CN204899228U - Pump line fixing device for construction - Google Patents

Pump line fixing device for construction Download PDF

Info

Publication number
CN204899228U
CN204899228U CN201520692597.0U CN201520692597U CN204899228U CN 204899228 U CN204899228 U CN 204899228U CN 201520692597 U CN201520692597 U CN 201520692597U CN 204899228 U CN204899228 U CN 204899228U
Authority
CN
China
Prior art keywords
fixed
body frame
building
pump line
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520692597.0U
Other languages
Chinese (zh)
Inventor
戴先平
凌捷
徐霞
李亮
潘辑
任小斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North Anji County West Of A City Development Corp Ltd
Original Assignee
North Anji County West Of A City Development Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North Anji County West Of A City Development Corp Ltd filed Critical North Anji County West Of A City Development Corp Ltd
Priority to CN201520692597.0U priority Critical patent/CN204899228U/en
Application granted granted Critical
Publication of CN204899228U publication Critical patent/CN204899228U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)
  • Details Of Reciprocating Pumps (AREA)

Abstract

The utility model provides a pump line fixing device for construction, including two pump lines, the pump line passes through body frame and building fixed connection, be provided with the rectangle frame on the body frame, the rectangle frame comprises two parallel arrangement's fixed plate A and two parallel arrangement's fixed plate B, the pump line passes through the hoop to be fixed and locks on fixed plate A and by the bolt, it is fixed to be the fixed strip of X -shaped form through two staggered arrangements between two pump lines, through locking device locking between two fixed strips, two fixed strip settings are on fixed plate B, be provided with the support between fixed plate B and the building, be provided with support steel sheet and fixed through several typed wall bolt between support and the building, be provided with body frame steel sheet and fixed through several typed wall bolt between body frame and the building. A pump line fixing device for construction's advantage lie in having rational in infrastructurely, safe firm, can improve production efficiency and reduce safe risk simultaneously.

Description

A kind of building operations pump line fastening devices
Technical field
The utility model relates to the realm of building construction, particularly a kind of building operations concrete pump pipe fixing device.
Background technology
It is all adopt steelframe and scaffold as the material of fixed pump pipe holder by rule of thumb that current construction of super highrise building concrete pump pipe is fixed, in construction of super highrise building, the construction of Core Walls Structure vertical structure is constructed prior to horizontal structure, the fixing of concrete pump pipe can only be born by the vertical structure of having constructed, by the power that produces in concrete conveyance by the special delivery of pump line fixed mount to vertical structure.Current construction of super highrise building fixing by rule of thumb pump line, due to the uncertainty of factors in concrete delivery service, there is larger security risk, construction enterprises do not form the fixing systems approach of concrete pump pipe, in Super High concrete construction, there is larger potential safety hazard.Pump line cannot be made to keep plumbness in prior art, the efficiency just causing concrete transportation once bending or inclination reduces simultaneously always.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of rational in infrastructure, safety and firmness, can enhance productivity and reduce the building operations pump line fastening devices of security risk simultaneously.
The technical scheme that the utility model solves the problems of the technologies described above is as follows:
A kind of building operations pump line fastening devices, comprise two pump lines, it is characterized in that: pump line is fixedly connected with building by body frame, body frame is provided with rectangle frame, the fixed head B that rectangle frame is be arranged in parallel by two fixed plate A be arranged in parallel and two is formed, pump line to be fixed in fixed plate A by hoop and by bolt-locking, the fixed strip being X-shaped shape by two interlaced arrangement between two pump lines is fixed, locked by locking device between two fixed strips, two fixed strips are arranged on fixed head B; Support is provided with between described fixed head B and building; Be provided with support steel plate between described support and building and fixed by several through-wall bolt, be provided with body frame steel plate between described body frame and building and fixed by several through-wall bolt.
Further, described Bracket setting has two to be separately positioned on body frame both sides.
Further, bracing frame is provided with between described support and body frame.
Further, rubber layer is provided with between described pump line and hoop.
Further, fixed by least three through-wall bolts between described support and building, fixed by least five through-wall bolts between described body frame and building.
Further, fixed by four through-wall bolts between described support and building, fixed by six through-wall bolts between described body frame and building.
Further, 45 ° are angularly less than between described support and body frame.
Further, between support frame as described above and body frame institute angularly and between support and body frame institute angularly sum be not more than 90 °.
Further, in 30 ° of angles between described support and body frame, in 50 ° of angles between support frame as described above and body frame.
The advantage of a kind of building operations pump line fastening devices described in the utility model is to have rational in infrastructure, safety and firmness, can enhance productivity and reduce security risk simultaneously.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described further:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is top view of the present utility model.
1, pump line, 2, fixed plate A, 3, rectangle frame 4, fixed head B, 5, fixed strip, 6, support, 7, body frame, 8, support steel plate, 9, through-wall bolt, 10, body frame steel plate, 11, building, 12, bracing frame, 13, locking device, 14, hoop, 15, bolt.
Detailed description of the invention
A kind of building operations pump line fastening devices, comprise two pump lines 1, it is characterized in that: pump line 1 is fixedly connected with building 11 by body frame 7, body frame 7 is provided with rectangle frame 3, the fixed head B4 that rectangle frame 3 is be arranged in parallel by two fixed plate A be arranged in parallel 2 and two is formed, pump line 1 to be fixed in fixed plate A 2 by hoop 14 and to be locked by bolt 15, the fixed strip 5 being X-shaped shape by two interlaced arrangement between two pump lines 1 is fixed, locked by locking device 13 between two fixed strips 5, two fixed strips 5 are arranged on fixed head B4; Support 6 is provided with between described fixed head B4 and building 11; Be provided with support steel plate 8 between described support 6 and building 11 and fixed by several through-wall bolt 9, be provided with body frame steel plate 10 between described body frame 7 and building 11 and fixed by several through-wall bolt 9.
Further, described support 6 is provided with two and is separately positioned on body frame 7 both sides.
Further, bracing frame 12 is provided with between described support 6 and body frame 7.
Further, rubber layer is provided with between described pump line 1 and hoop 14.
Further, fixed by least three through-wall bolts 9 between described support 6 and building 11, fixed by least five through-wall bolts 9 between described body frame 7 and building 11.
Further, fixed by four through-wall bolts 9 between described support 6 and building 11, fixed by six through-wall bolts 9 between described body frame 7 and building 11.
Further, 45 ° are angularly less than between described support 6 and body frame 7.
Further, between support frame as described above 12 and body frame 7 institute angularly and between support 6 and body frame 7 institute angularly sum be not more than 90 °.
Further, in 30 ° of angles between described support 6 and body frame 7, in 50 ° of angles between support frame as described above 12 and body frame 7.
During concrete enforcement, the utility model strengthens the fixed performance of body frame by arranging support, and the position simultaneously controlling support and body frame between support and body frame by arranging bracing frame is fixed not yielding.Pump line is fixed by hoop and is arranged on rectangle frame, and the movement of pump line is limited by the triangle formed between fixed strip and fixed plate A, triangle is most stable structure, so the fixed effect of pump line is better in the triangular structure of this formation, multiple fastening devices ensure that pump line can be vertically bending and can not shift position easily.
Preferably, between support and body frame, be angularly less than 45 °, simultaneously between bracing frame and body frame institute angularly and between support and body frame institute angularly sum be not more than 90 °.Make bracing frame better can limit distance between body frame and support like this, make body frame and support can not change of location easily, make fixed effect better.
Preventing hoop from hoop can be made when fixing pump line to cause damage to pump line outer wall by arranging rubber layer between pump line and hoop, extending the application life of pump line.
By adopting at least three through-wall bolts to fix between support and building, and between body frame and building, adopting at least five through-wall bolts to fix, making body frame and support to be better fixed on building, decreasing potential safety hazard.Adopt structure of the present utility model can reduce pump line topple over and bend to the potential safety hazard brought in work progress and the production efficiency in work progress can be improved to a certain extent.
The foregoing is only embodiment of the present utility model; not thereby the scope of the claims of the present utility model is limited; every utilize the utility model description to do equivalent structure or the conversion of equivalent flow process or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present utility model.
In sum, the advantage of a kind of building operations pump line fastening devices described in the utility model is to have rational in infrastructure, safety and firmness, can enhance productivity and reduce security risk simultaneously.

Claims (9)

1. a building operations pump line fastening devices, comprise two pump lines (1), it is characterized in that: pump line (1) is fixedly connected with building (11) by body frame (7), body frame (7) is provided with rectangle frame (3), rectangle frame (3) is by two fixed plate A be arranged in parallel (2) and two fixed head B(4 be arranged in parallel) form, pump line (1) is fixed on fixed plate A (2) by hoop (14) and goes up and locked by bolt (15), the fixed strip (5) being X-shaped shape by two interlaced arrangement between two pump lines (1) is fixed, by locking device (13) locking between two fixed strips (5), two fixed strips (5) are arranged on fixed head B(4) on, described fixed head B(4) and building (11) between be provided with support (6), be provided with support steel plate (8) between described support (6) and building (11) and fixed by several through-wall bolt (9), be provided with body frame steel plate (10) between described body frame (7) and building (11) and fixed by several through-wall bolt (9).
2. a kind of building operations pump line fastening devices according to claim 1, is characterized in that: described support (6) is provided with two and is separately positioned on body frame (7) both sides.
3. a kind of building operations pump line fastening devices according to claim 1 and 2, is characterized in that: be provided with bracing frame (12) between described support (6) and body frame (7).
4. a kind of building operations pump line fastening devices according to claim 1, is characterized in that: be provided with rubber layer between described pump line (1) and hoop (14).
5. a kind of building operations pump line fastening devices according to claim 3, it is characterized in that: fixed by least three through-wall bolts (9) between described support (6) and building (11), fixed by least five through-wall bolts (9) between described body frame (7) and building (11).
6. a kind of building operations pump line fastening devices according to claim 5, it is characterized in that: fixed by four through-wall bolts (9) between described support (6) and building (11), fixed by six through-wall bolts (9) between described body frame (7) and building (11).
7. a kind of building operations pump line fastening devices according to claim 3, is characterized in that: be angularly less than 45 ° between described support (6) and body frame (7).
8. a kind of building operations pump line fastening devices according to claim 7, is characterized in that: between support frame as described above (12) and body frame (7) institute angularly and between support (6) and body frame (7) angularly sum be not more than 90 °.
9. a kind of building operations pump line fastening devices according to claim 7, is characterized in that: in 30 ° of angles between described support (6) and body frame (7), in 50 ° of angles between support frame as described above (12) and body frame (7).
CN201520692597.0U 2015-09-09 2015-09-09 Pump line fixing device for construction Expired - Fee Related CN204899228U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520692597.0U CN204899228U (en) 2015-09-09 2015-09-09 Pump line fixing device for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520692597.0U CN204899228U (en) 2015-09-09 2015-09-09 Pump line fixing device for construction

Publications (1)

Publication Number Publication Date
CN204899228U true CN204899228U (en) 2015-12-23

Family

ID=54921415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520692597.0U Expired - Fee Related CN204899228U (en) 2015-09-09 2015-09-09 Pump line fixing device for construction

Country Status (1)

Country Link
CN (1) CN204899228U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107228231A (en) * 2017-08-02 2017-10-03 芜湖精达机械制造有限公司 A kind of new pump line rack

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107228231A (en) * 2017-08-02 2017-10-03 芜湖精达机械制造有限公司 A kind of new pump line rack

Similar Documents

Publication Publication Date Title
CN104196222A (en) Cantilever frame of tool type profile steel cantilever scaffold
CN205476441U (en) Concrete wall template structure
CN204299145U (en) For the operating platform that external climbing tower crane support frame is installed
CN204001650U (en) Overhanging scaffold for building
CN204899228U (en) Pump line fixing device for construction
CN203271096U (en) Operating platform
CN202899159U (en) Outer hanging type construction elevator foundation
CN202866261U (en) Operation hanging rack for civil construction
CN204040452U (en) A kind of Corner Link for tools type section steel builder's jack
CN205476556U (en) Horizontal protection device for scaffold operation layer for building
CN203160668U (en) Buckled type scaffold floor
CN204754267U (en) Adhere to molding die utensil formula and prevent guardrail bar based on buckle
CN204370828U (en) Tool-type protective screening
CN206844646U (en) A kind of high flexible assembly type elevator its support reinforcement mechanism of applicability
CN204210858U (en) Pcf plate storage rack
CN209114651U (en) A kind of obligatory point that can prevent wall crazing
CN203393721U (en) Inner support main purlin component
CN103276889B (en) Full hall fastener type steel pipe scaffold anti-side shifting method
CN203271105U (en) Auxiliary device of building hoist wall attaching frame
CN202755633U (en) Rebar hanger platform for installing wall template
CN201902026U (en) Building engineering edge protection railing with freely extended or reduced length
CN205444884U (en) Wallboard for civil engineering
CN205217862U (en) Can have enough to meet need bar straightener protection frame of use
CN204418637U (en) For the telescopic scaffold floor of integrated form scaffold
CN203393722U (en) Pair-supporting part

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151223

Termination date: 20160909