CN204168841U - Big tree transplanting taper earthwork sheet frame - Google Patents
Big tree transplanting taper earthwork sheet frame Download PDFInfo
- Publication number
- CN204168841U CN204168841U CN201420390369.3U CN201420390369U CN204168841U CN 204168841 U CN204168841 U CN 204168841U CN 201420390369 U CN201420390369 U CN 201420390369U CN 204168841 U CN204168841 U CN 204168841U
- Authority
- CN
- China
- Prior art keywords
- parcel
- earthwork
- taper
- big tree
- tree transplanting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Tents Or Canopies (AREA)
Abstract
The utility model discloses big tree transplanting taper earthwork sheet frame, comprise parcel wall, this parcel wall forms by wrapping up framework, is connected, this parcel framework is also provided with fixed frame between parcel framework by set bolt; Parcel wall is made up of at least three parcel frameworks, this parcel wall triangularity or rectangle or other polygons; Parcel framework is by locking crossbeam and promoting longeron and form, and promote longeron and be arranged on the two ends of locking crossbeam and interfixed by bolt, the quantity of locking crossbeam is 2 ~ 6, and its setting space each other can be equal or not etc.The utility model provides a kind of big tree transplanting taper earthwork sheet frame; reduce difficulty and the installation cost of installation; improve installation effectiveness; and can reuse; simultaneously can better protective plant root system when transporting; improve the survival rate of big tree transplanting, reduce the burden of enterprise, facilitate the development of enterprise.
Description
Technical field
The utility model relates to a kind of earthwork sheet frame, the taper earthwork sheet frame used when relating to a kind of tree grafting growth specifically.
Background technology
At present, native for circle ball or steel bar welding are wrapped native ball and have come by rope or iron wire by the method for big tree transplanting soil ball.And many times the operating environment of big tree transplanting is in the wild; need to carry out welding and cutting to a large amount of steel bars in the wild when working then to need to use the equipment such as bonding machine and cutting machine; and the condition of field work is comparatively harsh; process is time-consuming requires great effort again; there is potential safety hazard; be unfavorable for the personal safety protecting staff, also improve processing cost simultaneously, greatly hinder the normal development of enterprise.In addition, be subject to welded restriction, large-scale circle soil ball is easy to be destroyed when transporting, and earth is scattered, so cause root system of plant exposed, fracture, greatly reduce the survival rate of big tree transplanting, improve cost and the burden of enterprise.
Summary of the invention
In view of this; the utility model provides a kind of big tree transplanting taper earthwork sheet frame; reduce difficulty and the installation cost of installation; improve installation effectiveness; and can reuse, simultaneously can better protective plant root system when transporting, the survival rate of raising big tree transplanting; reduce the burden of enterprise, facilitate the development of enterprise.
For solving above technical problem, the technical solution of the utility model is:
Big tree transplanting taper earthwork sheet frame, comprises parcel wall, and this parcel wall forms by wrapping up framework, is connected, this parcel framework is also provided with fixed frame between parcel framework by set bolt (5).
As preferably, described parcel wall is made up of at least three parcel frameworks, this parcel wall triangularity or rectangle or other polygons.
Further, above-mentioned parcel framework forms with lifting longeron (3) by locking crossbeam (2), promote longeron (3) be arranged on the two ends of locking crossbeam (2) and interfixed by bolt, the quantity of locking crossbeam (2) is 2 ~ 6, and its setting space is each other equal or not etc.
Further, above-mentioned fixed frame is arranged on two adjacent parcel frameworks simultaneously, and fixed frame is made up of fixed cross beam (1) and stretching screw mandrel (4).
As preferably, the quantity of the fixed cross beam (1) on described each fixed frame is two, be separately positioned on the upside of the locking crossbeam (2) of the superiors and the downside of undermost locking crossbeam (2), the both sides of two fixed cross beams (1) fix respectively by a stretching screw mandrel (4).
As preferably, described fixed cross beam (1) is also bolted on the locking crossbeam (2) that contacts with it after determining position.
In addition, gap is provided with between described two adjacent liftings longeron (3), and interfixed by three set bolts (5), promote between longeron (3) at adjacent two and be also provided with two hanging bolts (6), wherein a hanging bolt (6) is arranged on two gap highest points promoted between longeron (3), and another root hanging bolt (6) is arranged on two positions do not overlapped with set bolt (5) arbitrarily promoted between longeron (3).
Compared with prior art, the utility model has following beneficial effect:
The utility model can use by manually directly carrying out assembling, do not need to be processed by equipment such as cutting and machine bonding machines in the wild, and then reduce the requirement using difficulty and operating environment, improve service efficiency, also better protect the personal safety of user of service simultaneously; Fixed frame of the present utility model better can regulate setting position according to native ball, thus can better agree with native ball, thus native spherical structure is better protected in transportation, avoid native ball to be scattered in transportation, better protect the root system of plant, improve the survival rate of big tree transplanting, further increase the benefit of enterprise; The utility model can assembly and disassembly, can reuse, greatly save use cost; The utility model structure is simple, easy to use, and the cost produced with processing is lower, can be good at carrying out large-scale manufacture and usage.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
On figure, Reference numeral is: 1-fixed cross beam; 2-locking crossbeam; 3-promote longeron; 4-stretching screw mandrel; 5-set bolt; 6-hanging bolt.
Embodiment
Core thinking of the present utility model is; a kind of big tree transplanting taper earthwork sheet frame is provided; reduce difficulty and the installation cost of installation; improve installation effectiveness; and can reuse, simultaneously can better protective plant root system when transporting, the survival rate of raising big tree transplanting; reduce the burden of enterprise, facilitate the development of enterprise.
In order to make those skilled in the art understand the technical solution of the utility model better, below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Embodiment 1
As shown in Figure 1, big tree transplanting taper earthwork sheet frame, comprises parcel wall, and this parcel wall forms by wrapping up framework, is connected, this parcel framework is also provided with fixed frame between parcel framework by set bolt 5.
As preferably, described parcel wall forms by four parcel frameworks, and this parcel wall is orthogonal.
Above-mentioned parcel framework is by locking crossbeam 2 and promoting longeron 3 and form, and promote longeron 3 and be arranged on the two ends of locking crossbeam 2 and interfixed by bolt, the quantity of locking crossbeam 2 is 2 ~ 6, and its setting space is each other equal or not etc.Optimum Spacing between every two locking crossbeams is 10 ~ 15CM.
Gap is provided with between described two adjacent lifting longerons 3, and interfixed by three set bolts 5, promote between longeron 3 at adjacent two and be also provided with two hanging bolts 6, wherein a hanging bolt 6 is arranged on two gap highest points promoted between longeron 3, and another root hanging bolt 6 is arranged on two positions do not overlapped with set bolt 5 arbitrarily promoted between longeron 3.
Above-mentioned fixed frame is arranged on two adjacent parcel frameworks simultaneously, and fixed frame is made up of fixed cross beam 1 and stretching screw mandrel 4.
As preferably, the quantity of the fixed cross beam 1 on described each fixed frame is two, be separately positioned on the upside of the locking crossbeam 2 of the superiors and the downside of undermost locking crossbeam 2, the both sides of two fixed cross beams 1 fix respectively by a stretching screw mandrel 4.
As preferably, described fixed cross beam 1 is also bolted on the locking crossbeam 2 that contacts with it after determining position.
First parcel framework is centered around around native ball during use, and by set bolt, it is connected and fixed mutually, after fixing, fixed frame is set on parcel framework, by stretching screw mandrel, it is connected up and down after fixed cross beam being arranged on relevant position, then be fixed on the locking crossbeam contacted by bolt, so just well complete the encapsulation process of native ball, then whole parcel wall is sling by hanging bolt, in the process of slinging, native ball exerts a force downwards under gravity, native ball inside is fited more, simultaneously native ball can better and framework fit together, thus avoid native ball and be scattered.
Embodiment 2
The difference of the present embodiment and embodiment 1 is only to wrap up wall and wraps up framework by three and form, this parcel wall triangularity.
Embodiment 3
The difference of the present embodiment and embodiment 1 is only to wrap up wall and wraps up framework by five or six and form, and this parcel wall becomes pentagon or hexagon.
Below be only preferred embodiment of the present utility model, it should be pointed out that above-mentioned preferred embodiment should not be considered as restriction of the present utility model, protection domain of the present utility model should be as the criterion with claim limited range.For those skilled in the art, not departing from spirit and scope of the present utility model, can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.
Claims (7)
1. big tree transplanting taper earthwork sheet frame, is characterized in that, comprises parcel wall, and this parcel wall forms by wrapping up framework, is connected, this parcel framework is also provided with fixed frame between parcel framework by set bolt (5).
2. big tree transplanting taper earthwork sheet frame according to claim 1, is characterized in that, described parcel wall is made up of at least three parcel frameworks, this parcel wall triangularity or rectangle or other polygons.
3. big tree transplanting taper earthwork sheet frame according to claim 2, it is characterized in that, described parcel framework forms with lifting longeron (3) by locking crossbeam (2), promote longeron (3) be arranged on the two ends of locking crossbeam (2) and interfixed by bolt, the quantity of locking crossbeam (2) is 2 ~ 6, and its setting space is each other equal or not etc.
4. big tree transplanting taper earthwork sheet frame according to claim 3, is characterized in that, described fixed frame is arranged on two adjacent parcel frameworks simultaneously, and fixed frame is made up of fixed cross beam (1) and stretching screw mandrel (4).
5. big tree transplanting taper earthwork sheet frame according to claim 4, it is characterized in that, the quantity of the fixed cross beam (1) on described each fixed frame is two, be separately positioned on the upside of the locking crossbeam (2) of the superiors and the downside of undermost locking crossbeam (2), the both sides of two fixed cross beams (1) fix respectively by a stretching screw mandrel (4).
6. big tree transplanting taper earthwork sheet frame according to claim 5, is characterized in that, described fixed cross beam (1) is also bolted on the locking crossbeam (2) that contacts with it after determining position.
7. big tree transplanting taper earthwork sheet frame according to claim 6, it is characterized in that, gap is provided with between described two adjacent liftings longeron (3), and interfixed by three set bolts (5), promote between longeron (3) at adjacent two and be also provided with two hanging bolts (6), wherein a hanging bolt (6) is arranged on two gap highest points promoted between longeron (3), and another root hanging bolt (6) is arranged on two positions do not overlapped with set bolt (5) arbitrarily promoted between longeron (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420390369.3U CN204168841U (en) | 2014-07-15 | 2014-07-15 | Big tree transplanting taper earthwork sheet frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420390369.3U CN204168841U (en) | 2014-07-15 | 2014-07-15 | Big tree transplanting taper earthwork sheet frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204168841U true CN204168841U (en) | 2015-02-25 |
Family
ID=52557693
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420390369.3U Active CN204168841U (en) | 2014-07-15 | 2014-07-15 | Big tree transplanting taper earthwork sheet frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204168841U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108934906A (en) * | 2018-09-06 | 2018-12-07 | 山东美华环境科技有限公司 | A kind of rare tree species transplanting digging packing apparatus and its packaging method |
-
2014
- 2014-07-15 CN CN201420390369.3U patent/CN204168841U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108934906A (en) * | 2018-09-06 | 2018-12-07 | 山东美华环境科技有限公司 | A kind of rare tree species transplanting digging packing apparatus and its packaging method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103711078A (en) | Temporary girder-type support for bridge construction and dismantling method thereof | |
CN204168841U (en) | Big tree transplanting taper earthwork sheet frame | |
CN202785351U (en) | Tower cranes attached operating platform | |
CN203767837U (en) | Special hanging basket structure for hanging gas pipelines | |
CN204689352U (en) | A kind of line bar hoisting device | |
CN203022328U (en) | Climbing operation platform | |
CN204139697U (en) | Pole guy fastening devices | |
CN202055501U (en) | Construction platform for connecting central silo and conic silo of cement storage | |
CN205222427U (en) | A hang material device for tray dress building material | |
KR20150075843A (en) | Cargo transport box | |
CN103437368B (en) | One encloses purlin parts | |
CN207314891U (en) | A kind of steel construction high-rise working safety belt safety rope branch hang device | |
CN206569896U (en) | A kind of piping fixed structure of fitting-out unit of pipe handling | |
CN202910945U (en) | Material pressing device based on raw wood cutting machine | |
CN204457855U (en) | Mass transport platform machine | |
CN203428735U (en) | Hook assembly of electric chain hoist | |
CN203491640U (en) | Split type stay wire disc | |
CN205132931U (en) | Tower crane balance arm direction is adhered to and is demolishd device | |
CN209720424U (en) | A kind of steel strand wires safety placement protective frame | |
CN103437363B (en) | Enclose purlin parts | |
CN204709676U (en) | A kind of stator hole falling-proof safety device | |
CN211314663U (en) | Hydraulic component maintenance operation table of reactor coolant pump | |
CN204162303U (en) | The high-altitude operation platform of single-beam crane | |
CN207090821U (en) | A kind of spacing safety plug of hanging basket | |
CN202899022U (en) | A bridge pier with embedded cross beams |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230710 Address after: No. 243 Diba Street, Pingquan Street, Jianyang City, Chengdu City, Sichuan Province, 610000 Patentee after: Sichuan Jiazhi Ecological Technology Co.,Ltd. Address before: No. 80, Qipan Road, Jianyang City, Ziyang City, Sichuan Province Patentee before: SICHUAN GUOGUANG AGROCHEMICAL Co.,Ltd. |
|
TR01 | Transfer of patent right |