CN204509920U - Crossing fast passing bridge construction - Google Patents

Crossing fast passing bridge construction Download PDF

Info

Publication number
CN204509920U
CN204509920U CN201520029034.3U CN201520029034U CN204509920U CN 204509920 U CN204509920 U CN 204509920U CN 201520029034 U CN201520029034 U CN 201520029034U CN 204509920 U CN204509920 U CN 204509920U
Authority
CN
China
Prior art keywords
bridge
traffic
open
horizontal
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520029034.3U
Other languages
Chinese (zh)
Inventor
陈红印
王殿荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Shun'an Zhongda Transportation Technology Services Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520029034.3U priority Critical patent/CN204509920U/en
Application granted granted Critical
Publication of CN204509920U publication Critical patent/CN204509920U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses crossing fast passing bridge construction, relate to field of urban traffic, be specifically related to a kind of passing bridge structure of Quick dredging traffic.Comprise be open to traffic bridge and pedway, the bridge that is open to traffic is made up of with the vertical bridge that is open to traffic the horizontal bridge that is open to traffic, and the horizontal bridge that is open to traffic becomes criss-cross construction with the vertical bridge that is open to traffic, and the horizontal bridge location that is open to traffic is above the vertical bridge that is open to traffic; The horizontal bridge that is open to traffic is made up of Bridge Foundation inclined-plane, two, left and right and bridge arcuate surface; Be connected by connection basis at the bottom of bridge bottom two Bridge Foundation inclined-planes, the below of bridge arcuate surface is provided with central spacer leg; Central authorities spacer leg top is connected with the bottom surface of bridge arcuate surface, central spacer leg bottom be connected basis at the bottom of bridge and be connected; Pedway is H type structure, four crossings place that horizontal be open to traffic bridge and the vertical bridge that is open to traffic that four feets of pedway are separately positioned on right-angled intersection are divided into.Solve the problem to peak time traffic jam existed in prior art; Also solve the unsafe problem of pedestrians travel's road.

Description

Crossing fast passing bridge construction
Technical field
The utility model relates to field of urban traffic, is specifically related to a kind of passing bridge structure of Quick dredging traffic.
Background technology
Current urban traffic situation is that the many people of car are many, and especially crossing congestion can't bear, in peak period, slowly current.And overpass bridge is the critical facility that transport solution blocks up in the market, but the overpass bridge construction period is long, occupation of land is many, costly, and be applicable to the open location of urban fringe and build, and the city central authorities of an inch of land is an inch of gold not broad at road almost cannot build;
The facility of the help pedestrians travel road that market has is pedestrian overcrossing and underground passage.Pedestrian overcrossing, because span is longer, is security consideration, design mostly complicated huge, and expend fund huge, quantity is also very limited, and pedestrians travel's road will be walked a long way and be turned back very inconvenient.Usually traffic accident is caused to take place frequently because pedestrian jaywalks arbitrarily and vehicle loiters.Underground passage is because relate to civil works, and engineering quantity is large, investment is many, and storage is also very few, and condition is also helpless to transport solution and blocks up.
Utility model content
The utility model provides crossing fast passing bridge construction, solves the problem to peak time traffic jam existed in prior art; Also solve the unsafe problem of pedestrians travel's road.
For solving the problem, the utility model adopts following technical scheme: crossing fast passing bridge construction, comprises be open to traffic bridge and pedway 7, and the bridge that is open to traffic is made up of with the vertical bridge 2 that is open to traffic the horizontal bridge 1 that is open to traffic, horizontal bridge 1 and vertical 2 one-tenth, the bridge criss-cross construction that is open to traffic of being open to traffic, the horizontal bridge 1 that is open to traffic is positioned at above the vertical bridge 2 that is open to traffic; The horizontal bridge 1 that is open to traffic is made up of Bridge Foundation inclined-plane 3, two, left and right and bridge arcuate surface 4; Be connected by connecting basis 6 at the bottom of bridge bottom two Bridge Foundation inclined-planes 3, the below of bridge arcuate surface 4 is provided with central spacer leg 5; Central authorities spacer leg 5 top is connected with the bottom surface of bridge arcuate surface 4, central spacer leg 5 bottom be connected basic 6 at the bottom of bridge and be connected; Pedway 7 is H type structure, four crossings place that horizontal be open to traffic bridge 1 and the vertical bridge 2 that is open to traffic that four feets of pedway 7 are separately positioned on right-angled intersection are divided into.
Advantage of the present utility model: the utility model can make vehicle and pedestrian wait for green light, all vehicles are current all continuously smoothly, both save time, fuel saving, also save renewal and the maintenance cost of traffic signals equipment a large amount of every year; The utility model makes vehicle and pedestrian use Correct Lane, and avoids the contact that crosses, and avoids more traffic accident, has ensured a large amount of person and property safety.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation;
Fig. 2 is the horizontal bridge construction schematic diagram that is open to traffic of the present utility model.
Symbol description in figure: 1 be the horizontal bridge that is open to traffic, 2 be Bridge Foundation inclined-plane, 4 be bridge arcuate surface, 5 be central spacer leg, 6 be pedway for connecting basis, 7 at the bottom of bridge for the vertical bridge that is open to traffic, 3.
Detailed description of the invention
By best embodiment, the utility model is described in detail below.
As shown in Figure 1, crossing fast passing bridge construction, comprises be open to traffic bridge and pedway 7, and the bridge that is open to traffic is made up of with the vertical bridge 2 that is open to traffic the horizontal bridge 1 that is open to traffic, horizontal bridge 1 and vertical 2 one-tenth, the bridge criss-cross construction that is open to traffic of being open to traffic, and the horizontal bridge 1 that is open to traffic is positioned at above the vertical bridge 2 that is open to traffic; The horizontal bridge 1 that is open to traffic is made up of Bridge Foundation inclined-plane 3, two, left and right and bridge arcuate surface 4; Be connected by connecting basis 6 at the bottom of bridge bottom two Bridge Foundation inclined-planes 3, the below of bridge arcuate surface 4 is provided with central spacer leg 5; Central authorities spacer leg 5 top is connected with the bottom surface of bridge arcuate surface 4, central spacer leg 5 bottom be connected basic 6 at the bottom of bridge and be connected.
Plugged into by multiple bridge inclined-planes unit and form in Bridge Foundation inclined-plane 3.A bridge inclined-plane unit is a prefabricated right angle trigonometry body of the wide steel structure of about 1 meter, considers manufacture, transport and easy to assembly quick and design.
Bridge arcuate surface 4 is plugged into by multiple arcuate surface unit and is formed.An arcuate surface unit is a wide ogive of about 1 meter, is the pith on top, inclined-plane, connecting bridge basis, is also that vehicle is by the important carrying and the transition portion that crossfade into descending of going up a slope.
Central authorities' spacer leg 5 is the isolation piles of isolating track below arcuate surface, is also the support column lifting arcuate surface, is cone triangle body prefabricated component.Its Main Function most of weight transmitting of arcuate surface is connected at the bottom of bridge effect that is above basic and segmentation track.
Connect basis 6 at the bottom of bridge to form by connecting base unit at the bottom of multiple bridge, connecting base unit at the bottom of each bridge is exactly one piece of elongated steel sheet connected of can plugging into, the important component part ensureing that Bridge Foundation surface width is stable, be also support arcuate surface central authorities spacer leg basis and prevent the excessive pedestal being absorbed in road surface of the stressed pressure of central spacer leg.
Pedway 7 is H type structure, four crossings place that horizontal be open to traffic bridge 1 and the vertical bridge 2 that is open to traffic that four feets of pedway 7 are separately positioned on right-angled intersection are divided into.
Remarkable bridge 7 is made up of upper and lower bridge inclined-plane, walkway and pillar.The inclined-plane of bridge up and down of remarkable bridge is the basis supporting remarkable bridge, is also the step helping pedestrian's remarkable bridge up and down.Walkway is pedestrian's passage with safety device that a section is moved towards the other end from crossing, is the steel structure facility of being plugged into by multiple prefabricated walkway unit.
Last it is noted that obviously, above-described embodiment is only for the utility model example is clearly described, and the restriction not to embodiment.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here exhaustive without the need to also giving all embodiments.And thus the apparent change of amplifying out or variation be still among protection domain of the present utility model.

Claims (1)

1. crossing fast passing bridge construction, comprises be open to traffic bridge and pedway, it is characterized in that, the bridge that is open to traffic is made up of with the vertical bridge that is open to traffic the horizontal bridge that is open to traffic, and the horizontal bridge that is open to traffic becomes criss-cross construction with the vertical bridge that is open to traffic, and the horizontal bridge location that is open to traffic is above the vertical bridge that is open to traffic; The horizontal bridge that is open to traffic is made up of Bridge Foundation inclined-plane, two, left and right and bridge arcuate surface; Be connected by connection basis at the bottom of bridge bottom two Bridge Foundation inclined-planes, the below of bridge arcuate surface is provided with central spacer leg; Central authorities spacer leg top is connected with the bottom surface of bridge arcuate surface, central spacer leg bottom be connected basis at the bottom of bridge and be connected; Pedway is H type structure, four crossings place that horizontal be open to traffic bridge and the vertical bridge that is open to traffic that four feets of pedway are separately positioned on right-angled intersection are divided into.
CN201520029034.3U 2015-01-16 2015-01-16 Crossing fast passing bridge construction Active CN204509920U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520029034.3U CN204509920U (en) 2015-01-16 2015-01-16 Crossing fast passing bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520029034.3U CN204509920U (en) 2015-01-16 2015-01-16 Crossing fast passing bridge construction

Publications (1)

Publication Number Publication Date
CN204509920U true CN204509920U (en) 2015-07-29

Family

ID=53707914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520029034.3U Active CN204509920U (en) 2015-01-16 2015-01-16 Crossing fast passing bridge construction

Country Status (1)

Country Link
CN (1) CN204509920U (en)

Similar Documents

Publication Publication Date Title
CN2832895Y (en) Multi-deck easily-dismountable full-stereo road traffic system
CN205676768U (en) The large span space three-dimensional intersection chevron shaped overline bridge of steel construction
CN102912701B (en) Multi-functional left-turn directional interchange overpass
CN105970791A (en) Land-saving overhead type pedestrian bridge
CN204509920U (en) Crossing fast passing bridge construction
CN104093905B (en) Be convenient to the crossroad structure that built crossroad is transformed
CN201738207U (en) High through capacity crossroad full intercommunication fly-over bridge
CN204475091U (en) A kind of cross directional barrier-free overpass
CN204343747U (en) The dolly parking lot in overhead, a kind of street
CN202380788U (en) Three-dimensional parking lot below elevated bridge in city center
CN105951547A (en) City express bus barrier-free pedestrian passageway
CN203129650U (en) Underground open type rail traffic vehicle park
CN202559387U (en) Well lid with adjustable wellhole crossing height
CN205856952U (en) A kind of stretch-proof road structure
CN104652207A (en) Bi-directional six-lane crossing rapid traffic bridge
CN205557214U (en) High -efficient convenient assembled transportation junction
CN201212135Y (en) Improved pedestrian crossing line
CN206376162U (en) Quickly lead directly to viaduct
CN205839502U (en) A kind of permeable road structure
CN204151716U (en) A kind of viaduct entrance blocks railing
CN204589738U (en) A kind of empty bridge formation
CN203451961U (en) Cross road structure for shunting fast and slow vehicles at T-shaped road junction
CN202688811U (en) Multifunctional lane-changing overpass at intersections
CN204097925U (en) Novel post and beam shaped steel guardrail
CN102720105A (en) Method for building traffic light-free overpass at crossroad (T road)

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170725

Address after: 830026 the Xinjiang Uygur Autonomous Region Urumqi economic and Technological Development Zone No. 991 Hill Street Yunling Valley residential area of 2 storey office building office room 2060

Patentee after: Xinjiang Shun'an Zhongda Transportation Technology Services Limited

Address before: 834700 1, 2, 198 Garden Street, tower 11, tower, the Xinjiang Uygur Autonomous Region

Co-patentee before: Wang Dianrong

Patentee before: Chen Hongyin