CN204434056U CN201520080144.2U CN201520080144U CN204434056U CN 204434056 U CN204434056 U CN 204434056U CN 201520080144 U CN201520080144 U CN 201520080144U CN 204434056 U CN204434056 U CN 204434056U
Authority
CN
China
Prior art keywords
crossbeams
welded
steel bar
reinforcing bar
circular hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520080144.2U
Other languages
English (en)
Inventor
刘雄
张金龙
熊焰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 5 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 5 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 5 Engineering Co Ltd filed Critical China Gezhouba Group No 5 Engineering Co Ltd
Priority to CN201520080144.2U priority Critical patent/CN204434056U/zh
Application granted granted Critical
Publication of CN204434056U publication Critical patent/CN204434056U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及一种钢筋吊具,它包括两根“工”字型横梁,在其中一根横梁的上顶面焊接有对称分布的吊耳,两根横梁的左端面分别焊接有横向套筒,两根横梁的右端面分别焊接有纵向套筒,插销插在横向套筒内,销轴安装在纵向套筒内,两根横梁的上下边缘都加工有半圆孔,合并之后形成圆孔,在两根横梁的两端设置有封端钢板。本实用新型采用上述结构设计,能够同时对多根钢筋进行吊装、安装,从而有效的提高了钢筋的安装效率和质量,同时保证了施工的安全性。

Description

钢筋吊具
技术领域
本实用新型涉及一种桥梁施工钢筋吊装辅助工作装置,特别是一种钢筋吊具。
背景技术
在桥梁施工过程中,需要对墩身和塔柱安装钢筋,目前采用的技术方案是:首先将加工好的钢筋半成品用钢丝绳捆绑在一起,然后再用吊机将成捆的半成品钢筋吊装至施工平台,再由工人再逐根安装到设计位置。采用此种方法其缺点是:高空作业,空间狭小,操作困难;工期时间较长;钢筋定位困难,垂直度较难保证。
因此,基于上述分析需要设计新的钢筋吊装安装方法,有效的克服上述钢筋安装困难问题,在保证安全施工的基础上提高施工效率。
发明内容
本实用新型所要解决的技术问题是提供一种钢筋吊具,此钢筋吊具,能够同时对多根钢筋进行吊装、安装,从而有效的提高了钢筋的安装效率和质量,同时保证了施工的安全性。实用新型的目的是这样实现的:
钢筋吊具,它包括两根“工”字型横梁,在其中一根横梁的上顶面焊接有对称分布的吊耳,两根横梁的左端面分别焊接有横向套筒,两根横梁的右端面分别焊接有纵向套筒,插销插在横向套筒内,销轴安装在纵向套筒内,两根横梁的上下边缘都加工有半圆孔,合并之后形成圆孔,在两根横梁的两端设置有封端钢板。
所述的两根横梁合并之后能够绕销轴转动。
所述插销能够在横向套筒内进行插拔。
所述圆孔之间的间距能够调整,圆孔的数量能够调整。
本实用新型有如下有益效果:
将此钢筋吊具应用于桥梁施工过程中钢筋的吊装和安装,能够同时对多根钢筋进行吊装,同时保证了钢筋的安装精度和安装质量,提高了桥梁施工的效率。
吊装之前将两根横梁绕着销轴转动分开,再将需要安装的钢筋放置于钢筋定位圆孔中,合上两根横梁夹紧钢筋并插上插销,然后用吊机吊住吊耳,连同钢筋一起吊装到需要安装的位置,由于圆孔之间的间距和需要进行对接的钢筋的间距相同,所以将吊着的钢筋对准需要进行安装的钢筋,同时旋紧钢筋连接套筒,钢筋安装完成之后拔掉插销,将两根横梁分开,吊离钢筋,然后再插上插销,继续进行下一次的吊装。
附图说明
下面结合附图和实施例对本实用新型作进一步说明。
图1为本实用新型的两根横梁连接面所在截面的剖面图。
图2为本实用新型的俯视图。
图3为本实用新型横梁、吊耳所在截面的剖视图。
图中:吊耳1、横梁2、插销3、横向套筒4、纵向套筒5、销轴6、圆孔7、封端钢板8。
具体实施方式
下面结合附图对本实用新型的实施方式做进一步的说明。
参见图1-3,图中具体的安装以及连接方式有,钢筋吊具,它包括两根“工”字型横梁2,在其中一根横梁2的上顶面焊接有对称分布的吊耳1,两根横梁2的左端面分别焊接有横向套筒4,两根横梁2的右端面分别焊接有纵向套筒5,插销3插在横向套筒4内,销轴6安装在纵向套筒5内,两根横梁2的上下边缘都加工有半圆孔,合并之后形成圆孔7,在两根横梁2的两端设置有封端钢板8;两根横梁2合并之后能够绕销轴6转动;插销3能够在横向套筒4内进行插拔;圆孔7之间的间距能够调整,圆孔7的数量能够调整。
本实用新型的装置具体工作过程及原理为:
吊装前,拔掉插销3,将横梁2分开,将加工好的钢筋放置在圆孔7上,然后将横梁2闭合,插上插销3,在用吊机吊住吊耳1,吊至安装钢筋的位置,由于圆孔7之间的间距和需要进行对接的钢筋的间距相同,所以将吊着的钢筋对准已安装好的钢筋,旋紧钢筋连接套筒,钢筋安装完成后拔掉插销3,将横梁2分开吊离钢筋,然后再插上插销3,进行下一吊装循环。
本实用新型的优点为:
1、采用具有钢筋孔的吊具进行钢筋吊装,避免了钢筋成捆吊装容易脱落的危险;
2、钢筋定位安装时由吊机吊着定位,避免了人工逐根安装定位,易于定位,节省人力和时间;
3、采用本本吊具进行钢筋安装,一次性可以安装多根钢筋,操作方便,工期短。

Claims (4)

1.钢筋吊具,其特征在于:它包括两根“工”字型横梁(2),在其中一根横梁(2)的上顶面焊接有对称分布的吊耳(1),两根横梁(2)的左端面分别焊接有横向套筒(4),两根横梁(2)的右端面分别焊接有纵向套筒(5),插销(3)插在横向套筒(4)内,销轴(6)安装在纵向套筒(5)内,两根横梁(2)相合并的上下两边缘都加工有半圆孔,合并之后形成圆孔(7),在两根横梁(2)的两端设置有封端钢板(8)。
2.根据权利要求1所述的钢筋吊具,其特征在于:所述的两根横梁(2)合并之后能够绕销轴(6)转动。
3.根据权利要求1或2所述的钢筋吊具,其特征在于:所述插销(3)能够在横向套筒(4)内进行插拔。
4.根据权利要求1所述的钢筋吊具,其特征在于:所述圆孔(7)之间的间距能够调整,圆孔(7)的数量能够调整。
CN201520080144.2U 2015-02-05 2015-02-05 钢筋吊具 Expired - Fee Related CN204434056U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520080144.2U CN204434056U (zh) 2015-02-05 2015-02-05 钢筋吊具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520080144.2U CN204434056U (zh) 2015-02-05 2015-02-05 钢筋吊具

Publications (1)

Publication Number Publication Date
CN204434056U true CN204434056U (zh) 2015-07-01

Family

ID=53601952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520080144.2U Expired - Fee Related CN204434056U (zh) 2015-02-05 2015-02-05 钢筋吊具

Country Status (1)

Country Link
CN (1) CN204434056U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105129602A (zh) * 2015-09-24 2015-12-09 中铁四局集团第二工程有限公司 长大竖向钢筋整体式起升吊具
CN107100651A (zh) * 2017-05-13 2017-08-29 山东佳信机械设备有限公司 一种隧道衬砌无缝连接钢筋定位、防水板铺设台车
CN113235826A (zh) * 2021-05-19 2021-08-10 中建桥梁有限公司 一种钢筋丝接安装定位方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105129602A (zh) * 2015-09-24 2015-12-09 中铁四局集团第二工程有限公司 长大竖向钢筋整体式起升吊具
CN107100651A (zh) * 2017-05-13 2017-08-29 山东佳信机械设备有限公司 一种隧道衬砌无缝连接钢筋定位、防水板铺设台车
CN107100651B (zh) * 2017-05-13 2023-05-26 山东佳信机械设备有限公司 一种隧道衬砌无缝连接钢筋定位、防水板铺设台车
CN113235826A (zh) * 2021-05-19 2021-08-10 中建桥梁有限公司 一种钢筋丝接安装定位方法

Similar Documents

Publication Publication Date Title
CN202080812U (zh) 一种大型钢筋笼专用吊具系统
CN204434056U (zh) 钢筋吊具
CN201473216U (zh) 钢筋安装吊架
CN103061265B (zh) 一种组合式钢筋笼吊装的施工方法
CN207986495U (zh) 一种桥梁高墩主筋吊装装置
CN203474231U (zh) 钢筋高塔安全吊装装置
CN202626328U (zh) 型材固化电泳池
CN205530228U (zh) 一种用于超长超大直径桩钢筋笼施工的井型架
CN202832296U (zh) 钻孔设备上的钻杆吊装装置
CN203289011U (zh) 耐张横担吊装器
CN206395795U (zh) 液压式电缆井盖简易开启装置
CN103910278A (zh) 可调节长度的吊装撑杆
CN204167793U (zh) 双回路直线钢管塔方横担卡具
CN202131012U (zh) 一种吊装金具
CN206345598U (zh) 重力式t型材吊运夹持工具
CN205776169U (zh) 灌注桩钢筋笼吊筋装置
CN204702404U (zh) 便携式吊具
CN204551442U (zh) 一种钢筋笼吊装活动吊钩
CN104384404B (zh) 一种钢筋笼接长施工方法及临时固定用挂钩
CN204435359U (zh) 钢筋笼吊架
CN203451059U (zh) 深水井维修提井用便携装置
CN201980854U (zh) 半自动吊砖夹具
CN207748737U (zh) 一种用于钢筋笼的可拆卸吊装系统
CN205419532U (zh) 一种预制板吊装工具
CN204401619U (zh) 预制桩固定装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150701

Termination date: 20210205