CN204441815U - Cable testing bridge hanging box and use the crane span structure assembly of this hanging box - Google Patents

Cable testing bridge hanging box and use the crane span structure assembly of this hanging box Download PDF

Info

Publication number
CN204441815U
CN204441815U CN201520059920.0U CN201520059920U CN204441815U CN 204441815 U CN204441815 U CN 204441815U CN 201520059920 U CN201520059920 U CN 201520059920U CN 204441815 U CN204441815 U CN 204441815U
Authority
CN
China
Prior art keywords
arm
connector
hanging box
upper connector
lower connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520059920.0U
Other languages
Chinese (zh)
Inventor
徐金峰
吴志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XUCHANG ZHONGKE NEW CABLE BRIDGE CO Ltd
Original Assignee
XUCHANG ZHONGKE NEW CABLE BRIDGE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUCHANG ZHONGKE NEW CABLE BRIDGE CO Ltd filed Critical XUCHANG ZHONGKE NEW CABLE BRIDGE CO Ltd
Priority to CN201520059920.0U priority Critical patent/CN204441815U/en
Application granted granted Critical
Publication of CN204441815U publication Critical patent/CN204441815U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to cable testing bridge hanging box and uses the crane span structure assembly of this hanging box, cable testing bridge hanging box comprises the upper connector of two-piece unit setting and lower connector, lower connector is provided with the hanging box groove passed along the longitudinal direction for respective cable crane span structure, lower connector is mounted on described upper connector by grab, notch.Hanging box comprises the upper connector of split setting and lower connector, first upper connector can be connected to the top of corresponding building during use, then the lower link that cable testing bridge is housed is mounted on upper connector by grab, notch, not by the impact of cable testing bridge in the process that upper connector is installed, the installation process of hanging box is simple and convenient.

Description

Cable testing bridge hanging box and use the crane span structure assembly of this hanging box
Technical field
The utility model relates to cable testing bridge hanging box and uses the crane span structure assembly of this hanging box.
Background technology
Common parts at routing field central bridge assembly, crane span structure assembly comprises cable testing bridge and hanging box, cable testing bridge is provided with the wiring groove extended along the longitudinal direction, during use, cable is laid in wiring groove, cable testing bridge is then lifted on the top of corresponding building by hanging box, hanging box comprises hanging box body, hanging box body is provided with the hanging box groove that recess current supply cable crane span structure upward loads along the longitudinal direction, the two ends, left and right of hanging box body are provided with left and right engaging lug, and left and right engaging lug is secured by bolts in the top of described building.Existing this hanging box Problems existing is: cable testing bridge is installed in the process of top of building by hanging box, need first cable testing bridge to be arranged in the hanging box groove of hanging box, then operating personnel one temple cable testing bridge while hanging box is locked in top of building, the heavier-weight of cable testing bridge, cause process hanging box being locked into top of building very inconvenient, the installation of whole cable testing bridge needs the manpower of at substantial, and installation effectiveness is low.
Summary of the invention
The purpose of this utility model is to provide a kind of cable testing bridge hanging box, to solve the problem that in prior art, hanging box inconvenience is fixing; The purpose of this utility model is also to provide a kind of crane span structure assembly using this cable testing bridge hanging box.
In order to solve the problem, in the utility model, the technical scheme of cable testing bridge hanging box is:
Cable testing bridge hanging box, comprise the upper connector of two-piece unit setting and lower connector, lower connector is provided with the hanging box groove passed along the longitudinal direction for respective cable crane span structure, lower connector is mounted on described upper connector by grab, notch.
Described upper connector comprises arm and upper connector right arm on the left of top arm, upper connector, and on the left of top arm, upper connector, arm and upper connector right arm form inverted U-shaped; On the left of the lower connector that lower connector comprises base arm, head end is fixedly arranged on the overhanging of described base arm left end endways elasticity, arm and head end are fixedly arranged on the lower connector right arm that described base arm right-hand member endways elasticity overhangs, described hanging box groove is surrounded by arm on the left of base arm, lower connector and lower connector right arm, described grab, notch comprise the draw-in groove that is arranged on the left and right side arm of lower connector and be arranged on the left and right side arm of upper connector with the grab of corresponding draw-in groove snap fit.
On the left of upper connector, arm and the hook portion of the grab in upper connector right arm are towards relative.
Described top arm offers the upper bolt penetration hole that axis extends along the vertical direction.
Described base arm offers the lower bolt penetration hole that axis extends along the vertical direction.
The technical scheme of the utility model central bridge assembly is:
Crane span structure assembly, comprise cable testing bridge and hanging box, cable testing bridge comprises the upper connector of two-piece unit setting and lower connector, and lower connector is provided with the hanging box groove passed along the longitudinal direction for described cable testing bridge, lower connector is mounted on described upper connector by grab, notch.
Described upper connector comprises arm and upper connector right arm on the left of top arm, upper connector, and on the left of top arm, upper connector, arm and upper connector right arm form inverted U-shaped; On the left of the lower connector that lower connector comprises base arm, head end is fixedly arranged on the overhanging of described base arm left end endways elasticity, arm and head end are fixedly arranged on the lower connector right arm that described base arm right-hand member endways elasticity overhangs, described hanging box groove is surrounded by arm on the left of base arm, lower connector and lower connector right arm, described grab, notch comprise the draw-in groove that is arranged on the left and right side arm of lower connector and be arranged on the left and right side arm of upper connector with the grab of corresponding draw-in groove snap fit.
On the left of upper connector, arm and the hook portion of the grab in upper connector right arm are towards relative.
Described top arm offers the upper bolt penetration hole that axis extends along the vertical direction.
Described base arm offers the lower bolt penetration hole that axis extends along the vertical direction.
The beneficial effects of the utility model are: hanging box comprises the upper connector of split setting and lower connector, first upper connector can be connected to the top of corresponding building during use, then the lower link that cable testing bridge is housed is mounted on upper connector by grab, notch, not by the impact of cable testing bridge in the process that upper connector is installed, the installation process of hanging box is simple and convenient.
Accompanying drawing explanation
Fig. 1 is the structural representation of cable testing bridge in an embodiment of the utility model central bridge assembly;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is the structural representation of the upper connector of hanging box in an embodiment of the utility model central bridge assembly;
Fig. 4 is the vertical view of Fig. 3;
Fig. 5 is the structural representation of the lower connector of hanging box in an embodiment of the utility model central bridge assembly;
Fig. 6 is the left view of Fig. 5.;
Embodiment
The embodiment of crane span structure assembly is as shown in figs. 1 to 6: crane span structure assembly comprises cable testing bridge and hanging box, cable testing bridge comprises the left plate 1 and right plate 2 that length extends along the longitudinal direction, cable testing bridge also comprises the connecting bridge 3 that multiple spaced length along the longitudinal direction extends all in left-right direction, left, right plate upper, lower end is provided with the plain hook 4 of lateral buckling in cable testing bridge, the left end of connecting bridge 3 is fixedly welded on the plain hook of left plate lower end, the right-hand member of connecting bridge 3 is fixedly welded on the plain hook of right plate lower end, left, right plate and connecting bridge surround the wiring groove extended along the longitudinal direction.Hanging box comprises the upper connector of two-piece unit setting and lower connector, and lower connector is mounted on upper connector by grab, notch.Upper connector comprises arm 9 and upper connector right arm 7 on the left of top arm 6, upper connector, on the left of top arm, upper connector, arm and upper connector right arm form inverted U-shaped, the hook portion that grab, notch comprise grab 8, two grabs be arranged on the left and right side arm of upper connector is towards relatively; On the left of the lower connector that lower connector comprises base arm 13, head end is fixedly arranged on the overhanging of base arm left end endways elasticity, arm 11 and head end are fixedly arranged on the lower connector right arm 12 that base arm right-hand member endways elasticity overhangs, on the left of base arm 13, lower connector, arm 11 and lower connector right arm 12 surround the hanging box groove that current supply cable crane span structure passes along the longitudinal direction, and grab, notch also comprise the draw-in groove 10 be arranged on the left and right side arm of lower connector.Top arm offers the upper bolt penetration hole 5 that axis extends along the vertical direction, base arm offers the lower bolt penetration hole 14 that axis extends along the vertical direction.
By connecting bolt, upper connector is installed in the top of building during use, cable testing bridge loads the hanging box groove of lower connector along the longitudinal direction, by connecting bolt, cable testing bridge is fixed on lower connector, push lower connector from the bottom to top, the left and right side arm of lower connector of lower connector can be pressed by grab top and produce strain, until grab snaps in the draw-in groove on the left and right side arm of lower connector, just achieve the connection of upper and lower connector, the installation of whole crane span structure assembly is simple and convenient.In other embodiment of this crane span structure assembly: lower bolt penetration hole also can not be established, now cable testing bridge can be fixed in hanging box groove by the identical matching relationship of hanging box groove and cable testing bridge; When upper bolt penetration hole also can use at the scene, scene is opened again, or upper bolt penetration hole also can not be established, and now also by Welding Structure, upper connector can be fixed on top of building; The hook portion of two grabs is towards all right opposing; On the left of lower connector, arm and lower connector right arm also can strains, now to need on the left of upper connector arm and upper connector right arm can strain; Hook and the position of hanging groove can also be replaced, such as to be arranged at by hanging groove on the left of upper connector on arm and upper connector right arm, to be arranged at by hook on the left of lower connector on arm and lower connector right arm; Plain hook on left and right side plate can not also be established, and now connecting bridge directly can be arranged at the lower end of left and right side plate; Connecting bridge can also to be secured by bolts on left and right side plate or one-body molded with left and right side plate; The left and right side arm of upper connector and the left and right side arm of lower connector also can not have elasticity, and now hook can mount on hanging groove along the longitudinal direction.
The embodiment of cable testing bridge hanging box is as illustrated in figures 3-6: the concrete structure of hanging box is identical with the hanging box described in above-mentioned each crane span structure Assemblies Example, is not described in detail in this.

Claims (10)

1. cable testing bridge hanging box, it is characterized in that: comprise the upper connector of two-piece unit setting and lower connector, lower connector is provided with the hanging box groove passed along the longitudinal direction for respective cable crane span structure, lower connector is mounted on described upper connector by grab, notch.
2. cable testing bridge hanging box according to claim 1, is characterized in that: described upper connector comprises arm and upper connector right arm on the left of top arm, upper connector, and on the left of top arm, upper connector, arm and upper connector right arm form inverted U-shaped; On the left of the lower connector that lower connector comprises base arm, head end is fixedly arranged on the overhanging of described base arm left end endways elasticity, arm and head end are fixedly arranged on the lower connector right arm that described base arm right-hand member endways elasticity overhangs, described hanging box groove is surrounded by arm on the left of base arm, lower connector and lower connector right arm, described grab, notch comprise the draw-in groove that is arranged on the left and right side arm of lower connector and be arranged on the left and right side arm of upper connector with the grab of corresponding draw-in groove snap fit.
3. cable testing bridge hanging box according to claim 2, is characterized in that: on the left of upper connector, arm and the hook portion of the grab in upper connector right arm are towards relative.
4. cable testing bridge hanging box according to claim 2, is characterized in that: described top arm offers the upper bolt penetration hole that axis extends along the vertical direction.
5. the cable testing bridge hanging box according to claim 2 ~ 4 any one, is characterized in that: described base arm offers the lower bolt penetration hole that axis extends along the vertical direction.
6. crane span structure assembly, comprise cable testing bridge and hanging box, it is characterized in that: cable testing bridge comprises the upper connector of two-piece unit setting and lower connector, lower connector is provided with the hanging box groove passed along the longitudinal direction for described cable testing bridge, lower connector is mounted on described upper connector by grab, notch.
7. crane span structure assembly according to claim 6, is characterized in that: described upper connector comprises arm and upper connector right arm on the left of top arm, upper connector, and on the left of top arm, upper connector, arm and upper connector right arm form inverted U-shaped; On the left of the lower connector that lower connector comprises base arm, head end is fixedly arranged on the overhanging of described base arm left end endways elasticity, arm and head end are fixedly arranged on the lower connector right arm that described base arm right-hand member endways elasticity overhangs, described hanging box groove is surrounded by arm on the left of base arm, lower connector and lower connector right arm, described grab, notch comprise the draw-in groove that is arranged on the left and right side arm of lower connector and be arranged on the left and right side arm of upper connector with the grab of corresponding draw-in groove snap fit.
8. crane span structure assembly according to claim 7, is characterized in that: on the left of upper connector, arm and the hook portion of the grab in upper connector right arm are towards relative.
9. crane span structure assembly according to claim 7, is characterized in that: described top arm offers the upper bolt penetration hole that axis extends along the vertical direction.
10. the crane span structure assembly according to claim 7 ~ 9 any one, is characterized in that: described base arm offers the lower bolt penetration hole that axis extends along the vertical direction.
CN201520059920.0U 2015-01-28 2015-01-28 Cable testing bridge hanging box and use the crane span structure assembly of this hanging box Expired - Fee Related CN204441815U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520059920.0U CN204441815U (en) 2015-01-28 2015-01-28 Cable testing bridge hanging box and use the crane span structure assembly of this hanging box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520059920.0U CN204441815U (en) 2015-01-28 2015-01-28 Cable testing bridge hanging box and use the crane span structure assembly of this hanging box

Publications (1)

Publication Number Publication Date
CN204441815U true CN204441815U (en) 2015-07-01

Family

ID=53609635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520059920.0U Expired - Fee Related CN204441815U (en) 2015-01-28 2015-01-28 Cable testing bridge hanging box and use the crane span structure assembly of this hanging box

Country Status (1)

Country Link
CN (1) CN204441815U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108963909A (en) * 2018-10-09 2018-12-07 江苏泰华消防电气设备有限公司 A kind of bridge lift frame device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108963909A (en) * 2018-10-09 2018-12-07 江苏泰华消防电气设备有限公司 A kind of bridge lift frame device
CN108963909B (en) * 2018-10-09 2024-03-29 江苏泰华消防电气设备有限公司 Bridge frame hanging device

Similar Documents

Publication Publication Date Title
CN204441814U (en) Cable testing bridge and use the crane span structure assembly of this cable testing bridge
CN203481420U (en) Grounding wire device used for power transmission line overhauling
CN204441815U (en) Cable testing bridge hanging box and use the crane span structure assembly of this hanging box
CN102996585B (en) Embracing hoop applied transformer rack assembling method
CN102623927B (en) Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method
CN202127196U (en) Inserted pin type yoke plate clamp for replacing linear rod double-linkage double-hanging-point insulator chain
CN202644404U (en) Combined rope clip of suspension bridge
CN203014270U (en) A triangular connecting plate connector used for a double bundled conductor in a power transmission line
CN202602171U (en) A tool for power-on replacing multi-loop double split conductor insulator of 220kV line
CN204333858U (en) Core-bunched strain clamp
CN202737386U (en) Insulator string fixing traction tool
CN202940543U (en) High-voltage cable fixing device
CN201584701U (en) Tool for replacing 'V' string insulator of 220kV line in live state
CN202501101U (en) Cable support arm
CN202730652U (en) Combined type cable clip for two main cables of suspension bridge
CN204387489U (en) A kind of Novel cable steel bracket
CN208948679U (en) Assembled hanger
CN203979652U (en) A kind ofly connect grid crane span structure connection set firm and that bearing power is strong
CN203135223U (en) Lightning arrester combined support of single-column transformer platform
CN201954109U (en) Novel corbel of cable bridge
CN201656393U (en) Linear strain device of gap type thermal resistant uprating conductor
CN104538812A (en) Slide wire installed on light rail
CN205769307U (en) A kind of tramcar bogie uplifting device
CN102808996A (en) Grid bridge for laying electric wires and cables
CN103697239B (en) Cable fixing hoop

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150701

Termination date: 20170128