CN204510842U - A kind of steel crane beam installed height mark adjusting device - Google Patents

A kind of steel crane beam installed height mark adjusting device Download PDF

Info

Publication number
CN204510842U
CN204510842U CN201520126855.9U CN201520126855U CN204510842U CN 204510842 U CN204510842 U CN 204510842U CN 201520126855 U CN201520126855 U CN 201520126855U CN 204510842 U CN204510842 U CN 204510842U
Authority
CN
China
Prior art keywords
steel
crane beam
clamps
adjusting device
steel crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520126855.9U
Other languages
Chinese (zh)
Inventor
马富巧
王兴林
刘晓蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry Huaxing Construction Co Ltd
Original Assignee
China Nuclear Industry Huaxing Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry Huaxing Construction Co Ltd filed Critical China Nuclear Industry Huaxing Construction Co Ltd
Priority to CN201520126855.9U priority Critical patent/CN204510842U/en
Application granted granted Critical
Publication of CN204510842U publication Critical patent/CN204510842U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a kind of steel crane beam installed height mark adjusting device, comprises two jack, also comprises two clamps and supports channel-section steel; On described two clamps, inner side offers grafting gap in the same position at top, and all offers rectangular through-hole in the same position near bottom; Described support channel-section steel two ends are fixed by securing member through after rectangular through-hole, and described jack is arranged on the support channel-section steel between described two clamps.The utility model changes the mode promoting auxiliary adjustment absolute altitude when steel crane beam is installed by crane gear lifting, and this utility model is practical, can meet the similar Steel Structure Installation engineering higher to absolute altitude required precision.Save construction cost, structure is simple and easy to operate, reduces the job safety risk that hoisting and hanging brings, and effectively can play the effect regulating steel crane beam installed height mark, improves job safety coefficient.

Description

A kind of steel crane beam installed height mark adjusting device
Technical field
The utility model relates to a kind of steel crane beam installed height mark adjusting device, belongs to Installation Technique of Steel Structure field.
Background technology
According to steel crane beam installed height mark control method in the past, what usually adopt is that crowbar single-point plays the regulative mode such as sled (crane girder for lighter in weight), auxiliary lifting lifting (crane girder for heavier-weight) of crane gear.According to the applicant understood, there is following problem in crane girder installed height mark control method in the past:
1, adopt crane gear to promote adjusting elevation, the activity duration is long, easily causes the wasting of resources, and needs configuration lifting special operation workers in steel crane beam lifting process, more on manpower drop into.
2, control method safety factor is lower in the past, crowbar easily occurs and slides and play the security risks such as grievous hurt.
3, the method for adjustment that single-point plays sled, crane gear assists lifting to promote, regulate accurate not to the absolute altitude of steel crane beam, be difficult to meet the higher engineering of steel crane beam absolute altitude requirement, and easily cause the longitudinal axis of steel crane beam to offset when adjusting, increase secondary adjustment workload.
Utility model content
Technical problem to be solved in the utility model is, overcomes the shortcoming of prior art, provides the special adjusting device that a kind of cost is low, applicability is strong, assembly operation is simple, safety is high.
In order to solve above technical problem, the utility model provides a kind of steel crane beam installed height mark adjusting device, comprises two jack, also comprises two clamps and supports channel-section steel; On described two clamps, inner side offers grafting gap in the same position at top, and all offers rectangular through-hole in the same position near bottom; Described support channel-section steel two ends are fixed by securing member through after rectangular through-hole, and described jack is arranged on the support channel-section steel between described two clamps.
The technical scheme that the utility model limits further is:
Further, the height that the grafting gap of described clamp is offered is slightly larger than steel crane beam bracket top flange gripper shoe thickness, described clamp is plugged in the gripper shoe of described steel crane beam bracket top flange by grafting gap, achieves effective connection of clamp and bracket top flange base plate.
Further, the distance between described two clamps is slightly larger than the width of steel crane beam bracket bottom flange gripper shoe.
Further, described clamp adopts steel plate to make.Overall structure good rigidly, manufacture craft is simple.Supporting channel-section steel connects into as a whole by two clamps, jack is laid by support channel-section steel, is realized the adjustment of crane girder end face absolute altitude by the jacking stroke of synchronous adjustment jack.
Further, also stiffener is installed with in the below of steel crane beam bracket top flange gripper shoe.
The beneficial effects of the utility model are: the utility model changes the mode promoting auxiliary adjustment absolute altitude when steel crane beam is installed by crane gear lifting, and this utility model is practical, can meet the similar Steel Structure Installation engineering higher to absolute altitude required precision.Save construction cost, structure is simple and easy to operate, reduces the job safety risk that hoisting and hanging brings, and effectively can play the effect regulating steel crane beam installed height mark, improves job safety coefficient.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is structure installment elevation of the present utility model;
Fig. 3 is the lateral view of structure shown in Fig. 2.
Detailed description of the invention
embodiment 1
A kind of steel crane beam installed height mark adjusting device that the present embodiment provides, as shown in Figures 1 to 3: comprise two jack 1, also comprises two clamps 2 and supports channel-section steel 3; On two clamps 2, inner side offers grafting gap 4 in the same position at top, and all offers rectangular through-hole 5 in the same position near bottom; Support channel-section steel 3 two ends to be fixed by latch 8 through after rectangular through-hole 5, jack 1 is arranged on the support channel-section steel 3 between two clamps 2.The height that the grafting gap 4 of clamp 2 is offered is slightly larger than steel crane beam bracket top flange gripper shoe thickness, and clamp 2 is plugged in steel crane beam bracket top flange gripper shoe 6 by grafting gap 4.Distance between two clamps 2 is slightly larger than the width of steel crane beam bracket bottom flange gripper shoe 10.
Stiffener 9 is also installed with below steel crane beam bracket top flange gripper shoe 6.
The size of clamp and fluting size are according to the weight of required crane girder, the operating space of jack and determining.Support selecting according to the weight of required crane girder and determining of channel-section steel and jack.When carrying out absolute altitude and regulating, realized by the jacking stroke adjusting jack.
Install and use in process, be first arranged on respectively by two pieces steel clamp 2 on the bracket top flange base plate 6 that need adjust below crane girder 7, two clamp 2 spacing are slightly larger than the width of steel crane beam bottom wing listrium; Afterwards support channel-section steel 3 is arranged on two clamps 2, composition center rest structure.Jack 1 is positioned over and supports on channel-section steel, realized the adjustment of steel crane beam installed height mark by the jacking stroke of synchronous adjustment jack 1.
In addition to the implementation, the utility model can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of the utility model requirement.

Claims (5)

1. a steel crane beam installed height mark adjusting device, comprises two jack, it is characterized in that: also comprise two clamps and support channel-section steel; On described two clamps, inner side offers grafting gap in the same position at top, and all offers rectangular through-hole in the same position near bottom; Described support channel-section steel two ends are fixed by securing member through after rectangular through-hole, and described jack is arranged on the support channel-section steel between described two clamps.
2. steel crane beam installed height mark adjusting device according to claim 1, it is characterized in that: the height that the grafting gap of described clamp is offered is slightly larger than steel crane beam bracket top flange gripper shoe thickness, and described clamp is plugged in the gripper shoe of described steel crane beam bracket top flange by grafting gap.
3. steel crane beam installed height mark adjusting device according to claim 1, is characterized in that: the distance between described two clamps is slightly larger than the width of steel crane beam bracket bottom flange gripper shoe.
4. steel crane beam installed height mark adjusting device according to claim 1, is characterized in that: described clamp adopts steel plate to make.
5. steel crane beam installed height mark adjusting device according to claim 1, is characterized in that: be also installed with stiffener in the below of steel crane beam bracket top flange gripper shoe.
CN201520126855.9U 2015-03-04 2015-03-04 A kind of steel crane beam installed height mark adjusting device Active CN204510842U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520126855.9U CN204510842U (en) 2015-03-04 2015-03-04 A kind of steel crane beam installed height mark adjusting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520126855.9U CN204510842U (en) 2015-03-04 2015-03-04 A kind of steel crane beam installed height mark adjusting device

Publications (1)

Publication Number Publication Date
CN204510842U true CN204510842U (en) 2015-07-29

Family

ID=53708834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520126855.9U Active CN204510842U (en) 2015-03-04 2015-03-04 A kind of steel crane beam installed height mark adjusting device

Country Status (1)

Country Link
CN (1) CN204510842U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779274A (en) * 2019-01-29 2019-05-21 中国五冶集团有限公司 The footstock that crane beam uses when adjusting
CN109780969A (en) * 2019-01-29 2019-05-21 中国五冶集团有限公司 Measurement method when crane beam adjusts
CN111894136A (en) * 2020-08-10 2020-11-06 中冶建工集团有限公司 Construction method of large-span steel reinforced concrete beam
WO2021254528A1 (en) * 2020-07-14 2021-12-23 中铁上海工程局集团有限公司 Steel track beam installation mould

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779274A (en) * 2019-01-29 2019-05-21 中国五冶集团有限公司 The footstock that crane beam uses when adjusting
CN109780969A (en) * 2019-01-29 2019-05-21 中国五冶集团有限公司 Measurement method when crane beam adjusts
WO2021254528A1 (en) * 2020-07-14 2021-12-23 中铁上海工程局集团有限公司 Steel track beam installation mould
CN111894136A (en) * 2020-08-10 2020-11-06 中冶建工集团有限公司 Construction method of large-span steel reinforced concrete beam

Similar Documents

Publication Publication Date Title
CN204510842U (en) A kind of steel crane beam installed height mark adjusting device
CN204370833U (en) Elements of Space Grid Truss supporting apparatus
CN204199683U (en) Hydraulic climbing formwork guide frame
CN204538469U (en) Diagonal-bracing type line lever switch support
CN202953653U (en) Telescopic guiding rail bracket of lift
CN205296966U (en) Transmission line iron tower
CN101837916A (en) Adjusting device of levelness of tractor stand on elevator
CN204760174U (en) Transformer base structure with adjustable
CN204138082U (en) For the buffer box in elevator hoistways
CN205855702U (en) A kind of Elevator weight sensor block assembly
CN203403368U (en) Bridge installing and locating support with improved structure
CN202227489U (en) Steel structure connection device
CN204532376U (en) Split type lifting construction trolley
CN204298697U (en) A kind of crane runway backing plate levelling gear
CN205296968U (en) Pylon
CN202000266U (en) Supporting structure of bridge coping template
CN204019070U (en) Derrick assembling combination steelframe
CN202811757U (en) Set bolt for aluminum mould
CN202131816U (en) Fixing device of communication tower
CN202544394U (en) Early-dismounting template system
CN205088678U (en) A mould that is used for pile bolck concrete secondary to pour
CN204000642U (en) The concrete prefabricated board mounting assembly of a kind of bridge construction
CN204096083U (en) A kind of alighting gear on 20kg remotely pilotless pesticide applicator
CN205474605U (en) Track board that adapts to different gauges
CN203247858U (en) Corrector for heavy steel column perpendicularity

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant