CN204139622U - 可调节柱钢筋定位卡具 - Google Patents

可调节柱钢筋定位卡具 Download PDF

Info

Publication number
CN204139622U
CN204139622U CN201420524210.6U CN201420524210U CN204139622U CN 204139622 U CN204139622 U CN 204139622U CN 201420524210 U CN201420524210 U CN 201420524210U CN 204139622 U CN204139622 U CN 204139622U
Authority
CN
China
Prior art keywords
steel bar
bar positioning
cross
positioning
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420524210.6U
Other languages
English (en)
Inventor
李�浩
梁向前
洪治平
康俊峰
燕燕
唐娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Construction Group Corp Ltd
Original Assignee
Hebei Construction Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Construction Group Corp Ltd filed Critical Hebei Construction Group Corp Ltd
Priority to CN201420524210.6U priority Critical patent/CN204139622U/zh
Application granted granted Critical
Publication of CN204139622U publication Critical patent/CN204139622U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

本实用新型公开了一种可调节柱钢筋定位卡具,其包括4根能组成一个矩形的支撑圆柱、4个十字形卡具和多个钢筋定位卡;十字形卡具是由两个一体或固定为一体的与支撑圆柱直径相匹配的圆管组成,两个圆管的中间壁上分别开有螺纹孔A,螺纹孔A上安装有顶丝A;4根支撑圆柱由十字形卡具连接并由顶丝A顶紧固定;钢筋定位卡是由一端壁的中间开有螺纹孔B的连接管,另一端壁上有一体或固定为一体的两个间隔距离大于被定位的柱钢筋直径的卡柱,螺纹孔B上安装有顶丝B。本实用新型使用方便,结构稳定,定位准确,便于安装拆卸和现场定位,能够重复利用,减少损耗,节约成本,且增加了工作效率。

Description

可调节柱钢筋定位卡具
技术领域
本实用新型涉及一种建筑施工工具,具体为一种柱钢筋定位卡具。
背景技术
钢筋混凝土柱是各种工程结构中最基本的承重构件,位于混凝土柱各个侧面的竖向受力钢筋( 即柱筋) 的施工质量直接影响混凝土柱的承载能力,而在施工过程中,柱筋往往容易受混凝土浇捣的影响而造成偏位,如何保证柱筋不偏位是钢筋安装成品保护的一个难点。目前的建筑施工现场,柱筋多是用以下方式几种定位:一是利用箍筋与柱筋的主筋绑扎连接,这种做法需绑扎的钢筋数量多,工序较为繁琐,工效低,且绑扎连接方式不牢固,在混凝土浇筑中容易产生位移;二是将定长的横向钢筋与主筋焊接,钢筋焊接需要特殊工种作业人员,增加人工费,费时费力,工效低,不能重复利用,大大增加成本;三是使用成品定位箍,不能重复利用,大大增加了成本。
发明内容
本实用新型的目的就是解决现有技术中存在的上述问题,提供一种可调节柱钢筋定位卡具,该钢筋定位工具使用方便,结构稳定,定位准确,便于安装拆卸和现场定位,能够重复利用,减少损耗,节约成本,且增加了工作效率。
为实现上述目的,本实用新型的技术解决方案是:一种可调节柱钢筋定位卡具,其包括4根能组成一个矩形的支撑圆柱、4个十字形卡具和多个钢筋定位卡;十字形卡具是由两个一体或固定为一体的与支撑圆柱直径相匹配的圆管组成,两个圆管的中间壁上分别开有螺纹孔A,螺纹孔A上安装有顶丝A;4根支撑圆柱由十字形卡具连接并由顶丝A顶紧固定;钢筋定位卡是由一端壁的中间开有螺纹孔B的连接管,另一端壁上有一体或固定为一体的两个间隔距离大于被定位的柱钢筋直径的卡柱, 螺纹孔B上安装有顶丝B。
使用时,按照图纸上给出的被定位的柱钢筋形成的框架内圈大小将本实用新型的4根支撑圆柱由十字形卡具固定好,并按照图纸上给出的柱钢筋的间距的要求将各卡柱固定在各支撑圆柱,然后将本实用新型置于被定位的柱钢筋形成的框架标高以上300mm~400mm 处内圈内,将各柱钢筋卡在相应的卡柱内即可浇注;浇注完成后,再将其脱模拆下即可继续使用。本实用新型使用方便快捷,结构稳定,定位准确,便于安装拆卸和现场定位,能够重复利用,减少损耗,节约成本,且增加了工作效率。节约环保、保证了施工质量。
附图说明
图1为本实用新型的俯视图;
图2为本实用新型的主视图。
具体实施方式
下面结合附图和具体实施例对本实用新型做进一步的描述。
如图1和图2所示,本实施例包括4根能组成一个矩形的支撑圆柱6、4个十字形卡具2和多个钢筋定位卡5(图中只是示意性的作出了2个,可根据柱钢筋的数量设置钢筋定位卡的个数)。十字形卡具2是由两个一体或固定为一体的与支撑圆柱6直径相匹配的圆管3和4组成,两个圆管3和4的中间壁上分别开有螺纹孔A,螺纹孔A上安装有顶丝A 1。4根支撑圆柱6由十字形卡具2连接并由顶丝A 1顶紧固定。钢筋定位卡5是由一端壁的中间开有螺纹孔B的连接管9,另一端壁上有一体或固定为一体的两个间隔距离大于被定位的柱钢筋直径的卡柱8, 螺纹孔B上安装有顶丝B 7。
上述实施例仅是优选的和示例性的,本领域技术人员还可以根据本专利的描述,选择使用其它等同技术,这些都由本专利的保护范围所覆盖。

Claims (1)

1.一种可调节柱钢筋定位卡具,其特征在于:其包括4根能组成一个矩形的支撑圆柱、4个十字形卡具和多个钢筋定位卡;十字形卡具是由两个一体或固定为一体的与支撑圆柱直径相匹配的圆管组成,两个圆管的中间壁上分别开有螺纹孔A,螺纹孔A上安装有顶丝A;4根支撑圆柱由十字形卡具连接并由顶丝A顶紧固定;钢筋定位卡是由一端壁的中间开有螺纹孔B的连接管,另一端壁上有一体或固定为一体的两个间隔距离大于被定位的柱钢筋直径的卡柱, 螺纹孔B上安装有顶丝B。
CN201420524210.6U 2014-09-13 2014-09-13 可调节柱钢筋定位卡具 Expired - Fee Related CN204139622U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420524210.6U CN204139622U (zh) 2014-09-13 2014-09-13 可调节柱钢筋定位卡具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420524210.6U CN204139622U (zh) 2014-09-13 2014-09-13 可调节柱钢筋定位卡具

Publications (1)

Publication Number Publication Date
CN204139622U true CN204139622U (zh) 2015-02-04

Family

ID=52416317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420524210.6U Expired - Fee Related CN204139622U (zh) 2014-09-13 2014-09-13 可调节柱钢筋定位卡具

Country Status (1)

Country Link
CN (1) CN204139622U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926950A (zh) * 2016-06-21 2016-09-07 天元建设集团有限公司 一种钢筋测量定位装置及其施工方法
CN106639327A (zh) * 2016-10-10 2017-05-10 中国冶集团有限公司 装配式建筑现浇筑连接层预留钢筋的定位加固系统及方法
CN107044208A (zh) * 2017-05-02 2017-08-15 中国建筑第八工程局有限公司 用于装配式预制墙板预留插筋的组装式定位模块及施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926950A (zh) * 2016-06-21 2016-09-07 天元建设集团有限公司 一种钢筋测量定位装置及其施工方法
CN106639327A (zh) * 2016-10-10 2017-05-10 中国冶集团有限公司 装配式建筑现浇筑连接层预留钢筋的定位加固系统及方法
CN106639327B (zh) * 2016-10-10 2019-04-23 中国一冶集团有限公司 装配式建筑现浇筑连接层预留钢筋的定位加固系统及方法
CN107044208A (zh) * 2017-05-02 2017-08-15 中国建筑第八工程局有限公司 用于装配式预制墙板预留插筋的组装式定位模块及施工方法
CN107044208B (zh) * 2017-05-02 2023-09-01 中国建筑第八工程局有限公司 用于装配式预制墙板预留插筋的组装式定位模块及施工方法

Similar Documents

Publication Publication Date Title
CN103061504B (zh) 混凝土板管道安装预留洞施工模具及施工方法
CN103132455B (zh) 三维组合式斜拉桥梁体索导管精确定位装置及定位方法
CN108978718B (zh) 一种检查井组合模板
CN203654313U (zh) 一种预埋地脚锚栓定位模具
CN109853945A (zh) 一种新型混凝土柱模板装置及其施工方法
CN106884505A (zh) 一种可调式框架柱钢筋定位箍及其安装及拆除方法
CN204386608U (zh) 一种隧道仰拱施工工装
CN204817843U (zh) 预制综合管廊的钢筋笼加工装置
CN206329032U (zh) 适用于装配式梁柱后浇段的模板
CN205660343U (zh) 用于钢筋笼焊接用扇形辅具
CN206428565U (zh) 一种混凝土定型钢模板支撑系统
CN211446999U (zh) 一种地脚螺栓定位模具
CN205742554U (zh) 一种钢柱与混凝土梁的混合结构体系
CN206752855U (zh) 一种可调式框架柱钢筋定位箍
CN105544976A (zh) 一种廊道边墙模板定位装置及定位方法
CN203383331U (zh) 型钢柱预埋螺栓简便定位钢模
CN103882840B (zh) 一种调压井现浇砼可装配式模板支架及其安装方法
CN219298826U (zh) 装配式预埋螺栓固定工具
CN202356549U (zh) 一种钢筋废料制作的螺旋箍筋加工工具
CN204455758U (zh) 定型夹具式模板支撑杆系
CN103981893B (zh) 燃汽机基础预埋螺栓悬挂加固装置及方法
CN214995260U (zh) 一种定位钢筋位置控制器
CN214615043U (zh) 一种预制构件预留钢筋定位校正装置
CN204418705U (zh) 地脚螺栓安装装置
CN203755269U (zh) 一种调压井现浇砼可装配式模板支架

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: Lu Gang Road Show in 071000 districts in Hebei city of Baoding province No. 125

Patentee after: HEBEI CONSTRUCTION GROUP Corp.,Ltd.

Address before: 071051, No. 54, 139 West Road, Xinshi District, Baoding, Hebei, Baoding

Patentee before: HEBEI CONSTRUCTION GROUP Co.,Ltd.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150204

CF01 Termination of patent right due to non-payment of annual fee