CN101901492A - Automatic generating method of electric network station wiring diagram - Google Patents

Automatic generating method of electric network station wiring diagram Download PDF

Info

Publication number
CN101901492A
CN101901492A CN2010101148563A CN201010114856A CN101901492A CN 101901492 A CN101901492 A CN 101901492A CN 2010101148563 A CN2010101148563 A CN 2010101148563A CN 201010114856 A CN201010114856 A CN 201010114856A CN 101901492 A CN101901492 A CN 101901492A
Authority
CN
China
Prior art keywords
model
interval
gap
station
wiring diagram
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010101148563A
Other languages
Chinese (zh)
Other versions
CN101901492B (en
Inventor
窦永康
李群山
是岳军
杨超
严志发
熊华强
王春明
李智
鄢发齐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGZHOU DONGRUI POWER SOFTWARE CO LTD
Original Assignee
CHANGZHOU DONGRUI POWER SOFTWARE CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU DONGRUI POWER SOFTWARE CO LTD filed Critical CHANGZHOU DONGRUI POWER SOFTWARE CO LTD
Priority to CN201010114856.3A priority Critical patent/CN101901492B/en
Publication of CN101901492A publication Critical patent/CN101901492A/en
Application granted granted Critical
Publication of CN101901492B publication Critical patent/CN101901492B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to an automatic generating method of an electric network station wiring diagram, which comprises the following steps of: a. establishing an interval model database, wherein the interval model database comprises all types of interval models in a station, each interval model is the most complete interval, each element equipment in the interval models is related to a check box, and the check box is used for numbering the related element equipment and supplying an operation interface for deleting the related element equipment; b. when the diagram is generated, selecting the interval model corresponding to the voltage grade of the station from the interval model database; and if the interval model needs to be modified, deleting the related and undesired element equipment by setting the check box, connecting the residual element equipment according to an interval wiring rule, and generating the corresponding electric network station wiring diagram. The invention realizes the function of automatically generating the diagram; the station wiring diagram can be automatically generated by a user through only simple selection and character input, the method saves time and labor, and the work efficiency is greatly improved.

Description

Automatic generating method of electric network station wiring diagram
Technical field
The present invention relates to the power network schedule automation field, be specifically related to a kind of automatic generating method of electric network station wiring diagram.
Background technology
The factory station comprises: transformer station and generating plant, transformer station mainly is divided into: primary substation, major network transformer station, secondary substation, distribution substation.The generating plant comprises: unit connection power plant, double bus scheme power plant, 3/2 wiring power plant etc.
In electric system, " at interval " be switchgear between inlet wire or outlet and the bus, it comprises: the bus connection device of being made up of isolating switch, isolation switch, ground connection disconnecting link, reactor etc., and relevant switchgear between the different electric pressure buses with two of transformer.Isolating switch and relevant device are formed virtual interval, and the notion of " at interval " also is applicable to transformer stations' configurations such as breaker connection and ring-like bus." at interval " also be commonly referred to " string ".
" Central China net straightening transfers equipment state the to make the term standard " issue of (hereinafter to be referred as " standard ") and execution that state makes operator scheme simplified scheduling flow, improved operating efficiency.Guaranteed the safety of the person and equipment from system.Each clause of " standard " is enumerated separately at each concrete operations content, has comprised the various concrete operations contents of required execution in the present operation of power networks, and content is reliable comprehensively, and is complete errorless.State makes operator scheme agree with mutually with every safe operation standard of sending out the power transformation industry at present, can play the effect of guarantor's body, guarantor's electrical network, guarantor's device security." standard " with " state makes the operational administrative system ", " Central China net is transferred typical scheduling operation task standard operation book ", common specification the electric grid operating behavior.
The Central China Power Grid dispatch state makes that operation ticket system is after making operator scheme implement according to state, the state of developing for the variation that adapts to the dispatching of power netwoks operator scheme makes operation ticket management system, and the state of having realized makes that the intelligence of operation order generates, anti-misoperation safety is checked on and the related management function.
Described Central China Power Grid dispatch state makes operation ticket system mainly comprise: operate anti-error analog subsystem and intelligence operation paper money system.
Operate anti-error analog subsystem and be form, adopt network topology and trend computing technique, realized that dispatch state makes, the simulation of individual event order and secondary device operation, functions such as maloperation identification warning with primary connection figure.
Intelligence operation paper money system comprises that mainly intending ticket audit preliminary command carries out functional module with monitoring, realized the overall process computer management that the scheduling operation ticket " is intended ticket-audit-pre-sending out-execution ", operation order makes rule-based reasoning intelligence draw a bill by state, for the ticket of operational order item by item that has generated, each bar state operational order that it comprised all can demonstrate the concrete individual event operational order content that it comprises automatically; This system can the INTELLIGENT IDENTIFICATION operation order in scheduling operation instruction (once reaching secondary device) and demonstration automatically in the anti-error analog subsystem of operation, and have operation statistics, the functions such as system and maintenance bill system interface of relieving with scheduling.
Scheduling operation simulation, state make reasoning intelligence become ticket, anti-error automatic demonstration etc. all to depend on primary connection figure, and whether the operation and maintenance of figure makes things convenient for directly has influence on the practicality that state makes operation ticket system.
Described primary connection map generalization method of the prior art is: each element that draws one by one connects each element the required primary connection figure of generation then.Obviously time-consuming, the effort of this method, work efficiency is lower.
For this reason, how realizing the automatic mapping function based on the station wiring diagram of main wiring mode characteristics and scheduling naming rule, is the technical matters that this area will solve.
Summary of the invention
Technical matters to be solved by this invention provides a kind of automatic generating method of electric network station wiring diagram simple to operation.
For solving the problems of the technologies described above, automatic generating method of electric network station wiring diagram of the present invention comprises the steps:
A, set up the gap model database, comprising all types of gap models in the factory station, and each gap model is complete interval; Each component equipment in the gap model all is associated with a check box, and this check box is used for providing operation interface to associated component equipment numbering and for deleting associated component equipment; When b, one-tenth figure, from the gap model database, select the corresponding gap model of electric pressure with the factory station; Revise this gap model as if needing, then delete associated unwanted component equipment, and will remain the wiring rules connection of component equipment, and generate corresponding electric network station wiring diagram by the interval by described check box is set.
Wherein, described complete interval comprises the component equipment that institute might need during such at interval, and these component equipments are by at interval wiring rules connection.
In described step b, after will remaining the wiring rules connection of component equipment, also, automatically the residue component equipment in this gap model is numbered according to default coding rule by the interval.
As another kind of automatic generating method of electric network station wiring diagram, it is characterized in that comprising the steps:
A, set up the gap model database, comprising all types of gap models in the factory station, and each gap model is complete interval; Each component equipment in the gap model all is associated with a check box, and this check box is used for providing operation interface to associated component equipment numbering and for deleting associated component equipment;
B, set up the substation model database, comprising various types of substation models; Each substation model can be provided with: all that may use in the factory station at interval, the trend of relative position, each electric pressure and the main transformer connecting line of relative position in station wiring diagram of the electric pressure that comprises of factory station, each electric pressure, main transformer;
When C, one-tenth figure, from the substation model database, select a substation model, the electric pressure that comprises in this substation model of selecting is set, from the gap model database, select and the corresponding gap model of these electric pressures then;
After D, all gap models are selected to finish, if need to revise a gap model of having selected, then in this gap model by described check box being set to delete associated unwanted component equipment;
E, according to the preset numbers rule, automatically each component equipment in this gap model is numbered, generate corresponding electric network station wiring diagram then.
Wherein, described complete interval comprises the component equipment that institute might need during such at interval, and these component equipments are by at interval wiring rules connection.
Among the described step D,, then obtain the equipment of this both-end elements on either side earlier, in this both-end element of deletion, generate a connecting line, with the equipment connection of this both-end elements on either side if will delete a both-end element.
Wherein, the type of the substation model in the described substation model database comprises at least: primary substation model, major network transformer station model, secondary substation model, distribution substation model, unit connection power plant model, double bus scheme power plant model and 3/2 wiring power plant model.
The present invention has positive effect: (1) automatic generating method of electric network station wiring diagram of the present invention, realized the automatic mapping function, the user only need simply select and the literal input, just can generate station wiring diagram automatically, time saving and energy saving, improved work efficiency greatly.(2) with the example that is spaced apart of 500kV, each in each factory station at interval all might be different, if any complete interval, imperfect interval, or the circuit band high anti-, not with high anti-, situation is ever-changing.Therefore, the present invention has defined the form of complete interval, promptly this comprised at interval the component equipment that might occur.At editor 500kV at interval the time, only need on this complete interval, can obtain needed at interval incomplete by some unwanted elements of deletion.(3) the present invention is associated check box with concrete component equipment, as deleting a disconnecting link or ground cutter, only need insert " X " in corresponding optional frame; High anti-as the circuit that will delete in the complete string of 500kV, only need with the anti-corresponding optional frame of this height in insert " X ", just can be with the anti-part deletion of whole height, and do not need to Gao Kangzhong disconnecting link, remove to insert " X " one by one in cutter, the high anti-pairing optional frame.
 
Description of drawings
For the easier quilt of content of the present invention is clearly understood, below the specific embodiment and in conjunction with the accompanying drawings of basis, the present invention is further detailed explanation, wherein
After the essential information that Fig. 1 stands for the factory among the embodiment sets, list a tree derivation of the essential information at factory station;
Fig. 2 is the also promptly complete interval of the string 1(among Fig. 1) the graphics edition interface;
Fig. 3 is on the graphics edition interface of Fig. 2, promptly in optional frame, fill out by check box is set *, to delete the synoptic diagram of unwanted component equipment;
Fig. 4 is that 500kV bus height resists the wiring diagram in the gap model database;
Fig. 5 is the local wiring diagram of T wiring for the disconnecting link both sides;
Fig. 6 is the local wiring diagram with ground cutter 1;
Fig. 7 is for needing the synoptic diagram of a plurality of elements of deletion.
Embodiment
The automatic generating method of electric network station wiring diagram of present embodiment comprises the steps:
A, set up the gap model database, comprising all types of gap models in the factory station, and each gap model is complete interval; Each component equipment in the gap model all is associated with a check box, and this check box is used for providing operation interface to associated component equipment numbering and for deleting associated component equipment;
When b, one-tenth figure, from the gap model database, select the corresponding gap model of electric pressure with the factory station; Revise this gap model as if needing, then delete associated unwanted component equipment, and will remain the wiring rules connection of component equipment, and generate corresponding electric network station wiring diagram by the interval by described check box is set.
Described complete interval comprises the component equipment that institute might need during such at interval, and these component equipments are by at interval wiring rules connection.
In described step b, after will remaining the wiring rules connection of component equipment, also, automatically the residue component equipment in this gap model is numbered according to default coding rule by the interval.
The automatic generating method of electric network station wiring diagram of present embodiment also comprises, it comprises:
Factory's name of station: the scheduling title that is meant the factory station.
Factory is called for short at the station: the abbreviation of factory's name of station.When generating the circuit name automatically, will use.
Related factory station number: related factory station is meant and newly founds the factory the factory of line connecting relation station between the station.With good and transformer station is example, with good and covert factory station of closing Shan Zhou, Zhengzhou, Fragrance Hill, tree peony is just arranged, so with good and become related factory station number and should be 4.Behind the related factory of input station number, in the circuit form, will produce corresponding information.
Geographic position, factory station: warp, the affiliated province of latitude coordinate and factory station at factory station should be filled in geographic position, factory station.Geographic coordinate data in " picture interface " should be interrelated with the position in " the geographical wiring diagram of Central China Power Grid ".If during newly-built factory station, when selecting factory's station location in " the geographical wiring diagram of Central China Power Grid ", coordinate data just appears in the hurdle, geographic position, factory station in " picture interface "; If revise the geographical position coordinates in " picture interface ", be reacted to " geographical wiring diagram " middle factory station location and also should change.
Factory's station type: factory's station type is divided transformer station, unit connection power plant, double bus scheme power plant, 3/2 wiring power plant.Because factory's station type difference, its mode of connection is also different.Therefore, when changing factory's station type, need the input essential information also just different.
Essential information: the essential information that station wiring diagram is set.According to factory's station type difference, be divided into following several form.
Figure 916173DEST_PATH_IMAGE002
In this table 2, only need the quantity of input block wiring string to get final product.
Figure 956855DEST_PATH_IMAGE004
In this table 4, only need the input respective numbers to get final product.
Line information:
If in " related factory station number " input 3, then in this circuit form, will show that 3 row blank lines are selective:
Figure 824719DEST_PATH_IMAGE002
After offside factory station had been selected, line name just can generate automatically.Such as: current factory name of station is good and change, the Fragrance Hill change has been selected in the station by offside factory, and so, first row in line name just provide two titles of " good fragrant I loop line " " fragrant good I loop line " selective, secondary series provides " good fragrant II loop line " " fragrant good II loop line ", by that analogy.In addition, first row additionally provide two titles selective: " good fragrant line " " fragrant good line ".At each related factory station, acquiescence can be provided with 5 circuits at present.
As Fig. 1, after essential information sets, system will list a tree derivation of the essential information at factory station.
As Fig. 2,, all provide relevant graphics edition interface at each string (promptly at interval).As after choosing string 1, just show the information of string 1.
System with acquiescence provide all switches, disconnecting link, the numbering of cutter, these numberings also can be revised by hand.Last figure is the information of complete string.If have subelement to need to remove, then only need in optional frame, beat " X " and get final product.As Fig. 3, demonstration be state before and after revising.
After the edit file of obtaining a complete string, so, system just needs the specified element of deletion in complete string automatically.According to the difference of element, the mode that is realized is also different.
⑴, deletion both-end element (as disconnecting link, switch): delete a both-end element, need to divide following 3 steps, see Fig. 5.With the disconnecting link among the deletion figure is example:
A, obtain the equipment of disconnecting link both sides,, then need to regenerate a connecting line, it is connected with the equipment of these both sides if deleted this element.Disconnecting link both sides among Fig. 5 all are the T wiring.
B, obtain the connecting line of disconnecting link both sides, and will obtain generic sequence of point of both sides connecting line.Because connecting the trend of the connecting line of disconnecting link both sides might not all be straight line, as " the disconnecting link B " among Fig. 5, the connecting line that one side is arranged is exactly a broken line, therefore, realizing the first step, when soon disconnecting link two side apparatus connected with new connecting line, we can not simply directly generate a straight connecting line, come them to couple together.We must be according to B1 to B5(as shown in Figure 5) order, obtain 5 points, then, the sequence of these 5 points is set to newly-generated connecting line gets on.
C, connect two side apparatus, delete original line and equipment, also have disconnecting link with newly-generated line.
⑵, delete single-ended element (as the ground cutter):
In Fig. 6, if deletion " cutter 1 " then needs all elements deletions among the frame line a.And, also need to resist the new connecting line of use to link to each other disconnecting link and height.The attended operation here is identical with deletion both-end element.
⑶, delete a plurality of elements (high anti-as circuit): in Fig. 7, if deletion whole piece circuit, the element that is enclosed as figure center line b all needs to delete so.But this moment is during to the deletion of single-ended, both-end element, and is different with the operation of front.As when deleting disconnecting link, can directly delete, and not consider to have connected the equipment at two ends again at needs, can improve into the efficient of figure like this.When unique part that needs special processing was exactly Line1 in deletion figure, this connecting line belonged to the coupling part with former string, if with after this line deletion, the T wiring shown in the figure also must be handled simultaneously.The operation of deleting this T wiring is similar as deletion both-end element, but when it should be noted that the acquisition point sequence, can not remove to obtain the point of Line1.
As another kind of automatic generating method of electric network station wiring diagram, it is characterized in that comprising the steps:
A, set up the gap model database, comprising all types of gap models in the factory station, and each gap model is complete interval; Each component equipment in the gap model all is associated with a check box, and this check box is used for providing operation interface to associated component equipment numbering and for deleting associated component equipment;
B, set up the substation model database, comprising various types of substation models; Each substation model can be provided with: all that may use in the factory station at interval, the trend of relative position, each electric pressure and the main transformer connecting line of relative position in station wiring diagram of the electric pressure that comprises of factory station, each electric pressure, main transformer;
When C, one-tenth figure, from the substation model database, select a substation model, the electric pressure that comprises in this substation model of selecting is set, from the gap model database, select and the corresponding gap model of these electric pressures then;
After D, all gap models are selected to finish, if need to revise a gap model of having selected, then in this gap model by described check box being set to delete associated unwanted component equipment;
E, according to the preset numbers rule, automatically each component equipment in this gap model is numbered, generate corresponding electric network station wiring diagram then.
Wherein, described complete interval comprises the component equipment that institute might need during such at interval, and these component equipments are by at interval wiring rules connection.
Among the described step D,, then obtain the equipment of this both-end elements on either side earlier, in this both-end element of deletion, generate a connecting line, with the equipment connection of this both-end elements on either side if will delete a both-end element.
Wherein, the type of the substation model in the described substation model database comprises at least: primary substation model, major network transformer station model, secondary substation model, distribution substation model, unit connection power plant model, double bus scheme power plant model and 3/2 wiring power plant model.
The foregoing description only is for example of the present invention clearly is described, and is not to be qualification to embodiments of the present invention.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here need not also can't give exhaustive to all embodiments.

Claims (7)

1. an automatic generating method of electric network station wiring diagram is characterized in that comprising the steps:
A, set up the gap model database, comprising all types of gap models in the factory station, and each gap model is complete interval; Each component equipment in the gap model all is associated with a check box, and this check box is used for providing operation interface to associated component equipment numbering and for deleting associated component equipment;
When b, one-tenth figure, from the gap model database, select the corresponding gap model of electric pressure with the factory station; Revise this gap model as if needing, then delete associated unwanted component equipment, and will remain the wiring rules connection of component equipment, and generate corresponding electric network station wiring diagram by the interval by described check box is set.
2. automatic generating method of electric network station wiring diagram according to claim 1 is characterized in that: described complete interval comprises the component equipment that institute might need during such at interval, and these component equipments are by at interval wiring rules connection.
3. automatic generating method of electric network station wiring diagram according to claim 1, it is characterized in that: in described step b, after will remaining the wiring rules connection of component equipment, also, automatically the residue component equipment in this gap model is numbered according to default coding rule by the interval.
4. an automatic generating method of electric network station wiring diagram is characterized in that comprising the steps:
A, set up the gap model database, comprising all types of gap models in the factory station, and each gap model is complete interval; Each component equipment in the gap model all is associated with a check box, and this check box is used for providing operation interface to associated component equipment numbering and for deleting associated component equipment;
B, set up the substation model database, comprising various types of substation models; Each substation model can be provided with: all that may use in the factory station at interval, the trend of relative position, each electric pressure and the main transformer connecting line of relative position in station wiring diagram of the electric pressure that comprises of factory station, each electric pressure, main transformer;
When C, one-tenth figure, from the substation model database, select a substation model, the electric pressure that comprises in this substation model of selecting is set, from the gap model database, select and the corresponding gap model of these electric pressures then;
After D, all gap models are selected to finish, if need to revise a gap model of having selected, then in this gap model by described check box being set to delete associated unwanted component equipment;
E, according to the preset numbers rule, automatically each component equipment in this gap model is numbered, generate corresponding electric network station wiring diagram then.
5. automatic generating method of electric network station wiring diagram according to claim 4 is characterized in that: described complete interval comprises the component equipment that institute might need during such at interval, and these component equipments are by at interval wiring rules connection.
6. automatic generating method of electric network station wiring diagram according to claim 4, it is characterized in that: among the described step D, if will delete a both-end element, then obtain the equipment of this both-end elements on either side earlier, in this both-end element of deletion, generate a connecting line, with the equipment connection of this both-end elements on either side.
7. automatic generating method of electric network station wiring diagram according to claim 4 is characterized in that: the type of the substation model in the described substation model database comprises at least: primary substation model, major network transformer station model, secondary substation model, distribution substation model, unit connection power plant model, double bus scheme power plant model and 3/2 wiring power plant model.
CN201010114856.3A 2010-02-26 2010-02-26 Automatic generating method of electric network station wiring diagram Expired - Fee Related CN101901492B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010114856.3A CN101901492B (en) 2010-02-26 2010-02-26 Automatic generating method of electric network station wiring diagram

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010114856.3A CN101901492B (en) 2010-02-26 2010-02-26 Automatic generating method of electric network station wiring diagram

Publications (2)

Publication Number Publication Date
CN101901492A true CN101901492A (en) 2010-12-01
CN101901492B CN101901492B (en) 2016-05-18

Family

ID=43226999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010114856.3A Expired - Fee Related CN101901492B (en) 2010-02-26 2010-02-26 Automatic generating method of electric network station wiring diagram

Country Status (1)

Country Link
CN (1) CN101901492B (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102436523A (en) * 2011-10-17 2012-05-02 浙江省电力试验研究院 Method for automatically mapping digital substation interval wiring diagram
CN103955867A (en) * 2014-04-25 2014-07-30 常州东瑞电力软件有限公司 Automatic generating device for power distribution network wiring diagram
CN104007721A (en) * 2014-05-08 2014-08-27 河北省电力勘测设计研究院 Intelligent generation method of coal conveying program control wiring diagrams of heat-engine plants
CN104091292A (en) * 2014-07-24 2014-10-08 国家电网公司 Power grid wiring picture incremental maintenance method based on CIM/E model
CN104166944A (en) * 2014-07-28 2014-11-26 济南联盛电子科技有限公司 Switching operation bill generation method of railway transformation and distribution substation
CN104182526A (en) * 2014-08-27 2014-12-03 凯里供电局 Gap-model based synchronous automatic diagram-database generating method
CN105322654A (en) * 2014-07-25 2016-02-10 国家电网公司 Overhead line current status displaying method and device
CN105426569A (en) * 2015-10-27 2016-03-23 云南电网有限责任公司 Rule-driven automatic generation and update method for distribution network single line diagram
CN106295008A (en) * 2016-08-12 2017-01-04 许继集团有限公司 Bus, non-bus are spaced method for drafting and device and main electrical scheme method for drafting
CN106503298A (en) * 2016-09-26 2017-03-15 许继电气股份有限公司 A kind of Topology connection drawing generating method of intelligent substation and device
CN106570283A (en) * 2016-11-09 2017-04-19 上海申瑞继保电气有限公司 Automatic drawing method for primary wiring diagram of electric power operation system
CN106600457A (en) * 2016-12-06 2017-04-26 国网福建省电力有限公司 Transformer-substation micro-computer five-prevention main wiring diagram analysis system
CN107978007A (en) * 2017-12-15 2018-05-01 贵州电网有限责任公司 Chart spacing automatically generates non-maintaining method in a kind of regulation and control integral system
CN109947859A (en) * 2017-08-25 2019-06-28 南方电网科学研究院有限责任公司 Power distribution network drawing modeling method, system, storage medium and computer equipment
CN110046391A (en) * 2019-03-18 2019-07-23 国网江苏省电力有限公司连云港供电分公司 Transforming plant primary wiring diagram automatic generation method based on monitoring information table
CN111310408A (en) * 2020-02-27 2020-06-19 海南电网有限责任公司 Large power grid tidal current graph plant station node bus splitting mapping method
CN112084611A (en) * 2020-11-16 2020-12-15 华自科技股份有限公司 Power station topology generation method and storage medium
CN112529541A (en) * 2020-12-25 2021-03-19 山东鲁能软件技术有限公司 Method and system for generating equipment measurement label in distribution network line diagram
CN113625644A (en) * 2021-08-19 2021-11-09 国网四川省电力公司电力科学研究院 Auxiliary system for debugging alternating current system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101272051A (en) * 2008-05-06 2008-09-24 江苏省电力公司南京供电公司 Information system integration method of electric network production control region and management information region
US20080288462A1 (en) * 2007-05-16 2008-11-20 Naono Norihiko Database system and display method on information terminal

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080288462A1 (en) * 2007-05-16 2008-11-20 Naono Norihiko Database system and display method on information terminal
CN101272051A (en) * 2008-05-06 2008-09-24 江苏省电力公司南京供电公司 Information system integration method of electric network production control region and management information region

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
沙树名等: "一种基于CIM的厂站接线图自动生成技术", 《电力系统自动化》 *
陈道达: "变电站综合自动化系统中图形组态软件的应用与研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102436523A (en) * 2011-10-17 2012-05-02 浙江省电力试验研究院 Method for automatically mapping digital substation interval wiring diagram
CN103955867A (en) * 2014-04-25 2014-07-30 常州东瑞电力软件有限公司 Automatic generating device for power distribution network wiring diagram
CN104007721B (en) * 2014-05-08 2017-01-04 河北省电力勘测设计研究院 The defeated coal of thermal power plant program control wiring diagram intelligent generation method
CN104007721A (en) * 2014-05-08 2014-08-27 河北省电力勘测设计研究院 Intelligent generation method of coal conveying program control wiring diagrams of heat-engine plants
CN104091292A (en) * 2014-07-24 2014-10-08 国家电网公司 Power grid wiring picture incremental maintenance method based on CIM/E model
CN105322654B (en) * 2014-07-25 2018-09-18 国家电网公司 Overhead line current state display methods and device
CN105322654A (en) * 2014-07-25 2016-02-10 国家电网公司 Overhead line current status displaying method and device
CN104166944A (en) * 2014-07-28 2014-11-26 济南联盛电子科技有限公司 Switching operation bill generation method of railway transformation and distribution substation
CN104166944B (en) * 2014-07-28 2017-07-04 济南联盛电子科技有限公司 A kind of grid switching operation bill automatic generation method of railway substation
CN104182526A (en) * 2014-08-27 2014-12-03 凯里供电局 Gap-model based synchronous automatic diagram-database generating method
CN105426569A (en) * 2015-10-27 2016-03-23 云南电网有限责任公司 Rule-driven automatic generation and update method for distribution network single line diagram
CN106295008A (en) * 2016-08-12 2017-01-04 许继集团有限公司 Bus, non-bus are spaced method for drafting and device and main electrical scheme method for drafting
CN106295008B (en) * 2016-08-12 2019-05-14 许继集团有限公司 Bus, non-bus interval method for drafting and device and main electrical scheme method for drafting
CN106503298A (en) * 2016-09-26 2017-03-15 许继电气股份有限公司 A kind of Topology connection drawing generating method of intelligent substation and device
CN106503298B (en) * 2016-09-26 2019-11-26 许继电气股份有限公司 A kind of Topology connection drawing generating method of intelligent substation and device
CN106570283A (en) * 2016-11-09 2017-04-19 上海申瑞继保电气有限公司 Automatic drawing method for primary wiring diagram of electric power operation system
CN106600457B (en) * 2016-12-06 2020-08-14 国网福建省电力有限公司 Microcomputer five-prevention main wiring diagram analysis system of transformer substation
CN106600457A (en) * 2016-12-06 2017-04-26 国网福建省电力有限公司 Transformer-substation micro-computer five-prevention main wiring diagram analysis system
CN109947859A (en) * 2017-08-25 2019-06-28 南方电网科学研究院有限责任公司 Power distribution network drawing modeling method, system, storage medium and computer equipment
CN109947859B (en) * 2017-08-25 2023-12-05 南方电网科学研究院有限责任公司 Power distribution network drawing modeling method, system, storage medium and computer equipment
CN107978007A (en) * 2017-12-15 2018-05-01 贵州电网有限责任公司 Chart spacing automatically generates non-maintaining method in a kind of regulation and control integral system
CN110046391A (en) * 2019-03-18 2019-07-23 国网江苏省电力有限公司连云港供电分公司 Transforming plant primary wiring diagram automatic generation method based on monitoring information table
CN110046391B (en) * 2019-03-18 2021-05-07 国网江苏省电力有限公司连云港供电分公司 Automatic transformer substation primary wiring diagram generation method based on monitoring information table
CN111310408A (en) * 2020-02-27 2020-06-19 海南电网有限责任公司 Large power grid tidal current graph plant station node bus splitting mapping method
CN112084611A (en) * 2020-11-16 2020-12-15 华自科技股份有限公司 Power station topology generation method and storage medium
CN112084611B (en) * 2020-11-16 2021-02-02 华自科技股份有限公司 Power station topology generation method and storage medium
CN112529541A (en) * 2020-12-25 2021-03-19 山东鲁能软件技术有限公司 Method and system for generating equipment measurement label in distribution network line diagram
CN113625644A (en) * 2021-08-19 2021-11-09 国网四川省电力公司电力科学研究院 Auxiliary system for debugging alternating current system
CN113625644B (en) * 2021-08-19 2022-04-15 国网四川省电力公司电力科学研究院 Auxiliary system for debugging alternating current system

Also Published As

Publication number Publication date
CN101901492B (en) 2016-05-18

Similar Documents

Publication Publication Date Title
CN101901492A (en) Automatic generating method of electric network station wiring diagram
CN105373655B (en) A kind of method of one electrical secondary system connection figure of organic association Intelligent transformer station
CN106157167B (en) Secondary equipment remote control operation ticket system and implementation method of secondary equipment remote control operation ticket
CN104133953B (en) Intelligent substation secondary design system
CN104123271B (en) Intelligent substation secondary design system based on Excel
CN101923346B (en) Method and system for automatically generating anti-sabotage, anti-blocking, water irrigation, breathing, fire burning logic rules of substation
CN110336375A (en) A kind of processing method and system of power system monitor warning information
CN104537573A (en) Power grid operation information panoramic visualized display system
CN106021203B (en) Intelligent substation anti-misoperation lockout logic graphical expression method
CN103123758A (en) Dispatching automation digital physical hybrid simulation training system
CN102957205A (en) Method and system for establishing distribution network model
CN104166944B (en) A kind of grid switching operation bill automatic generation method of railway substation
CN108153996A (en) The method that electrical wiring group cabinet is realized with COMOS platforms
CN103761413A (en) Substation anti-misoperation logic intelligent generating method based on topology analysis
CN108520163A (en) Three-dimensional net rack method for automatic modeling based on CIM model and SVG figures
CN104360835A (en) Automatic sequential control operation ticket generation method based on topologic mode
CN104361531B (en) The recognition methods of the excessive risk faulty equipment of electric substation automation system and system
CN108683178A (en) Substation switching automatic generation method
CN110276516A (en) Distribution monitoring analysis and repairing command methods based on power grid GIS
CN105938506A (en) Graph visualization system for power grid power flow analysis
CN103455678B (en) Quadratic Imaginary loop chart collaborative design method based on the empty terminal of standardization
CN110705001A (en) Equipment-based monitoring information objectification modeling method for power system
CN103647279B (en) A kind of forecast failure set creation method based on plant stand wiring information
CN103545805B (en) Modeling-based railway power supply arm monitoring method
CN107766949A (en) Failure rapid rush-repair commander's business information exchange method based on meta-model

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160518