CN105604225A - Buckling assembly type dry hanging stone curtain wall vertical steel skeleton connection system and construction method thereof - Google Patents
Buckling assembly type dry hanging stone curtain wall vertical steel skeleton connection system and construction method thereof Download PDFInfo
- Publication number
- CN105604225A CN105604225A CN201610046700.3A CN201610046700A CN105604225A CN 105604225 A CN105604225 A CN 105604225A CN 201610046700 A CN201610046700 A CN 201610046700A CN 105604225 A CN105604225 A CN 105604225A
- Authority
- CN
- China
- Prior art keywords
- connecting plate
- vertical
- steel skeleton
- vertical steel
- curtain wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
- E04B2/965—Connections of mullions and transoms
Abstract
The invention discloses a buckling assembly type dry hanging stone curtain wall vertical steel skeleton connection system and a construction method thereof. The buckling assembly type dry hanging stone curtain wall vertical steel skeleton connection system comprises a vertical steel skeleton, a vertical connecting plate and a connecting plate base, wherein the connecting plate base is fixed on a building vertical face wall or a pillar; the vertical steel skeleton is fixed on the vertical connecting plate and is arranged on the connecting plate base by the vertical connecting plate; the vertical connecting plate is fixed on the connecting plate base by clamping connection in a detachable way. The buckling assembly type dry hanging stone curtain wall vertical steel skeleton connection system is simple in structure and convenient and fast to assemble; furthermore, the problems that when a building dry hanging stone curtain wall steel skeleton is assembled in site, the quality of welding joints is not qualified or rust prevention measures have disadvantages, so that the partial or whole steel skeleton is damaged, and unsafe factors such as drop of dry hanging stone, collapse of skeleton and the like are further caused can be avoided. After the buckling assembly type dry hanging stone curtain wall vertical steel skeleton connection system is used, rapid, convenient and safe construction of a dry hanging stone curtain wall can be realized.
Description
Technical field
The present invention relates to build decorative engineering device field, specifically a kind of buckle pin-connected panel dry-hang stone curtain wall is perpendicularTo steel skeleton connected system and construction method.
Background technology
Building dry-hang stone curtain wall adopts vertically more and level connects into steel skeleton to shaped steel, and stone material is solid by suspension memberFix on crossbeam shaped steel, present stage, the each tie point of steel skeleton takes bolt to connect, be welded to connect or bolt moreAdd and be welded to connect. Said method, bolt connects, and workload is larger, and how because of member mismachining tolerance, causesBolt connects difficulty, cannot penetrate bolt hole. Welding connecting mode, is provided with many weld seams, field operation welderingConnect difficult quality guarantee, though and weld seam brushed antirust paint, be difficult to thoroughly play rust inhibition, far not moreAnd the rust-proof effect of factory's galvanizing processing, therefore, the steel skeleton corrosion problems that there will be in use more. Spiral shellBolt adds the method for being welded to connect, the problem that still unresolved singular association side exists. Therefore, need to develop oneFast, connected system and the construction method of safety, convenient installation dry-hang stone steel skeleton have seemed very necessaryAnd it is urgent.
Summary of the invention
In view of this, the object of this invention is to provide a kind of buckle pin-connected panel dry-hang stone curtain wall vertical steel skeletonConnected system and construction method, can install dry-hang stone steel skeleton fast, safely, easily.
Buckle pin-connected panel dry-hang stone curtain wall vertical steel skeleton connected system of the present invention, comprise vertical steel skeleton,Vertical connecting plate and connecting plate pedestal; Described connecting plate pedestal is fixed on elevation of building wall or post, described perpendicularBe fixed on vertical connecting plate and be installed on connecting plate pedestal by vertical connecting plate to steel skeleton; Describedly vertically connectFishplate bar connects and fixes removably in connecting plate pedestal.
Further, described connecting plate pedestal is provided with the draw-in groove for the vertical connecting plate of clamping; Described draw-in groove isStrip and opening up.
Further, described draw-in groove is at least two and spread configuration vertically.
Further, described vertical connecting plate is vertical with draw-in groove to be arranged, the limit portion of vertical connecting plate be provided with forThe snapper teeth of draw-in groove clamping.
Further, described vertical connecting plate is with respect to the paired setting of each connecting plate pedestal and along draw-in groove length to dividingList in the both sides of vertical steel skeleton; Described vertical connecting plate is provided with the horizontal bar for connecting vertical steel skeletonShape hole.
Further, also comprise insert in draw-in groove for along draw-in groove length to vertical connecting plate is carried out to spacing rubberPlug.
Further, described draw-in groove medial surface is concavity, and described rubber stopper is the little projection in large top, bottom.
Further, also comprise the support bar being supported between vertical steel skeleton and elevation of building wall or post.
Further, described support bar comprises and is located at the interior screw mandrel of vertical steel skeleton inner side and through vertical steel skeletonAnd vertical steel skeleton is fixed on to the connector of interior screw mandrel; Described interior screw mandrel is supported in elevation of building wall or postOne end is Rubber end.
The construction method of buckle pin-connected panel dry-hang stone curtain wall vertical steel skeleton connected system of the present invention, first existsOn elevation of building wall or post, draw the position of vertical steel skeleton, connect by the vertical steel frame position line drawing is fixingFishplate bar pedestal, and vertical connecting plate is connected with vertical skeleton, afterwards, by vertical steel skeleton by vertically connectingFishplate bar clamping is arranged on connecting plate pedestal, afterwards, draws the horizontal level of the vertical skeleton of will graticule adjustment, andBy fastening between vertical steel skeleton and vertical connecting plate, before being connected between vertical connecting plate and pedestal, establish rubber slab,After vertical steel skeleton is fixing, in the draw-in groove of connecting plate pedestal, lay rubber stopper to limit the position of vertical connecting platePut, adjust afterwards support bar length and make support bar and elevation of building wall or capital tight.
The invention has the beneficial effects as follows: buckle pin-connected panel dry-hang stone curtain wall vertical steel skeleton of the present invention connectsSystem Construction is simple, easy to assembly quick, meanwhile, has avoided the on-the-spot group of building dry-hang stone curtain wall steel skeletonWhen spelling, welded contact treatment measures off quality or antirust are unfavorable causes framework local or entirety damage to bringThe unsafe factors such as dry-hang stone drops or skeleton collapses, adopt this apparatus system can realize dry-hang stone curtain wallQuick, convenient, safe construction.
Brief description of the drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is connecting plate base construction schematic diagram;
Fig. 4 is the right view of Fig. 3;
Fig. 5 is the structural representation of vertical connecting plate;
Fig. 6 is the structural representation of rubber stopper.
Detailed description of the invention
Fig. 1 is structural representation of the present invention; Fig. 2 is the top view of Fig. 1; Fig. 3 is connecting plate pedestal knotStructure schematic diagram; Fig. 4 is the right view of Fig. 3; Fig. 5 is the structural representation of vertical connecting plate; Fig. 6 is rubberThe structural representation of plug, as shown in the figure: the vertical reinforcing bar of buckle pin-connected panel dry-hang stone curtain wall of the present embodimentFrame connected system, comprises vertical steel skeleton 1, vertical connecting plate 2 and connecting plate pedestal 3; Described connecting plate baseSeat 3 is fixed on elevation of building wall 4 or post, and described vertical steel skeleton 1 is fixed on vertical connecting plate 2 logicalCross vertical connecting plate 2 and be installed on connecting plate pedestal 3; The clamping removably of described vertical connecting plate 2Be fixed on connecting plate pedestal 3; Vertical steel skeleton 1 is the main supporting member of Building Curtain Wall Structures, employing channel-section steel,The shaped steel such as I-steel are processed into, vertical steel skeleton 1 through upper end, bottom and middle part fixed connection point be attached toThe outer surface of elevation of building wall 4 or post, arranges multiple tracks vertical steel skeleton 1 along building level direction, for anti-Rust, vertical steel skeleton 1 is generally taked the antirust processing such as zinc-plated, and vertical connecting plate 2 is adopted with vertical steel skeleton 1With bolt connection, connecting plate pedestal 3 adopts expansion bolt or through-wall bolt to be fixed on elevation of building wall 4 or postUpper, connecting plate pedestal 3 is provided with the via hole that supplies expansion bolt or through-wall bolt to pass; The buckle of the present embodimentPin-connected panel dry-hang stone curtain wall vertical steel skeleton 1 connection system construction is simple, easy to assembly quick, meanwhile,While having avoided the on-the-spot spelling of building dry-hang stone curtain wall steel skeleton, welded contact processing off quality or antirust is arrangedExecute unfavorable to cause that framework local or entirety damage that the dry-hang stone that brings drops or skeleton collapses etc. dangerous because ofElement, adopts this apparatus system can realize quick, convenient, the safe construction of dry-hang stone curtain wall.
In the present embodiment, described connecting plate pedestal 3 is provided with the draw-in groove 5 for the vertical connecting plate 2 of clamping;Described draw-in groove 5 is strip and opening up, and connecting plate pedestal 3 is slab construction, and draw-in groove 5 is by fixingCurling of the bar shaped in connecting plate pedestal 3 surfaces surrounds with connecting plate pedestal 3 surfaces, is not only convenient to vertically connectConnecting and fixing of fishplate bar 2, and multiple vertical connecting plate 2 can share a connecting plate pedestal 3, can ensureThe accuracy of each vertical connecting plate 2 relative positions, constructability.
In the present embodiment, described draw-in groove 5 is at least two and spread configuration vertically, can improve verticallyConnective stability between connecting plate 2 and connecting plate pedestal 3, and then improve security.
In the present embodiment, the setting vertical with draw-in groove 5 of described vertical connecting plate 2, the limit portion of vertical connecting plate 2Be provided with for the snapper teeth 6 of draw-in groove 5 clampings, snapper teeth 6 and draw-in groove 5 corresponding setting one by one, when clampingSnapper teeth 6 is inserted in draw-in groove 5, Stability Analysis of Structures, and bearing capacity is strong.
In the present embodiment, described vertical connecting plate 2 arranges and edge card in pairs with respect to each connecting plate pedestal 3Groove 5 is long to the both sides that are respectively in vertical steel skeleton 1; Described vertical connecting plate 2 is provided with for connecting verticalThe horizontal bar hole 7 of steel skeleton 1; Bolt is then fastening through horizontal bar hole 7 and vertical steel skeleton 1Together, horizontal bar hole 7 can be realized vertical steel skeleton 1 along horizontal minute movement, is convenient to regulate vertical steelThe position of skeleton 1.
In the present embodiment, also comprise insert in draw-in groove 5 for long to vertical connecting plate 2 is entered along draw-in groove 5The rubber stopper 8 that row is spacing, the quantity of rubber stopper 8 and position are can carry out vertical connecting plate 2 reliablyLocation is as the criterion, rubber stopper 8 inserted in draw-in groove 5 after vertical connecting plate 2 is connected in to connecting plate pedestal 3,Easy construction, quick.
In the present embodiment, described draw-in groove 5 medial surfaces are concavity, and described rubber stopper 8 is that large top, bottom is littleProjection, facilitates the fixing of rubber stopper 8, and draw-in groove 5 is the narrow structure of inner width mouth, and rubber stopper 8 is inserted to cardGroove 5 rear stabilities are good, difficult drop-off.
In the present embodiment, also comprise the support being supported between vertical steel skeleton 1 and elevation of building wall 4 or postBar 9, support bar 9 with connecting plate pedestal 3 along vertical array, the corresponding each vertical reinforcing bar of connecting plate pedestal 3It is multiple and along vertical array that frame 1 arranges, and support bar 9 is installed between adjacent two connecting plate pedestals 3 with rightVertical steel skeleton 1 supports, and improves mounting structure stability and the bearing capacity of vertical steel skeleton 1.
In the present embodiment, described support bar 9 comprises to be located at the interior screw mandrel of vertical steel skeleton 1 inner side and to pass perpendicularTo steel skeleton 1 and vertical steel skeleton 1 is fixed on to the connector of interior screw mandrel; Described interior screw mandrel is supported in buildingOne end of vertical plane wall 4 or post is Rubber end; Connector comprises and is connected in the screw mandrel of interior screw mandrel and is installed on screw mandrelOn nut, by nut, vertical steel skeleton 1 and screw mandrel are fixed together, rotary screw rod can utilize silkScrew connection structure between bar and interior screw mandrel is adjusted bearing height; Rubber end and interior screw mandrel are fixed as one,Rubber end is tapered, and face area is larger, and bearing capacity is strong.
The construction method of buckle pin-connected panel dry-hang stone curtain wall vertical steel skeleton 1 connected system of the present embodiment,First on elevation of building wall 4 or post, draw the position of vertical steel skeleton 1, by 1, the vertical steel skeleton drawingPut line fixed connecting plate pedestal 3, and vertical connecting plate 2 is connected with vertical skeleton, afterwards, by vertical steelSkeleton 1 is arranged on connecting plate pedestal 3 by vertical connecting plate 2 clampings, afterwards, draws the adjustment of will graticule perpendicularTo the horizontal level of skeleton, and by fastening between vertical steel skeleton 1 and vertical connecting plate 2, vertical connecting plate2 with pedestal between establish rubber slab before being connected, rubber slab is located between vertical connecting plate and pedestal, makes vertical connecting plateWith pedestal fixation, after vertical steel skeleton 1 is fixing, in the draw-in groove 5 of connecting plate pedestal 3, lay rubber stopper8 to limit the position of vertical connecting plate 2, adjusts afterwards support bar 9 length and make support bar 9 and elevation of buildingWall 4 or capital are tight, and this construction method is convenient and swift, can save man-hour, stabilized structure, durable.
Finally explanation, above embodiment is only unrestricted in order to technical scheme of the present invention to be described, althoughWith reference to preferred embodiment, the present invention is had been described in detail, those of ordinary skill in the art should be appreciated thatCan modify or be equal to replacement technical scheme of the present invention, and not depart from technical solution of the present inventionAim and scope, it all should be encompassed in the middle of claim scope of the present invention.
Claims (10)
1. a buckle pin-connected panel dry-hang stone curtain wall vertical steel skeleton connected system, is characterized in that: compriseVertical steel skeleton, vertical connecting plate and connecting plate pedestal; Described connecting plate pedestal be fixed on elevation of building wall orOn post, described vertical steel skeleton is fixed on vertical connecting plate and is installed on connecting plate pedestal by vertical connecting plate;Described vertical connecting plate connects and fixes removably in connecting plate pedestal.
2. buckle pin-connected panel dry-hang stone curtain wall vertical steel skeleton connected system according to claim 1,It is characterized in that: described connecting plate pedestal is provided with the draw-in groove for the vertical connecting plate of clamping; Described draw-in groove isStrip and opening up.
3. buckle pin-connected panel dry-hang stone curtain wall vertical steel skeleton connected system according to claim 2,It is characterized in that: described draw-in groove is at least two and spread configuration vertically.
4. buckle pin-connected panel dry-hang stone curtain wall vertical steel skeleton connected system according to claim 3,It is characterized in that: described vertical connecting plate is vertical with draw-in groove to be arranged, the limit portion of vertical connecting plate be provided with forThe snapper teeth of draw-in groove clamping.
5. buckle pin-connected panel dry-hang stone curtain wall vertical steel skeleton connected system according to claim 4,It is characterized in that: described vertical connecting plate is with respect to the paired setting of each connecting plate pedestal and along draw-in groove length to dividingList in the both sides of vertical steel skeleton; Described vertical connecting plate is provided with the horizontal bar for connecting vertical steel skeletonShape hole.
6. buckle pin-connected panel dry-hang stone curtain wall vertical steel skeleton connected system according to claim 5,It is characterized in that: also comprise insert in draw-in groove for along draw-in groove length to vertical connecting plate is carried out to spacing rubberPlug.
7. buckle pin-connected panel dry-hang stone curtain wall vertical steel skeleton connected system according to claim 6,It is characterized in that: described draw-in groove medial surface is concavity, described rubber stopper is the little projection in large top, bottom.
8. buckle pin-connected panel dry-hang stone curtain wall vertical steel skeleton connected system according to claim 1,It is characterized in that: also comprise the support bar being supported between vertical steel skeleton and elevation of building wall or post.
9. buckle pin-connected panel dry-hang stone curtain wall vertical steel skeleton connected system according to claim 8,It is characterized in that: described support bar comprises to be located at the interior screw mandrel of vertical steel skeleton inner side and to pass vertical steel skeletonAnd vertical steel skeleton is fixed on to the connector of interior screw mandrel; Described interior screw mandrel is supported in elevation of building wall or postOne end is Rubber end.
10. a construction method for buckle pin-connected panel dry-hang stone curtain wall vertical steel skeleton connected system, its featureBe: first on elevation of building wall or post, draw the position of vertical steel skeleton, by the vertical steel skeleton position drawingPut line fixed connecting plate pedestal, and vertical connecting plate is connected with vertical skeleton, afterwards, by vertical steel skeletonBe arranged on connecting plate pedestal by vertical connecting plate clamping, afterwards, draw the water of the vertical skeleton of will graticule adjustmentMean place, and by fastening between vertical steel skeleton and vertical connecting plate, before being connected between vertical connecting plate and pedestalIf rubber slab is laid rubber stopper after vertical steel skeleton is fixing and is connected to limit vertically in the draw-in groove of connecting plate pedestalThe position of fishplate bar, adjusts afterwards support bar length and makes support bar and elevation of building wall or capital tight, and rubber stopper is usedIn the horizontal level of fixing vertical connecting plate, support bar makes vertical connecting plate and pedestal fix more firm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610046700.3A CN105604225B (en) | 2016-01-22 | 2016-01-22 | The vertical steel skeleton connection system of the pin-connected panel dry-hang stone curtain wall that is buckled and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610046700.3A CN105604225B (en) | 2016-01-22 | 2016-01-22 | The vertical steel skeleton connection system of the pin-connected panel dry-hang stone curtain wall that is buckled and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105604225A true CN105604225A (en) | 2016-05-25 |
CN105604225B CN105604225B (en) | 2018-05-04 |
Family
ID=55984524
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610046700.3A Active CN105604225B (en) | 2016-01-22 | 2016-01-22 | The vertical steel skeleton connection system of the pin-connected panel dry-hang stone curtain wall that is buckled and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105604225B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677458A (en) * | 2017-02-23 | 2017-05-17 | 管大海 | Assembly type construction decorative plate |
CN107130759A (en) * | 2017-06-15 | 2017-09-05 | 合肥光聚财建筑装饰工程有限公司 | The safety-type outer wall heat insulating and decorating plate of high-building construction and its construction method |
CN110714557A (en) * | 2019-10-22 | 2020-01-21 | 江苏盛世伟业新材料有限公司 | Glass curtain wall applied to energy-saving building |
CN112144717A (en) * | 2020-10-09 | 2020-12-29 | 齐彪 | Framework installation mechanism for building curtain wall engineering construction |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4873805A (en) * | 1988-07-21 | 1989-10-17 | Ting Raymond M L | Connecting means of curtainwall supporting mullions |
CN201062389Y (en) * | 2007-06-08 | 2008-05-21 | 杜金泽 | Latch hook type curtain wall column mounting regulating structure |
CN201762920U (en) * | 2010-05-20 | 2011-03-16 | 朝泽实业股份有限公司 | Honeycomb board |
CN203654558U (en) * | 2014-01-15 | 2014-06-18 | 徐明山 | Detachable grid system |
CN204098416U (en) * | 2014-07-31 | 2015-01-14 | 深圳市美术装饰工程有限公司广州分公司 | Decorative wall panels erecting device |
-
2016
- 2016-01-22 CN CN201610046700.3A patent/CN105604225B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4873805A (en) * | 1988-07-21 | 1989-10-17 | Ting Raymond M L | Connecting means of curtainwall supporting mullions |
CN201062389Y (en) * | 2007-06-08 | 2008-05-21 | 杜金泽 | Latch hook type curtain wall column mounting regulating structure |
CN201762920U (en) * | 2010-05-20 | 2011-03-16 | 朝泽实业股份有限公司 | Honeycomb board |
CN203654558U (en) * | 2014-01-15 | 2014-06-18 | 徐明山 | Detachable grid system |
CN204098416U (en) * | 2014-07-31 | 2015-01-14 | 深圳市美术装饰工程有限公司广州分公司 | Decorative wall panels erecting device |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677458A (en) * | 2017-02-23 | 2017-05-17 | 管大海 | Assembly type construction decorative plate |
CN107130759A (en) * | 2017-06-15 | 2017-09-05 | 合肥光聚财建筑装饰工程有限公司 | The safety-type outer wall heat insulating and decorating plate of high-building construction and its construction method |
CN110714557A (en) * | 2019-10-22 | 2020-01-21 | 江苏盛世伟业新材料有限公司 | Glass curtain wall applied to energy-saving building |
CN112144717A (en) * | 2020-10-09 | 2020-12-29 | 齐彪 | Framework installation mechanism for building curtain wall engineering construction |
Also Published As
Publication number | Publication date |
---|---|
CN105604225B (en) | 2018-05-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105604225A (en) | Buckling assembly type dry hanging stone curtain wall vertical steel skeleton connection system and construction method thereof | |
CN201763002U (en) | Independent adjustable steel supporting device | |
CN104196055A (en) | Construction method for frameworks on lower portion of basement exterior wall | |
CN102691412B (en) | Prefabricated frame structure connection supporting template with adjustable vertical height | |
CN208122353U (en) | A kind of guard rail connector | |
KR20110010248A (en) | Multi u-head bracket apparatus for bridge construction | |
CN104120811A (en) | Metal panel unitized curtain wall system | |
CN208167533U (en) | A kind of heavy type truss pipe support system | |
JP5612353B2 (en) | building | |
JP3189564U (en) | Fall prevention fence for concrete structures | |
CN205314323U (en) | Hang stone material curtain connected system futilely | |
CN214696984U (en) | Cast-in-place box girder concrete curing means | |
JP3971420B2 (en) | Balcony railing | |
CN206438389U (en) | Pier stud connecting bracket component | |
CN111877390A (en) | Large-scale tower crane basis fixing device | |
CN106571775A (en) | Combiner box support and combiner box | |
CN110130391A (en) | Isolated footing pre-embedded bolt mounting structure and method | |
CN203905221U (en) | A steel structural support under a ground rail | |
CN110424266B (en) | Assembled device for controlling bridge deck pavement elevation and elevation control method | |
CN214831950U (en) | Tower column inner seal top support | |
CN104481032B (en) | One nuclear power plant body of wall hanger and construction method thereof | |
CN216479300U (en) | Vertical fire pipeline fixing device | |
CN204299011U (en) | The supporting construction of high-low bay floor support plate | |
CN211691303U (en) | Civil air defense door frame supporting structure | |
CN202755642U (en) | Bracket used for floor hanging mold construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |