CN202755642U - Bracket used for floor hanging mold construction - Google Patents

Bracket used for floor hanging mold construction Download PDF

Info

Publication number
CN202755642U
CN202755642U CN 201220357723 CN201220357723U CN202755642U CN 202755642 U CN202755642 U CN 202755642U CN 201220357723 CN201220357723 CN 201220357723 CN 201220357723 U CN201220357723 U CN 201220357723U CN 202755642 U CN202755642 U CN 202755642U
Authority
CN
China
Prior art keywords
plate
bracket
narrow slot
floor
hangs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220357723
Other languages
Chinese (zh)
Inventor
李芳�
魏建国
杨忠勇
黄明洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry Huaxing Construction Co Ltd
Original Assignee
China Nuclear Industry Huaxing Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry Huaxing Construction Co Ltd filed Critical China Nuclear Industry Huaxing Construction Co Ltd
Priority to CN 201220357723 priority Critical patent/CN202755642U/en
Application granted granted Critical
Publication of CN202755642U publication Critical patent/CN202755642U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a bracket used for floor hanging mold construction, and belongs to the technical field of a building operation facility. The bracket comprises an upper flange plate, a wall adhering plate, an inserting plate and two lateral plates. One side of the upper flange plate is fixedly connected with the upper side of the wall adhering plate in vertical mode, right-angle sides of the two lateral plates are respectively and fixedly connected with two horizontal sides of the upper flange plate and two vertical sides of the wall adhering plate in vertical mode, a waist-shaped hole which extends vertically is arranged in the middle of the wall adhering plate, an arc concave small support plate is fixedly arranged on the lower portion of the wall adhering plate, the width of the waist-shaped hole is matched with the diameter of an installation bolt, and the lower arc side of the waist-shaped hole fits with an arc concave of the small support plate. A narrow inserting groove is arranged on one of lateral plates, a bridging part, far away from one side of the narrow inserting groove of the lateral plate, is fixedly arranged on the wall adhering wall, and the bridging part forms a wide inserting groove. The inserting plate is provided with inclination which is matched with the wide inserting groove and the narrow inserting groove and can achieve self locking. The bracket for floor hanging mold construction is simple in structure, and convenient to install, and thereby properly solves difficulty problems in the prior art. Bearing capacity of the bracket can completely meet demands.

Description

A kind of floor hangs mould construction bracket
Technical field
The utility model relates to a kind of building-supporting member, and especially a kind of floor hangs the mould construction and uses bracket, belongs to the Facilities technical field.
Background technology
In the building operations of nuclear power station and so on, the member such as for a long time, the support system of floor bottom mould sets up pylon, scaffold always on raft foundation or at lower floor's floor, shore is to bear concrete deadweight and working load.But run into raft foundation or lower floor's floor is mounted with main equipment in supporting member positions such as pylons, when causing supporting member on raft foundation or on lower floor's floor without " place ", can't adopt above conventional supporting way to realize the support of floor bottom mould.To this, once mentioned in " the special method for supporting comparative analysis of nuclear power station preloader floor " in professional magazine the 12nd phase in 2010 " construction technology ", and illustrated that this was that technical barrier to be solved is arranged.
Summary of the invention
The purpose of this utility model is: proposing a kind ofly can provide the floor bottom mould of secure support point to support at the wall body vertical face to use steel corbel, thereby solves the difficult problem that above-mentioned existing floor bottom mould can't support.
In order to reach above purpose, floor of the present utility model hangs the mould construction and uses bracket, it is characterized in that: comprise top flange plate and the attached wall plate of rectangle, and plate and the biside plate with right-angle side; One side of described top flange plate is connected with the top of attached wall plate is vertical, the right-angle side of described biside plate respectively with two horizontal sides of top flange plate and attached wall plate two vertical side is vertical is connected; Described attached wall plate middle part is shaped with the mounting hole of vertical extension, and the bottom fixedly has the recessed little fagging of circular arc; The width of described mounting hole and the diameter of erection bolt match, and recessed the matching of circular arc of lower arc-shaped edges and described little fagging; One of described side plate is shaped with narrow slot, and described attached wall plate is fixed with the bridgeware that forms wide slot away from a side that is shaped with narrow slot side plate; Described plate has with described wide slot and narrow slot matches and gradient that can self-locking.
During use, carry out according to the following steps:
The first step, fixedly has the built-in fitting of screw at the predetermined absolute altitude place of the body of wall of floor bottom mould to be supported;
Second step, floor is hung mould construction be attached on the wall in upper position with top flange plate with bracket, and fix with passing the erection bolt that is screwed in the built-in fitting screw behind the attached wall plate mounting hole lower end;
In the 3rd step, plate is tightly slotting towards narrow slot direction by wide slot, make its following wedging erection bolt.
Like this, bracket of the present utility model is placing steel beam thereon just, becomes on the wall body vertical face the reliably load-bearing strong point, and that realizes that floor bottom mould supports hangs the mould construction.
The utility model floor hangs that mould construction is simple with steel bracket structure, easy for installation, and bearing capacity meets the demands fully, thus properly settled when on raft foundation or the floor when having the reasons such as large-scale preloader not have sufficient space, floor bottom mould is without the difficult problem at place.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further described.
Fig. 1 is the perspective view of an embodiment of the utility model.
Fig. 2 is the plane projection structural representation of Fig. 1 embodiment.
Fig. 3 is the use mounting structure schematic diagram of Fig. 1 embodiment.
The specific embodiment
Embodiment one
The floor of present embodiment hangs mould construction with bracket selection steel plate, structure as depicted in figs. 1 and 2, mainly by top flange plate 1 and the attached wall plate 2 of rectangle, and plate 5 and biside plate 3,4 with right-angle side form.The top vertical welding that the inner edge of top flange plate 1 rides over attached wall plate 2 is connected, biside plate 3,4 is at right angles trapezoidal, the bottom has hypotenuse, and right-angle side is connected with two horizontal sides of top flange plate and two vertical side vertical weldings of attached wall plate respectively, consists of the effect of bearing rib.Attached wall plate 2 middle parts are except the lower mounting hole 2-2 that is shaped with vertical extension, also be shaped with mounting hole 2-1, can bracket is temporary fixed when the effect of this mounting hole is the bracket installation on the one hand, do not reach when requiring when the flatness of top flange plate 1 on the other hand, can regulate and control by the lower mounting hole 2-2 of this waist hole and its below the flatness of the top flange plate 1 of bracket.Lower mounting hole 2-2 bottom is welded and fixed has the recessed little fagging 9 of circular arc.The width of lower mounting hole 2-2 and the diameter of erection bolt match, and recessed the matching of circular arc of lower arc-shaped edges and little fagging 9.Side plate 3 is shaped with the narrow slot that top edge tilts.Attached wall plate 2 is welded with the bridgeware that forms wide slot away from a side of narrow slot side plate 3, and this bridgeware is welded by upper pier plate 6, the lower pier plate 7 of space and the bridge plate 8 that is connected across between 6 times pier plates 7 of upper pier plate.The lower limb 6-1 of upper pier plate 6 and narrow slot top edge tilt in the same way, and its extended line overlaps with the top edge of narrow slot, and the top edge of lower pier plate 7 and the lower edge of narrow slot are on the same level line.Plate 5 has with wide slot and narrow slot the gradient that matches, can self-locking, and lower limb is to have the ripple limit of strengthening wedge action, a narrower end has the dop that extends to form up and down, effect is to guarantee to make plate and bracket form supporting single unit system before bracket is installed, be difficult for landing from bracket with the plate of dop, can prevent that bracket from installing front card and losing.
During use, referring to Fig. 5, fixedly has first the built-in fitting of screw at the predetermined absolute altitude place of the body of wall of floor bottom mould to be supported; Again floor is hung the mould construction and be attached on the wall in upper position with top flange plate with bracket, and fix with passing the erection bolt that is screwed in the built-in fitting screw behind the attached wall plate mounting hole lower end; Afterwards plate is tightly inserted towards narrow slot direction by wide slot, made its following wedging erection bolt.In the process of fastening erection bolt, note keeping the top flange plate leveling.At last, set up the double flute steel as the strong point of main girder steel at bracket, hang the required complete support system of mould construction thereby form.
Facts have proved, the floor of present embodiment hang mould construction with steel bracket structure rationally, install convenient, provide the suitable load-bearing strong point for floor hangs the mould construction on the wall body vertical face, bearing capacity meets the demands fully, also is adapted at adopting without other construction occasion of ground supports condition.

Claims (5)

1. a floor hangs the mould construction and uses bracket, it is characterized in that: comprise top flange plate and the attached wall plate of rectangle, and plate and the biside plate with right-angle side; One side of described top flange plate is connected with the top of attached wall plate is vertical, the right-angle side of described biside plate respectively with two horizontal sides of top flange plate and attached wall plate two vertical side is vertical is connected; Described attached wall plate middle part is shaped with the mounting hole of vertical extension, and the bottom fixedly has the recessed little fagging of circular arc; The width of described mounting hole and the diameter of erection bolt match, and recessed the matching of circular arc of lower arc-shaped edges and described little fagging; One of described side plate is shaped with narrow slot, and described attached wall plate is fixed with the bridgeware that forms wide slot away from a side that is shaped with narrow slot side plate; Described plate has with described wide slot and narrow slot matches and gradient that can self-locking.
2. floor according to claim 1 hangs mould construction and uses bracket, it is characterized in that: described bridgeware is welded by the upper pier plate of space, lower pier plate and the bridge plate that is connected across between the upper and lower pier plate.
3. floor according to claim 2 hangs mould construction bracket, it is characterized in that: the top edge of described narrow slot tilts, the lower limb of described upper pier plate and narrow slot top edge tilt in the same way, and its extended line overlaps with the top edge of narrow slot, and the top edge of described lower pier plate and the lower edge of described narrow slot are on the same level line.
4. floor according to claim 3 hangs the mould construction and uses bracket, and it is characterized in that: the lower limb of described plate is the ripple limit.
5. floor according to claim 4 hangs the mould construction and uses bracket, and it is characterized in that: the narrower end of described plate has the dop that extends to form up and down.
CN 201220357723 2012-07-23 2012-07-23 Bracket used for floor hanging mold construction Expired - Fee Related CN202755642U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220357723 CN202755642U (en) 2012-07-23 2012-07-23 Bracket used for floor hanging mold construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220357723 CN202755642U (en) 2012-07-23 2012-07-23 Bracket used for floor hanging mold construction

Publications (1)

Publication Number Publication Date
CN202755642U true CN202755642U (en) 2013-02-27

Family

ID=47734831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220357723 Expired - Fee Related CN202755642U (en) 2012-07-23 2012-07-23 Bracket used for floor hanging mold construction

Country Status (1)

Country Link
CN (1) CN202755642U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102758523A (en) * 2012-07-23 2012-10-31 中国核工业华兴建设有限公司 Bracket for floor hoisting die construction and use method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102758523A (en) * 2012-07-23 2012-10-31 中国核工业华兴建设有限公司 Bracket for floor hoisting die construction and use method thereof
CN102758523B (en) * 2012-07-23 2014-10-01 中国核工业华兴建设有限公司 Bracket for floor hoisting die construction and use method thereof

Similar Documents

Publication Publication Date Title
CN203430059U (en) Temporary fixing device used for installing large-span steel structure roof primary truss
CN105040945B (en) Connection node structure of fair-faced concrete prefabrication exterior wall hanging plates
CN203821867U (en) Shear wall body assembling and aligning device
CN206000165U (en) A kind of aluminum alloy mould plate form bracing fast assembly and disassembly mechanism
CN103866693A (en) Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge
CN104947958A (en) Adjustable support frame for truss assembly
CN202755642U (en) Bracket used for floor hanging mold construction
CN204826211U (en) Outer wall hanging plate connecting device of precast concrete
CN108104482B (en) Batter post installation method
CN102758523B (en) Bracket for floor hoisting die construction and use method thereof
CN105604225A (en) Buckling assembly type dry hanging stone curtain wall vertical steel skeleton connection system and construction method thereof
CN204738536U (en) Subway station side wall concrete form support frame
CN103291042B (en) A kind of can the curtain wall pendant of three-dimensional regulation
CN102653947B (en) Underground embedded steel component limiting straightening construction method
CN103982049B (en) Shear wall body assembling machine straightening device
CN201605589U (en) Fixed end
CN205444951U (en) A rotary joint connecting device for prefabricated component bracing
CN211498452U (en) Novel bridge telescoping device
CN204715362U (en) A kind of deep foundation ditch embedded column base bracing frame
CN208087094U (en) A kind of inclined-plane cell cube Lift-on/Lift-off System
CN107298391B (en) Tower crane attached wall structure and its construction method
CN205224571U (en) Anchor of builder's jack
CN204225491U (en) The support chock of formwork keel
CN209942225U (en) Adjustable temporary supporting truss for fabricated floor
CN216239023U (en) Self-adaptive multi-direction adjusting star wheel anti-falling support based on curtain wall embedded part

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130227

Termination date: 20210723