CN204450473U - A kind of adjustable tooling platform - Google Patents

A kind of adjustable tooling platform Download PDF

Info

Publication number
CN204450473U
CN204450473U CN201520087559.2U CN201520087559U CN204450473U CN 204450473 U CN204450473 U CN 204450473U CN 201520087559 U CN201520087559 U CN 201520087559U CN 204450473 U CN204450473 U CN 204450473U
Authority
CN
China
Prior art keywords
tooling platform
water pipe
plate
location
adjusting screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520087559.2U
Other languages
Chinese (zh)
Inventor
毛盾
董俊威
阙燚彬
毛丹丹
陈楚
陈智星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Machinery and Ship Co Ltd
Original Assignee
Ge Zhou Ba Mechanical Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ge Zhou Ba Mechanical Industry Co Ltd filed Critical Ge Zhou Ba Mechanical Industry Co Ltd
Priority to CN201520087559.2U priority Critical patent/CN204450473U/en
Application granted granted Critical
Publication of CN204450473U publication Critical patent/CN204450473U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a kind of adjustable tooling platform, tooling platform frame structure is formed by many longerons and Duo Gen beam welding, hold-down nut is provided with inside crosspoint, adjusting screw(rod) forms with nut and is threaded, parallels is provided with bottom adjusting screw(rod), parallels and ground touch, three limits of tooling platform framework are provided with water pipe, multiple liquid level gauge is connected with water pipe by three-way connection, water filling dewatering orifice is arranged on water pipe, the vertical side of location-plate is connected with the cross rail inner of tooling platform framework, the horizontal side of location-plate is connected with ground by expansion bolt.To installation accuracies such as generating sets, this tooling platform under the condition not needing the aids such as theodolite, can require that higher equipment is installed fast, convenient to operation, and can be used in any mixed earth concrete floor.

Description

A kind of adjustable tooling platform
Technical field
The utility model relates to a kind of tooling platform that may be used for generating set assembling, wiring; Also can be used for the equipment that other installation accuracy is higher, belong to tooling platform technical field.
Background technology
Generating set assembling need by assembling fittings such as public base, engine, generator, water tanks together, and assembly precision requires higher, strict especially to the flatness requirement of platform.General steel-structure factory building, be mixed earth concrete floor, for generating set, its earth construction can not meet installation requirement, and ground is directly padded and put flat plate, because the uneven also remote-effects in ground are to the stationarity of steel plate, on install also affect larger, but again reconstruct ground and bury quantities needed for steel plate underground too greatly, cost is high.Therefore, need development and Design one simple and direct, easily adjustable tool platform solve problems, this tooling platform can be applicable to any steel-structure factory building, can promote the use of on a large scale in engineering reality.
Summary of the invention
Technical problem to be solved in the utility model is, a kind of adjustable tooling platform is provided, this tooling platform can under the condition not needing the aids such as theodolite, fast the installation accuracies such as generating set are required that higher equipment is installed, convenient to operation, and any mixed earth concrete floor can be used in.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of adjustable tooling platform, tooling platform frame structure is formed by many longerons and Duo Gen beam welding, hold-down nut is provided with inside crosspoint, adjusting screw(rod) forms with nut and is threaded, parallels is provided with bottom adjusting screw(rod), parallels and ground touch, three limits of tooling platform framework are provided with water pipe, multiple liquid level gauge is connected with water pipe by three-way connection, water filling dewatering orifice is arranged on water pipe, the vertical side of location-plate is connected with the cross rail inner of tooling platform framework, the horizontal side of location-plate is connected with ground by expansion bolt.
Described longitudinal and cross beam adopts I-steel, is connected after longitudinal and cross beam welding with fixed head again.
Described location-plate is L-type structure.
The top of described liquid level gauge is demountable structure, and is connected with air.
The utility model achieves following technique effect:
The utility model adopts above-mentioned design, under the condition not needing the aids such as theodolite, can require that higher equipment is installed fast, ensure that the horizontal accuracy of erection unit to installation accuracies such as generating sets.
Described tooling platform frame structure is formed by many longerons and Duo Gen beam welding, hold-down nut is provided with inside crosspoint, adjusting screw(rod) forms with nut and is threaded, parallels is provided with bottom adjusting screw(rod), parallels and ground touch, and can be adjusted by adjusting screw(rod) to the height of tooling platform framework.
Three limits of described tooling platform framework are provided with water pipe, and multiple liquid level gauge is connected with water pipe by three-way connection, and water filling dewatering orifice is arranged on water pipe, judge whether tooling platform framework is in level by the liquid level on liquid level gauge.
The vertical side of described location-plate is connected with the cross rail inner of tooling platform framework, the horizontal side of location-plate is connected with ground by expansion bolt, after tooling platform framework adjustment level, can be connected with tooling platform frame structure by location-plate, thus tooling platform framework is fixed.
The top of described liquid level gauge is demountable structure, and is connected with air, thus ensure that water pipe and liquid level gauge form law of connected vessels.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Fig. 1 is top view of the present utility model.
Fig. 2 is front view of the present utility model.
In figure: longeron 1, crossbeam 2, water pipe 3, three-way connection 4, liquid level gauge 5, parallels 6, adjusting screw(rod) 7, water filling dewatering orifice 8, fixed head 9, hold-down nut 10, location-plate 11, expansion bolt 12.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiment of the present utility model is described further.
See Fig. 1-2, a kind of adjustable tooling platform, tooling platform frame structure is welded by many longerons 1 and Duo Gen crossbeam 2, hold-down nut 10 is provided with inside crosspoint, adjusting screw(rod) 7 forms with nut 10 and is threaded, parallels 6 is provided with bottom adjusting screw(rod) 7, parallels 6 touches with ground, three limits of tooling platform framework are provided with water pipe 3, multiple liquid level gauge 5 is connected with water pipe 3 by three-way connection 4, water filling dewatering orifice 8 is arranged on water pipe 3, the vertical side of location-plate 11 is connected with inside the crossbeam 2 of tooling platform framework, the horizontal side of location-plate 11 is connected with ground by expansion bolt 12, described longeron 1 and crossbeam 2 adopt I-steel, are connected after longeron 1 and crossbeam 2 weld with fixed head 9 again, described location-plate 11 is L-type structure, the top of described liquid level gauge 5 is demountable structure, and is connected with air.
Specific embodiments of the present utility model and operation principle are:
See Fig. 1-2, this programme is formed by 2, three I-shaped steel longitudinal beam 1 butt welding of two I-steel crossbeams, and crossbeam 2 quantity can change according to tooling platform size, and longeron 1 two ends port cuts away a part, forms wedge shape, is connected with the side of crossbeam 2; When it places smooth, weld flat with fixed head 9, crossbeam 2 and longeron 1 contact position electric arc welding are fixed.Tooling platform is welded and fixed nut 10 according to actual conditions in each corner, places adjusting screw(rod) 7 in hold-down nut 10, and adjusting screw(rod) 7 is contacted by parallels 6 with ground, by the height regulating hold-down nut 10 and adjusting screw(rod) 7 to adjust platform; Three limits of tooling platform framework are provided with water pipe 3, multiple liquid level gauge 5 is connected with water pipe 3 by three-way connection 4, water filling dewatering orifice 8 is arranged on water pipe 3, liquid level gauge 5 top can freely be dismantled, communicate with air, liquid level gauge 5 for benchmark, ensures liquid level gauge 5 at grade with plane on I-steel crossbeam 2, water liquid can free flow in liquid level gauge 5, water pipe 3, and hose arranges water filling dewatering outlet 8; Placement positioning plate 11 inside I-steel crossbeam 2, location-plate 11 is L-type, and the perpendicular side of location-plate 11 is leaned on mutually with I-steel, horizontal side and ground.
Specific works process is, in water pipe 3, inject clean water, and clean water can show on height level meter, and by adjustment adjusting screw(rod) 7, regulate podium level, when the level scale on liquid level gauge 5 is consistent, the flatness of tooling platform reaches requirement; Location-plate 11 horizontal side is fixedly linked by expansion bolt 12 and ground, perpendicular side and crossbeam 2 are welded and fixed, the scale of height level meter will be noted in welding process, symmetrical welding simultaneously, after location-plate 11 is fixing, removal adjusting screw(rod) 7 discharges water, and tooling platform is placed straight steel plate, facilitates the installation of other equipment.

Claims (4)

1. an adjustable tooling platform, it is characterized in that: tooling platform frame structure is welded by many longerons (1) and many crossbeams (2), hold-down nut (10) is provided with inside crosspoint, adjusting screw(rod) (7) forms with nut (10) and is threaded, adjusting screw(rod) (7) bottom is provided with parallels (6), parallels (6) touches with ground, three limits of tooling platform framework are provided with water pipe (3), multiple liquid level gauge (5) is connected with water pipe (3) by three-way connection (4), water filling dewatering orifice (8) is arranged on water pipe (3), the vertical side of location-plate (11) is connected with crossbeam (2) inner side of tooling platform framework, the horizontal side of location-plate (11) is connected with ground by expansion bolt (12).
2. a kind of adjustable tooling platform according to claim 1, is characterized in that: described longeron (1) and crossbeam (2) adopt I-steel, uses fixed head (9) to be connected again after longeron (1) and crossbeam (2) welding.
3. a kind of adjustable tooling platform according to claim 1, is characterized in that: described location-plate (11) is L-type structure.
4. a kind of adjustable tooling platform according to claim 1, is characterized in that: the top of described liquid level gauge (5) is demountable structure, and is connected with air.
CN201520087559.2U 2015-02-09 2015-02-09 A kind of adjustable tooling platform Expired - Fee Related CN204450473U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520087559.2U CN204450473U (en) 2015-02-09 2015-02-09 A kind of adjustable tooling platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520087559.2U CN204450473U (en) 2015-02-09 2015-02-09 A kind of adjustable tooling platform

Publications (1)

Publication Number Publication Date
CN204450473U true CN204450473U (en) 2015-07-08

Family

ID=53657416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520087559.2U Expired - Fee Related CN204450473U (en) 2015-02-09 2015-02-09 A kind of adjustable tooling platform

Country Status (1)

Country Link
CN (1) CN204450473U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107538442A (en) * 2017-09-21 2018-01-05 宜昌船舶柴油机有限公司 Vertical rotary workbench
CN110979578A (en) * 2019-12-10 2020-04-10 江南造船(集团)有限责任公司 Installation device and installation method for connector in floating platform module

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107538442A (en) * 2017-09-21 2018-01-05 宜昌船舶柴油机有限公司 Vertical rotary workbench
CN110979578A (en) * 2019-12-10 2020-04-10 江南造船(集团)有限责任公司 Installation device and installation method for connector in floating platform module

Similar Documents

Publication Publication Date Title
CN203247603U (en) High-order rag bolt positioner
CN203247859U (en) Alignment device for butt joint perpendicularity of large steel columns
CN204431472U (en) Make precast beam pedestal
CN103526954B (en) Construction method of overweight precision embedded part
CN104032969A (en) Precise positioning and process regulation and control device for vibration isolation support embedded plate
CN204450473U (en) A kind of adjustable tooling platform
CN102287058A (en) Method for installing and leveling large-plane high-precision embedded part
CN106193094B (en) A kind of embedding anchor bolts construction mould and foundation bolt adjust construction method
CN102926538A (en) Reaction box and construction method of reaction wall
CN106193330B (en) A kind of steel building construction land tenure foot bolt pre-embedded construction method
CN102691412A (en) Prefabricated frame structure connection supporting template with adjustable vertical height
CN203797266U (en) Frame supporting leg assembly capable of being used for adjusting levelness and height of device
CN104594317A (en) Working platform, single pile foundation, offshore working platform and installing method of offshore working platform
CN203371513U (en) Special installation platform for laser tracker
CN105604225A (en) Buckling assembly type dry hanging stone curtain wall vertical steel skeleton connection system and construction method thereof
CN105350407A (en) Three-dimensional adjusting device for magnetic suspension track
CN101929210A (en) Combination connector used for connecting beam and upright in stone curtain wall
CN203879041U (en) Embedded plate positioning support frame
CN204645626U (en) Flue, ventilation stack reserved opening shutoff mould
CN204435337U (en) Workbench and single-pile foundation and offshore work platform
CN103174300B (en) Viscous damper installation construction method
CN206591451U (en) A kind of positioner installed for vertical reinforcement
CN213337618U (en) Artificial rainfall simulation device for debris flow test
CN106368330B (en) Steel building construction land tenure foot bolt pre-embedded construction method
CN204919587U (en) Basis built -in fitting with adjustable it is two -way

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180103

Address after: 18 No. 443007 Hubei city in Yichang province Xiao Ting Road

Patentee after: Machinery & Ship Co., Ltd., China Gezhouba Group

Address before: 18 No. 443007 Hubei city of Yichang province located in Xiaoting District Road

Patentee before: Ge Zhou Ba mechanical industry Co., Ltd

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150708

Termination date: 20200209