CN204385926U - Surface dry concrete ater-casting, ground waterproofing node - Google Patents

Surface dry concrete ater-casting, ground waterproofing node Download PDF

Info

Publication number
CN204385926U
CN204385926U CN201420839993.7U CN201420839993U CN204385926U CN 204385926 U CN204385926 U CN 204385926U CN 201420839993 U CN201420839993 U CN 201420839993U CN 204385926 U CN204385926 U CN 204385926U
Authority
CN
China
Prior art keywords
concrete
ater
casting
water
waterproof roll
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420839993.7U
Other languages
Chinese (zh)
Inventor
庄静
魏静
宋功业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU MINING ENGINEERING GROUP Co Ltd
Original Assignee
JIANGSU MINING ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU MINING ENGINEERING GROUP Co Ltd filed Critical JIANGSU MINING ENGINEERING GROUP Co Ltd
Priority to CN201420839993.7U priority Critical patent/CN204385926U/en
Application granted granted Critical
Publication of CN204385926U publication Critical patent/CN204385926U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

Ground surface dry concrete ater-casting waterproofing node is the ater-casting antiseepage of clear-water concrete structure and designing, and belongs to the realm of building construction; Ground surface dry concrete ater-casting waterproofing node by after water slightly expanded concrete, additional coiled material, waterproof roll, steel plate water stopper, expanded metal lath, first pouring concrete, surface concrete layer, expanded metal lath and bed course form; After water between slightly expanded concrete and first pouring concrete should be closely knit seamless, after water after slightly expanded concrete construct, arrange one at ater-casting place and add coiled material, then laying water-proof coiled material thereon, re-lay surface concrete layer; The beneficial effects of the utility model are that surface dry concrete ater-casting, ground waterproofing node structure is simple, and waterproof is reliable, can avoid causing clear-water concrete variable color because of ater-casting seepage.

Description

Surface dry concrete ater-casting, ground waterproofing node
Technical field
Ground surface dry concrete ater-casting waterproofing node is the ater-casting antiseepage of ground surface dry concrete structure and designing, and belongs to the realm of building construction.
Background technology
When groundwater table is higher, easily there is seepage at the position, ater-casting of ground surface dry concrete structure in ground, just in case clear-water concrete ater-casting Nodes generation seepage, then this place's concrete color can be caused to change, and affect the impression quality of clear-water concrete.
Land used surface dry concrete ater-casting waterproofing node can address these problems.
Utility model content
The specific practice of this programme is:
As shown in Figure 1, ground surface dry concrete ater-casting waterproofing node by after water slightly expanded concrete 1, additional coiled material 2, waterproof roll 3, steel plate water stopper 4, expanded metal lath 5, first pouring concrete 6, surface concrete layer 7 and bed course 8 form; On bed course 8 during paving waterproof roll 1, increase the additional coiled material 2 of paving at position, surface dry concrete ater-casting, ground; Before the first pouring concrete 6 of both sides is built, steel plate water stopper 4 is installed, steel plate water stopper 4 after water between slightly expanded concrete 1 and first pouring concrete 6; After water slightly expanded concrete 1 surface consistent with the surfacing of first pouring concrete 6; Water the upper surface of slightly expanded concrete 1 after additional coiled material 2 is shelved on, not bonding with concrete slab, both sides grow seam 200-300 millimeter; Waterproof roll 3 and first pouring concrete 6 are firmly pasted, neither bonding with concrete slab at additional coiled material 2 position, also not bonding with waterproof roll 3; Expanded metal lath 5 is arranged when indwelling ater-casting, when watering slightly expanded concrete 1 after building, is poured in concrete by expanded metal lath 5; Surface concrete layer 7 is on waterproof roll 3.
The strength grade that slightly expanded concrete 1 strength grade should be not less than first pouring concrete 6 is watered after described, preferential recommendation waters the concreting of slightly expanded concrete 1 strength grade higher than a first pouring concrete 6 strength grade grade after adopting, and add appropriate micro-expanding agent, build rear maintenance and must not be less than 7 days.
Described additional coiled material 2 is the waterproof rolls with waterproof roll 3 same specification, homogenous quantities, preferential recommendation cement-based waterproof coiled material, and waterproof roll 3 and basic unit 8 concrete slab firm pasting, during paving waterproof roll 3, the moisture content of bed course 8 is not more than 9%.
Described steel plate water stopper 4 is the plate-type components made with steel plate, fixing on reinforcing bar before concreting.
Described expanded metal lath 5 adopts the steel plate of band mesh to make, and installs before building first pouring concrete 6.
When described first pouring concrete 6 is built by after water the position of slightly expanded concrete 1, by expanded metal lath 5 by first pouring concrete 6 with after water slightly expanded concrete 1 and separate.
Described surface concrete layer 7, adds coiled material 2 on ground, waterproof roll 3 is built after laying.
Described surface dry concrete ater-casting, ground waterproofing node, is characterized in that bed course 8 is built immediately after test slot of foundation.
The beneficial effects of the utility model are that surface dry concrete ater-casting, ground waterproofing node structure is simple, and waterproof is reliable, can avoid causing clear-water concrete variable color because of ater-casting seepage.
Accompanying drawing explanation
Fig. 1 is surface dry concrete ater-casting, ground waterproofing node organigram.
In figure: water slightly expanded concrete after 1-; 2-adds coiled material; 3-waterproof roll; 4-steel plate water stopper; 5-expanded metal lath; The first pouring concrete of 6-; 7-surface concrete layer; 8-bed course.
Detailed description of the invention
Embodiment
Certain surface dry concrete ater-casting, engineering ground waterproofing node as shown in Figure 1, as shown in Figure 1, ground surface dry concrete ater-casting waterproofing node by after water slightly expanded concrete 1, additional coiled material 2, waterproof roll 3, steel plate water stopper 4, expanded metal lath 5, first pouring concrete 6, surface concrete layer 7 and bed course 8 form; On bed course 8 during paving waterproof roll 1, increase the additional coiled material 2 of paving at position, surface dry concrete ater-casting, ground; Before the first pouring concrete 6 of both sides is built, steel plate water stopper 4 is installed, steel plate water stopper 4 after water between slightly expanded concrete 1 and first pouring concrete 6; After water slightly expanded concrete 1 surface consistent with the surfacing of first pouring concrete 6; Water the upper surface of slightly expanded concrete 1 after additional coiled material 2 is shelved on, not bonding with concrete slab, both sides grow seam 200-300 millimeter; Waterproof roll 3 and first pouring concrete 6 are firmly pasted, neither bonding with concrete slab at additional coiled material 2 position, also not bonding with additional coiled material 2; Expanded metal lath 5 is arranged when indwelling ater-casting, when watering slightly expanded concrete 1 after building, is poured in concrete by expanded metal lath 5; Surface concrete layer 7 is on waterproof roll 3.
After to water slightly expanded concrete 1 strength grade be C30, than first pouring concrete, strength grade C25 high one-level, and add appropriate micro-expanding agent, build rear maintenance and must not be less than 7 days.
Additional coiled material 2 is the waterproof rolls with waterproof roll 3 same specification, homogenous quantities, and adopt cement-based waterproof coiled material, with bed course 8 firm pasting, during paving waterproof roll 3, the moisture content of bed course 8 is not more than 9%.
Steel plate water stopper 4 is the plate-type components made with steel plate, fixing on reinforcing bar before concreting.
Expanded metal lath 5 adopts the steel plate of band mesh to make, and installs before building first pouring concrete 6.
When first pouring concrete 6 is built by after water the position of slightly expanded concrete 1, by expanded metal lath 5 by first pouring concrete 6 with after water slightly expanded concrete 1 and separate.
Surface concrete layer 7, adds coiled material 2 on ground, waterproof roll 3 is built after laying.
Surface dry concrete ater-casting, ground waterproofing node, is characterized in that bed course 8 is built immediately after test slot of foundation.

Claims (8)

1. surface dry concrete ater-casting waterproofing node, is characterized by: described waterproofing node by after water slightly expanded concrete (1), additional coiled material (2), waterproof roll (3), steel plate water stopper (4), expanded metal lath (5), first pouring concrete (6), surface concrete layer (7) and bed course (8) form; When bed course (8) upper paving waterproof roll (1), increase the additional coiled material (2) of paving at position, surface dry concrete ater-casting, ground; Before the first pouring concrete (6) of both sides is built, steel plate water stopper (4) is installed, waters between slightly expanded concrete (1) and first pouring concrete (6) after steel plate water stopper (4) is positioned at; After water slightly expanded concrete (1) surface consistent with first pouring concrete (6) surfacing; Water the upper surface of slightly expanded concrete (1) after additional coiled material (2) is shelved on, not bonding with concrete slab, both sides grow seam 200-300 millimeter; Waterproof roll (3) and first pouring concrete (6) are firmly pasted, neither bonding with concrete slab at additional coiled material (2) position, also not bonding with waterproof roll (3); Expanded metal lath (5) is arranged when indwelling ater-casting, when watering slightly expanded concrete (1) after building, is poured in concrete by expanded metal lath (5); Surface concrete layer (7) is on waterproof roll (3).
2. surface dry concrete ater-casting waterproofing node according to claim 1ly, waters the strength grade that slightly expanded concrete (1) strength grade should be not less than first pouring concrete (6), and adds appropriate micro-expanding agent after it is characterized in that.
3. surface dry concrete ater-casting waterproofing node according to claim 1ly, is characterized in that additional coiled material (2) is the waterproof roll with waterproof roll (3) same specification, homogenous quantities, waterproof roll (3) and concrete slab firm pasting.
4. surface dry concrete ater-casting waterproofing node according to claim 1ly, is characterized in that steel plate water stopper (4) is the plate-type component made with steel plate, fixing on reinforcing bar before concreting.
5. surface dry concrete ater-casting waterproofing node according to claim 1ly, is characterized in that expanded metal lath (5) adopts the steel plate of band mesh to make, builds first pouring concrete (6) front installation.
6. surface dry concrete ater-casting waterproofing node according to claim 1ly, when it is characterized in that first pouring concrete (6) is built by after water the position of slightly expanded concrete (1), by expanded metal lath (5) by first pouring concrete (6) with after water slightly expanded concrete (1) and separate.
7. surface dry concrete ater-casting waterproofing node according to claim 1ly, is characterized in that surface concrete layer (7), adds coiled material (2), waterproof roll (3) is built after laying on ground.
8. surface dry concrete ater-casting waterproofing node according to claim 1ly, is characterized in that bed course (8) is built immediately after test slot of foundation.
CN201420839993.7U 2014-12-26 2014-12-26 Surface dry concrete ater-casting, ground waterproofing node Expired - Fee Related CN204385926U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420839993.7U CN204385926U (en) 2014-12-26 2014-12-26 Surface dry concrete ater-casting, ground waterproofing node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420839993.7U CN204385926U (en) 2014-12-26 2014-12-26 Surface dry concrete ater-casting, ground waterproofing node

Publications (1)

Publication Number Publication Date
CN204385926U true CN204385926U (en) 2015-06-10

Family

ID=53358658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420839993.7U Expired - Fee Related CN204385926U (en) 2014-12-26 2014-12-26 Surface dry concrete ater-casting, ground waterproofing node

Country Status (1)

Country Link
CN (1) CN204385926U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110117967A (en) * 2019-05-13 2019-08-13 安徽四建基础建设工程有限公司 A kind of building settlement post-cast strip new waterproof tectonic sieving and implementation method
CN112663678A (en) * 2020-12-22 2021-04-16 上海勘测设计研究院有限公司 Post-cast strip structure and construction method thereof
CN114439051A (en) * 2022-03-15 2022-05-06 南京长江都市建筑设计股份有限公司 Underground chamber roof post-cast strip waterproof structure and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110117967A (en) * 2019-05-13 2019-08-13 安徽四建基础建设工程有限公司 A kind of building settlement post-cast strip new waterproof tectonic sieving and implementation method
CN112663678A (en) * 2020-12-22 2021-04-16 上海勘测设计研究院有限公司 Post-cast strip structure and construction method thereof
CN114439051A (en) * 2022-03-15 2022-05-06 南京长江都市建筑设计股份有限公司 Underground chamber roof post-cast strip waterproof structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN203742623U (en) Water-pressure-resistant composite structure for tunnel
CN204385926U (en) Surface dry concrete ater-casting, ground waterproofing node
CN203866663U (en) Porous pavement structure
CN106759104A (en) Ecological slope protection structure and construction method
CN105201025B (en) Basement waterproofing construction and its construction method
CN104206064A (en) Underground salt elimination method for saline and alkali land
CN203701255U (en) Device for collecting rainwater on road to supplement underground water
CN104404985A (en) Construction method for basement floor post-cast strip waterproofing structure
CN204982789U (en) A dam body prevention of seepage drainage system for roller compacted concrete dam
CN205242453U (en) Waterproof structure of basement roof movement joint
CN205676931U (en) A kind of basement waterproofing base plate
CN203583802U (en) Waterproof roll rolling compaction device
CN204491678U (en) For the attractive joint of outer wall of basement
CN204940476U (en) Be applied to the water guiding system in sponge urban ecology ground system
CN203361489U (en) Planting soil roof fan, tuber pipe support
CN203247838U (en) Fully-buried basement side wall post-pouring belt advance water stop formwork
CN204385925U (en) Flooring clear-water concrete ater-casting waterproofing node
CN204626473U (en) Basement roof waterproof construction
CN204626470U (en) A kind of winter construction pile crown water-tight device
CN205206845U (en) Waterproof construction at cable tunnel movement joint position
CN205046589U (en) Waterproof structure of basement
CN205224057U (en) Frozen water deposit cutting side slope reinforcement and protection structure
CN205604268U (en) Soil property side slope drainage structure
CN105297748A (en) Ice water accumulation cutting slope reinforcement and protection structure
CN205476117U (en) Structure that passive form building parapet bears down on one

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150610

Termination date: 20151226