CN202501101U - Cable support arm - Google Patents

Cable support arm Download PDF

Info

Publication number
CN202501101U
CN202501101U CN2012200187601U CN201220018760U CN202501101U CN 202501101 U CN202501101 U CN 202501101U CN 2012200187601 U CN2012200187601 U CN 2012200187601U CN 201220018760 U CN201220018760 U CN 201220018760U CN 202501101 U CN202501101 U CN 202501101U
Authority
CN
China
Prior art keywords
cable support
long
arm
trailing arm
crane span
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200187601U
Other languages
Chinese (zh)
Inventor
葛伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUAI'AN HENGHUI ELECTRICAL EQUIPMENT CO Ltd
Original Assignee
HUAI'AN HENGHUI ELECTRICAL EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUAI'AN HENGHUI ELECTRICAL EQUIPMENT CO Ltd filed Critical HUAI'AN HENGHUI ELECTRICAL EQUIPMENT CO Ltd
Priority to CN2012200187601U priority Critical patent/CN202501101U/en
Application granted granted Critical
Publication of CN202501101U publication Critical patent/CN202501101U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a cable support arm, comprising a long arm and a short arm. One end of the long arm and one end of the short arm are vertically connected in an L shape. The long arm possesses a rectangular bolt hole which is coaxially arranged with the long arm. According to the utility model, the distance between the cable support and a wall can be adjusted at will, and even when a wall is not consistent in height, the cable support is kept vertical through the adjustment of a bolt fixing device. In addition, no holes is required at the bottom surface of the cable support, the connection of the cable support and the arm is realized through the connection holes at two ends of the cable support, and the usage is easy to achieve.

Description

A kind of cable testing bridge trailing arm
Technical field
The utility model relates to cable testing bridge, particularly a kind of cable testing bridge trailing arm.
Background technique
In the existing technology, the crane span structure trailing arm that uses in the cable testing bridge installation process all is to make according to fixed dimension in advance, and is highly fixing.When laying crane span structure, run into rugged metope through regular meeting, because crane span structure trailing arm height is nonconforming, need to make again a trailing arm that meets requirement for height usually then and there.So, be very much waste of manpower and material resources, increase cost, and can not satisfy the needs of a large amount of installment works in job site, working efficiency is low.In addition, crane span structure trailing arm of the prior art all is fixing crane span structure from the crane span structure bottom surface, connects the required bolt hole of trailing arm because the crane span structure bottom surface reserves, crane span structure bottom surface punching in installation process, just both are connected with bolt then, and working efficiency is not high.
Summary of the invention
In order to solve the problems of the technologies described above, the utility model provides a kind of cable testing bridge trailing arm, can leave the wall distance by the can regulate crane span structure, and simple in structure, convenient easy-to-use.
The utility model is realized through following technological scheme:
Said crane span structure trailing arm has long-armed and galianconism, a long-armed end and L-shaped vertical connection of galianconism one end.Said long-armed, galianconism is respectively equipped with bolt hole.
The further improved technological scheme of the utility model is that said bolt hole is a rectangle, is coaxially set with long-armed.
The utility model compared with prior art has following obvious advantage:
One, the crane span structure of can regulating arbitrarily of the utility model leaves the wall distance, runs into rugged body of wall, also can keep crane span structure level or vertical through the fixed position of regulating bolt.
Two, the utility model does not need in crane span structure bottom surface punching, can directly utilize the attachment hole at crane span structure two ends to realize and being connected of trailing arm, and is simple and easy to do.
Description of drawings
Fig. 1 is the utility model schematic perspective view.
Fig. 2 is the utility model front view.
Fig. 3 is the utility model plan view.
Fig. 4 is the utility model side view.
Fig. 5 is the utility model working state figure.
1. trailing arms among the figure, 2. long-armed, 21. bolts hole, 3. galianconism, 31. bolts hole, 4. cable testing bridge, 41. attachment holes, 5. bolt, 6. wall.
Embodiment
As shown in Figure 1, a kind of cable testing bridge trailing arm, crane span structure trailing arm 1 have long-armed 2 with galianconism 3, long-armed 2 one ends and L-shaped vertical connection of galianconism 3 one ends.Be respectively equipped with bolt hole 21,31 on said long-armed 2, the galianconism 3.Said bolt hole 21 is a rectangle, and long-armed 2 is coaxially set.For attractive in appearance, rectangle bolt hole 21 two ends can be semicircle.
As shown in Figure 2; During cabling crane span structure 4, two trailing arms 1 place cable testing bridge 4 both sides, near cable testing bridge 4; Use bolt 5 that galianconism 3 is fixed on metope 6; Adjust the position of cable testing bridge 4, long-armed 2 bolt hole of crane span structure attachment hole 41 and trailing arm 1 is aimed at, trailing arm 1 is connected fixing with crane span structure 4 with bolt 5.
If actual demand also can be in any local punching of crane span structure both sides, as be connected fixing the use with trailing arm.

Claims (2)

1. cable testing bridge trailing arm, it is characterized in that: said crane span structure trailing arm (1) has long-armed (2) and galianconism (3), long-armed (2) one ends and L-shaped vertical connection of galianconism (3) one ends; Be respectively equipped with bolt hole (21,31) on said long-armed (2), the galianconism (3).
2. a kind of cable testing bridge trailing arm according to claim 1 is characterized in that: said bolt hole (21) is a rectangle, is coaxially set with long-armed (2).
CN2012200187601U 2012-01-17 2012-01-17 Cable support arm Expired - Fee Related CN202501101U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200187601U CN202501101U (en) 2012-01-17 2012-01-17 Cable support arm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200187601U CN202501101U (en) 2012-01-17 2012-01-17 Cable support arm

Publications (1)

Publication Number Publication Date
CN202501101U true CN202501101U (en) 2012-10-24

Family

ID=47037715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200187601U Expired - Fee Related CN202501101U (en) 2012-01-17 2012-01-17 Cable support arm

Country Status (1)

Country Link
CN (1) CN202501101U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103292037A (en) * 2013-06-24 2013-09-11 向荣集团有限公司 Combined cable bridge corbel
CN104960621A (en) * 2015-06-29 2015-10-07 上海外高桥造船有限公司 Adjustable flat steel
CN113922296A (en) * 2021-09-06 2022-01-11 深圳市卡斯纽科技有限公司 Multifunctional adjustable ladder type bridge device for data center machine room

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103292037A (en) * 2013-06-24 2013-09-11 向荣集团有限公司 Combined cable bridge corbel
CN103292037B (en) * 2013-06-24 2015-12-02 向荣集团有限公司 A kind of composite cable bridge-rack trailing arm
CN104960621A (en) * 2015-06-29 2015-10-07 上海外高桥造船有限公司 Adjustable flat steel
CN113922296A (en) * 2021-09-06 2022-01-11 深圳市卡斯纽科技有限公司 Multifunctional adjustable ladder type bridge device for data center machine room

Similar Documents

Publication Publication Date Title
CN202501101U (en) Cable support arm
CN205397857U (en) Supplementary heliostat hoist and mount transportation installation device
CN205212179U (en) But angle regulation's lightning rod
CN204486153U (en) A kind of glue laminating apparatus of capacitive touch screen
CN204009331U (en) The multimedia teaching projector mount that cultural industry management teaching is used
CN202830663U (en) Construction lifting tool for track board of railway
CN203654533U (en) Connecting device of unit curtain walls
CN204493895U (en) Electric cable support
CN201672151U (en) Rotary cable latch hook
CN204139401U (en) A kind of curtain wall hanger system
CN204611236U (en) A kind of cable bearer
CN204823816U (en) Big automobile -used electrically conductive frame of hoist walking
CN203023651U (en) Vertical type upper right elbow structure of cable bridge
CN204569072U (en) A kind of erecting frame of cage guide
CN203374991U (en) Steel structure electric line pipe and trunking hanging connecting piece
CN202917819U (en) Distribution box guide rail
CN203850771U (en) Rainproof cover plate for cable tray
CN202571905U (en) Screw supporting seat with height adjustment function
CN202674539U (en) Vertical diameter-changing height-adjusting device universally used for ocean platform bridge frames
CN205226638U (en) A adjustable bracket for pipe laying
CN203056477U (en) Suspension height adjusting device for cable
CN202750351U (en) Pole-used optical network terminal communication box
CN204942985U (en) Video monitoring camera mounting support
CN103628604B (en) A kind of linkage of cell curtain wall
CN203585758U (en) Car roof maintenance box fixing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121024

Termination date: 20130117

CF01 Termination of patent right due to non-payment of annual fee