CN103699760B - A kind of multilayer closed-loop main station detection data source simulation method - Google Patents

A kind of multilayer closed-loop main station detection data source simulation method Download PDF

Info

Publication number
CN103699760B
CN103699760B CN201410010342.1A CN201410010342A CN103699760B CN 103699760 B CN103699760 B CN 103699760B CN 201410010342 A CN201410010342 A CN 201410010342A CN 103699760 B CN103699760 B CN 103699760B
Authority
CN
China
Prior art keywords
data
remote
real
information
simulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410010342.1A
Other languages
Chinese (zh)
Other versions
CN103699760A (en
Inventor
王艳
庄卫金
李峰
占震滨
王勇
张永刚
于芳
章立宗
冯树海
孙名扬
薛大立
柳津
徐攀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201410010342.1A priority Critical patent/CN103699760B/en
Publication of CN103699760A publication Critical patent/CN103699760A/en
Application granted granted Critical
Publication of CN103699760B publication Critical patent/CN103699760B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Abstract

The present invention relates to a kind of analogy method in dispatching automation of electric power systems field, and in particular to a kind of multilayer closed-loop main station detection data source simulation method.The method meets the full electric network stable state real time data of operation of power networks mechanism by ripe electric analog software simulation; all kinds of fault messages are simulated by failure generation module, and fault message is decomposed into remote signalling displacement table, SOE tables, remote signalling and put the record during several tables, remote measurement put several tables, protection signal table or be directly stored in the transmission relief area of communication module;Communication module reads real-time databases by different cycles, and according to putting several tables>Displacement table>The data priority organization of unity data of equipment list, ultimately form the analog data of delta data and cycle data combination.The method that the present invention is provided can provide electrical network normal operating mode, maximum operational mode, disturbance, accident, the electrical network real-time running data under snowslide isotype, and the every business detection for system provides reasonable with more comprehensively data source.

Description

A kind of multilayer closed-loop main station detection data source simulation method
Technical field
The present invention relates to a kind of analogy method in dispatching automation of electric power systems field, and in particular to a kind of multilayer closed-loop Main station detection data source simulation method.
Background technology
With the development of intelligent power grid technology, the intelligent level of automation system for the power network dispatching is also accordingly carried Height, its functional coverage face are increasingly complicated, and the requirement of reliability and safety is higher, therefore newly-built in automation system for the power network dispatching With upgrading, New function should be more careful when developing and putting into operation.
However, the country is in terms of the system acceptance of dispatch automated system and functional verification, all lacking for a long time can be also The data source of former actual field environment, is mostly, by manual type in factory, according to dependence test entry, to arrange specific aim local Test scene is tested or is verified, the limitation that there are scene and data;And part cannot in factory inspection function, then need Directly debug in system at the scene, not only limited by system mode at that time, and there is serious system potential safety hazard.
Therefore it provides the closed-loop simulation source consistent with live running environment is the primary of electric power scheduling automatization system detection Step.Existing some power system simulation softwares can provide the electric network data for meeting operation of power networks mechanism, but can not meet The demand of simulated disturbance and Standards Code interface when electric power scheduling automatization system is detected.
The content of the invention
For the deficiencies in the prior art, it is an object of the invention to provide a kind of simulation of multilayer closed-loop main station detection data source Method, can provide electrical network normal operating mode, maximum operational mode, disturbance, accident, the electrical network under snowslide isotype and transport in real time Row data, for system the detection of every business provides rationally with more comprehensively data source.
The purpose of the present invention is realized using following technical proposals:
The present invention provides a kind of multilayer closed-loop main station detection data source simulation method, and which thes improvement is that, the side Method comprises the steps:
(1)Generated Power System Steady-state telemetry and remote signalling data are obtained from electric analog software, real time data is stored in The primary equipment class table in storehouse;
(2)Failure generation module generates fault simulation information, and the digital simulation class table and data for being stored in real-time data base leads to The transmission relief area of letter module;
(3)Data communication module obtains Power System Steady-state data and fault disturbance analog information from real-time data base, is stored in The transmission relief area of data communication module, is combined into final communication data, leads to system under test (SUT) according to actual field communication environment News;
(4)Data communication module receives the control command that system under test (SUT) sends, the remote information table in real-time data base With the verification of remote regulating information table, after verification is qualified, electric analog software is sent to;
(5)Electric analog software adjusts state, transformer gear or the generating of switch tool according to the control command for being passed Machine is exerted oneself, and emulates the electric network swim that brings of adjustment and change and be stored in real-time database, delta data is fed back by data communication module To system under test (SUT), the effect of closed loop control is reached.
Further, the step(1)In, the generation of Power System Steady-state telemetry is included from on-site collection actual electric network Model, figure, data section and external network equivalent information, import power system simulation software as the primary data in detection source, make For initial section;According to the load variations curve of on-site collection, in addition the adjustment of 5% small range power is input into as power flow changing, defeated Go out uninterrupted electric network swim section;
The primary equipment class table of the real-time data base includes generator table, transformator table, bus table, circuit table, load Table, switch tool table, chopper table and capacity reactance table.
Further, the step(2)In, the digital simulation class table of the real-time data base includes remote signalling displacement table, SOE Table, remote signalling are put several tables, remote measurement and put several tables and protection signal table;
Failure generation module generates fault simulation information, and the type of simulation is divided into electric network fault data and stress test number According to;The electric network fault data include electric network fault, equipment fault and disturbance of data;Pressure testing data includes that the short time impacts Data, long-time pressure data and high frequency degrees of data;
When simulating grid failure and equipment fault, arrange to electric analog software sending method and ask, receive and arrange successfully After response, corresponding switch tool table and protection signal table are updated, chronologically the remote signalling change information of complete documentation, is stored in phase Remote signalling displacement/SOE the tables answered, while electric analog software updates transmitted telemetry according to institute's request method;Data are led to Letter module will delete remote signalling displacement/SOE table records from real-time data base after reading;
When analog data is disturbed, record artificial remote measurement, remote signalling and put several information, be stored in artificial remote measurement and number is put in remote signalling Table, artificial remote measurement will be deleted from real-time database after reading for data communication module and several table records are put in remote signalling;
During simulated pressure test data, according to time, number and frequency demand generate sequential complete documentation remote signalling and Remote measurement change information, is stored directly in the transmission relief area of data communication module, by clearing buffers after data communication module reading Remote signalling and remote measurement change information in area.
Further, the step(3)In, data communication module is according to the mode of periodicity reading from real-time data base Power System Steady-state data and fault disturbance analog information are obtained, and Power System Steady-state data are read by second level, are disturbed by Millisecond read failure Dynamic analog information;According to the priority groups of data into final communication data, the priority of data processing is:Put several tables>Displacement table> Equipment list;
Communicate with system under test (SUT) according to actual field communication environment, including according to live real network port number and reality Stipulations configuring condition(Actual stipulations configuring condition such as DL476, IEC60870-5-104 etc.)Communicated, using data variation The mode that transmission and cycle transmission combine transmits data, meets telecontrol system telemetry-acquisition change and transmitted less than 3 seconds, remote signalling Regulation of the change less than transmission in 1 second;Unified transmission relief area is set up when realizing and relief area and link thread pool is received, together When to simulate thousands of links concurrent, fully meet the requirement of actual communication.
Further, the step(4)In, data communication module receives the control command that system under test (SUT) sends, Jing Guoshi When data base in remote information table and remote regulating information table verification, remote information table and remote regulating information table are set data moulds Intend class table, deposit the essential information and procedural information of remote control and remote regulating;
Checking treatment process includes:Signal procedure receives remote control remote regulating and issues checking treatment program, checking treatment program root Processed according to current state, when current state is that locking or controlled state are not inconsistent with equipment current state, verification state is not right Return " unsuccessful ", otherwise verify state and correctly send power system simulation software to;It is continuous in the dual pathways or multiple operating values During arrival, arrive first and first process, and lock;The discovery order arrived afterwards is abandoned with above consistent, and locking causes overtime discarding, and state is not To abandoning, discarding need to beam back " unsuccessful " message.
Further, the system of methods described is multilayer closed-loop main station detection data source analog systemss, the system Including the failure generation module, real-time data base, data communication module and the system under test (SUT) that are sequentially connected, the failure generation module Including section file submodule, fault simulation submodule and disturbance of data submodule;The section file submodule, fault simulation Submodule and disturbance of data submodule are connected with real-time data base by the interface of simulation layer;The data communication module includes Send relief area and receive relief area;The transmission relief area and reception relief area are by the stipulations interface of standard(Standard Stipulations interface such as DL476, IEC60870-5-104 etc.)It is connected with system under test (SUT).
Compared with the prior art, the beneficial effect that reaches of the present invention is:
1st, the invention provides a kind of dispatching automation main station system detection data source analogue technique, can be simulated by different level Full electric network stable state real time data, fault data and pressure testing data, and ultimately form overall situation data and local fault data The uniform data source for combining;External system control command can be received simultaneously, and respective feedback, Ke Yiwei are made according to order The detection of dispatching automation main station system provides the closed loop highly consistent with live running environment unified data source.
2nd, present invention also offers a kind of communication environment building method of dispatching automation main station system detection, can be by existing Field actual environment configuration link number and protocol type, data transportation requirements reach the telemetry-acquisition of telemechanical transmission regulation to be changed not Transmitted more than 3 seconds, remote signalling change was transmitted less than 1 second, can provide and scene operation for the detection of dispatching automation main station system The consistent communication environment of environment high.
3rd, in the present invention, disclose a kind of automation system for the power network dispatching detection data source simulation side of multilayer closed-loop Method, meets the full electric network stable state real time data of operation of power networks mechanism by ripe electric analog software simulation, is generated by failure All kinds of fault messages of module simulation, and fault message is decomposed into remote signalling displacement table, SOE tables, remote signalling puts several tables, remote measurement and put number Record in table, protection signal table is directly stored in the transmission relief area of communication module;Communication module was read by the different cycles Real-time database, and according to putting several tables>Displacement table>The data priority organization of unity data of equipment list, ultimately form delta data and The analog data of cycle data combination.
4th, in the present invention, a kind of actual communication environment building method of automation system for the power network dispatching is disclosed, in data Communication layers arrange unified transmission relief area and receive relief area and link thread pool;The thread of link thread pool is according to specified Working attributes carry out work, be divided into and pass The parsing of defeated, stipulations, internal communication etc..Thousands of links can be simulated simultaneously concurrent, fully met the requirement of actual communication, and General manufacturer only possesses the test link of unitss when test is dispatched from the factory, it is impossible to the actual communication need of simulation.
Description of the drawings
Fig. 1 is the flow chart of the multilayer closed-loop main station detection data source simulation method that the present invention is provided;
Fig. 2 is the remote control flow chart that the present invention is provided.
Specific embodiment
Below in conjunction with the accompanying drawings the specific embodiment of the present invention is described in further detail.
The invention provides a kind of main station detection data source simulation method of multi-level closed loop, can simulate each quasi-representative Operation of power networks scene, disturbance scene and extreme fault scenes under data, be power network schedule automation main station system system inspection Survey and functional verification provides more true, comprehensive data source.
Its flow chart is as shown in figure 1, comprise the steps:
(1)Generated Power System Steady-state telemetry and remote signalling data are obtained from electric analog software, real time data is stored in The primary equipment class table in storehouse;
The generation of Power System Steady-state data, including the model from on-site collection actual electric network, figure, data section and outer net etc. Value information, imports ripe power system simulation software as the primary data in detection source, as initial section;Small range in addition Power adjustment is input into as power flow changing, exports uninterrupted electric network swim section.
The primary equipment class table of real-time data base includes generator table, transformator table, bus table, circuit table, load meter, knife Lock table, chopper table, capacity reactance table etc..
(2)Failure generation module generates fault simulation information, and the digital simulation class table and data for being stored in real-time data base leads to The transmission relief area of letter module;
The digital simulation class table of real-time data base includes that remote signalling displacement table, SOE tables, remote signalling are put several tables, remote measurement and put several tables, guarantor Shield signal table.
Failure generation module generates fault simulation information, and the type of simulation is divided into electric network fault data and stress test number According to.Electric network fault data include electric network fault, equipment fault, disturbance of data etc.;Pressure testing data includes short time number of strokes According to, long-time pressure data, high frequency degrees of data etc..
When simulating grid failure and equipment fault, arrange to electric analog software sending method and ask, receive and arrange successfully After response, corresponding switch tool table and protection signal table are updated, chronologically the remote signalling change information of complete documentation, is stored in phase Remote signalling displacement/SOE the tables answered, while electric analog software updates transmitted telemetry according to institute's request method;Data are led to Letter module will delete remote signalling displacement/SOE table relative recordings from real-time database after reading.
When analog data is disturbed, record artificial remote measurement, remote signalling and put several information, be stored in artificial remote measurement, remote signalling and put several tables, Data communication module will be deleted artificial remote measurement, remote signalling from real-time database after reading and put several table relative recordings.
During simulated pressure test data, the remote signalling, distant of sequential complete documentation is generated according to the demand of time, number and frequency Change information is surveyed, the transmission relief area of data communication module is stored directly in, data communication module will empty related note after reading Record.
(3)Data communication module obtains Power System Steady-state data and fault disturbance analog information from real-time data base, is stored in The transmission relief area of data communication module, is combined into final communication data, according to actual field communication environment and communication;
Data communication module obtains Power System Steady-state data and failure from real-time data base according to the mode that periodicity reads Analog information, reads Power System Steady-state data by second level, by Millisecond read failure analog information.According to data priority groups into Final data, the priority of data processing is:Put several tables>Displacement table>Equipment list.
Communicate by actual field communication environment and system under test (SUT), including can be according to live real network port number and reality Stipulations configuring condition communicated, transmit data by the way of data variation transmission and cycle transmission combine, meet far Dynamic system telemetry collection change was transmitted less than 3 seconds, regulation of the remote signalling change less than transmission in 1 second.Unification is set up when realizing Send relief area and receive relief area and link thread pool, thousands of links can be simulated simultaneously concurrently, reality has been fully met The requirement of border communication.
(4)Data communication module receives the control command that system under test (SUT) sends, the remote information table in real-time data base With the verification of remote regulating information table, after verification is qualified, electric analog software is sent to;
The control command that reception system under test (SUT) is sended over remote information table and remote regulating information table in real-time data base Verification.Remote information table and remote regulating information table are set digital simulation class tables, house the basic letter of remote control and remote regulating Breath and procedural information.Processing procedure includes:Signal procedure receives remote control remote regulating and issues checking treatment program, checking treatment program root Processed according to current state, when current state is that locking or controlled state are not inconsistent with equipment current state, verification state is not right Return " unsuccessful ", otherwise verify state and correctly send simulated program to;When the dual pathways or multiple operating values are continuously reached, first To first processing, and lock;The discovery order arrived afterwards is abandoned with above consistent, and locking causes overtime discarding, state to abandoning, not to be lost Abandon and need to beam back " unsuccessful " message.The remote control flow chart that the present invention is provided is as shown in Fig. 2 realize the environment of closed loop control.
(5)Electric analog software adjusts state, transformer gear or the generating of switch tool according to the control command for being passed Machine is exerted oneself, and emulates the electric network swim that brings of adjustment and change and be stored in real-time database, delta data is fed back by data communication module To system under test (SUT), the effect of closed loop is reached.
The system of the method provided by the present invention is multilayer closed-loop main station detection data source analog systemss, and the system includes Failure generation module, real-time data base, data communication module and the system under test (SUT) being sequentially connected, the failure generation module include Section file submodule, fault simulation submodule and disturbance of data submodule;The section file submodule, fault simulation submodule Block and disturbance of data submodule are connected with real-time data base by the interface of simulation layer;The data communication module includes sending Relief area and reception relief area;The transmission relief area and receive relief area by the stipulations interface such as DL476 of standard, IEC60870-5-104 etc. is connected with system under test (SUT).
Finally it should be noted that:Above example is only to illustrate technical scheme rather than a limitation, most Pipe has been described in detail to the present invention with reference to above-described embodiment, and those of ordinary skill in the art should be understood:Still The specific embodiment of the present invention can be modified or equivalent, and without departing from any of spirit and scope of the invention Modification or equivalent, which all should be covered in the middle of scope of the presently claimed invention.

Claims (3)

1. a kind of multilayer closed-loop main station detection data source simulation method, it is characterised in that methods described comprises the steps:
(1) generated Power System Steady-state telemetry and remote signalling data are obtained from power system simulation software, is stored in real time data The primary equipment class table in storehouse;
(2) failure generation module generates fault simulation information, is stored in the digital simulation class table and data communication mould of real-time data base The transmission relief area of block;
(3) data communication module obtains Power System Steady-state data and fault disturbance analog information from real-time data base, is stored in data The transmission relief area of communication module, is combined into final communication data, communicates with system under test (SUT) according to actual field communication environment;
(4) data communication module receives the control command that system under test (SUT) sends, the remote information table and distant in real-time data base The verification of information table is adjusted, after verification is qualified, power system simulation software is sent to;
(5) power system simulation software adjusts state, transformer gear or the generating of switch tool according to the control command for being passed Machine is exerted oneself, and emulates the electric network swim that brings of adjustment and change and be stored in real-time data base, by data communication module delta data System under test (SUT) is fed back to, the effect of closed loop control is reached;
In the step (2), the digital simulation class table of the real-time data base includes that number is put in remote signalling displacement table, SOE tables, remote signalling Table, remote measurement put several tables and protection signal table;
Failure generation module generates fault simulation information, and the type of simulation is divided into electric network fault data and pressure testing data; The electric network fault data include electric network fault, equipment fault and disturbance of data;Pressure testing data includes short time number of strokes According to, long-time pressure data and high frequency degrees of data;
When simulating grid failure and equipment fault, arrange to power system simulation software sending method and ask, receive and arrange successfully After response, corresponding switch tool table and protection signal table are updated, chronologically the remote signalling change information of complete documentation, is stored in phase Remote signalling displacement/SOE the tables answered, while power system simulation software updates transmitted telemetry according to institute's request method;Number Remote signalling displacement/SOE table records will be deleted from real-time data base after reading according to communication module;
When analog data is disturbed, record artificial remote measurement, remote signalling and put several information, be stored in artificial remote measurement and several tables are put in remote signalling, number Artificial remote measurement will be deleted from real-time data base after reading according to communication module and several table records will be put in remote signalling;
During simulated pressure test data, the remote signalling and remote measurement of sequential complete documentation are generated according to the demand of time, number and frequency Change information, is stored directly in the transmission relief area of data communication module, by emptying buffer after data communication module reading Remote signalling and remote measurement change information;
In the step (3), data communication module obtains Power System Steady-state from real-time data base according to the mode that periodicity reads Data and fault disturbance analog information, read Power System Steady-state data by second level, disturb analog information by Millisecond read failure;Press According to data priority groups into final communication data, the priority of data processing is:Put several tables>Displacement table>Equipment list;
Communicate with system under test (SUT) according to actual field communication environment, including the stipulations according to live real network port number and reality Configuring condition is communicated, and is transmitted using data variation and the cycle transmits by the way of combining and transmits data, meet telecontrol system Telemetry-acquisition change was transmitted less than 3 seconds, regulation of the remote signalling change less than transmission in 1 second;Unified transmission is set up to buffer when realizing Area and reception relief area and link thread pool, while thousands of links of simulation are concurrent, fully meet the requirement of actual communication;
In the step (4), data communication module receives the control command that system under test (SUT) sends, the remote control in real-time data base The verification of information table and remote regulating information table, remote information table and remote regulating information table are set digital simulation class tables, are deposited distant Control and the essential information and procedural information of remote regulating;
Checking treatment process includes:Signal procedure receives remote control remote regulating and issues checking treatment program, and checking treatment program is according to ought Front state is processed, and when current state is that locking or controlled state are not inconsistent with equipment current state, verification state is not to returning " unsuccessful ", otherwise verifies state and correctly sends power system simulation software to;Continuously reach in the dual pathways or multiple operating values When, arrive first and first process, and lock;The discovery order arrived afterwards is abandoned with above consistent, and locking causes overtime discarding, and state is not to losing Abandon, discarding need to beam back " unsuccessful " message.
2. analogy method as claimed in claim 1, it is characterised in that in the step (1), the life of Power System Steady-state telemetry Into the model, figure, data section and external network equivalent information that include from on-site collection actual electric network, as the initial number in detection source According to power system simulation software is imported, as initial section;According to the load variations curve of on-site collection 5% small range work(in addition Rate adjustment is input into as power flow changing, exports uninterrupted electric network swim section;
The primary equipment class table of the real-time data base includes generator table, transformator table, bus table, circuit table, load meter, opens Close disconnecting link table, chopper table and capacity reactance table.
3. analogy method as claimed in claim 1, it is characterised in that the system of methods described is multilayer closed-loop main station inspection Survey data source analog systemss, failure generation module that the system includes being sequentially connected, real-time data base, data communication module and System under test (SUT), the failure generation module include section file submodule, fault simulation submodule and disturbance of data submodule;Institute Section file submodule, fault simulation submodule and disturbance of data submodule are stated by the interface and real-time data base of simulation layer Connection;The data communication module includes sending relief area and receives relief area;The transmission relief area and reception relief area are equal It is connected with system under test (SUT) by the stipulations interface of standard.
CN201410010342.1A 2014-01-09 2014-01-09 A kind of multilayer closed-loop main station detection data source simulation method Active CN103699760B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410010342.1A CN103699760B (en) 2014-01-09 2014-01-09 A kind of multilayer closed-loop main station detection data source simulation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410010342.1A CN103699760B (en) 2014-01-09 2014-01-09 A kind of multilayer closed-loop main station detection data source simulation method

Publications (2)

Publication Number Publication Date
CN103699760A CN103699760A (en) 2014-04-02
CN103699760B true CN103699760B (en) 2017-04-05

Family

ID=50361287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410010342.1A Active CN103699760B (en) 2014-01-09 2014-01-09 A kind of multilayer closed-loop main station detection data source simulation method

Country Status (1)

Country Link
CN (1) CN103699760B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107942721A (en) * 2017-10-30 2018-04-20 中国电力科学研究院有限公司 A kind of emulation mode and system of supporting scheduling system to verify
CN108958719B (en) * 2018-04-03 2020-08-11 北京航空航天大学 Artificial intelligence writing method for source code of digital aircraft buffer area information processing
CN108958216B (en) * 2018-06-06 2020-04-17 南京国电南自电网自动化有限公司 Automatic detection system and method for new energy AGC or AVC control system
CN109066618B (en) * 2018-09-27 2019-10-29 国网江苏省电力有限公司 The switching value method of inspection, device and storage medium based on short-term time scale
CN109342848B (en) * 2018-09-29 2022-01-25 国网河北省电力有限公司电力科学研究院 Avalanche testing method and system for dispatching automation master station and terminal equipment

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103488835A (en) * 2013-09-26 2014-01-01 国家电网公司 Simulation platform and method for dispatching automation system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2532738B2 (en) * 1990-09-26 1996-09-11 松下電器産業株式会社 Failure simulation method of logic circuit
JP3428313B2 (en) * 1996-09-30 2003-07-22 株式会社東芝 Failure simulation method and failure analysis method for large-scale integrated circuit device
US10373082B2 (en) * 2011-02-24 2019-08-06 Qcoefficient, Inc. Integration of commercial building operations with electric system operations and markets
CN102209074B (en) * 2011-05-30 2014-10-22 中国电力科学研究院 All-digital dynamic simulation system of power system
CN102710020B (en) * 2012-06-12 2014-04-23 中国电力科学研究院 Service bus-based real time data wide-area interaction method of scheduling integration system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103488835A (en) * 2013-09-26 2014-01-01 国家电网公司 Simulation platform and method for dispatching automation system

Also Published As

Publication number Publication date
CN103699760A (en) 2014-04-02

Similar Documents

Publication Publication Date Title
CN103699760B (en) A kind of multilayer closed-loop main station detection data source simulation method
CN103488835B (en) The emulation platform of a kind of dispatch automated system and emulation mode thereof
CN103295163B (en) Chart-model integrated transformer substation and dispatch master station cooperation modeling method
CN101894488B (en) Distributed three-dimensional simulation training system for regional power system transformer station
CN101272051B (en) Information system integration method of electric network production control region and management information region
CN105978152B (en) A kind of intelligent substation telemechanical apparatus and the method for regulating and controlling main website automated closed-loop joint debugging
CN108400908A (en) Supervisory control of substation information checks and accepts device and method automatically
CN104052633B (en) Intelligent station 61850 and the stipulations integration test method of telemechanical 104
CN109726234A (en) Integrated circuit testing Information Management System based on industry internet
CN104483842B (en) One kind regulation and control one automation main website comparison method
CN106026087B (en) Fault scenes analogy method containing distributed power distribution network
CN109992571A (en) A kind of intelligent substation configuration file line closed loop check system and method for calibration
CN110784020A (en) Automatic checking and accepting equipment, system and method for monitoring information
CN204291050U (en) A kind of dispatching and monitoring information check system
CN110112831A (en) A kind of supervisory control of substation information automation checks and accepts device and its acceptance method
CN108306753A (en) Simulator, test method and the system of a kind of Ith area data communication network shutdown
CN104037937A (en) Simulation intelligent substation measurement and control device
CN102324788A (en) Power dispatching integrated anti-misoperation simulation comprehensive management platform
CN110958327A (en) Intelligent substation remote testing system and method
CN103905275A (en) Electric power telecontrol equipment testing method based on IEC61850 replacement services
CN110336375A (en) A kind of processing method and system of power system monitor warning information
CN102916489B (en) Virtual terminal automatic wiring method based on primary system structure of regional power grid
CN104574204B (en) Intelligent measuring and control device ICD models automatic identification system and method
CN106570781B (en) Intelligent substation monitoring information step-by-step acceptance method based on three-layer two-network structure
CN105680441B (en) Simulation based on stimulated replacement technology is to a device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant