CN106570283A - Automatic drawing method for primary wiring diagram of electric power operation system - Google Patents

Automatic drawing method for primary wiring diagram of electric power operation system Download PDF

Info

Publication number
CN106570283A
CN106570283A CN201610984394.8A CN201610984394A CN106570283A CN 106570283 A CN106570283 A CN 106570283A CN 201610984394 A CN201610984394 A CN 201610984394A CN 106570283 A CN106570283 A CN 106570283A
Authority
CN
China
Prior art keywords
chopper
switch cubicle
switch
cabinet
drawn
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610984394.8A
Other languages
Chinese (zh)
Inventor
李昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SUNRISE POWER TECHNOLOGY Co Ltd
Original Assignee
SHANGHAI SUNRISE POWER TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SUNRISE POWER TECHNOLOGY Co Ltd filed Critical SHANGHAI SUNRISE POWER TECHNOLOGY Co Ltd
Priority to CN201610984394.8A priority Critical patent/CN106570283A/en
Publication of CN106570283A publication Critical patent/CN106570283A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Patch Boards (AREA)

Abstract

An automatic drawing method for a primary wiring diagram of an electric power operation system relates to the technical field of an electric power system. The automatic drawing method settles a technical problem of ensuring high accuracy of a wiring diagram. The automatic drawing method comprises the steps of establishing a switchgear meter and a circuit breaker meter for the electric power operation system, drawing each switchgear on the primary wiring diagram of the operation system according to the switchgear meter G and the circuit breaker meter D, arranging the switchgears on the diagram to multiple rows according to the voltage grade; drawing each circuit breaker on the primary wiring diagram of the operation system, and drawing connecting lines between the switchgears on the primary wiring diagram of the operation system. The automatic drawing method provided by the invention can reduce workload of a maintainer.

Description

Electric power operational system primary connection figure automatic drafting method
Technical field
The present invention relates to power system technology, more particularly to a kind of electric power operational system primary connection figure side of drafting automatically The technology of method.
Background technology
With the continuous expansion of electrical network scale, electrical network monitoring and operation maintenance workload increasingly increase, electric power operational system Electrical network monitoring level, and equipment automatization management degree can be effectively improved, the workload of operation maintenance personnel is reduced.
Electric power operational system primary connection figure is extremely important for electric power operational system, compares high-voltage electric power system, electric power The characteristics of operational system primary connection figure has switch many, and often have multiple switch to combine in a switch cubicle, and And switch cubicle needs are corresponding with field position, the position of the switch needs corresponding with field position.
Current electric power operational system primary connection figure is drawn by attendant, and this artificial method for drafting is difficult to Avoid error, wiring diagram correctness from being difficult to ensure that, influence whether the normal operation of electric power operational system, and the work of attendant Measure also larger.
The content of the invention
For defect present in above-mentioned prior art, the technical problem to be solved is to provide one kind and can guarantee that Wiring diagram correctness, can reduce the electric power operational system primary connection figure automatic drafting method of attendant's workload.
In order to solve above-mentioned technical problem, a kind of electric power operational system primary connection figure provided by the present invention is drawn automatically Method, it is characterised in that comprise the following steps that:
1)A switch cubicle table G is set up for electric power operational system, includes all in electric power operational system in switch cubicle table G The record of switch cubicle, include in the record of each switch cubicle cabinet numbering ID of the switch cubicle, cabinet serial number Gsx, cabinet title, Upstream switch cabinet sequence number Gsy;
If in two switch cubicles, the chopper in one of switch cubicle is that the chopper in another switch cubicle is powered, Then by the switch cubicle belonging to supply side chopper, the upstream switch cabinet of the switch cubicle being defined as belonging to power side chopper;
Wherein, the cabinet serial number Gsx of switch cubicle refers to that position of the switch cubicle in transformer station puts in order, if a switch Cabinet has upstream switch cabinet, then upstream switch cabinet sequence number Gsy of the switch cubicle is the cabinet order of the upstream switch cabinet of the switch cubicle Number;
2)A chopper table D is set up for electric power operational system, includes all in electric power operational system in chopper table D The record of chopper, includes chopper numbering ID, the chopper serial number of the chopper in the record of each chopper Dsx, chopper title, affiliated switch cubicle numbering ID, circuit breaker voltage grade;
Wherein, the chopper serial number Dsx of chopper refers to that position of the chopper in switch cubicle puts in order, chopper Affiliated switch cubicle numbering ID refers to cabinet numbering ID of the switch cubicle belonging to the chopper;
3)According to switch cubicle table G and chopper table D, each switch cubicle is drawn on operational system primary connection figure, and cause fortune Maintain each switch cubicle on unified wiring diagram and be arranged in multiple rows of, and the voltage of each switch cubicle in same row etc. to after by elder generation Level is identical, and each switch cubicle in same row presses cabinet serial number Gsx by elder generation to rear sequential;
Wherein, the electric pressure of each switch cubicle is consistent with the electric pressure of the chopper in the switch cubicle;
4)According to switch cubicle table G and chopper table D, each chopper is drawn on operational system primary connection figure, and each is disconnected Road device is plotted in the switch cubicle belonging to the chopper, and the chopper in same switch cubicle presses chopper serial number Dsx By elder generation to rear sequential, and when the quantity of the chopper in a switch cubicle is 1, the graphic plotting of chopper is grown up Degree is less than width, when the quantity of the chopper in a switch cubicle is more than 1, by the graphic plotting of chopper into length more than width Degree, and each chopper in same switch cubicle is with a connection line parallel;
5)According to switch cubicle table G and chopper table D, the connecting line between switch cubicle is drawn on operational system primary connection figure;
If a switch cubicle has upstream switch cabinet, in one bus of drawn beneath of the upstream switch cabinet of the switch cubicle Bs, and a connecting line is drawn connecting the switch cubicle and bus Bs.
Further, the length and width of each switch cubicle drawn is respectively:
It is Gx that setting tool has the quantity of the switch cubicle in the switch cubicle row of most switch cubicles, if Gx<4, then make Gmaxnum =4, if Gx>10, then Gmaxnum=10 are made, if 4< Gx <10, then make Gmaxnum=Gx;
Wherein, SLen is the length of the switch cubicle currently drawn, and SWei is the width of the switch cubicle currently drawn, Winwith is the width of operational system primary connection figure, and U is the electric pressure of the switch cubicle currently drawn.
Further, the length and width of each chopper drawn is respectively:
It is Gx that setting tool has the quantity of the switch cubicle in the switch cubicle row of most switch cubicles, if Gx<4, then make Gmaxnum =4, if Gx>10, then Gmaxnum=10 are made, if 4< Gx <10, then make Gmaxnum=Gx;
Wherein, Winwith is the width of operational system primary connection figure;
If the quantity of the chopper in switch cubicle belonging to the chopper currently drawn is 1, SLen currently to be drawn Chopper width, SWei is the length of the chopper currently drawn;
If the quantity of the chopper in switch cubicle belonging to the chopper currently drawn is more than 1, SLen currently to be painted The length of the chopper of system, SWei is the width of the chopper currently drawn.
The electric power operational system primary connection figure automatic drafting method that the present invention is provided, switch cubicle and chopper according to work The order at journey scene carries out serial number, and arranges the level of cabinet according to electric pressure, draws automatically from the order of current supply circuit Primary connection figure, can guarantee that wiring diagram correctness, moreover it is possible to reduce attendant's workload.
Description of the drawings
Fig. 1 is the flow chart of the electric power operational system primary connection figure automatic drafting method of the embodiment of the present invention.
Specific embodiment
Embodiments of the invention are described in further detail below in conjunction with description of the drawings, but the present embodiment is not used to limit The system present invention, every analog structure using the present invention and its similar change, all should list protection scope of the present invention in, the present invention In pause mark represent the relation of sum.
As shown in figure 1, a kind of electric power operational system primary connection figure automatic drafting method that the embodiment of the present invention is provided, Characterized in that, comprising the following steps that:
1)A switch cubicle table G is set up for electric power operational system, includes all in electric power operational system in switch cubicle table G The record of switch cubicle, include in the record of each switch cubicle cabinet numbering ID of the switch cubicle, cabinet serial number Gsx, cabinet title, Upstream switch cabinet sequence number Gsy;
If in two switch cubicles, the chopper in one of switch cubicle is that the chopper in another switch cubicle is powered, Then by the switch cubicle belonging to supply side chopper, the upstream switch cabinet of the switch cubicle being defined as belonging to power side chopper;
Wherein, the cabinet serial number Gsx of switch cubicle refers to that position of the switch cubicle in transformer station puts in order, if a switch Cabinet has upstream switch cabinet, then upstream switch cabinet sequence number Gsy of the switch cubicle is the cabinet order of the upstream switch cabinet of the switch cubicle Number;
2)A chopper table D is set up for electric power operational system, includes all in electric power operational system in chopper table D The record of chopper, includes chopper numbering ID, the chopper serial number of the chopper in the record of each chopper Dsx, chopper title, affiliated switch cubicle numbering ID, circuit breaker voltage grade;
Wherein, the chopper serial number Dsx of chopper refers to that position of the chopper in switch cubicle puts in order, chopper Affiliated switch cubicle numbering ID refers to cabinet numbering ID of the switch cubicle belonging to the chopper;
3)According to switch cubicle table G and chopper table D, each switch cubicle is drawn on operational system primary connection figure, and cause fortune Maintain each switch cubicle on unified wiring diagram and be arranged in multiple rows of, and the voltage of each switch cubicle in same row etc. to after by elder generation Level is identical, and each switch cubicle in same row presses cabinet serial number Gsx by elder generation to rear sequential;
Wherein, the electric pressure of each switch cubicle is consistent with the electric pressure of the chopper in the switch cubicle;
4)According to switch cubicle table G and chopper table D, each chopper is drawn on operational system primary connection figure, and each is disconnected Road device is plotted in the switch cubicle belonging to the chopper, and the chopper in same switch cubicle presses chopper serial number Dsx By elder generation to rear sequential, and when the quantity of the chopper in a switch cubicle is 1, the graphic plotting of chopper is grown up Degree is less than width, when the quantity of the chopper in a switch cubicle is more than 1, by the graphic plotting of chopper into length more than width Degree, and each chopper in same switch cubicle is with a connection line parallel;
5)According to switch cubicle table G and chopper table D, the connecting line between switch cubicle is drawn on operational system primary connection figure;
If a switch cubicle has upstream switch cabinet, in one bus of drawn beneath of the upstream switch cabinet of the switch cubicle Bs, and a connecting line is drawn connecting the switch cubicle and bus Bs.
In the embodiment of the present invention, the length and width of each switch cubicle drawn is respectively:
It is Gx that setting tool has the quantity of the switch cubicle in the switch cubicle row of most switch cubicles, if Gx<4, then make Gmaxnum =4, if Gx>10, then Gmaxnum=10 are made, if 4< Gx <10, then make Gmaxnum=Gx;
Wherein, SLen is the length of the switch cubicle currently drawn, and SWei is the width of the switch cubicle currently drawn, Winwith is the width of operational system primary connection figure, and U is the electric pressure of the switch cubicle currently drawn.
In the embodiment of the present invention, the length and width of each chopper drawn is respectively:
It is Gx that setting tool has the quantity of the switch cubicle in the switch cubicle row of most switch cubicles, if Gx<4, then make Gmaxnum =4, if Gx>10, then Gmaxnum=10 are made, if 4< Gx <10, then make Gmaxnum=Gx;
Wherein, Winwith is the width of operational system primary connection figure;
If the quantity of the chopper in switch cubicle belonging to the chopper currently drawn is 1, SLen currently to be drawn Chopper width, SWei is the length of the chopper currently drawn;
If the quantity of the chopper in switch cubicle belonging to the chopper currently drawn is more than 1, SLen currently to be painted The length of the chopper of system, SWei is the width of the chopper currently drawn.

Claims (3)

1. a kind of electric power operational system primary connection figure automatic drafting method, it is characterised in that comprise the following steps that:
1)A switch cubicle table G is set up for electric power operational system, includes all in electric power operational system in switch cubicle table G The record of switch cubicle, include in the record of each switch cubicle cabinet numbering ID of the switch cubicle, cabinet serial number Gsx, cabinet title, Upstream switch cabinet sequence number Gsy;
If in two switch cubicles, the chopper in one of switch cubicle is that the chopper in another switch cubicle is powered, Then by the switch cubicle belonging to supply side chopper, the upstream switch cabinet of the switch cubicle being defined as belonging to power side chopper;
Wherein, the cabinet serial number Gsx of switch cubicle refers to that position of the switch cubicle in transformer station puts in order, if a switch Cabinet has upstream switch cabinet, then upstream switch cabinet sequence number Gsy of the switch cubicle is the cabinet order of the upstream switch cabinet of the switch cubicle Number;
2)A chopper table D is set up for electric power operational system, includes all in electric power operational system in chopper table D The record of chopper, includes chopper numbering ID, the chopper serial number of the chopper in the record of each chopper Dsx, chopper title, affiliated switch cubicle numbering ID, circuit breaker voltage grade;
Wherein, the chopper serial number Dsx of chopper refers to that position of the chopper in switch cubicle puts in order, chopper Affiliated switch cubicle numbering ID refers to cabinet numbering ID of the switch cubicle belonging to the chopper;
3)According to switch cubicle table G and chopper table D, each switch cubicle is drawn on operational system primary connection figure, and cause fortune Maintain each switch cubicle on unified wiring diagram and be arranged in multiple rows of, and the voltage of each switch cubicle in same row etc. to after by elder generation Level is identical, and each switch cubicle in same row presses cabinet serial number Gsx by elder generation to rear sequential;
Wherein, the electric pressure of each switch cubicle is consistent with the electric pressure of the chopper in the switch cubicle;
4)According to switch cubicle table G and chopper table D, each chopper is drawn on operational system primary connection figure, and each is disconnected Road device is plotted in the switch cubicle belonging to the chopper, and the chopper in same switch cubicle presses chopper serial number Dsx By elder generation to rear sequential, and when the quantity of the chopper in a switch cubicle is 1, the graphic plotting of chopper is grown up Degree is less than width, when the quantity of the chopper in a switch cubicle is more than 1, by the graphic plotting of chopper into length more than width Degree, and each chopper in same switch cubicle is with a connection line parallel;
5)According to switch cubicle table G and chopper table D, the connecting line between switch cubicle is drawn on operational system primary connection figure;
If a switch cubicle has upstream switch cabinet, in one bus of drawn beneath of the upstream switch cabinet of the switch cubicle Bs, and a connecting line is drawn connecting the switch cubicle and bus Bs.
2. electric power operational system primary connection figure automatic drafting method according to claim 1, it is characterised in that drawn The length and width of each switch cubicle be respectively:
It is Gx that setting tool has the quantity of the switch cubicle in the switch cubicle row of most switch cubicles, if Gx<4, then make Gmaxnum =4, if Gx>10, then Gmaxnum=10 are made, if 4< Gx <10, then make Gmaxnum=Gx;
Wherein, SLen is the length of the switch cubicle currently drawn, and SWei is the width of the switch cubicle currently drawn, Winwith is the width of operational system primary connection figure, and U is the electric pressure of the switch cubicle currently drawn.
3. electric power operational system primary connection figure automatic drafting method according to claim 1, it is characterised in that drawn The length and width of each chopper be respectively:
It is Gx that setting tool has the quantity of the switch cubicle in the switch cubicle row of most switch cubicles, if Gx<4, then make Gmaxnum =4, if Gx>10, then Gmaxnum=10 are made, if 4< Gx <10, then make Gmaxnum=Gx;
Wherein, Winwith is the width of operational system primary connection figure;
If the quantity of the chopper in switch cubicle belonging to the chopper currently drawn is 1, SLen currently to be drawn Chopper width, SWei is the length of the chopper currently drawn;
If the quantity of the chopper in switch cubicle belonging to the chopper currently drawn is more than 1, SLen currently to be painted The length of the chopper of system, SWei is the width of the chopper currently drawn.
CN201610984394.8A 2016-11-09 2016-11-09 Automatic drawing method for primary wiring diagram of electric power operation system Withdrawn CN106570283A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610984394.8A CN106570283A (en) 2016-11-09 2016-11-09 Automatic drawing method for primary wiring diagram of electric power operation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610984394.8A CN106570283A (en) 2016-11-09 2016-11-09 Automatic drawing method for primary wiring diagram of electric power operation system

Publications (1)

Publication Number Publication Date
CN106570283A true CN106570283A (en) 2017-04-19

Family

ID=58540777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610984394.8A Withdrawn CN106570283A (en) 2016-11-09 2016-11-09 Automatic drawing method for primary wiring diagram of electric power operation system

Country Status (1)

Country Link
CN (1) CN106570283A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113295910A (en) * 2021-05-14 2021-08-24 马鞍山电力规划勘察设计院有限责任公司 Split type clamp type current transformer and transformer substation line surveying and mapping method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101901492A (en) * 2010-02-26 2010-12-01 常州东瑞电力软件有限公司 Automatic generating method of electric network station wiring diagram
CN104462473A (en) * 2014-12-19 2015-03-25 国家电网公司 Method for automatically generating CIM-G-format plant-station internal wiring diagram based on CIM-E power grid model
US20160004799A1 (en) * 2013-02-15 2016-01-07 Scheider Electric Indusries Sas Method for generating an electric installation modelling file, computer program product, associated modelling file and electronic display device
CN105512213A (en) * 2016-02-03 2016-04-20 国家电网公司 Intelligent substation primary-secondary equipment state information visual displaying method based on configuration files and G language
CN106055808A (en) * 2016-06-06 2016-10-26 南京磐能电力科技股份有限公司 Transformer substation main wiring diagram automatic drawing method based on SCL model file

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101901492A (en) * 2010-02-26 2010-12-01 常州东瑞电力软件有限公司 Automatic generating method of electric network station wiring diagram
US20160004799A1 (en) * 2013-02-15 2016-01-07 Scheider Electric Indusries Sas Method for generating an electric installation modelling file, computer program product, associated modelling file and electronic display device
CN104462473A (en) * 2014-12-19 2015-03-25 国家电网公司 Method for automatically generating CIM-G-format plant-station internal wiring diagram based on CIM-E power grid model
CN105512213A (en) * 2016-02-03 2016-04-20 国家电网公司 Intelligent substation primary-secondary equipment state information visual displaying method based on configuration files and G language
CN106055808A (en) * 2016-06-06 2016-10-26 南京磐能电力科技股份有限公司 Transformer substation main wiring diagram automatic drawing method based on SCL model file

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113295910A (en) * 2021-05-14 2021-08-24 马鞍山电力规划勘察设计院有限责任公司 Split type clamp type current transformer and transformer substation line surveying and mapping method
CN113295910B (en) * 2021-05-14 2022-06-03 国网安徽省电力有限公司马鞍山供电公司 Split type clamp type current transformer and transformer substation line surveying and mapping method

Similar Documents

Publication Publication Date Title
CN105373655B (en) A kind of method of one electrical secondary system connection figure of organic association Intelligent transformer station
CN103066689B (en) Online selection system of load transferring paths of 10kV feeders
CN107741563B (en) Test platform suitable for relay protection device
CN103885411A (en) Integrated automation system of power station
CN104360835A (en) Automatic sequential control operation ticket generation method based on topologic mode
CN203350349U (en) Transformer substation bus phase voltage off-limit alarm system
CN201383712Y (en) Ring-network cabinet monitor terminal
CN106556778A (en) A kind of Insulation Inspection Device for Direct-Current System
CN104849591A (en) Power distribution automation integrated test detection device
CN102832713B (en) CAN (controller area network) bus based distribution automation terminal and analog quantity acquisition method thereof
CN103904564A (en) High-voltage distribution device with double breakers used for single bus segmentation and application thereof
CN106570283A (en) Automatic drawing method for primary wiring diagram of electric power operation system
CN202383231U (en) Undercurrent singlephase earth fault comprehensive line selection system
CN105071337A (en) Self-feedback intelligent earth leakage protection controlling device and method
CN108152779A (en) Electronic current mutual inductor check system and method
CN202153246U (en) Direct current system grounding and ring network fault positioning system
CN203967831U (en) A kind of intelligent multiloop first cabinet of each row
CN104035003A (en) Single-segmented-bus parallel-PT logic judgment method for selecting line with small grounding current
CN202330619U (en) Novel intelligent low-current grounded line selection device
CN106600006A (en) Power failure monitoring system of 10 KV network topology structure and power failure determination method
CN207038883U (en) A kind of field layer I/O device quick-replaceable interface switching device
CN105590493B (en) A kind of distributed intelligence substation accident analogue system
CN204719152U (en) A kind of power distribution automation integration test pick-up unit
CN203774631U (en) High-voltage distribution device with dual circuit breakers in single bus sectionalizing mode
CN204156604U (en) A kind of Multifunctional power distribution automatization terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170419

WW01 Invention patent application withdrawn after publication