CN202131816U - Fixing device of communication tower - Google Patents

Fixing device of communication tower Download PDF

Info

Publication number
CN202131816U
CN202131816U CN201120222534U CN201120222534U CN202131816U CN 202131816 U CN202131816 U CN 202131816U CN 201120222534 U CN201120222534 U CN 201120222534U CN 201120222534 U CN201120222534 U CN 201120222534U CN 202131816 U CN202131816 U CN 202131816U
Authority
CN
China
Prior art keywords
flange
nut
communication tower
hold
leveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201120222534U
Other languages
Chinese (zh)
Inventor
范洪章
范晓光
刘再忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI PROVINCE JINGXIAN COUNTY HONGYUAN TELE-COMMUNICATION Co Ltd
Original Assignee
HEBEI PROVINCE JINGXIAN COUNTY HONGYUAN TELE-COMMUNICATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI PROVINCE JINGXIAN COUNTY HONGYUAN TELE-COMMUNICATION Co Ltd filed Critical HEBEI PROVINCE JINGXIAN COUNTY HONGYUAN TELE-COMMUNICATION Co Ltd
Priority to CN201120222534U priority Critical patent/CN202131816U/en
Application granted granted Critical
Publication of CN202131816U publication Critical patent/CN202131816U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model discloses a fixing device of a communication tower, which comprises a first flange arranged at the lower portion of the communication tower, a second flange matched with the first flange and located below the first flange, bolts and nuts, wherein the bolts and the nuts are evenly distributed. The fixing device of the communication tower is characterized in that the nuts comprise a first fixing nut, a second fixing nut and a leveling nut. The first fixing nut is arranged on the upper face of the first flange, the second fixing nut is fixed on the upper face of the second flange, and the leveling nut is arranged on the lower face of the first flange and located above the second fixing nut. A gap is reserved between the second fixing nut and the leveling nut. The fixing device of the communication tower can conveniently adjust the verticality during installation of the communication tower by adjusting the leveling nut, thereby improving construction efficiency.

Description

The communication tower fastening devices
Technical field
The utility model relates to a kind of communication tower fastening devices.
Background technology
Communication tower in the base station generally is fixed on the steel work basis of below through flange, and present communication tower often occurs it when mounted and the basic verticality of steel work is regulated inconvenient problem, has influenced efficiency of construction.
The utility model content
The technical problem that the utility model will solve provides a kind of communication tower fastening devices easy for installation.
For solving the problems of the technologies described above; The technical scheme that the utility model is taked is: a kind of communication tower fastening devices; It comprises first flange of being located at the communication tower bottom, with second flange that is positioned at its below of the supporting setting of first flange and bolt, nut; Its key technology is: said nut comprises first hold-down nut, second hold-down nut and leveling nut, said first hold-down nut be located at first flange above, said second hold-down nut be fixed in second flange above; Said leveling nut is located at the following of first flange and is positioned at the top of second hold-down nut, leaves the gap between said second hold-down nut and the leveling nut.
Adopt the beneficial effect that technique scheme produced to be: the utility model can be adjusted the levelness of first flange easily through regulating the leveling nut, thus the adjustment of verticality when having made things convenient for communication tower to install, and easy construction has improved efficiency of construction greatly.
Description of drawings
Fig. 1 is the sketch map of the utility model;
Wherein, 1, communication tower; 2, reinforcing rib; 3, bolt; 4, first hold-down nut; 5, first flange; 6, leveling nut; 7, second hold-down nut; 8, second flange.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is done further detailed explanation.
Referring to accompanying drawing 1; The utility model comprises first flange 5 of being located at communication tower 1 bottom, with second flange 8 that is positioned at its below of first flange, 5 supporting settings and be distributed in bolt 3, the nut on the flange; Said nut comprises first hold-down nut 4, second hold-down nut 7 and leveling nut 6; Said first hold-down nut 4 be located at first flange 5 above; Said second hold-down nut 7 be fixed in second flange 8 above, said leveling nut 6 is located at the following of first flange 5 and is positioned at the top of second hold-down nut 7, the number of leveling nut 6 is selected as required; Leave the gap between said second hold-down nut 7 and the leveling nut 6, this gap is to regulate when adjusting the verticality of communication tower 1.
During installation, through the verticality that communication tower 1 is regulated in the position of regulating each leveling nut 6, install adjustment is convenient.During use, second flange 8 is fixedly installed on the good steel work basis of construction, is fixedly connected with first flange 5 of communication tower 1 bottom then.

Claims (1)

1. communication tower fastening devices; It comprises first flange (5) of being located at communication tower (1) bottom, with second flange (8) that is positioned at its below of the supporting setting of first flange (5) and bolt (3), nut; It is characterized in that: said nut comprises first hold-down nut (4), second hold-down nut (7) and leveling nut (6); Said first hold-down nut (4) be located at first flange (5) above; Said second hold-down nut (7) be fixed in second flange (8) above; Said leveling nut (6) is located at the following of first flange (5) and is positioned at the top of second hold-down nut (7), leaves the gap between said second hold-down nut (7) and the leveling nut (6).
CN201120222534U 2011-06-28 2011-06-28 Fixing device of communication tower Expired - Lifetime CN202131816U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120222534U CN202131816U (en) 2011-06-28 2011-06-28 Fixing device of communication tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120222534U CN202131816U (en) 2011-06-28 2011-06-28 Fixing device of communication tower

Publications (1)

Publication Number Publication Date
CN202131816U true CN202131816U (en) 2012-02-01

Family

ID=45520589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120222534U Expired - Lifetime CN202131816U (en) 2011-06-28 2011-06-28 Fixing device of communication tower

Country Status (1)

Country Link
CN (1) CN202131816U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102962895A (en) * 2012-11-16 2013-03-13 中联重科股份有限公司 Concrete mixing plant, support leg mounting structure and processing and assembling method thereof
CN108612383A (en) * 2018-05-14 2018-10-02 广州供电局有限公司 Pre- inclined adjustable type electric power pylon

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102962895A (en) * 2012-11-16 2013-03-13 中联重科股份有限公司 Concrete mixing plant, support leg mounting structure and processing and assembling method thereof
CN102962895B (en) * 2012-11-16 2015-09-09 中联重科股份有限公司 Processing and assembling method of support leg mounting structure of concrete mixing plant
CN108612383A (en) * 2018-05-14 2018-10-02 广州供电局有限公司 Pre- inclined adjustable type electric power pylon
CN108612383B (en) * 2018-05-14 2020-05-12 广州供电局有限公司 Pre-deviation adjustment type power transmission iron tower

Similar Documents

Publication Publication Date Title
CN203320700U (en) Steel structure column foot connecting structure
CN202646935U (en) Universal rotating cable support
CN203795877U (en) Mounting height adjusting device for cup-mouth-shaped foundation steel column
CN102535509A (en) Construction method of high-flatness equipment foundation and adjusting structure thereof
CN202131816U (en) Fixing device of communication tower
CN202045503U (en) Adjusting and supporting mechanism for foot margins of lathe
CN204250308U (en) A kind of jacking apparatus of hatch cover
CN204510842U (en) A kind of steel crane beam installed height mark adjusting device
CN203872113U (en) Photovoltaic bracket fixing structure
CN204729850U (en) Two-layer lift-sliding class column leveling support
CN101837916A (en) Adjusting device of levelness of tractor stand on elevator
CN202247939U (en) Sizing block-free equipment installation mechanism
CN202220316U (en) Horizontal and vertical correction device for running steel rails
CN203632603U (en) Solar panel supporting bracket
CN201455643U (en) Leveling device for installation of equipment
CN203359725U (en) Adjustable elevator buffer pier
CN204298697U (en) A kind of crane runway backing plate levelling gear
CN201915507U (en) Adjustable setting mould
CN203071426U (en) Power distribution cabinet convenient for rapid leveling
CN204383204U (en) A kind of section insulator adjustment instrument
CN204538895U (en) A kind of combination mounting structure of Pump and Electromotor
CN205622574U (en) Solar panel installing support frame
CN201158786Y (en) Ground rail installation apparatus
CN202029322U (en) Injection machine installation level adjusting device
CN202625627U (en) Level regulating device for rail of bridge crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120201

CX01 Expiry of patent term