CN204139650U - A kind of extension type vertical channel - Google Patents
A kind of extension type vertical channel Download PDFInfo
- Publication number
- CN204139650U CN204139650U CN201420429197.6U CN201420429197U CN204139650U CN 204139650 U CN204139650 U CN 204139650U CN 201420429197 U CN201420429197 U CN 201420429197U CN 204139650 U CN204139650 U CN 204139650U
- Authority
- CN
- China
- Prior art keywords
- guardrail
- halfpace
- vertical channel
- clamped beam
- extension type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420429197.6U CN204139650U (en) | 2014-07-31 | 2014-07-31 | A kind of extension type vertical channel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420429197.6U CN204139650U (en) | 2014-07-31 | 2014-07-31 | A kind of extension type vertical channel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204139650U true CN204139650U (en) | 2015-02-04 |
Family
ID=52416345
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420429197.6U Active CN204139650U (en) | 2014-07-31 | 2014-07-31 | A kind of extension type vertical channel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204139650U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107059535A (en) * | 2017-06-16 | 2017-08-18 | 徐工集团工程机械有限公司 | Vehicle climbs the servicing unit of step |
CN111232672A (en) * | 2020-01-17 | 2020-06-05 | 陕西艾潽机械制造有限公司 | Fracturing sand blending tank |
-
2014
- 2014-07-31 CN CN201420429197.6U patent/CN204139650U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107059535A (en) * | 2017-06-16 | 2017-08-18 | 徐工集团工程机械有限公司 | Vehicle climbs the servicing unit of step |
CN111232672A (en) * | 2020-01-17 | 2020-06-05 | 陕西艾潽机械制造有限公司 | Fracturing sand blending tank |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204126230U (en) | Assembly scaffold unit | |
CN204125829U (en) | Half high-rise unsettled insulation maintenance gap bridge | |
CN204139650U (en) | A kind of extension type vertical channel | |
CN204475593U (en) | Support structure installed by a kind of curtain wall | |
CN103532048B (en) | A kind of large-scale lattice crossing frame of Rapid Combination | |
CN204001650U (en) | Overhanging scaffold for building | |
CN205063032U (en) | Wall connection node structure | |
CN206016247U (en) | A kind of wall form support system | |
CN204414294U (en) | One can free assembled mould | |
CN204299157U (en) | The mounted lifting device in attached lifting scaffold side | |
CN204081182U (en) | A kind of two-way mixing cross wise reinforcement truss self-supporting floor support plate | |
CN203430006U (en) | Quick disassembly and assembly cantilever bracket for building outer wall construction | |
CN105297756A (en) | Assembling type formwork structure | |
CN203617612U (en) | Quickly combined large lattice type crossing frame | |
CN103711244B (en) | The double-deck full steel structure floor of embedded steel channel beam | |
CN204590657U (en) | Formwork bracing system | |
CN204212385U (en) | Scaffold strengthened by truss | |
CN203361596U (en) | Auxiliary support of integrated lifting operation platform | |
CN201850779U (en) | Security movable railing | |
CN204098217U (en) | A kind of lifting braced structures | |
CN204174919U (en) | Scaffold | |
CN204899228U (en) | Pump line fixing device for construction | |
CN204163365U (en) | A kind of overhanging scaffold assembly | |
CN104372921A (en) | Scaffold | |
CN203961122U (en) | A kind of Two bors d's oeuveres C section steel purlin termination that is applicable to large span purlin |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Ruirong Inventor after: Cai Ronggen Inventor after: Du Zhihu Inventor after: Liu Tao Inventor after: Zeng Weineng Inventor after: Yuan Xiaomin Inventor after: Ren Taoyuan Inventor before: Chen Ruirong Inventor before: Cai Ronggen Inventor before: Du Zhihu Inventor before: Yuan Xiaomin Inventor before: Ren Taoyuan |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: CHEN RUIRONG CAI RONGGEN DU ZHIHU YUAN XIAOMIN REN TAOYUAN TO: CHEN RUIRONG CAI RONGGEN DU ZHIHU LIU TAO CENG WEINENG YUAN XIAOMIN REN TAOYUAN |
|
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province Patentee after: China Construction Engineering Group Co., Ltd Address before: 518040 Guangdong city of Shenzhen province Futian District Che Kung Temple Binhe Tairan industry tipping 17 storey building No. 17A Patentee before: China Construction Steel Structure Corp. Ltd. |