CN202755633U - Rebar hanger platform for installing wall template - Google Patents

Rebar hanger platform for installing wall template Download PDF

Info

Publication number
CN202755633U
CN202755633U CN 201220389025 CN201220389025U CN202755633U CN 202755633 U CN202755633 U CN 202755633U CN 201220389025 CN201220389025 CN 201220389025 CN 201220389025 U CN201220389025 U CN 201220389025U CN 202755633 U CN202755633 U CN 202755633U
Authority
CN
China
Prior art keywords
support
hook
hanger platform
platform
installing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220389025
Other languages
Chinese (zh)
Inventor
罗非
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry Huaxing Construction Co Ltd
Original Assignee
China Nuclear Industry Huaxing Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry Huaxing Construction Co Ltd filed Critical China Nuclear Industry Huaxing Construction Co Ltd
Priority to CN 201220389025 priority Critical patent/CN202755633U/en
Application granted granted Critical
Publication of CN202755633U publication Critical patent/CN202755633U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a rebar hanger platform for installing a wall template, and belongs to the technical field of building construction instrument. The rebar hanger platform for installing the wall template comprises a hook hung on a main channel of a plate, a brace, a rack, a support and an operating floor, wherein a vertical plane and an inclined plane are connected to form a V- shaped structure of the support, and the hook and the support are vertically mounted in the vertical plane of the support, the hook is arranged above the support, the operating floor is fixed and installed on the top of the support. The rebar hanger platform for installing the wall template is capable of installing an upper part of the plate through the rebar hanger platform hung on the main channel of the plate without further putting up an operating floor, thus not only the time for further putting up the operating floor is saved, but also the spaces occupied by the operating floor are reduced, and efficiency of construction is improved, and the security risk raised when constructors climbing and operating on the plate without any equipment is reduced at the same time.

Description

Wall form is installed and uses reinforcing bar hanger platform
Technical field
The utility model is related to a kind of wall form installation reinforcing bar hanger platform, belongs to construction fixture technology field.
Background technology
At present, in in-situ concrete wall template system, part is numerous.When form height exceedes normal person's height ranges, its upper part is installed and encountered difficulties, and job site typically need to separately set up operating platform, installs required to meet wall form upper part.Longer particularly with wall length, the high larger wall of wall, if setting up operating platform temporarily, not only occupies live and hard up space, and exhausts substantial amounts of time and manpower and materials, brings pressure to safety construction, also reduces efficiency of construction.
Utility model content
Technical problem to be solved in the utility model be the shortcoming for overcoming prior art there is provided a kind of wall form installation reinforcing bar hanger platform, can save wall form set-up time and space, improve efficiency of construction.
In order to solve above technical problem, the utility model provides a kind of wall form installation and uses reinforcing bar hanger platform, including hook, support, support and the operating desk being hung on template main joist, the support connects and composes V-shaped structure by vertical plane and inclined-plane, the hook and support are vertically mounted on the vertical plane of the support, and the hook is positioned at the top of the support;The operating desk installs the top for being connected to the support.
The technical scheme that the utility model is further limited is:Foregoing wall form is installed and uses reinforcing bar hanger platform, and the hook, support, support and operating desk are welded by round steel is assembled.
Foregoing wall form, which is installed, uses reinforcing bar hanger platform, and the round steel diameter range is 14~Φ of Φ 20mm.
Further, foregoing wall form is installed used and linked up with reinforcing bar hanger platform, the support at least provided with two, and the hook dimensions are matched with the template main joist specification.
The beneficial effects of the utility model are:The utility model can be in the case where separately not setting up operating platform, by hanging on the reinforcing bar hanger platform on template main joist, installation form upper part, not only save the time for separately setting up operating platform, and reduce the space-consuming of such operating platform, template construction efficiency is improved, while reducing the security risk of the free-hand climbing of workmen operation in template.
Brief description of the drawings
The utility model is further illustrated below in conjunction with the accompanying drawings.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is Fig. 1 right view.
Fig. 3 is Fig. 1 top view.
Fig. 4 is the utility model use state figure.
Embodiment
A kind of wall form that the present embodiment is provided is installed and uses reinforcing bar hanger platform, structure is as shown in Figures 1 to 4, including the hook 201 being hung on template main joist 101, support 202, support 203 and operating desk 204, hook, support, support and operating desk assembled are welded by Φ 16mm round steel, support 203 connects and composes V-shaped structure by vertical plane and inclined-plane, hook 201 and support 202 are vertically mounted on the vertical plane of support, hook 201 is located at the top of support 202, two hooks are set on support 203, and hook dimensions are matched with template main joist specification, the width of support is matched with secondary joist specification;Operating desk 204 installs the top for being connected to support.
Two in the present embodiment hooks, support, four supports and operating desk each several part by the round steel of Φ 16 it is cleaved, bend, assemble and be welded, weld bead height is 6mm, and the size and support width of hook should match with template primary and secondary keel specification respectively.During site operation; first the Screw arbor with nut at both-ends and template supporting leg of template bottom, template bearing diagonal are installed; and ensure that template is firm and can not topple; reinforcing bar hanger platform is hung on template main joist again; and be supported on secondary joist; workmen stands under the protection of safety belt and continues installation form upper part on reinforcing bar hanger platform.
In addition to the implementation, the utility model can also have other embodiment.All use equivalents or the technical scheme of equivalent transformation formation, all fall within the protection domain of the utility model requirement.

Claims (4)

1. wall form is installed and uses reinforcing bar hanger platform, it is characterised in that:Including hook, support, support and the operating desk being hung on template main joist, the support connects and composes V-shaped structure by vertical plane and inclined-plane, and the hook and support are vertically mounted on the vertical plane of the support, and the hook is positioned at the top of the support;The operating desk installs the top for being connected to the support.
2. wall form according to claim 1 is installed and uses reinforcing bar hanger platform, it is characterised in that:The hook, support, support and operating desk are welded by round steel is assembled.
3. wall form according to claim 2 is installed and uses reinforcing bar hanger platform, it is characterised in that:The round steel diameter range is 14~Φ of Φ 20mm.
4. wall form according to claim 1 is installed and uses reinforcing bar hanger platform, it is characterised in that:At least provided with two hooks on the support, and the hook dimensions are matched with the template main joist specification.
CN 201220389025 2012-08-08 2012-08-08 Rebar hanger platform for installing wall template Expired - Lifetime CN202755633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220389025 CN202755633U (en) 2012-08-08 2012-08-08 Rebar hanger platform for installing wall template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220389025 CN202755633U (en) 2012-08-08 2012-08-08 Rebar hanger platform for installing wall template

Publications (1)

Publication Number Publication Date
CN202755633U true CN202755633U (en) 2013-02-27

Family

ID=47734822

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220389025 Expired - Lifetime CN202755633U (en) 2012-08-08 2012-08-08 Rebar hanger platform for installing wall template

Country Status (1)

Country Link
CN (1) CN202755633U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306775A (en) * 2019-06-27 2019-10-08 中国二十二冶集团有限公司 Outer wall suspension scaffold and construction method for pipe gallery construction
CN110725597A (en) * 2019-10-23 2020-01-24 中国十九冶集团有限公司 Construction platform erection structure and method for ring beam at top of concrete silo

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306775A (en) * 2019-06-27 2019-10-08 中国二十二冶集团有限公司 Outer wall suspension scaffold and construction method for pipe gallery construction
CN110725597A (en) * 2019-10-23 2020-01-24 中国十九冶集团有限公司 Construction platform erection structure and method for ring beam at top of concrete silo

Similar Documents

Publication Publication Date Title
CN104453197B (en) High Large Cantilever concrete structural steel shape supports platform
CN201261942Y (en) Stand platform for cantilevered concrete structure construction
CN204299145U (en) For the operating platform that external climbing tower crane support frame is installed
CN202755633U (en) Rebar hanger platform for installing wall template
CN205713096U (en) A kind of roofing cantilevered structure form bracing system
CN204663030U (en) Assembled-type house precast floor slab installation sectional shelf-unit
CN204126238U (en) Steel plate shear force wall operation platform and bracing frame thereof
CN203783105U (en) Fast construction operating platform used for section steel column interior pouring concrete
CN206308702U (en) A kind of portable basis of derrick crane
CN206034875U (en) Supplementary installation swing arm formula tower crane instrument roof beam hanging flower basket device
CN202899159U (en) Outer hanging type construction elevator foundation
CN202969897U (en) Ringlock type scaffold joist system
CN204266571U (en) A kind of builder's jack i iron pre-embedded device
CN204126290U (en) Elevator shaft horizontal protective device
CN110778109A (en) Angle-adjustable support fitting
CN203834906U (en) Triangular operation platform used for capital construction slope face
CN205314539U (en) Large -scale cantilever type combination steel form
CN203669345U (en) External protection device of bailey truss platform
CN203441074U (en) Scaffold connecting device
CN203769341U (en) Anti-falling grating plate of steel platform
CN203257075U (en) Core tube inner lifting type multifunctional operating platform for high-rise building construction
CN203430006U (en) Quick disassembly and assembly cantilever bracket for building outer wall construction
CN103276889B (en) Full hall fastener type steel pipe scaffold anti-side shifting method
CN207348447U (en) A kind of scaffold lifting is early to tear system open
CN208215308U (en) Suspension type station

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130227

CX01 Expiry of patent term