CN204339983U - 先张法预制板梁拉杆式整体张拉装置 - Google Patents

先张法预制板梁拉杆式整体张拉装置 Download PDF

Info

Publication number
CN204339983U
CN204339983U CN201420763688.4U CN201420763688U CN204339983U CN 204339983 U CN204339983 U CN 204339983U CN 201420763688 U CN201420763688 U CN 201420763688U CN 204339983 U CN204339983 U CN 204339983U
Authority
CN
China
Prior art keywords
stretching end
cross beam
rear cross
pull bar
stretching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420763688.4U
Other languages
English (en)
Inventor
肖来兵
黄超
周如明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201420763688.4U priority Critical patent/CN204339983U/zh
Application granted granted Critical
Publication of CN204339983U publication Critical patent/CN204339983U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

本实用新型公开一种先张法预制板梁拉杆式整体张拉装置,属于桥梁施工技术领域。该张拉装置包括承力架、预应力筋、锚固端横梁、张拉端中横梁、张拉端后横梁、张拉端前横梁、千斤顶以及拉杆;锚固端横梁以及张拉端中横梁分别设置在承力架的两端,张拉端后横梁、张拉端前横梁设置在张拉装置的右侧张拉端,张拉端后横梁通过拉杆与张拉端前横梁连接,预应力筋与张拉端后横梁连接,张拉端后横梁通过拉杆与张拉端前横梁连接,千斤顶顶推张拉端前横梁,张拉端前横梁拉动张拉端后横梁及预应力筋,实现整体张拉。本实用新型能够提高预应力筋张拉的安全性能并且具有张拉便捷的特点。

Description

先张法预制板梁拉杆式整体张拉装置
技术领域
本实用新型属于桥梁施工技术领域,涉及一种先张法预制板梁的张拉装置,尤其是采用拉杆式整体张拉的张拉装置。
背景技术
目前,传统的先张法预制板梁的张拉一般采用在承力架上直接张拉钢绞线或采用工具筋和连接器与预应力筋连接张拉。上述传统的张拉方法,钢绞线损耗较大、施工过程复杂,张拉费时工效不高,安全性能不好。
发明内容
本实用新型针对现有先张法预制板梁张拉方法存在的预应力筋损耗量大、张拉效率不高、安全性能不好等技术问题,提供一种先张法预制板梁拉杆式整体张拉装置,该张拉装置能节省预应力筋的用量、提高工作效率、提升安全性能。
本实用新型所提供的一种先张法预制板梁拉杆式整体张拉装置包括承力架1、预应力筋3、锚固端横梁5、张拉端中横梁6、张拉端后横梁7、张拉端前横梁8、千斤顶9以及拉杆10;所述锚固端横梁5以及所述张拉端中横梁6分别设置在所述承力架1的两端,所述张拉端后横梁7、张拉端前横梁8设置在所述张拉装置的右侧张拉端,所述张拉端后横梁7通过所述拉杆10与所述张拉端前横梁8连接,所述预应力筋3与所述张拉端后横梁7连接,张拉端后横梁7通过拉杆10与张拉端前横梁8连接,所述千斤顶9顶推所述张拉端前横梁8,所述张拉端前横梁8拉动所述张拉端后横梁7及所述预应力筋3,实现整体张拉。
所述拉杆10两端刻有凹槽,所述拉杆10从所述张拉端中横梁6的预留洞口穿过,所述拉杆10两段分别用螺帽旋紧,张拉时处于所述张拉中横梁6处的中间螺帽松开,张拉完成后将处于张拉中横梁6处的螺帽旋紧,以固定所述预应力筋3。所述锚固端横梁5、张拉端中横梁6、张拉端后横梁7、张拉端前横梁8均由工字钢和钢板焊接而成。
本实用新型通过采用两根拉杆与前、后两道张拉横梁连接,代替了此段的预应力筋或工具筋,实现了先张法预制板梁预应力筋的拉杆式整体张拉。由于采用两根拉杆代替此段预应力筋或工具筋,从而节省了此段的预应力筋用量,减少了预应力筋的连接安装时间,提高了工效,提高了预应力筋张拉的安全性能并且具有张拉便捷等技术特点。
附图说明
图1是本实用新型先张法预制板梁拉杆式整体张拉装置结构示意图;
图2是图1中I-I方向剖视结构示意图。
图中:1:承力架;2:预制梁底模;3:预应力筋;4:锚具;5:锚固端横梁;6:张拉端中横梁;7:张拉端后横梁;8:张拉端前横梁;9:千斤顶;10:拉杆;11:拉杆端螺帽;12:拉杆中螺帽;13:滑移轨道。
具体实施方式
本实用新型所提供的一种先张法预制板梁拉杆式整体张拉装置包括承力架1、预应力筋3、锚固端横梁5、张拉端中横梁6、张拉端后横梁7、张拉端前横梁8、千斤顶9以及拉杆10;拉杆10中间穿过张拉端中横梁6把张拉端后横梁7与张拉端前横梁8连接起来形成一个整体,拉杆10两端处张拉端后横梁7与张拉端前横梁分别用用拉杆端螺帽11旋紧固定,张拉端中横梁6处拉杆中螺帽12松开,在千斤顶9的作用力下,张拉端前横梁8通过拉杆10拖动张拉端后横梁7向前滑移,张拉端后横梁7整体拖动预制板梁预应力筋向前张拉。达到预应力张拉力设计值和伸长值后,于张拉端中横梁6处旋紧拉杆中螺帽12,最后退行千斤顶即完成了预应力整体张拉。

Claims (3)

1.一种先张法预制板梁拉杆式整体张拉装置,其特征在于该张拉装置包括承力架(1)、预应力筋(3)、锚固端横梁(5)、张拉端中横梁(6)、张拉端后横梁(7)、张拉端前横梁(8)、千斤顶(9)以及拉杆(10);所述锚固端横梁(5)以及所述张拉端中横梁(6)分别设置在所述承力架(1)的两端,所述张拉端后横梁(7)以及所述张拉端前横梁(8)设置在所述张拉装置的右侧张拉端,所述张拉端后横梁(7)通过所述拉杆(10)与所述张拉端前横梁(8)连接,所述预应力筋(3)与所述张拉端后横梁(7)连接,张拉端后横梁(7)通过所述拉杆(10)与所述张拉端前横梁(8)连接,所述千斤顶(9)顶推所述张拉端前横梁(8),所述张拉端前横梁(8)拉动所述张拉端后横梁(7)及所述预应力筋(3),实现整体张拉。
2.根据权利要求1所述张拉装置,其特征在于所述拉杆(10)两端刻有凹槽,所述拉杆(10)从所述张拉端中横梁(6)的预留洞口穿过,所述拉杆(10)两端分别用螺帽旋紧,张拉时处于所述张拉中横梁(6)处的中间螺帽松开,张拉完成后将处于张拉中横梁(6)处的螺帽旋紧,以固定所述预应力筋(3)。
3.根据权利要求1所述张拉装置,其特征在于所述锚固端横梁(5)、张拉端中横梁(6)、张拉端后横梁(7)、张拉端前横梁(8)均由工字钢和钢板焊接而成。
CN201420763688.4U 2014-12-08 2014-12-08 先张法预制板梁拉杆式整体张拉装置 Expired - Fee Related CN204339983U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420763688.4U CN204339983U (zh) 2014-12-08 2014-12-08 先张法预制板梁拉杆式整体张拉装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420763688.4U CN204339983U (zh) 2014-12-08 2014-12-08 先张法预制板梁拉杆式整体张拉装置

Publications (1)

Publication Number Publication Date
CN204339983U true CN204339983U (zh) 2015-05-20

Family

ID=53223280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420763688.4U Expired - Fee Related CN204339983U (zh) 2014-12-08 2014-12-08 先张法预制板梁拉杆式整体张拉装置

Country Status (1)

Country Link
CN (1) CN204339983U (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155420A (zh) * 2015-08-31 2015-12-16 中建市政工程有限公司 一种先张法预制梁板整体张拉系统
CN105835226A (zh) * 2016-05-26 2016-08-10 中铁二十三局集团轨道交通工程有限公司 一种先张法预制梁台座
CN105946112A (zh) * 2016-05-26 2016-09-21 中铁二十三局集团轨道交通工程有限公司 一种先张法预应力放张施工装置及方法
CN106013810A (zh) * 2016-05-26 2016-10-12 中铁二十三局集团轨道交通工程有限公司 一种先张法预应力张拉施工方法
CN106079067A (zh) * 2016-08-08 2016-11-09 中国铁道科学研究院铁道建筑研究所 一种预制轨道板的张拉装置及其方法
CN106079068A (zh) * 2016-08-08 2016-11-09 中国铁道科学研究院铁道建筑研究所 一种先张预制轨道板同步放张装置及其实现方法
CN107322785A (zh) * 2017-06-22 2017-11-07 中交二航局第四工程有限公司安徽分公司 混凝土预制桥板制作用钢索张紧机构
CN109397523A (zh) * 2018-12-25 2019-03-01 郴州远大住宅工业有限公司 一种预应力钢筋张拉工装及其使用方法
CN110029582A (zh) * 2019-05-16 2019-07-19 中铁十五局集团第一工程有限公司 一种用于系杆拱桥双吊杆同步张拉的装置及方法
CN110524675A (zh) * 2019-08-20 2019-12-03 保利长大工程有限公司 一种先张法预制工字梁及其施工方法
CN112590000A (zh) * 2020-12-11 2021-04-02 保利长大工程有限公司 一种折线先张法梁板预应力整体张拉放张方法

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155420A (zh) * 2015-08-31 2015-12-16 中建市政工程有限公司 一种先张法预制梁板整体张拉系统
CN106013810B (zh) * 2016-05-26 2019-02-01 中铁二十三局集团轨道交通工程有限公司 一种先张法预应力张拉施工方法
CN105835226A (zh) * 2016-05-26 2016-08-10 中铁二十三局集团轨道交通工程有限公司 一种先张法预制梁台座
CN105946112A (zh) * 2016-05-26 2016-09-21 中铁二十三局集团轨道交通工程有限公司 一种先张法预应力放张施工装置及方法
CN106013810A (zh) * 2016-05-26 2016-10-12 中铁二十三局集团轨道交通工程有限公司 一种先张法预应力张拉施工方法
CN105946112B (zh) * 2016-05-26 2019-02-19 中铁二十三局集团轨道交通工程有限公司 一种先张法预应力放张施工装置及方法
CN106079067A (zh) * 2016-08-08 2016-11-09 中国铁道科学研究院铁道建筑研究所 一种预制轨道板的张拉装置及其方法
CN106079068B (zh) * 2016-08-08 2018-09-14 中国铁道科学研究院铁道建筑研究所 一种先张预制轨道板同步放张装置及其实现方法
CN106079068A (zh) * 2016-08-08 2016-11-09 中国铁道科学研究院铁道建筑研究所 一种先张预制轨道板同步放张装置及其实现方法
CN107322785A (zh) * 2017-06-22 2017-11-07 中交二航局第四工程有限公司安徽分公司 混凝土预制桥板制作用钢索张紧机构
CN107322785B (zh) * 2017-06-22 2019-05-14 中交二航局第四工程有限公司安徽分公司 混凝土预制桥板制作用钢索张紧机构
CN109397523A (zh) * 2018-12-25 2019-03-01 郴州远大住宅工业有限公司 一种预应力钢筋张拉工装及其使用方法
CN110029582A (zh) * 2019-05-16 2019-07-19 中铁十五局集团第一工程有限公司 一种用于系杆拱桥双吊杆同步张拉的装置及方法
CN110029582B (zh) * 2019-05-16 2024-06-11 中铁十五局集团第一工程有限公司 一种用于系杆拱桥双吊杆同步张拉的装置及方法
CN110524675A (zh) * 2019-08-20 2019-12-03 保利长大工程有限公司 一种先张法预制工字梁及其施工方法
CN112590000A (zh) * 2020-12-11 2021-04-02 保利长大工程有限公司 一种折线先张法梁板预应力整体张拉放张方法

Similar Documents

Publication Publication Date Title
CN204339983U (zh) 先张法预制板梁拉杆式整体张拉装置
CN202169644U (zh) 先张法预应力混凝土板桩整体式张拉台座
CN102785290B (zh) 一种先张法预应力u形梁用穿心牵引式台座及其施工方法
CN203769342U (zh) 刚性自锁式预应力碳纤维板锚固系统
CN106401196A (zh) 一种预应力锚具用钢绞线张拉装置
CN203347322U (zh) 电杆拉线卡具
CN203129020U (zh) 一种现浇箱梁超长张拉穿束装置
CN201567677U (zh) 索膜结构预应力施加螺栓张拉装置
CN204822997U (zh) 一种输送带张紧调节装置
CN205277436U (zh) 用于盾构管片纵向拉紧的装置
CN202073897U (zh) 百万千瓦级机组锅炉用钢结构螺栓
CN201747056U (zh) 一种用于混凝土圈梁浇捣的支撑构造
CN103334424B (zh) 钢轨制安工艺及钢轨抗滑桩
CN202294858U (zh) 一种抱轨锁紧装置
CN203096731U (zh) 一端无端板的预应力空心方桩组件
CN104184094A (zh) 拉线连接调整夹具
CN209354163U (zh) 一种隧道钢拱架支撑装置
CN203320428U (zh) 一种钢筋混凝土桥梁与桥面板的新型加固装置
CN203403683U (zh) 一种双层穿筋装置
CN206173820U (zh) 环链式预应力钢丝绳自动同步张拉系统
CN202899037U (zh) 一种设置中下横梁的桥梁悬臂浇筑施工挂篮
CN204012574U (zh) 拉线连接调整夹具
CN104400901A (zh) 一种预应力钢筋张拉机中的固定装置
CN201343867Y (zh) 一种套筒式钢丝连接器
CN203159149U (zh) 大跨度预应力双拱架吊装结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150520