CN204370317U - For pouring into the construction equipment of sand proportioning and closed water proof in the interim sandbox of swivel bridges - Google Patents

For pouring into the construction equipment of sand proportioning and closed water proof in the interim sandbox of swivel bridges Download PDF

Info

Publication number
CN204370317U
CN204370317U CN201420665380.6U CN201420665380U CN204370317U CN 204370317 U CN204370317 U CN 204370317U CN 201420665380 U CN201420665380 U CN 201420665380U CN 204370317 U CN204370317 U CN 204370317U
Authority
CN
China
Prior art keywords
sandbox
sand
overcoat
swivel bridges
interim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420665380.6U
Other languages
Chinese (zh)
Inventor
张志强
董李军
郝忠民
毛海鹏
张鸿
冯英磊
晏凤转
夏元
梁晓枫
戎万仁
原智
毛振宇
吴强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
Road and Bridge Construction Co Ltd of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge Construction Co Ltd of China Railway Sixth Group Co Ltd filed Critical Road and Bridge Construction Co Ltd of China Railway Sixth Group Co Ltd
Priority to CN201420665380.6U priority Critical patent/CN204370317U/en
Application granted granted Critical
Publication of CN204370317U publication Critical patent/CN204370317U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to the technical field that swivel bridges rotor system is installed, be specifically related to a kind of construction equipment for pouring into sand proportioning and closed water proof in the interim sandbox of swivel bridges, when solving existing swivel bridges rotor system installation, the situation of swivel bridges stress system conversion can not be completed in time, and then the problem causing construction delay and rotor system to damage.It comprises sandbox inner sleeve setting up and down and sandbox overcoat, sandbox inner sleeve bottom is set within sandbox overcoat, clearance aperture between the inside and outside cover of sandbox makees oil sealing by 1# lithium saponify, between sandbox inner sleeve outer bottom and sandbox overcoat inner bottom part, quartz sand packed layer is set, sandbox jacket bottom arranged outside draws sand mouth, draws sand mouth and makes oil sealing by 1# lithium saponify and carry out shutoff by sand block plate.The utility model reduces that interim sandbox sedimentation is uneven easily hardens and the impact of difficulty on swivel bridges construction removed by sandbox, the stable of steel structure of turning when ensure that the operation duration of swivel bridges and turn.

Description

For pouring into the construction equipment of sand proportioning and closed water proof in the interim sandbox of swivel bridges
Technical field
The utility model belongs to across the technical field of building swivel bridges for temporary support system, is specifically related to a kind of construction equipment for pouring into sand proportioning and closed water proof in the interim sandbox of swivel bridges.
Background technology
In swivel bridges construction, due to superstructure and substructure construction longer for interval time, ball pivot need enter stressed for a long time, affect the stable of Rotary ball hinge and slideway, therefore need to arrange interim sandbox to support, but in interim sandbox, the control stress point that waterproof is interim sandbox installation quality closed by perfusion sand proportioning and sandbox.It is an incremental process that swivel bridges is turned stressed, and along with the construction of superstructure, rotor system is stressed gradually.In time being subject to unbalanced load, ball pivot and spike will be subject to the effect of unbalanced load, and off normal occurs, larger on subsequent handling impact.After installing interim sandbox, when Superstructure Construction, load carries out transmission load by interim sandbox, is evenly distributed on by load in substructure, reduces the uneven stressed of ball pivot and spike.Therefore sandbox is the main member of stress transmission in swivel bridges work progress.But in practical operation, because sandbox is in stress transmission process, sandbox is stressed gradually, and in sandbox, sand is closely knit gradually, then in work progress under the natural conditions effect such as rainwater, in sandbox, sand hardens, difficulty when causing removing.Affect the operations such as swivel bridges is weighed, rotation, during dismounting, slideway is damaged, affect the rotation of spike, increase the mill resistance coefficient that slides, produce instability condition, potential safety hazard is formed to bridge line during rotation.
Summary of the invention
Problem to be solved in the utility model: existing sandbox does not have standard to fill with sand requirement, constructor can only carry out filling with sand proportioning in adjustment sandbox according to on-the-spot practice of construction condition, in case of in sandbox, sand makes moist, pour in down a chimney after water, sand hardens shaping, cause sandbox to remove difficulty, damage larger to slideway when abolishing sandbox.
The utility model adopts following technical scheme to realize:
For pouring into the construction equipment of sand proportioning and closed water proof in the interim sandbox of swivel bridges, comprise sandbox inner sleeve setting up and down and sandbox overcoat, sandbox inner sleeve bottom is set within sandbox overcoat, clearance aperture between the inside and outside cover of sandbox makees oil sealing by 1# lithium saponify, between sandbox inner sleeve outer bottom and sandbox overcoat inner bottom part, quartz sand packed layer is set, sandbox jacket bottom arranged outside draws sand mouth, draws sand mouth and makes oil sealing by 1# lithium saponify and carry out shutoff by sand block plate.
When swivel bridges upper load increases gradually; the utility model can prevent from causing because sandbox sedimentation is excessive; in sandbox sand harden remove difficulty; simultaneously because the rational proportion of sand causes sand space little; settlement stability; can play a protective role to ball pivot, ensure that the safety and stability of core system of turning.Damage slideway when superstructure can prevent from removing interim sandbox after completing again, what ensure when structure is turned is stable, reliable.
The utility model hinge structure has following beneficial effect: when swivel bridges rotator construction, superstructure load can be delivered to substructure by the utility model uniformly, reduce differential settlement to sand in the infringement of rotor system (ball pivot) and sandbox harden remove time infringement to slideway of turning, by application of the present utility model, reduce interim sandbox sedimentation uneven easily harden and sandbox remove difficulty on swivel bridges construction impact, reduce the impact of natural calamity on interim sandbox, to turn when ensure that the operation duration of swivel bridges and turn the stable of steel structure.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present utility model,
Fig. 2 is the a-a sectional view of Fig. 1,
In figure: 1-sandbox inner sleeve, 2-quartz sand packed layer, 3-sandbox overcoat, 4-1# lithium saponify oil sealing, 5-sandbox base, 6-sand block sheet, 7-draws sand mouth.
Detailed description of the invention
By reference to the accompanying drawings detailed description of the invention of the present utility model is described further.
For pouring into the construction equipment of sand proportioning and closed water proof in the interim sandbox of swivel bridges, comprise sandbox inner sleeve 1 setting up and down and sandbox overcoat 3, sandbox inner sleeve 1 bottom is set within sandbox overcoat 3, clearance aperture between the inside and outside cover of sandbox makees oil sealing by 1# lithium saponify, between sandbox inner sleeve outer bottom and sandbox overcoat inner bottom part, quartz sand packed layer 2 is set, sandbox overcoat 3 bottom outside arranges and draws sand mouth 7, draws sand mouth 7 and makes oil sealing by 1# lithium saponify and carry out shutoff by sand block plate 9.
Quartz sand packed layer is the compound that 3mm and 5mm quartz sand mixes according to 1:1, and sectional dimension is determined according to rotor system middle slideway size.The utility model bottom is placed in turns on slideway, and top is connected with upper cushion cap of turning.The quartz sand compound of 2cm laid by sandbox between sandbox base 8 and slideway before installing.Generally, the distance of slideway and upper cushion cap is greater than the utility model height 30cm, the compound adjustment that this discrepancy in elevation mixes according to 1:1 by pouring into 3mm and 5mm quartz sand in sandbox overcoat.Swivel bridges top construction period, sandbox is placed in foundation ditch for a long time, and in sandbox, quartz sand easily makes moist and hardens, and therefore between the inside and outside cover of sandbox, arranges 1# lithium saponify oil sealing with sand block mouth and is used for carrying out sandbox waterproof, protection against the tide, prevented water from entering sandbox.After reaching the condition of turning, removing 1# lithium saponify oil sealing, taking out sand block sheet 6 from drawing sand mouth 7, to twitch with 1 cun of steel pipe get sand from drawing sand mouth 7.Complete after getting sand, rub sandbox back and forth, destroy the quartz sand between sandbox base 8 and slideway, thus the sandbox drawing out quartz sand is taken out.
Pour into quartz sand between the inside and outside cover of the utility model sandbox and directly do not import Rotary ball hinge or flat hinge into meet swivel bridges upper load, avoid rotor system to damage by larger load for a long time.When swivel bridges is constructed, the utility model directly can reduce the installation of swivel bridges rotor system and the workload of profit system transition, to avoid in sandbox quartz sand because of ratio and waterproof improper, sclerosis is caused to be hardened, can not completely remove, carry out damaging the main rotor system component such as slideway, spike when destructiveness is removed, cause serious consequence.

Claims (1)

1. one kind for pouring into the construction equipment of sand proportioning and closed water proof in the interim sandbox of swivel bridges, it is characterized in that: comprise sandbox inner sleeve (1) setting up and down and sandbox overcoat (3), sandbox inner sleeve (1) bottom is set within sandbox overcoat (3), in sandbox, clearance aperture between overcoat arranges 1# lithium saponify oil sealing (4), quartz sand packed layer (2) is set between sandbox inner sleeve outer bottom and sandbox overcoat inner bottom part, sandbox overcoat (3) bottom outside arranges and draws sand mouth (7), draw sand mouth (7) make oil sealing by 1# lithium saponify and carry out shutoff by sand block plate (9).
CN201420665380.6U 2014-11-10 2014-11-10 For pouring into the construction equipment of sand proportioning and closed water proof in the interim sandbox of swivel bridges Expired - Fee Related CN204370317U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420665380.6U CN204370317U (en) 2014-11-10 2014-11-10 For pouring into the construction equipment of sand proportioning and closed water proof in the interim sandbox of swivel bridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420665380.6U CN204370317U (en) 2014-11-10 2014-11-10 For pouring into the construction equipment of sand proportioning and closed water proof in the interim sandbox of swivel bridges

Publications (1)

Publication Number Publication Date
CN204370317U true CN204370317U (en) 2015-06-03

Family

ID=53326549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420665380.6U Expired - Fee Related CN204370317U (en) 2014-11-10 2014-11-10 For pouring into the construction equipment of sand proportioning and closed water proof in the interim sandbox of swivel bridges

Country Status (1)

Country Link
CN (1) CN204370317U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484167A (en) * 2016-01-13 2016-04-13 合肥工业大学 Unbalanced weight monitoring device and construction method for overall process of construction of hanging basket at upper part of horizontal rotation T structure
CN109914254A (en) * 2019-03-21 2019-06-21 中铁十六局集团第二工程有限公司 A kind of Novel anti-blockage, it is easy to assemble, can synchronous unloading temporary support flask device
CN113668408A (en) * 2021-08-24 2021-11-19 中铁工程设计咨询集团有限公司 Self-falling beam swivel spherical hinge

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484167A (en) * 2016-01-13 2016-04-13 合肥工业大学 Unbalanced weight monitoring device and construction method for overall process of construction of hanging basket at upper part of horizontal rotation T structure
CN109914254A (en) * 2019-03-21 2019-06-21 中铁十六局集团第二工程有限公司 A kind of Novel anti-blockage, it is easy to assemble, can synchronous unloading temporary support flask device
CN113668408A (en) * 2021-08-24 2021-11-19 中铁工程设计咨询集团有限公司 Self-falling beam swivel spherical hinge

Similar Documents

Publication Publication Date Title
CN204370317U (en) For pouring into the construction equipment of sand proportioning and closed water proof in the interim sandbox of swivel bridges
CN203977246U (en) A kind of assembling road
CN201826511U (en) Elevation control system for pouring construction of concrete floors
CN104727339B (en) Power equipment basis two-step construction method
CN203890843U (en) Highway earth rammer used for civil engineering
CN206956783U (en) A kind of assembling type device for detecting manhole
CN103422499B (en) Casing construction method inside and outside a kind of permafrost region pile foundation
CN105908752B (en) Formwork supporting and stripping system for pouring concrete on side wall and working process of formwork supporting and stripping system
CN204738239U (en) Abut convenient to construction of turning
CN204825969U (en) Inspection shaft subsides prevents and treats structure
CN104652302A (en) Advancing construction method of ultralarge pipe roofing box culvert
KR102130359B1 (en) Wind turbine Re-powering Foundation structures
CN202416316U (en) Permanent anchor cable pier head model for quick supporting
CN103898839A (en) Bridge supplementary pile preloading consolidation method
CN104612174B (en) A kind of ultra-soft cob brick loose tool assists the construction method of suspended deck structure
CN104652426B (en) A kind of saline soil area waterglass anticorrosion pile foundation construction method
CN204370463U (en) Ultra-soft cob brick loose tool assists suspended deck structure
CN203700899U (en) Steel tool-type temporary construction road
CN204298845U (en) A kind of centrifuge ground based on existing terrace and spiral protecting wall
CN204435892U (en) The concealed device for measuring height of the floating flooring of clear-water concrete magma
CN205530400U (en) Batter pile test model steel reinforcement cage cushion inclines
CN204023497U (en) A kind of sand-gravel dam slope protection device
CN208118104U (en) A kind of die device for the production of cement culvert pipe
CN202073107U (en) Enclosed construction of dewatering well
CN203270765U (en) Fabricated template of cast-in-situ rainwater inlet well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150603

Termination date: 20201110