore this practicality
New rights protection scope, should be as listed by the claim of the utility model.
Claims (3)
1. a kind of concrete temporary support moulding bed for large-scale steel structure assembly, includes the top plate (1) of basement, top plate (1)
Lower face pour the frame column (2) of basement, is inserted with vertical spacer bar (3) in frame column (2), its feature exists
In:Expose the upper surface of top plate (1) and pour and the opposite concrete stub of frame column (2) in the upper end of spacer bar (3)
(4), steel plate (5) is mounted with the top of concrete stub (4), steel plate (5) is weldingly fixed on the top of spacer bar (3).
2. a kind of concrete temporary support moulding bed for large-scale steel structure assembly according to claim 1, its feature exist
In:The cross section of the frame column (2) is identical with the shape of cross section of concrete stub (4), the spacer bar in frame column (2)
(3) more are equipped with.
3. a kind of concrete temporary support moulding bed for large-scale steel structure assembly according to claim 1, its feature exist
In:The height of the concrete stub (4) is 1.2~1.6m.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721318584.2U CN207277864U (en) | 2017-10-13 | 2017-10-13 | A kind of concrete temporary support moulding bed for large-scale steel structure assembly |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721318584.2U CN207277864U (en) | 2017-10-13 | 2017-10-13 | A kind of concrete temporary support moulding bed for large-scale steel structure assembly |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207277864U true CN207277864U (en) | 2018-04-27 |
Family
ID=61980074
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721318584.2U Expired - Fee Related CN207277864U (en) | 2017-10-13 | 2017-10-13 | A kind of concrete temporary support moulding bed for large-scale steel structure assembly |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207277864U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115929079A (en) * | 2022-10-25 | 2023-04-07 | 中铁广州工程局集团有限公司 | Ultrahigh temporary support column connecting structure and mounting and dismounting process |
-
2017
- 2017-10-13 CN CN201721318584.2U patent/CN207277864U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115929079A (en) * | 2022-10-25 | 2023-04-07 | 中铁广州工程局集团有限公司 | Ultrahigh temporary support column connecting structure and mounting and dismounting process |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205839767U (en) | A kind of deep foundation pit steel tube/concrete is combined inner supporting structure | |
| CN204898706U (en) | Steel pipe pile foundation communication tower structure | |
| CN204983171U (en) | Prefabricated post connecting device | |
| CN201310072Y (en) | Supporting bracket of bridge construction | |
| CN103552911B (en) | A kind of movable boom hoisting and the construction installation method of use thereof | |
| CN105298205B (en) | A kind of power network electric pole reinforces heightening device and its construction method | |
| CN105350816B (en) | Reinforcement and heightening device for power grid poles | |
| CN203361170U (en) | Supporting upright column pile for building foundation pit support | |
| CN209585099U (en) | A kind of substation truss assembled pile foundation using flanged joint | |
| CN218437113U (en) | Groove that can dismantle fast supports installation component | |
| CN207109843U (en) | A kind of goaf transmission line foundation bracing means | |
| CN203373769U (en) | Draught fan foundation ring supporting structure arranged on soft soil foundation | |
| CN217537791U (en) | Pin-connected panel walking operation platform truck | |
| CN219772998U (en) | Friendly road slope photovoltaic support structure for integrated development of transportation and energy | |
| CN101864835B (en) | Early-dismantling support of aluminum alloy top plate | |
| CN201588413U (en) | Reinforcing structure for concrete bracket in original workshop | |
| CN204679074U (en) | Novel surface observation pier structure | |
| CN207314348U (en) | A kind of fixed structure of flare template | |
| CN201671105U (en) | Framed tower foundation embedded part | |
| CN201459752U (en) | Pole prefabricated foundation | |
| CN202227482U (en) | Connection structure for roof truss and concrete column | |
| CN201786013U (en) | Reusable anchor member for cantilever scaffold | |
| CN209468705U (en) | A kind of structure for repairing culvert using corrugated steel construction rapid reinforcement | |
| CN204983157U (en) | Connection structure of reinforced concrete column and bracket | |
| CN205894075U (en) | A pull -out ware for steel pipe retaining pile retrieves |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180427 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |