CN204480302U - Wire harness intelligent testing machine networking structure - Google Patents

Wire harness intelligent testing machine networking structure Download PDF

Info

Publication number
CN204480302U
CN204480302U CN201520004120.9U CN201520004120U CN204480302U CN 204480302 U CN204480302 U CN 204480302U CN 201520004120 U CN201520004120 U CN 201520004120U CN 204480302 U CN204480302 U CN 204480302U
Authority
CN
China
Prior art keywords
wire harness
testing machine
intelligent testing
production
main frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520004120.9U
Other languages
Chinese (zh)
Inventor
吴金炳
张满新
吴军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Luzhiyao Technology Co Ltd
Original Assignee
Suzhou Luzhiyao Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Luzhiyao Technology Co Ltd filed Critical Suzhou Luzhiyao Technology Co Ltd
Priority to CN201520004120.9U priority Critical patent/CN204480302U/en
Application granted granted Critical
Publication of CN204480302U publication Critical patent/CN204480302U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses wire harness intelligent testing machine networking structure, countless wire harness intelligent testing machine can arrange main frame to network respectively by wireless or cable network and the production schedule by described wire harness intelligent testing machine networking mechanism, the described production schedule and free device link planing method, can according to the situation planning plan of arranging production of equipment, described wire harness intelligent testing machine grouping can by production task order structure to concrete wire harness intelligent testing machine with test interlock method, and the production test task of each wire harness intelligent testing machine is adjusted in time according to actual production feedback.The utility model utilizes software intelligent networking, and the reasonable arrangement production schedule is also according to actual production testing progress, and instant adjustment production test instruction, optimize and produce, cost is low, has fool proof, mistake proofing, warning and the remarkable function such as general.

Description

Wire harness intelligent testing machine networking structure
Technical field
The utility model relates to a kind of wire harness conducting instrument, is specifically related to wire harness intelligent testing machine networking structure.
Background technology
The wire harness loop checkout equipment that wire harness manufacturer uses carries out the detection of wire harness conducting, and can detect the open circuit of wire harness and wrong road by wire harness conducting instrument, we usually become wire harness loop monitor station.Manual contrast drawing uses homemade instrument, and we are called conduction device, can change a social system, taken away by doorbell switch with doorbell.One end is positive pole, and one end is negative pole, as long as or the multiple spot welding wiring whether conducting in the shield bore position of specifying, just can judge the open circuit of wire harness or wrong road at two of wire harness.This method is usually the manual inspection that trial production of new products is carried out.Existing wire harness conducting instrument versatility is low, and testing efficiency, testing cost is high, and intelligence degree is also low.
Summary of the invention
The purpose of this utility model is the above problem overcoming prior art existence, wire harness intelligent testing machine networking structure is provided, the utility model utilizes software intelligent networking, the reasonable arrangement production schedule according to actual production testing progress, instant adjustment production test instruction, optimize and produce, cost is low, has fool proof, mistake proofing, warning and the remarkable function such as general.
For realizing above-mentioned technical purpose, reach above-mentioned technique effect, the utility model is achieved through the following technical solutions:
Wire harness intelligent testing machine networking structure, comprise link planing method and wire harness intelligent testing machine of the production schedule and free device to divide into groups and test interlock method, countless wire harness intelligent testing machine can arrange main frame to network respectively by wireless or cable network and the production schedule by described wire harness intelligent testing machine networking structure, the described production schedule and free device link planing method, can according to the situation planning plan of arranging production of equipment, described wire harness intelligent testing machine grouping can by production task order structure to concrete wire harness intelligent testing machine with test interlock method, and the production test task of each wire harness intelligent testing machine is adjusted in time according to actual production feedback.
Further, described wire harness intelligent testing machine networking structure comprises: the production schedule arranges main frame (1), test and management wireless telecommunications main frame (3) and wire harness intelligent testing machine (6), the described production schedule arranges main frame (1) to be connected with test and management wireless telecommunications main frame (3) by wireless network or cable network (2), and exchange information, described test and management wireless telecommunications main frame (3) is provided with management end wireless signal sending/receiving module (4), described wire harness intelligent testing machine (6) is provided with produces line end wireless signal sending/receiving module (5), described management end wireless signal sending/receiving module (4) and product line end wireless signal sending/receiving module (5) carry out interactive communication by wireless signal (7).
Further, the described production schedule and the free device planing method that links comprises the following steps:
Step 1) arranges main frame (1) to obtain from the production schedule needs specifications and models and the output plan of production wire harness;
Step 2) production schedule arrange main frame (1) by test and management wireless telecommunications main frame (3) understand wire harness intelligent testing machine (6) state and idle condition, according to equipment and producers' situation, the reasonable distribution production schedule;
The step 3) production schedule arranges main frame (1) to be arranged wire harness specifications and models and the quantity plan of production separately respectively to each wire harness intelligent testing machine (6) by test and management wireless telecommunications main frame (3);
The wire harness specifications and models that each wire harness intelligent testing machine (6) of step 4) has needed to producers' Real-time Feedback of this working group and quantity plan;
The producers of this working group of step 5) are undertaken producing and testing by the production schedule instruction of wire harness intelligent testing machine (6);
The producers of this working group of step 6) progressively complete production test task according to plan, and wire harness intelligent testing machine (6) is in real time to test and management wireless telecommunications main frame (3) feedback prodction situation;
The producers of this working group of step 7) complete production task, and personnel and wire harness intelligent testing machine (6) enter the armed state of new wire harness production task.
Further, described wire harness intelligent testing machine grouping comprises the following steps: with test interlock method
The employee of this operation position of each wire harness intelligent testing machine (6) of step 1) carries out production test by the instruction of production test plan;
Step 2) employee of this operation position produces wire harness, complete corresponding test formality, wire harness is judged as qualified, and be placed into certified products district, the quantity completing wire harness of the wire harness intelligent testing machine (6) of this station adds 1, wire harness quantity to be done subtracts 1, defective wire harness quantity is constant, and feed back each single wire harness production result to test and management wireless telecommunications main frame (3), the quantity completing wire harness on test and management wireless telecommunications main frame (3) adds 1, wire harness quantity to be done subtracts 1, and defective wire harness quantity is constant;
The employee of this operation position of step 3) produces wire harness, complete corresponding test formality, wire harness is judged as defective, and be placed into NonConforming Parts Area or district of doing over again, the quantity completing wire harness of the wire harness intelligent testing machine (6) of this station adds 1, wire harness quantity to be done is constant, defective wire harness quantity adds 1, and feed back each single wire harness production result to test and management wireless telecommunications main frame (3), the quantity completing wire harness on test and management wireless telecommunications main frame (3) adds 1, wire harness quantity to be done is constant, and defective wire harness quantity adds 1;
Speed of production and the production qualification rate of step 4) each wire harness intelligent testing machine (6) station Manufacturing Worker are different;
Step 5) test and management wireless telecommunications main frame (3) real-time statistics and gather the real-time production test information of each wire harness intelligent testing machine (6), and real-time update gather after the quantity completing wire harness, wire harness to be done and defective wire harness quantity;
Step 6) test and management wireless telecommunications main frame (3) real-time statistics and gather speed of production and the production qualification rate of each wire harness intelligent testing machine (6), real-time optimization also redistributes the production schedule task of each wire harness intelligent testing machine (6) work position, place employee;
Step 7) each wire harness intelligent testing machine (6) work position, place employee is by dynamic production schedule task, and with the fastest speed of production, the highest yields and minimum artificial and hold facility complete whole wire harness production schedules.
Further, the described production schedule arranges main frame (1) can connect simultaneously and control the test and management wireless telecommunications main frame (3) of arbitrary number.
Further, described test and management wireless telecommunications main frame (3) can connect simultaneously and manage the wire harness intelligent testing machine (6) of 1-256 platform.
The beneficial effects of the utility model are:
The utility model utilizes software intelligent networking, and the reasonable arrangement production schedule is also according to actual production testing progress, and instant adjustment production test instruction, optimize and produce, cost is low, has fool proof, mistake proofing, warning and the remarkable function such as general.
Above-mentioned explanation is only the general introduction of technical solutions of the utility model, in order to better understand technological means of the present utility model, and can be implemented according to the content of instructions, coordinates accompanying drawing to be described in detail as follows below with preferred embodiment of the present utility model.Embodiment of the present utility model is provided in detail by following examples and accompanying drawing thereof.
Accompanying drawing explanation
Accompanying drawing described herein is used to provide further understanding of the present utility model, and form a application's part, schematic description and description of the present utility model, for explaining the utility model, is not formed improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 is the network-building method schematic diagram of a kind of embodiment of the present utility model;
Fig. 2 is the front axis side view of a kind of embodiment of the present utility model;
Fig. 3 is the back side axis side view of a kind of embodiment of the present utility model;
Number in the figure illustrates: 1, the production schedule arranges main frame, 2, wireless network or cable network, 3, test and management wireless telecommunications main frame, 4, management end wireless signal sending/receiving module, 5, line end wireless signal sending/receiving module is produced, 6, wire harness intelligent testing machine, 7, wireless signal.
Embodiment
Below with reference to the accompanying drawings and in conjunction with the embodiments, describe the utility model in detail.
With reference to shown in Fig. 1, wire harness intelligent testing machine networking structure, comprise link planing method and wire harness intelligent testing machine of the production schedule and free device to divide into groups and test interlock method, countless wire harness intelligent testing machine can arrange main frame to network respectively by wireless or cable network and the production schedule by described wire harness intelligent testing machine networking structure, the described production schedule and free device link planing method, can according to the situation planning plan of arranging production of equipment, described wire harness intelligent testing machine grouping can by production task order structure to concrete wire harness intelligent testing machine with test interlock method, and the production test task of each wire harness intelligent testing machine is adjusted in time according to actual production feedback.
Further, described wire harness intelligent testing machine networking structure comprises: the production schedule arranges main frame 1, test and management wireless telecommunications main frame 3 and wire harness intelligent testing machine 6, the described production schedule arranges main frame 1 to be connected with test and management wireless telecommunications main frame 3 by wireless network or cable network 2, and exchange information, described test and management wireless telecommunications main frame 3 is provided with management end wireless signal sending/receiving module 4, described wire harness intelligent testing machine 6 is provided with and produces line end wireless signal sending/receiving module 5, described management end wireless signal sending/receiving module 4 and product line end wireless signal sending/receiving module 5 carry out interactive communication by wireless signal 7.
Further, the described production schedule and the free device planing method that links comprises the following steps:
Step 1) arranges main frame 1 to obtain from the production schedule needs specifications and models and the output plan of production wire harness;
Step 2) production schedule arranges main frame 1 to be understood state and the idle condition of wire harness intelligent testing machine 6 by test and management wireless telecommunications main frame 3, according to equipment and producers' situation, the reasonable distribution production schedule;
The step 3) production schedule arranges main frame 1 to be arranged wire harness specifications and models and the quantity plan of production separately respectively to each wire harness intelligent testing machine 6 by test and management wireless telecommunications main frame 3;
The wire harness specifications and models that each wire harness intelligent testing machine 6 of step 4) has needed to producers' Real-time Feedback of this working group and quantity plan;
The producers of this working group of step 5 are undertaken producing and testing by the production schedule instruction of wire harness intelligent testing machine 6;
Step 6) producers of this working group progressively complete production test task according to plan, and wire harness intelligent testing machine 6 feeds back prodction situation to test and management wireless telecommunications main frame 3 in real time;
Step 7) producers of this working group complete production task, and personnel and wire harness intelligent testing machine 6 enter the armed state of new wire harness production task.
Further, described wire harness intelligent testing machine grouping comprises the following steps: with test interlock method
Step 1) employee of this operation position of each wire harness intelligent testing machine 6 carries out production test by the instruction of production test plan;
Step 2) employee of this operation position produces wire harness, complete corresponding test formality, wire harness is judged as qualified, and be placed into certified products district, the quantity completing wire harness of the wire harness intelligent testing machine 6 of this station adds 1, wire harness quantity to be done subtracts 1, defective wire harness quantity is constant, and feed back each single wire harness production result to test and management wireless telecommunications main frame 3, the quantity completing wire harness on test and management wireless telecommunications main frame 3 adds 1, wire harness quantity to be done subtracts 1, and defective wire harness quantity is constant;
Step 3) employee of this operation position produces wire harness, complete corresponding test formality, wire harness is judged as defective, and be placed into NonConforming Parts Area or district of doing over again, the quantity completing wire harness of the wire harness intelligent testing machine 6 of this station adds 1, wire harness quantity to be done is constant, defective wire harness quantity adds 1, and feed back each single wire harness production result to test and management wireless telecommunications main frame 3, the quantity completing wire harness on test and management wireless telecommunications main frame 3 adds 1, wire harness quantity to be done is constant, and defective wire harness quantity adds 1;
Step 4) speed of production of each wire harness intelligent testing machine 6 station Manufacturing Worker and production qualification rate different;
Step 5) test and management wireless telecommunications main frame 3 real-time statistics and gather the real-time production test information of each wire harness intelligent testing machine 6, and real-time update gather after the quantity completing wire harness, wire harness to be done and defective wire harness quantity;
Step 6) test and management wireless telecommunications main frame 3 real-time statistics and gather speed of production and the production qualification rate of each wire harness intelligent testing machine 6, real-time optimization also redistributes the production schedule task of each wire harness intelligent testing machine 6 place work position employee;
Step 7) each wire harness intelligent testing machine 6 place work position employee is by dynamic production schedule task, and with the fastest speed of production, the highest yields and minimum artificial and hold facility complete whole wire harness production schedules.
Further, the described production schedule arranges main frame 1 can connect simultaneously and control the test and management wireless telecommunications main frame 3 of arbitrary number.
Further, described test and management wireless telecommunications main frame 3 can connect simultaneously and manage the wire harness intelligent testing machine 6 of 1-256 platform.
The foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, for a person skilled in the art, the utility model can have various modifications and variations.All within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (3)

1. wire harness intelligent testing machine networking structure, it is characterized in that: described wire harness intelligent testing machine networking structure comprises: the production schedule arranges main frame (1), test and management wireless telecommunications main frame (3) and wire harness intelligent testing machine (6), the described production schedule arranges main frame (1) to be connected with test and management wireless telecommunications main frame (3) by wireless network or cable network (2), and exchange information, described test and management wireless telecommunications main frame (3) is provided with management end wireless signal sending/receiving module (4), described wire harness intelligent testing machine (6) is provided with produces line end wireless signal sending/receiving module (5), described management end wireless signal sending/receiving module (4) and product line end wireless signal sending/receiving module (5) carry out interactive communication by wireless signal (7).
2. wire harness intelligent testing machine networking structure according to claim 1, is characterized in that: the described production schedule arranges main frame (1) can connect simultaneously and control the test and management wireless telecommunications main frame (3) of arbitrary number.
3. wire harness intelligent testing machine networking structure according to claim 2, is characterized in that: described test and management wireless telecommunications main frame (3) can connect simultaneously and manage the wire harness intelligent testing machine (6) of 1-256 platform.
CN201520004120.9U 2015-01-05 2015-01-05 Wire harness intelligent testing machine networking structure Expired - Fee Related CN204480302U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520004120.9U CN204480302U (en) 2015-01-05 2015-01-05 Wire harness intelligent testing machine networking structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520004120.9U CN204480302U (en) 2015-01-05 2015-01-05 Wire harness intelligent testing machine networking structure

Publications (1)

Publication Number Publication Date
CN204480302U true CN204480302U (en) 2015-07-15

Family

ID=53636080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520004120.9U Expired - Fee Related CN204480302U (en) 2015-01-05 2015-01-05 Wire harness intelligent testing machine networking structure

Country Status (1)

Country Link
CN (1) CN204480302U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110850337A (en) * 2019-10-24 2020-02-28 广州市槿泓电子有限公司 Multi-wire-bundle testing system, method, device and storage medium

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110850337A (en) * 2019-10-24 2020-02-28 广州市槿泓电子有限公司 Multi-wire-bundle testing system, method, device and storage medium

Similar Documents

Publication Publication Date Title
CN106556759B (en) A kind of power distribution automation apparatus debugging method and debugging system
CN103630849B (en) Household electrical appliances power supply automatic detecting device and method of testing
CN106444709A (en) Automatic testing method and device of distribution intelligent function of power distribution terminal
CN104570768A (en) Information physics semi-physical simulation system based on Rt-Lab and OPNET
CN101901492A (en) Automatic generating method of electric network station wiring diagram
CN206384166U (en) Aircraft general-utility test platform
CN108646111A (en) A kind of relay protection automatic test approach and system based on 61850 communications
CN109510314B (en) Method for scheduling interaction between intelligent command DICP system and inspection robot system
CN107203648A (en) One kind visualization maintenance peace arranges system and method
CN109904928A (en) A kind of transmission line malfunction monitoring and control method and monitoring system
CN207249389U (en) Subway train control and management system simulator stand
CN110000263A (en) A kind of punch line automatic press control system
CN204480302U (en) Wire harness intelligent testing machine networking structure
CN108649695A (en) A kind of intelligent inspection system based on intelligent robot
CN108279652A (en) A kind of intelligent manufacturing cell system and its control method
CN105634132A (en) 10kV low-voltage intelligent distribution network system with reactive compensation function
CN103699760B (en) A kind of multilayer closed-loop main station detection data source simulation method
CN104484776A (en) Intelligent test task arranging method based on linkage of intelligent wiring harness testing machines and production orders
CN104504534A (en) Wire harness intelligent testing machine and shipment plan linkage intelligent partition test method
CN104635710A (en) Wire bundle intelligent testing machine and production plan interworking change adjusting method
CN106534270A (en) Simulation system for internet of things
CN104035401A (en) Numerical control thermal forming vulcanization system and control method thereof
CN206877382U (en) A kind of power plant's dynamic cruising inspection system based on full factory's threedimensional model
CN104714522A (en) Automatic feedback and analysis chart generation method for test data of intelligent wire harness testing machines
CN209327819U (en) A kind of pulsed quantity signal input part daughter board

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 215153 Jiangsu city of Suzhou province science and Technology City high tech Zone Yandang Road No. 88

Patentee after: SUZHOU LZY TECHNOLOGY Co.,Ltd.

Address before: 215011 No. 55 Xiangyang Road, hi tech Zone, Jiangsu, Suzhou

Patentee before: SUZHOU LZY TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150715