CN105604225B - The vertical steel skeleton connection system of the pin-connected panel dry-hang stone curtain wall that is buckled and construction method - Google Patents
The vertical steel skeleton connection system of the pin-connected panel dry-hang stone curtain wall that is buckled and construction method Download PDFInfo
- Publication number
- CN105604225B CN105604225B CN201610046700.3A CN201610046700A CN105604225B CN 105604225 B CN105604225 B CN 105604225B CN 201610046700 A CN201610046700 A CN 201610046700A CN 105604225 B CN105604225 B CN 105604225B
- Authority
- CN
- China
- Prior art keywords
- connecting plate
- vertical
- steel skeleton
- vertical steel
- card slot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
- E04B2/965—Connections of mullions and transoms
Abstract
The invention discloses the vertical steel skeleton connection system of one kind buckle pin-connected panel dry-hang stone curtain wall and construction method, including vertical steel skeleton, vertical connecting plate and connecting plate pedestal;The connecting plate pedestal is fixed on elevation of building wall or column, and the vertical steel skeleton is fixed on vertical connecting plate and is installed on connecting plate pedestal by vertical connecting plate;The vertical connecting plate is removably connected and fixed in connecting plate pedestal;The vertical steel skeleton connection system construction of buckle pin-connected panel dry-hang stone curtain wall of the present invention is simple, it is easy to assembly quick, at the same time, welded contact is off quality when avoiding building dry-hang stone curtain wall steel skeleton scene spelling or antirust treatment measure is unfavorable causes framework local or integrally damages the dry-hang stone brought to drop or the insecurity such as skeleton collapses, and the quick, convenient of dry-hang stone curtain wall, safe construction can be realized using present apparatus system.
Description
Technical field
It is specifically a kind of buckle vertical reinforcing bar of pin-connected panel dry-hang stone curtain wall the present invention relates to decorative engineering device field is built
Frame connects system and construction method.
Background technology
Building dry-hang stone curtain wall connects into steel skeleton using vertical and horizontal direction shaped steel more, and stone material is fixed on horizontal stroke by suspension member
On beam type steel, at this stage, each tie point of steel skeleton is taken more to be bolted, is welded to connect or bolt adds and is welded to connect.Above-mentioned side
Method, is bolted, and workload is larger, and causes to be bolted difficulty because of component mismachining tolerance more, can not penetrate bolt hole.Weldering
Connect connection mode, equipped with a plurality of weld seam, field operation welding quality is difficult to ensure that, though and weld seam brushed antirust paint, it is more difficult
It is therefore, when in use that steel skeleton occurs far away from the rust-proof effect of factory's galvanizing processing thoroughly to play anti-rust action more
Corrosion problem.Bolt adds the method for being welded to connect, still unresolved singular association side there are the problem of.Therefore, one kind need to be developed
Quickly, the connection system of dry-hang stone steel skeleton safely, conveniently is installed and construction method has been very necessary and urgent.
The content of the invention
In view of this, the object of the present invention is to provide the vertical steel skeleton connection system of one kind buckle pin-connected panel dry-hang stone curtain wall
System and construction method, can quickly, safely and conveniently install dry-hang stone steel skeleton.
The buckle pin-connected panel dry-hang stone curtain wall vertical steel skeleton connection system of the present invention, including it is vertical steel skeleton, vertical
Connecting plate and connecting plate pedestal;The connecting plate pedestal is fixed on elevation of building wall or column, and the vertical steel skeleton is fixed on
Vertical connecting plate is simultaneously installed on connecting plate pedestal by vertical connecting plate;The vertical connecting plate is removably clamped solid
Due to connecting plate pedestal.
Further, the connecting plate pedestal is equipped with the card slot for being used for being clamped vertical connecting plate;The card slot is strip
It is and opening up.
Further, the card slot at least two and vertically spread configuration.
Further, the vertical connecting plate is vertically arranged with card slot, and the edge of vertical connecting plate, which is equipped with, to be used for and card slot card
The snapper teeth connect.
Further, the vertical connecting plate is arranged in pairs and perpendicular along card slot length to being respectively in relative to each connecting plate pedestal
To the both sides of steel skeleton;The vertical connecting plate is equipped with the horizontal bar hole for being used for connecting vertical steel skeleton.
Further, further include in insertion card slot be used for carry out spacing rubber stopper along card slot length to vertical connecting plate.
Further, the card slot medial surface is concavity, and the rubber stopper is the small convex block in the big top in lower part.
Further, the supporting rod being supported between vertical steel skeleton and elevation of building wall or column is further included.
Further, the supporting rod and including the interior screw on the inside of vertical steel skeleton and through vertical steel skeleton will erect
The connector of interior screw is fixed on to steel skeleton;It is Rubber end that the interior screw, which is supported in elevation of building wall or one end of column,.
The construction method of the vertical steel skeleton connection system of buckle pin-connected panel dry-hang stone curtain wall of the present invention, it is first vertical in building
The position of vertical steel skeleton is drawn on face wall or column, by the vertical steel frame position line fixed connecting plate pedestal drawn, and will be perpendicular
It is connected with vertical skeleton to connecting plate, afterwards, vertical steel skeleton is installed on connecting plate pedestal by the clamping of vertical connecting plate,
Afterwards, draw will graticule to adjust the horizontal level of vertical skeleton, and will be fastened between vertical steel skeleton and vertical connecting plate, vertically connected
Rubber slab is set before being connected between fishplate bar and pedestal, vertical steel skeleton places rubber stopper to limit after fixing in the card slot of connecting plate pedestal
The position of vertical connecting plate is made, the pole length of adjustment support afterwards makes supporting rod and elevation of building wall or capital tight.
The beneficial effects of the invention are as follows:The vertical steel skeleton connection system structure of buckle pin-connected panel dry-hang stone curtain wall of the present invention
Make it is simple, it is easy to assembly quick, meanwhile, welded contact quality is not when avoiding building dry-hang stone curtain wall steel skeleton scene spelling
Qualified or antirust treatment measure is unfavorable to be caused framework local or integrally damages that the dry-hang stone brought drops or skeleton collapses etc. no
Safety factor, the quick, convenient of dry-hang stone curtain wall, safe construction can be realized using present apparatus system.
Brief description of the drawings
Fig. 1 is the structure diagram of the present invention;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is connecting plate base construction schematic diagram;
Fig. 4 is the right view of Fig. 3;
Fig. 5 is the structure diagram of vertical connecting plate;
Fig. 6 is the structure diagram of rubber stopper.
Embodiment
Fig. 1 is the structure diagram of the present invention;Fig. 2 is the top view of Fig. 1;Fig. 3 is connecting plate base construction schematic diagram;Figure
4 be the right view of Fig. 3;Fig. 5 is the structure diagram of vertical connecting plate;Fig. 6 is the structure diagram of rubber stopper, as shown in the figure:
The vertical steel skeleton connection system of buckle pin-connected panel dry-hang stone curtain wall of the present embodiment, including vertical steel skeleton 1, vertical connecting plate
2 and connecting plate pedestal 3;The connecting plate pedestal 3 is fixed on elevation of building wall 4 or column, and the vertical steel skeleton 1 is fixed on perpendicular
Connecting plate pedestal 3 is installed on to connecting plate 2 and by vertical connecting plate 2;The vertical connecting plate 2 is removably clamped
It is fixed on connecting plate pedestal 3;Vertical steel skeleton 1 is the main supporting member of Building Curtain Wall Structures, is added using shaped steel such as channel steel, I-steel
Work is made, and vertical steel skeleton 1 is attached to the outer surface of elevation of building wall 4 or column, edge through upper end, bottom and middle part fixed connection point
Building level direction sets the vertical steel skeleton 1 of multiple tracks, and for antirust, vertical steel skeleton 1 generally takes zinc-plated antirust treatment of Denging, erects
It is connected by screw bolts to connecting plate 2 and vertical steel skeleton 1, connecting plate pedestal 3 is fixed on and is built using expansion bolt or through-wall bolt
Build on vertical plane wall 4 or column, connecting plate pedestal 3 is equipped with the via passed through for expansion bolt or through-wall bolt;The card of the present embodiment
It is simple to detain vertical 1 connection system construction of steel skeleton of pin-connected panel dry-hang stone curtain wall, it is easy to assembly quick, meanwhile, avoid building
Welded contact is off quality during dry-hang stone curtain wall steel skeleton scene spelling or antirust treatment measure is unfavorable causes framework local
Or integrally damage the dry-hang stone brought and drop or the insecurity such as skeleton collapses, cladding stone can be realized using present apparatus system
The quick, convenient of material curtain wall, safe construction.
In the present embodiment, the connecting plate pedestal 3 is equipped with the card slot 5 for being used for being clamped vertical connecting plate 2;The card slot 5
For strip and opening up, connecting plate pedestal 3 is slab construction, and card slot 5 is by being fixed on the bar shaped on 3 surface of connecting plate pedestal
Curling block is surrounded with 3 surface of connecting plate pedestal, is not only convenient for connecting and fixing for vertical connecting plate 2, and multiple vertical connecting plates 2
A connecting plate pedestal 3 can be shared, the accuracy of 2 relative position of each vertical connecting plate is can guarantee that, easy to construct.
In the present embodiment, the card slot 5 at least two and vertically spread configuration, can improve vertical connecting plate 2
With the connective stability between connecting plate pedestal 3, and then improve security.
In the present embodiment, the vertical connecting plate 2 is vertically arranged with card slot 5, the edge of vertical connecting plate 2 be equipped with for
The snapper teeth 6 that card slot 5 is clamped, snapper teeth 6 and card slot 5, which correspond, to be set, and snapper teeth 6 is inserted into card slot 5 during clamping, and structure is steady
Fixed, bearing capacity is strong.
In the present embodiment, the vertical connecting plate 2 be arranged in pairs relative to each connecting plate pedestal 3 and along card slot 5 grow to
It is respectively in the both sides of vertical steel skeleton 1;The vertical connecting plate 2 is equipped with the horizontal bar hole for being used for connecting vertical steel skeleton 1
7;Bolt through horizontal bar hole 7 and vertical steel skeleton 1 and then is tightened together, horizontal bar hole 7 can realize vertical reinforcing bar
Frame 1 is along horizontal minute movement, easy to adjust the position of vertical steel skeleton 1.
In the present embodiment, further include spacing to being carried out to vertical connecting plate 2 for being grown along card slot 5 in insertion card slot 5
Rubber stopper 8, quantity and the position of rubber stopper 8 so as to reliably being positioned to vertical connecting plate 2 subject to, by vertical connecting plate
2 be connected in connecting plate pedestal 3 after rubber stopper 8 is inserted into card slot 5, it is easy for construction, quick.
In the present embodiment, 5 medial surface of card slot is concavity, and the rubber stopper 8 is the small convex block in the big top in lower part, convenient
The fixation of rubber stopper 8, i.e. card slot 5 are the narrow structure of interior wide opening, and it is good that rubber stopper 8 is inserted into 5 rear stability of card slot, not easily to fall off.
In the present embodiment, the supporting rod 9 being supported between vertical steel skeleton 1 and elevation of building wall 4 or column is further included, is supported
Bar 9 is vertically arranged with connecting plate pedestal 3, and connecting plate pedestal 3 corresponds to each vertical steel skeleton 1 and sets multiple and vertically arrange
Row, supporting rod 9 are installed between two neighboring connecting plate pedestal 3 to be supported to vertical steel skeleton 1, improve vertical steel skeleton
1 mounting structure stability and bearing capacity.
In the present embodiment, the supporting rod 9 includes the interior screw for being arranged on the inner side of vertical steel skeleton 1 and through vertical steel skeleton
1 and vertical steel skeleton 1 is fixed on to the connector of interior screw;The interior screw is supported in elevation of building wall 4 or one end of column is
Rubber end;Connector includes being connected to the screw of interior screw and the nut being installed on screw, by nut by vertical steel skeleton 1
It is fixed together with screw, it is high that rotary screw rod can adjust support using the screw connection structure between screw and interior screw
Degree;Rubber end is fixed as one with interior screw, and Rubber end is tapered, and face area is larger, and bearing capacity is strong.
The vertical steel skeleton 1 of buckle pin-connected panel dry-hang stone curtain wall of the present embodiment connects the construction method of system, is first building
The position that vertical steel skeleton 1 is drawn on vertical plane wall 4 or column is built, by 1 position line fixed connecting plate pedestal of vertical steel skeleton drawn
3, and vertical connecting plate 2 is connected with vertical skeleton, afterwards, vertical steel skeleton 1 is clamped installed in company by vertical connecting plate 2
On fishplate bar pedestal 3, afterwards, will graticule is drawn to adjust the horizontal level of vertical skeleton, and by vertical steel skeleton 1 and vertical connecting plate 2
Between fasten, between vertical connecting plate 2 and pedestal connect before set rubber slab, rubber slab is located between vertical connecting plate and pedestal, makes to erect
To connecting plate and pedestal fixation, vertical steel skeleton 1 places rubber stopper 8 to limit after fixing in the card slot 5 of connecting plate pedestal 3
The position of vertical connecting plate 2 is made, adjusting 9 length of supporting rod afterwards makes supporting rod 9 and elevation of building wall 4 or capital tight, the construction
Method is convenient and efficient, can save man-hour, stabilized structure, durable.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with
The present invention is described in detail in good embodiment, it will be understood by those of ordinary skill in the art that, can be to the skill of the present invention
Art scheme technical scheme is modified or replaced equivalently, without departing from the objective and scope of technical solution of the present invention, it should all cover at this
Among the right of invention.
Claims (3)
1. the vertical steel skeleton connection system of one kind buckle pin-connected panel dry-hang stone curtain wall, it is characterised in that:Including vertical steel skeleton,
Vertical connecting plate and connecting plate pedestal;The connecting plate pedestal is fixed on elevation of building wall or column, and the vertical steel skeleton is consolidated
Connecting plate pedestal is installed on due to vertical connecting plate and by vertical connecting plate;The vertical connecting plate removably blocks
Connect and be fixed on connecting plate pedestal;Further include the supporting rod being supported between vertical steel skeleton and elevation of building wall or column, the branch
Strut includes the interior screw being arranged on the inside of vertical steel skeleton and is fixed on interior screw through vertical steel skeleton and by vertical steel skeleton
Connector;It is Rubber end that the interior screw, which is supported in elevation of building wall or one end of column,;The connecting plate pedestal, which is equipped with, to be used
In the card slot for being clamped vertical connecting plate;The card slot is strip and opening up;The card slot at least two and along perpendicular
Nogata is to spread configuration;The vertical connecting plate is vertically arranged with card slot, and the edge of vertical connecting plate, which is equipped with, to be used for and card slot card
The snapper teeth connect;Further include in insertion card slot be used for carry out spacing rubber stopper along card slot length to vertical connecting plate;It is described
Card slot medial surface is concavity, and the rubber stopper is the small convex block in the big top in lower part.
2. the vertical steel skeleton connection system of buckle pin-connected panel dry-hang stone curtain wall according to claim 1, it is characterised in that:
The vertical connecting plate is arranged in pairs relative to each connecting plate pedestal and along card slot length to the both sides for being respectively in vertical steel skeleton;
The vertical connecting plate is equipped with the horizontal bar hole for being used for connecting vertical steel skeleton.
A kind of 3. construction method of the vertical steel skeleton connection system of the pin-connected panel dry-hang stone curtain wall that is buckled, it is characterised in that:First exist
The position of vertical steel skeleton is drawn on elevation of building wall or column, by the vertical steel frame position line fixed connecting plate pedestal drawn,
And be connected vertical connecting plate with vertical skeleton, afterwards, vertical steel skeleton is installed on connecting plate by the clamping of vertical connecting plate
On pedestal, afterwards, the horizontal level that vertical skeleton is adjusted at graticule is pulled to, and will be tight between vertical steel skeleton and vertical connecting plate
Gu vertical connecting plate sets rubber slab before being connected with connecting plate pedestal, after vertical steel skeleton fixation in the card slot of connecting plate pedestal
Rubber stopper is placed to limit the position of vertical connecting plate, the pole length of adjustment support afterwards makes supporting rod and elevation of building wall or capital
Tightly, rubber stopper is used for the horizontal level for fixing vertical connecting plate, and it is more firm that supporting rod makes vertical connecting plate be fixed with connecting plate pedestal
Gu.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610046700.3A CN105604225B (en) | 2016-01-22 | 2016-01-22 | The vertical steel skeleton connection system of the pin-connected panel dry-hang stone curtain wall that is buckled and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610046700.3A CN105604225B (en) | 2016-01-22 | 2016-01-22 | The vertical steel skeleton connection system of the pin-connected panel dry-hang stone curtain wall that is buckled and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105604225A CN105604225A (en) | 2016-05-25 |
CN105604225B true CN105604225B (en) | 2018-05-04 |
Family
ID=55984524
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610046700.3A Active CN105604225B (en) | 2016-01-22 | 2016-01-22 | The vertical steel skeleton connection system of the pin-connected panel dry-hang stone curtain wall that is buckled and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105604225B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677458A (en) * | 2017-02-23 | 2017-05-17 | 管大海 | Assembly type construction decorative plate |
CN107130759A (en) * | 2017-06-15 | 2017-09-05 | 合肥光聚财建筑装饰工程有限公司 | The safety-type outer wall heat insulating and decorating plate of high-building construction and its construction method |
CN110714557A (en) * | 2019-10-22 | 2020-01-21 | 江苏盛世伟业新材料有限公司 | Glass curtain wall applied to energy-saving building |
CN112144717A (en) * | 2020-10-09 | 2020-12-29 | 齐彪 | Framework installation mechanism for building curtain wall engineering construction |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4873805A (en) * | 1988-07-21 | 1989-10-17 | Ting Raymond M L | Connecting means of curtainwall supporting mullions |
CN201062389Y (en) * | 2007-06-08 | 2008-05-21 | 杜金泽 | Latch hook type curtain wall column mounting regulating structure |
CN201762920U (en) * | 2010-05-20 | 2011-03-16 | 朝泽实业股份有限公司 | Honeycomb board |
CN203654558U (en) * | 2014-01-15 | 2014-06-18 | 徐明山 | Detachable grid system |
CN204098416U (en) * | 2014-07-31 | 2015-01-14 | 深圳市美术装饰工程有限公司广州分公司 | Decorative wall panels erecting device |
-
2016
- 2016-01-22 CN CN201610046700.3A patent/CN105604225B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4873805A (en) * | 1988-07-21 | 1989-10-17 | Ting Raymond M L | Connecting means of curtainwall supporting mullions |
CN201062389Y (en) * | 2007-06-08 | 2008-05-21 | 杜金泽 | Latch hook type curtain wall column mounting regulating structure |
CN201762920U (en) * | 2010-05-20 | 2011-03-16 | 朝泽实业股份有限公司 | Honeycomb board |
CN203654558U (en) * | 2014-01-15 | 2014-06-18 | 徐明山 | Detachable grid system |
CN204098416U (en) * | 2014-07-31 | 2015-01-14 | 深圳市美术装饰工程有限公司广州分公司 | Decorative wall panels erecting device |
Also Published As
Publication number | Publication date |
---|---|
CN105604225A (en) | 2016-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105604225B (en) | The vertical steel skeleton connection system of the pin-connected panel dry-hang stone curtain wall that is buckled and construction method | |
CN201763002U (en) | Independent adjustable steel supporting device | |
CN211873847U (en) | Building engineering template fixing device | |
CN214460540U (en) | Safety support device for wharf cofferdam | |
CN208122353U (en) | A kind of guard rail connector | |
KR20110010248A (en) | Multi u-head bracket apparatus for bridge construction | |
CN213088957U (en) | Quick sectional shelf-unit that building engineering used | |
US11781282B2 (en) | Locking t-bolts, post sleeves, post sleeves with shear connections, and related systems and methods | |
CN205743048U (en) | Correction positioner installed by a kind of curtain wall large-size column | |
CN205502616U (en) | Be applied to and face frontier defense guardrail in construction of large tracts of land floor template | |
CN208167533U (en) | A kind of heavy type truss pipe support system | |
CN205314323U (en) | Hang stone material curtain connected system futilely | |
CN206438389U (en) | Pier stud connecting bracket component | |
CN112814384A (en) | Floor slab reverse supporting system based on steel pipe bundle combined structure and construction method | |
CN207974539U (en) | Large area concrete bed course and the face storehouses Ceng Fen smoother | |
CN207633607U (en) | Aluminum alloy combination support type unit stone curtain wall | |
CN105297624B (en) | Arch bridge inspection car rail device | |
CN215843830U (en) | Framework supporting structure for coating open station | |
CN110130391A (en) | Isolated footing pre-embedded bolt mounting structure and method | |
CN220377373U (en) | Water-stopping steel plate fixing device | |
CN219239084U (en) | Tower machine operation platform mounting structure | |
CN109519606A (en) | Centrosymmetric oblique pull frame-type fixes device | |
CN211691303U (en) | Civil air defense door frame supporting structure | |
CN216949435U (en) | I-steel and pole setting connection tool | |
CN216089471U (en) | Multilayer composite protection type stainless steel frame structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |