CN204125938U - The strong foundation pile of superelevation filled by waste residue - Google Patents

The strong foundation pile of superelevation filled by waste residue Download PDF

Info

Publication number
CN204125938U
CN204125938U CN201320679700.9U CN201320679700U CN204125938U CN 204125938 U CN204125938 U CN 204125938U CN 201320679700 U CN201320679700 U CN 201320679700U CN 204125938 U CN204125938 U CN 204125938U
Authority
CN
China
Prior art keywords
pile
waste residue
superelevation
filled
preformed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320679700.9U
Other languages
Chinese (zh)
Inventor
周兆弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201320679700.9U priority Critical patent/CN204125938U/en
Application granted granted Critical
Publication of CN204125938U publication Critical patent/CN204125938U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a kind of friction that can either effectively expand between preformed pile and ground soil property, improve the bearing capacity of preformed pile, while can conveniently completing the pile extension of preformed pile again, realize the waste residue that between preformed pile and ground, grouting under pressure and waste residue are filled and fill the strong foundation pile of superelevation, different geological stratifications in pile foundation hole, expand and have one or more annular grooves, more piece slip casting preformed pile is positioned at pile foundation hole, waste residue packed layer is positioned at precast pile surrounding and groove, high pressure concrete slurry exports and discharges preformed pile bottom and surrounding by erectting Grouting Pipe lower end and form expanded head pile head and bag stake pile body wall.

Description

The strong foundation pile of superelevation filled by waste residue
Technical field
The utility model relates to a kind of friction that can either effectively expand between preformed pile and ground soil property, improve the bearing capacity of preformed pile, while can conveniently completing the pile extension of preformed pile again, realize the waste residue that between preformed pile and ground, grouting under pressure and waste residue are filled and fill the strong foundation pile of superelevation, belong to prefabricated pile foundation and manufacture field.
Background technology
CN101058979A, title " a kind of construction method of pulling-resistant and pressure-resistant slip casting preformed pile ", is characterized in that the construction method of pulling-resistant and pressure-resistant slip casting preformed pile is realized by following steps: one, hole downwards on the basal layer of building according to the design elevation of stake and aperture; Two, after pore-forming in hole under enter steel pipe with injected hole or plastic pipe, the position of steel pipe or plastic pipe is placed in the middle in hole; Three, reinforcing bar or reinforcing cage is entered under in the hole outside steel pipe or plastic pipe; Four, sand or rubble is entered under in the space between the outer wall and hole wall of steel pipe or plastic pipe; Five, the Grouting Pipe with grouting stop-valve is entered under in steel pipe or plastic pipe; Six, start grouting pump and start slip casting in stake holes; Seven, after pile, steel pipe or plastic pipe be respectively and be effectively connected between the basal layer of reinforcing bar or reinforcing cage and building and carry out envelope stake waterproofing work.This patent is actual is a kind of Grouting, its weak point: one is that construction speed is slow, and time-consuming, stake cost processed is high; Two is to pull out and concrete centrifugal forming owing to cannot realize haling of reinforcing cage between the reinforcing cage in Grouting and concrete, and the compactness of therefore shaping concrete precast pile is low, bearing capacity is well below haling preformed pile.
Utility model content
Purpose of design: avoid the weak point in background technology, design a kind of friction that can either effectively expand between preformed pile and ground soil property, improve the bearing capacity of preformed pile, while can conveniently completing the pile extension of preformed pile again, realize the waste residue that between preformed pile and ground, grouting under pressure and waste residue are filled and fill the strong foundation pile of superelevation.
Design scheme: in order to realize above-mentioned purpose of design.1, during pile foundation boring, adopting the reaming bit boring adapting to geological structure layer material according to geology techonosphere material, and expand the design of one or more annular grooves in the boring of different geological stratification reaming bits, is one of technical characteristic of the present utility model.The object done like this is: because waste residue inserts is building debris, slag waste material, slag, metal waste residue etc., when it is along precast pile pressure pile datum hole, the pressure of its press-in is more than tens tons, therefore between pile body and geological materials, surrounding forms dense packing effect layer, this packed layer not only forms hood type forced friction to pile body, and fill the annular boss that formed again geological stratification define support, particularly for sandy soils, soft mud, fill out extra large layer and form strong support, drastically increase the stability of pile foundation geology periphery.2, being longitudinally provided with the design of erectting Grouting Pipe in preformed pile, is technical characteristic two of the present utility model.The object done like this is: when the slip casting preformed pile of the application is positioned at pile foundation hole, high pressure concrete slurry is by erectting Grouting Pipe note bottom port and to inject at the bottom of pile foundation hole and upwards bursting and become muddy when a thaw sets in slip casting along prefabricated pile lining after ground compacting bottom slurry pile foundation hole, when the pressure of slip casting of bursting and become muddy when a thaw sets in reaches the pressure of high-pressure slip-casting, frost boiling slip casting is in halted state automatically, preformed pile slip casting portion of upwards bursting and become muddy when a thaw sets in forms compactness high preformed pile foundation bearing head, drastically increases the bearing capacity of preformed pile.3, in prefabricated pile of multi-segments, the below of the grout outlet of first segment preformed pile (a bottom joint preformed pile) lower surface setting Grouting Pipe is provided with the design of peviform frost boiling dish, is the utility model technical characteristic three.The object done like this is: peviform frost boiling dish is fixed on first segment preformed pile lower surface and peviform frost boiling dish rim and the lower surface of first segment preformed pile are spacing when coordinating, it both can prevent the soil in pile foundation hole or sand blocking from erectting Grouting Pipe grout outlet, can force again and erect Grouting Pipe grout outlet high pressure spray and go out slurry and rout up along peviform frost boiling dish and turn over, reach the formation that the compacting of first segment preformed pile bottom ground and high density, high strength carry pile crown.
Technical scheme: the strong foundation pile of superelevation filled by a kind of waste residue, different geological stratifications in pile foundation hole, expand and have one or more annular grooves, more piece slip casting preformed pile is positioned at pile foundation hole, waste residue packed layer is positioned at precast pile surrounding and groove, and high pressure concrete slurry exports and discharges preformed pile bottom and surrounding by erectting Grouting Pipe lower end and form expanded head pile head and bag stake pile body wall.
The utility model is compared with background technology, one is started concrete to hale preformed pile and utilize Grouting stake holes, realize concrete and hale highly reliable, the undamaged location of preformed pile, namely effectively expand the friction of haling between concrete precast pile and ground soil property, greatly improve again the single bearing capacity haling concrete precast pile; Two be can complete the pile extension of preformed pile quickly and easily while, not only makes to hale concrete precast pile periphery pile foundation soil property compactness and increase, and the concrete density that high-pressure slip-casting is formed is large, intensity is high; Three is utilize waste residue to fill, and has both improve the stability of pile foundation surrounding geology state, has reached making full use of waste residue again, reached the object of environmental protection, material-saving.
Accompanying drawing explanation
Fig. 1 is the structural representation that the strong foundation pile of superelevation filled by waste residue
Fig. 2 is the structural representation of slip casting preformed pile.
Detailed description of the invention
Embodiment 1: with reference to attached Fig. 1 and 2.The strong foundation pile of superelevation filled by a kind of waste residue, different geological stratifications in pile foundation hole, expand and have one or more annular grooves, more piece slip casting preformed pile 1 is positioned at pile foundation hole, waste residue packed layer 10 is positioned at precast pile surrounding and groove, high pressure concrete slurry exports discharge by erectting Grouting Pipe 2 lower end, and preformed pile 1 bottom and surrounding form expanded head pile head 9 and bag stake pile body wall.Described preformed pile 1 core is provided with one or more below of erectting the grout outlet of setting Grouting Pipe 2 in first segment preformed pile 1 lower surface in Grouting Pipe 2, prefabricated pile of multi-segments and is provided with peviform frost boiling dish 4, and it is that spacing coordinates 6 with first segment preformed pile 1 lower surface that 4 basins edges are coiled in peviform frost boiling.Described Grouting Pipe 2 times is connected with the end plate 7 being fixed on first segment preformed pile 1 lower surface and Grouting Pipe 2 discharge opening directly coils 4 to peviform frost boiling.Described peviform frost boiling is coiled 4 back sides and is welded with pile top 5.Described peviform frost boiling dish 4 is connected with adopting steel column 3 between end plate 7.Described peviform frost boiling dish 4 adopts steel column 3 to be connected with first segment preformed pile 1 lower surface, or with bolts.Adopt concaveconvex structure socket connection between described Grouting Pipe 2 and Grouting Pipe or adopt screw thread to spin or adopt buckle clamping.It is characterized in that: along being hypotenuse for straight flange, upper edge under described annular groove.
It is to be understood that: although above-described embodiment to be contrasted detailed text description to mentality of designing of the present utility model; but these text descriptions; just the simple text of the utility model mentality of designing is described; instead of the restriction to the utility model mentality of designing; any do not exceed the utility model mentality of designing combination, increase or amendment, all fall in protection domain of the present utility model.

Claims (8)

1. the strong foundation pile of superelevation filled by a waste residue, it is characterized in that: the different geological stratifications in pile foundation hole, expand and have one or more annular grooves, more piece slip casting preformed pile (1) is positioned at pile foundation hole, waste residue packed layer (10) is positioned at precast pile surrounding and groove, high pressure concrete slurry exports discharge by erectting Grouting Pipe (2) lower end, and preformed pile (1) bottom and surrounding form expanded head pile head (9) and bag stake pile body wall.
2. the strong foundation pile of superelevation filled by waste residue according to claim 1, it is characterized in that: described preformed pile (1) core is provided with one or more below of erectting the grout outlet of first segment preformed pile (1) lower surface setting Grouting Pipe (2) in Grouting Pipe (2), prefabricated pile of multi-segments and is provided with peviform frost boiling dish (4), peviform frost boiling dish (4) basin edge is that spacing coordinates (6) with first segment preformed pile (1) lower surface.
3. the strong foundation pile of superelevation filled by waste residue according to claim 2, it is characterized in that: be connected with the end plate (7) being fixed on first segment preformed pile (1) lower surface under described Grouting Pipe (2) and Grouting Pipe (2) discharge opening directly to peviform frost boiling dish (4) face.
4. the strong foundation pile of superelevation filled by the waste residue according to Claims 2 or 3, it is characterized in that: described peviform frost boiling dish (4) back side is welded with pile top (5).
5. the strong foundation pile of superelevation filled by the waste residue according to Claims 2 or 3, it is characterized in that: described peviform frost boiling dish (4) is connected with adopting steel column (3) between end plate (7).
6. the strong foundation pile of superelevation filled by the waste residue according to Claims 2 or 3, it is characterized in that: described peviform frost boiling dish (4) and first segment preformed pile (1) lower surface adopt steel column (3) to be connected, or with bolts.
7. the strong foundation pile of superelevation filled by waste residue according to claim 1, it is characterized in that: adopt concaveconvex structure socket connection between described Grouting Pipe (2) and Grouting Pipe or adopt screw thread to spin or adopt buckle clamping.
8. the strong foundation pile of superelevation filled by waste residue according to claim 1, it is characterized in that: along being hypotenuse for straight flange, upper edge under described annular groove.
CN201320679700.9U 2013-10-31 2013-10-31 The strong foundation pile of superelevation filled by waste residue Expired - Lifetime CN204125938U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320679700.9U CN204125938U (en) 2013-10-31 2013-10-31 The strong foundation pile of superelevation filled by waste residue

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320679700.9U CN204125938U (en) 2013-10-31 2013-10-31 The strong foundation pile of superelevation filled by waste residue

Publications (1)

Publication Number Publication Date
CN204125938U true CN204125938U (en) 2015-01-28

Family

ID=52382306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320679700.9U Expired - Lifetime CN204125938U (en) 2013-10-31 2013-10-31 The strong foundation pile of superelevation filled by waste residue

Country Status (1)

Country Link
CN (1) CN204125938U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113279410A (en) * 2021-05-27 2021-08-20 中煤长江基础建设有限公司 Bag slip casting formula foundation ditch bearing structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113279410A (en) * 2021-05-27 2021-08-20 中煤长江基础建设有限公司 Bag slip casting formula foundation ditch bearing structure
CN113279410B (en) * 2021-05-27 2022-06-10 中煤长江基础建设有限公司 Bag slip casting formula foundation ditch bearing structure

Similar Documents

Publication Publication Date Title
CN202124865U (en) Quick plugging device for dewatering wellhead of sand-free cement pipe deep well
CN103669365A (en) External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof
CN105714834B (en) A kind of construction technology of hardpan preexisting hole grouting behind shaft or drift lining H profile steel stake
CN104358252B (en) The bored pile perforation structure of spillage and construction method in water prevention
CN104818713A (en) Profile steel cement soil pile construction method adaptive to various stratums
CN1265062C (en) Construction for making piles and tools
CN103603336B (en) Grouting precast pile and grouting method
CN207362838U (en) A kind of tool-type soft soil foundation irrigates pile wall
CN203213101U (en) Embedding grouting combined pile
CN103911993B (en) A kind of PHA anchor pole and construction method thereof
CN103603341B (en) Waste-residue fill ultrahigh strength pile foundation manufacturing process
CN205857173U (en) A kind of Novel steel casing sheath applying bored concrete pile on the water
CN102626946A (en) Manufacture method for concrete irregular fender post
CN204401613U (en) The structure of bored pile perforation spillage in water prevention
CN104074197A (en) Large-diameter thin-walled tubular pile composite anchor rod type foundation pit support structure and construction method thereof
CN204125938U (en) The strong foundation pile of superelevation filled by waste residue
CN103603345B (en) Cement mixing grouting pile foundations and forming method
CN201502065U (en) Anchor rod joint excavation compound basis
CN103603363B (en) Cement mixing-filling convex joint pile foundation and manufacturing process
CN206368375U (en) A kind of electric power pylon basis
CN204059341U (en) Bamboo joint type mortar pile
CN203129143U (en) Static pressure jet flow piling wall forming equipment
CN205012333U (en) Recoverable FRP stock with enlarged footing
CN203821422U (en) Cement stirring slip casting raised joint pile
CN101255797A (en) Method for mounting blown sand and slip-casting of mine well wall as well as slip-casting pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20150128