CN203481420U - Grounding wire device used for power transmission line overhauling - Google Patents

Grounding wire device used for power transmission line overhauling Download PDF

Info

Publication number
CN203481420U
CN203481420U CN201320574851.8U CN201320574851U CN203481420U CN 203481420 U CN203481420 U CN 203481420U CN 201320574851 U CN201320574851 U CN 201320574851U CN 203481420 U CN203481420 U CN 203481420U
Authority
CN
China
Prior art keywords
hook
grounding
clamping plate
ground connection
top end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320574851.8U
Other languages
Chinese (zh)
Inventor
薛慧君
操松元
段海庭
刘华
孟令
林世忠
廖必文
钱玉柱
晏节晋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Anhui Power Transmission and Transformation Engineering Co Ltd
Original Assignee
State Grid Corp of China SGCC
Anhui Power Transmission and Transformation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Anhui Power Transmission and Transformation Engineering Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201320574851.8U priority Critical patent/CN203481420U/en
Application granted granted Critical
Publication of CN203481420U publication Critical patent/CN203481420U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model discloses a grounding wire device used for power transmission line overhauling, which comprises a grounding hook and a grounding clamp which is connected to the grounding hook through a lead, wherein the grounding hook is bent into a top end straight part and a lower part hook part by a plate, a clamping plate is arranged between the top end straight part and the lower part hook part, the middle position of the clamping plate is fixedly connected with a pull rod, the upper end of the pull rod passes through a pull rod hole formed in the top end straight part of the grounding hook and is connected with a pull rope through a pull rope ring, parts of the clamping plate on two sides of the pull rod are respectively fixed and connected with a bolt, the upper end of each bolt passes through a screw hole formed in the top end straight part of the grounding hook and is fixed by a nut, and bolts arranged between the clamping plate and the top end straight part of the grounding hook are sleeved with springs; the middle part on the front side of the clamping plate is connected with a hanger, and the middle part on the front side of the top end straight part of the grounding hook is provided with a clamping groove matched with the hanger; and the pull rod arranged between the clamping plate and the top end straight part of the grounding hook is embedded with a hanging buckle. The grounding wire device has the advantages of good anti-dropping performance, strong application flexibility and the like.

Description

用于输电线路检修的接地线装置Ground wire device for transmission line maintenance

技术领域technical field

本实用新型涉及一种用于输电线路检修的接地线装置,属电力检修保护工具技术领域。The utility model relates to a grounding wire device used for maintenance of power transmission lines, which belongs to the technical field of electric power maintenance protection tools.

背景技术Background technique

电力系统输电线路发生故障,需要停电检修。停电检修的重要保护措施是装设接地线,以确保检修人员在检修过程中免遭触电伤害。现有的接地线通常是采用与地连接的线夹夹挂停电的线路导线上的。由于线夹与线路导线之间的接触不牢固,易受风力等因素干扰造成脱落,加之特高压线路杆塔上的横杆与线路导线之间的垂直距离较长,致使线夹装设、拆夹困难。The transmission line of the power system fails and needs to be shut down for maintenance. An important protective measure for power outage maintenance is to install a grounding wire to ensure that maintenance personnel are protected from electric shock during the maintenance process. Existing grounding wire usually adopts the clamp clip that is connected with the ground to hang on the circuit conductor of power failure. Because the contact between the clamp and the line conductor is not firm, it is easy to be disturbed by wind and other factors and cause it to fall off. In addition, the vertical distance between the horizontal bar on the UHV line tower and the line conductor is relatively long, resulting in the installation and removal of the clamp. difficulty.

实用新型内容Utility model content

本实用新型的目的在于提供一种装设、拆除便捷,防脱效果好的用于输电线路检修的接地线装置。The purpose of the utility model is to provide a grounding wire device which is convenient for installation and dismantling, and has good anti-off effect, and is used for maintenance of power transmission lines.

其技术方案是:一种用于输电线路检修的接地线装置,包括接地钩和通过导线连接在接地钩上的接地卡,其特征在于:所述的接地钩由板块弯折为顶端平直部分和下部弯钩两部分,呈近似的“C”型结构,接地钩顶端平直部分与弯钩部分之间设有夹板,夹板居中位置处固接有拉杆,拉杆上端穿过接地钩顶端平直部分开设的拉杆孔,通过拉绳环与拉绳连接,拉杆两边的夹板上分别固接有螺栓,螺栓的上端穿过接地钩顶端平直部分开设的螺孔,由螺母固定,夹板与接地钩顶端平直部分之间的螺栓上套装有弹簧;夹板前侧居中的部位连接有挂钩,接地钩顶端平直部分前侧居中的部位开设有与挂钩配合的卡槽;夹板与接地钩顶端平直部分之间的拉杆上内嵌有挂扣。Its technical solution is: a grounding wire device for maintenance of power transmission lines, including a grounding hook and a grounding card connected to the grounding hook through a wire, characterized in that the grounding hook is bent by a plate into a flat top part There are two parts, the lower hook and the lower hook, which are similar to the "C" structure. There is a splint between the straight part of the top of the ground hook and the hook part, and a tie rod is fixed at the center of the splint. The upper end of the tie rod passes through the top of the ground hook and is straight. Part of the pull rod hole is connected with the pull rope through the pull rope ring. The splints on both sides of the pull rod are respectively fixed with bolts. The bolts between the straight parts at the top are set with springs; the center part of the front side of the splint is connected with a hook, and the center part of the front side of the straight part at the top of the grounding hook is provided with a card slot that matches the hook; the top of the splint and the grounding hook are straight The drawbars are built into the drawbars between the sections.

其技术效果是:本装置利用套装在夹板与接地钩顶端平直部分之间螺栓上弹簧的舒张力和手动拉杆连接的夹板,可方便的控制与接地钩弯钩部分配合的夹板,实现对线路导线的包裹夹紧或放松脱离,具有安装、拆卸容易,接地钩与线路导线接触牢固,防脱性好,使用灵活性强等特点,适合110kV及以上电压等级的输电线路停电检修作业时使用。Its technical effect is: the device uses the tension of the spring on the bolt between the splint and the straight part of the top of the grounding hook and the splint connected by the manual pull rod, which can conveniently control the splint that cooperates with the hook part of the grounding hook to realize the alignment of the line. The wrapping and clamping or loosening of the wires has the characteristics of easy installation and disassembly, firm contact between the grounding hook and the line wires, good detachment resistance, and strong use flexibility. It is suitable for power outage maintenance operations of transmission lines with voltage levels of 110kV and above.

附图说明Description of drawings

图1是本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2是图1的侧视图;Fig. 2 is a side view of Fig. 1;

图3是图1的俯视图。FIG. 3 is a top view of FIG. 1 .

具体实施方式Detailed ways

如图1-3所示,一种用于输电线路检修的接地线装置,包括接地钩3和通过导线33连接在接地钩上的接地卡34。所述的接地钩3由板块弯折为顶端平直部分和下部弯钩两部分,呈近似的“C”型结构。接地钩顶端平直部分31与弯钩部分之间设有夹板7,夹板居中位置处固接有拉杆1,拉杆上端穿过接地钩顶端平直部分开设的拉杆孔,通过拉绳环与绝缘拉绳8连接,拉杆两边的夹板上分别固接有螺栓2,螺栓的上端穿过接地钩顶端平直部分开设的螺孔,由螺母固定。夹板与接地钩顶端平直部分之间的螺栓上套装有弹簧5。夹板前侧居中的部位连接有挂钩6,接地钩顶端平直部分前侧居中的部位开设有与挂钩配合的卡槽32;夹板与接地钩顶端平直部分之间的拉杆上内嵌有挂扣4。As shown in FIGS. 1-3 , a grounding wire device for power transmission line maintenance includes a grounding hook 3 and a grounding clip 34 connected to the grounding hook through a wire 33 . The grounding hook 3 is bent from a plate into two parts, a straight top part and a lower hook, which are in an approximate "C" shape. A splint 7 is arranged between the straight part 31 at the top of the grounding hook and the hook part, and a tie rod 1 is fixedly connected to the center of the splint. Rope 8 connects, and the clamping plate on pull bar both sides is fixedly connected with bolt 2 respectively, and the upper end of bolt passes the screw hole that grounding hook top straight part offers, is fixed by nut. A spring 5 is sleeved on the bolt between the splint and the straight part at the top of the grounding hook. The center part of the front side of the splint is connected with a hook 6, and the center part of the front side of the straight part of the top of the grounding hook is provided with a card slot 32 for matching with the hook; the pull rod between the splint and the straight part of the top of the grounding hook is embedded with a hook 4.

使用时,利用绝缘拉绳8拉动拉杆1,使夹板7上的挂钩6与接地钩顶端平直部分上的卡槽32咬合,将接地卡34固定在杆塔塔材上;然后下放绝缘拉绳,使接地钩3的弯钩部分从线路导线下方钩住导线,轻轻拉紧绝缘拉绳带动拉杆上升,使夹板上的挂钩脱离接地钩顶端平直部分上的卡槽,套装在接地钩顶端平直部分与夹板之间的螺栓2上的弹簧5,在舒张力的作用下,迅速弹压夹板下压,从而将线路导线包裹夹紧在夹板和接地钩的弯钩部分之间,实现防脱目的;作业完毕,拉动拉杆使挂扣4上升穿过拉杆孔后,放松拉杆使挂扣自动卡接在接地钩顶端平直部分的上端面上,从而使夹板放松并脱离线路导线,接地钩弯钩部分在重力的作用下,脱离线路导线,即可完成拆除接地线。When in use, use the insulating stay rope 8 to pull the pull rod 1, so that the hook 6 on the splint 7 is engaged with the draw-in groove 32 on the straight part of the grounding hook top, and the grounding card 34 is fixed on the pole tower material; then the insulating stay rope is lowered, Make the hook part of the grounding hook 3 hook the wire from the bottom of the line wire, gently tighten the insulating pull rope to drive the pull rod up, so that the hook on the splint is detached from the card slot on the straight part of the top of the grounding hook, and set it on the flat top of the grounding hook. The spring 5 on the bolt 2 between the straight part and the splint, under the action of the tension, quickly springs the splint and presses down, so that the line wire is wrapped and clamped between the splint and the hook part of the grounding hook, and the purpose of preventing it from falling off is achieved. After the operation is completed, pull the pull rod to make the buckle 4 rise through the hole of the pull rod, relax the pull rod so that the buckle is automatically clamped on the upper end surface of the straight part of the top of the ground hook, so that the splint is loosened and separated from the line wire, and the ground hook hook Under the action of gravity, part of the ground wire can be removed from the line wire to complete the removal.

Claims (1)

1. the grounding wire device for power transmission lines overhauling, comprise ground connection hook and be connected to the grounding clamp on ground connection hook by wire, it is characterized in that: described ground connection hook (3) is top straight portion and bottom crotch two parts by plate bending, be approximate " C " type structure, between ground connection hook top straight portion (31) and crotch part, be provided with clamping plate (7), place, clamping plate middle position is connected with pull bar (1), the tie rod hole that pull bar upper end is offered through ground connection hook top straight portion, by stay cord ring, be connected with stay cord (8), on the clamping plate on pull bar both sides, be connected with respectively bolt (2), the screw that the upper end of bolt is offered through ground connection hook top straight portion, by nut, fixed, on bolt between clamping plate and ground connection hook top straight portion, be set with spring (5), position placed in the middle, clamping plate front side is connected with hook (6), and position placed in the middle, straight portion front side, ground connection hook top offers and links up with the draw-in groove (32) coordinating, on pull bar between clamping plate and ground connection hook top straight portion, be embedded with and buckle (4).
CN201320574851.8U 2013-09-16 2013-09-16 Grounding wire device used for power transmission line overhauling Expired - Fee Related CN203481420U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320574851.8U CN203481420U (en) 2013-09-16 2013-09-16 Grounding wire device used for power transmission line overhauling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320574851.8U CN203481420U (en) 2013-09-16 2013-09-16 Grounding wire device used for power transmission line overhauling

Publications (1)

Publication Number Publication Date
CN203481420U true CN203481420U (en) 2014-03-12

Family

ID=50229687

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320574851.8U Expired - Fee Related CN203481420U (en) 2013-09-16 2013-09-16 Grounding wire device used for power transmission line overhauling

Country Status (1)

Country Link
CN (1) CN203481420U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103490190A (en) * 2013-09-16 2014-01-01 安徽送变电工程公司 Ground wire device used for power transmission line maintenance
CN104241885A (en) * 2014-08-29 2014-12-24 国家电网公司 Power transmission line maintenance ground wire hanging device
CN105353336A (en) * 2015-12-08 2016-02-24 国网山东省电力公司潍坊供电公司 Wiring tool for mutual inductor detection
CN105703088A (en) * 2016-04-11 2016-06-22 国家电网公司 Grounding wire apparatus
CN106099442A (en) * 2016-06-04 2016-11-09 国网山东省电力公司菏泽供电公司 A kind of transformer station enclosed busbar bridge ground loop
CN106299736A (en) * 2016-08-24 2017-01-04 国网山东省电力公司蓬莱市供电公司 A kind of electric power detecting instrument grounding device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103490190A (en) * 2013-09-16 2014-01-01 安徽送变电工程公司 Ground wire device used for power transmission line maintenance
CN104241885A (en) * 2014-08-29 2014-12-24 国家电网公司 Power transmission line maintenance ground wire hanging device
CN105353336A (en) * 2015-12-08 2016-02-24 国网山东省电力公司潍坊供电公司 Wiring tool for mutual inductor detection
CN105703088A (en) * 2016-04-11 2016-06-22 国家电网公司 Grounding wire apparatus
CN106099442A (en) * 2016-06-04 2016-11-09 国网山东省电力公司菏泽供电公司 A kind of transformer station enclosed busbar bridge ground loop
CN106299736A (en) * 2016-08-24 2017-01-04 国网山东省电力公司蓬莱市供电公司 A kind of electric power detecting instrument grounding device
CN106299736B (en) * 2016-08-24 2018-11-16 肇庆胜尚知识产权服务有限公司 A kind of electric power detecting instrument earthing or grounding means

Similar Documents

Publication Publication Date Title
CN203481420U (en) Grounding wire device used for power transmission line overhauling
CN204144479U (en) A kind of earth connection
CN203300937U (en) High-hitching ground wire operating lever
CN203251021U (en) Pay-off trolley clamping device
CN103594964A (en) Pole tower lead supporting frame
CN203242778U (en) Special tool for hanging grounding wire of large angle tower
CN203119413U (en) V-shaped string for prevention of wind deflection
CN204205395U (en) Cross-arm bracket
CN203932808U (en) Replacing insulator under electrified wire lifting device
CN103490190A (en) Ground wire device used for power transmission line maintenance
CN203522016U (en) A device for lifting overhead ground wires
CN203707374U (en) 110 kV bus knife down lead wire clamp protector
CN205092508U (en) Special use of suspension type composite insulator is rolled off production line and is hung ladder
CN210866548U (en) Ground wire connector
CN204144800U (en) The special cross-arm card of a kind of ZML type tower
CN203690820U (en) Wire fixing device of power transmission and transformation line
CN203617613U (en) Pole tower lead supporting frame
CN204205171U (en) A kind of novel grounded line structure
CN203377540U (en) Adjustable insulator hook
CN203233104U (en) High-voltage line maintenance grounding wire special wire hanger
CN202611558U (en) Safety insulation ladder
CN203859238U (en) Connector capable of improving installation efficiency of main ground wire
CN203774472U (en) Grounding wire protection device for overhaul of transformer
CN203660091U (en) Ground wire apparatus for power-failure maintenance of overhead transmission line
CN204326684U (en) In, heavy icing area 35kV transmission line of electricity single loop anchor support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140312

Termination date: 20180916