CN203821422U - Cement stirring slip casting raised joint pile - Google Patents

Cement stirring slip casting raised joint pile Download PDF

Info

Publication number
CN203821422U
CN203821422U CN201320679986.0U CN201320679986U CN203821422U CN 203821422 U CN203821422 U CN 203821422U CN 201320679986 U CN201320679986 U CN 201320679986U CN 203821422 U CN203821422 U CN 203821422U
Authority
CN
China
Prior art keywords
pile
grouting
slip casting
cement
grouting pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320679986.0U
Other languages
Chinese (zh)
Inventor
周兆弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201320679986.0U priority Critical patent/CN203821422U/en
Application granted granted Critical
Publication of CN203821422U publication Critical patent/CN203821422U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a cement stirring slip casting raised joint pile suitable for a soft soil foundation and a common geologic structure and a method forming the same. The cement stirring slip casting raised joint pile has great bearing capability, can replace a cement stirring pile and reduce pile distribution density. The cement stirring slip casting raised joint pile comprises a slip casting pile. Cement covers the periphery of the slip casting pile in the foundation; the slip casting pile is mixed with cement to form a solidification layer; the bottom of the slip casting pile is head-expanded concrete pile heads; a plurality of annular slip casting pipes are annularly embedded on the wall of the slip casting pile from bottom to top; the plurality of annular slip casting pipes are respectively communicated with a vertical slip casting pipe; and a casting injection hole is annularly formed in each annular slip casting pipe surface. The cement stirring slip casting raised joint pile is advantageous in that first, a precedent that a cement stirring pile is carried by the slip casting pile and foundation is solidified by cement slurry solicitation is created; the cement stirring slip casting raised joint pile is suitable for a soft soil foundation and a common geologic structure and can fully replace the cement stirring pile; and third, by the use of the cement stirring slip casting raised joint pile, cement use amount is reduced and pile quality is guaranteed.

Description

The protruding joint pile foundation of cement mixing-filling
Technical field
The utility model relates to one and had both been applicable to soft foundation, be applicable to again general geological structure, simultaneously there is again high-bearing capacity, and can replace cement mixing pile, reduce the protruding joint pile foundation of cement mixing-filling and the manufacturing process of pile foundation distribution density, belong to slip casting pile foundation and manufacture field.
Background technology
Current existing cement mixing pile construction method: 1) position of p ile machine, centering are put well behind agitation pile stake position, mobile mixing pile machine arrives and refers to fixed pile, centering.2) adjust leading truck verticality: adopt transit or the two-way control leading truck of ceiling hammer verticality.By design and code requirement, verticality be less than 1.0% long.3) stir in advance: start deep-mixing pile driver rotating disk, after stirring-head rotating speed is normal, can make drilling rod stir along sinking limit, leading truck limit, subsidence velocity can regulate and control by gear, and operating current should not be greater than rated value.4) mixing slurries: deep mixer stirs simultaneously in advance, backstage mixing cement grout, treats, before mud jacking, slurries are put into aggregate bin.Select the common silicate cement mixing of cement grade 425# slurries, water/binder ratio is controlled at 0.45~0.50 scope, is no less than 50Kg according to every meter of deep-mixed pile cement consumption of designing requirement.5) whitewashing is stirred and is promoted: sink to arriving after projected depth, open mortar pump, send and starch to stirring-head grout outlet by pipeline, after pulp, start mixing pile machine and tensioning chain device, stir limit by definite hoisting velocity (0.50~0.8m/min) the limit whitewashing of design and promote drilling rod, slurries and the soil body are are fully mixed and stirred.6) repeating stirring sinks: stir drill bit and be promoted to after the above 500mm height in stake top, close mortar pump, repeat stirring and sink down into projected depth, subsidence velocity is undertaken by designing requirement.7) whitewashing repeats to stir and promotes: sink to arriving after projected depth, whitewashing repeats to stir and promotes, and is promoted to ground always.8) stake machine displacement: constructed after a pile, mobile stake machine, to next pile position, repeats above step and carries out the construction of next pile.The deficiency of its existence it: the intensity difference of pile foundation, bearing capacity is little, under equal bearing capacity, needs to increase Pile Diameter and density, takes a lot of work, time-consuming, foundation pile cost of manufacture is high.
Utility model content
Purpose of design: avoid the weak point in background technology, design one had both been applicable to soft foundation, be applicable to again general geological structure, simultaneously there is again high-bearing capacity, and can replace cement mixing pile, reduce the protruding joint pile foundation of cement mixing-filling of pile foundation distribution density.
Design scheme: in order to realize above-mentioned purpose of design.1, being positioned at the slip casting pile body periphery of ground and bottom bag Li cement and mud and being uniformly mixed the design of formation solidification layer, is one of technical characterictic of the present utility model.The object of doing is like this: cement mixing pile is a kind of pile foundation for reinforced soft soil ground processing, it has realized the formation in Soft Clay condition storied building pile foundation, but not only bearing capacity is little, pile foundation distribution density is large, manufacturing cost is high, and the yield rate of pile foundation and quality cannot ensure.The application is on the basis of cement mixing pile, under the prerequisite of cement mixing boring moulding and ot-yet-hardened, grouting pile is pressed in the stake hole of cement mixing pile, after solidifying, not only make pile foundation Cheng Zaili become several times improve, and greatly reduce the distribution density of pile foundation, and yield rate and the quality of pile foundation are improved widely.2, in grouting pile, being longitudinally provided with the design of erectting Grouting Pipe, is two of technical characterictic of the present utility model.The object of doing is like this: in the time that the application's grouting pile is positioned at pile foundation hole, high pressure concrete slurry by the ground compacting of at the bottom of erectting Grouting Pipe note bottom port and injecting pile foundation hole and slurry pile foundation hole bottom after along the slip casting of upwards bursting and become muddy when a thaw sets in of slip casting pile lining, in the time that the pressure of frost boiling slip casting reaches the pressure of high-pressure slip-casting, frost boiling slip casting is automatically in halted state, the grouting pile slip casting portion of upwards bursting and become muddy when a thaw sets in forms compactness high grouting pile foundation bearing head, has greatly improved the bearing capacity of grouting pile.3, the below that the grout outlet of Grouting Pipe is erect in first segment grouting pile in more piece grouting pile (a bottom joint grouting pile) lower surface is provided with the design of peviform frost boiling dish, is three of the utility model technical characterictic.The object of doing is like this: when peviform frost boiling dish is fixed on to first segment grouting pile lower surface and peviform frost boiling dish rim and the lower surface of first segment grouting pile and is spacing and coordinates, it both can prevent that soil or sand in pile foundation hole from stopping up setting Grouting Pipe grout outlet, can force again setting Grouting Pipe grout outlet high pressure spray to go out slurry and rout up and turn over along peviform frost boiling dish, reach the compacting of first segment grouting pile bottom ground and the formation that high density, high strength are carried pile crown.
Technical scheme: the protruding joint pile foundation of a kind of cement mixing-filling, comprise grouting pile, the slip casting pile body periphery bag Li cement and the mud that are positioned at ground are uniformly mixed formation solidification layer, grouting pile bottom is for expanding a concrete pile head, multiple hoop Grouting Pipe from bottom to top hoop be embedded on the wall of grouting pile and multiple hoop Grouting Pipe respectively with erect Grouting Pipe and be communicated with, on hoop Grouting Pipe face, hoop has gunniting hole.
The utility model compared with background technology, the one, started the precedent that cement mixing pile adopts grouting pile carrying, cement slurry to solidify solid base; The 2nd, be both applicable to soft foundation, be applicable to again general geological structure, there is again high-bearing capacity, and can replace cement mixing pile completely simultaneously; The 3rd, not only greatly reduce cement consumption, and guaranteed the quality of stake; The 4th, when can completing quickly and easily the pile extension of grouting pile, not only make to hale concrete grouting stake periphery pile foundation soil property compactness and increase, and the concrete density that high-pressure slip-casting forms is large, intensity is high; The 5th, utilize waste residue to fill, both improved the stability of pile foundation surrounding geology state, reach again the making full use of of waste residue, reach the object of environmental protection, material-saving; The 6th, the pile body that the hoop Grouting Pipe of tubular pile body forms is just as Bamboo-shaped pile tube, what the concrete pipe base that Bamboo-shaped pile tube and high-pressure slip-casting form formed is the carrying of ring pile body, not only greatly improved the loaded area of pile tube, and bearing strength obtains the raising of essence.
Brief description of the drawings
Fig. 1 is the structural representation of the protruding joint pile foundation of cement mixing-filling.
Fig. 2 is the sectional structure schematic diagram of Grouting Pipe.
Fig. 3 is the structural representation of slip casting pipe pile.
Fig. 4 is the plan structure schematic diagram of slip casting pipe pile.
Fig. 5 is the structural representation before telescoping tube stretch-draw.
Fig. 6 is the structural representation after telescoping tube stretch-draw.
Fig. 7 is the syndeton schematic diagram of hoop Grouting Pipe and threeway.
Detailed description of the invention
Embodiment 1: with reference to accompanying drawing 1-7.The protruding joint pile foundation of a kind of cement mixing-filling, comprise grouting pile 1, the grouting pile 1 body periphery Bao Li cement and the mud that are positioned at ground 100 are uniformly mixed formation solidification layer 9, grouting pile 1 bottom is for expanding a concrete pile head 8, multiple hoop Grouting Pipe 10 from bottom to top hoop be embedded on the wall of grouting pile 1 and multiple hoop Grouting Pipe 10 respectively with erect slip casting 2 pipes and be communicated with, 10 of hoop Grouting Pipe go up hoops and have gunniting hole 11.Described grouting pile refers to concrete prefabricated hollow pile, concrete prefabricated real core stake.Described grouting pile 1 core is provided with one or more below of erectting the grout outlet of first segment grouting pile 1 lower surface setting Grouting Pipe 2 in Grouting Pipe 2, more piece grouting pile and is provided with peviform frost boiling dish 4, and peviform frost boiling is coiled 4 basins and coordinated 6 along being spacing with first segment grouting pile 1 lower surface.Described Grouting Pipe be connected with the end plate 7 that is fixed on first segment grouting pile 1 lower surface for 2 times and Grouting Pipe 2 discharge openings directly to 4, peviform frost boiling dish.Described peviform frost boiling is coiled 4 back sides and is welded with pile top 5, adopts steel column 3 to be connected between described peviform frost boiling dish 4 and end plate 7.Described peviform frost boiling dish 4 adopts steel column 3 to be connected with first segment grouting pile 1 lower surface, or with bolts.Between described Grouting Pipe 2 and Grouting Pipe, adopt concaveconvex structure socket connection or adopt screw thread spin or adopt buckle clamping.Described multiple hoop Grouting Pipe 10 is communicated with setting Grouting Pipe 2 by three way cock 13 separately respectively.Described gunniting hole 11 be extend out tubaeform.Described three way cock 13 is pressure valve plate, valve core three-way valve or three-way solenoid valve.Described setting Grouting Pipe 2 tops are stretching structure 12, and described stretching structure 12 is hollow section stretching structure.
Embodiment 2: on the basis of embodiment 1, described stretching structure 12 is cannula structures and is made up of outer tube 31, O-ring seals 32, inner tube 33, grouting port 34, grouting port 34 is welded on inner tube 33 upper port, and inner tube 33 is inserted outer tube 31 sealing grafting by O-ring seals 32 and coordinated.
The protruding joint pile foundation of its cement mixing-filling manufacturing process: according to the degree of depth of Pile Foundations Design, while so adopting cement mixing drilled pile machine drill grouting pile mud hole, boring limit, rig limit ejection cement paste, make soil and the cement paste of holing out be mixed into slurry mix, after having holed by the pile foundation hole of grouting pile snubbing slurry mix time, slurry mix is wrapped in grouting pile pile body and bottom, after solidifying, obtain the protruding joint pile foundation of cement mixing-filling, then the more piece Grouting Pipe in the stake of more piece grouting is docked successively, then high pressure concrete slurry is discharged to moment by erectting the outlet of Grouting Pipe lower end, concrete from peviform frost boiling dish extrude backward lower in ground pressure injection form expanded head pile head, concrete is extruded and is formed a bag stake pile body solidification layer along turning on grouting pile outer wall afterwards by peviform frost boiling dish, when pile tube outer wall surrounding soil mixes with a part of cement slurry when upwards turning over power and reaching the force value setting, hoop Grouting Pipe on slip casting pile lining is opened successively spool according to the force value setting from bottom to top pile body surrounding space is carried out to high-pressure mortar spraying slip casting step by step, until grouting pile topmost hoop Grouting Pipe completes high-pressure slip-casting, thereby reach and improved grouting pile and native friction has improved the supporting capacity of stake after to be bonded greatly.
Or hoop Grouting Pipe on slip casting pile lining is opened successively spool according to the force value setting from bottom to top pile body surrounding space is carried out to high-pressure mortar spraying slip casting step by step, be that first high-pressure slip-casting enters along erectting Grouting Pipe the hoop Grouting Pipe that is positioned at grouting pile bottom successively from bottom to up, and by hoop Grouting Pipe to the pile foundation hole high-pressure slip-casting of grouting pile pile body surrounding, in the time being positioned at the grouting pressure of hoop Grouting Pipe of grouting pile bottom and reaching the force value setting, high-pressure slurry enters the hoop Grouting Pipe that is located thereon one-level automatically, now in hoop Grouting Pipe, spool is opened and passes through the pile foundation hole high-pressure slip-casting of hoop Grouting Pipe to tubular pile body surrounding, by that analogy, until tube pile high-pressure slip casting completes, as also can top-down methods the same in Subgrade soil.
It is to be understood that: although above-described embodiment is to the mentality of designing of the present utility model detailed text description of contrasting; but these text descriptions; just the simple text of the utility model mentality of designing is described; instead of restriction to the utility model mentality of designing; any combination, increase or amendment that does not exceed the utility model mentality of designing, all falls in protection domain of the present utility model.

Claims (10)

1. the protruding joint pile foundation of cement mixing-filling, comprise grouting pile (1), it is characterized in that: grouting pile (1) the body periphery Bao Li cement and the mud that are positioned at ground (100) are uniformly mixed formation solidification layer (9), grouting pile (1) bottom is for expanding a concrete pile head (8), multiple hoop Grouting Pipe (10) from bottom to top hoop be embedded on the wall of grouting pile (1) and multiple hoop Grouting Pipe (10) respectively with erect slip casting (2) pipe and be communicated with, on hoop Grouting Pipe (10) face, hoop has gunniting hole (11).
2. the protruding joint pile foundation of cement mixing-filling according to claim 1, is characterized in that: described grouting pile refers to concrete prefabricated hollow pile, concrete prefabricated real core stake.
3. the protruding joint pile foundation of cement mixing-filling according to claim 1, it is characterized in that: described grouting pile (1) core is provided with one or more below of erectting the grout outlet of first segment grouting pile (1) lower surface setting Grouting Pipe (2) in Grouting Pipe (2), more piece grouting pile and is provided with peviform frost boiling dish (4), and peviform frost boiling dish (4) basin coordinates (6) along being spacing with first segment grouting pile (1) lower surface.
4. the protruding joint pile foundation of cement mixing-filling according to claim 3, is characterized in that: described Grouting Pipe (2) is lower be connected with the end plate (7) that is fixed on first segment grouting pile (1) lower surface and Grouting Pipe (2) discharge opening directly to peviform frost boiling dish (4) face.
5. according to the protruding joint pile foundation of the cement mixing-filling described in claim 3 or 4, it is characterized in that: described peviform frost boiling dish (4) back side is welded with pile top (5), between described peviform frost boiling dish (4) and end plate (7), adopt steel column (3) to be connected.
6. according to the protruding joint pile foundation of the cement mixing-filling described in claim 3 or 4, it is characterized in that: described peviform frost boiling dish (4) adopts steel column (3) to be connected with first segment grouting pile (1) lower surface, or with bolts.
7. the protruding joint pile foundation of cement mixing-filling according to claim 3, is characterized in that: between described Grouting Pipe (2) and Grouting Pipe, adopt concaveconvex structure socket connection or adopt screw thread spin or adopt buckle clamping.
8. the protruding joint pile foundation of cement mixing-filling according to claim 3, is characterized in that: described multiple hoop Grouting Pipe (10) are communicated with setting Grouting Pipe (2) by three way cock (13) separately respectively.
9. the protruding joint pile foundation of cement mixing-filling according to claim 8, is characterized in that: described three way cock (13) is pressure valve plate, valve core three-way valve or three-way solenoid valve.
10. the protruding joint pile foundation of cement mixing-filling according to claim 3, it is characterized in that: described setting Grouting Pipe (2) top is stretching structure (12), described stretching structure (12) is hollow section stretching structure, described stretching structure (3) is cannula structures and is made up of outer tube (31), O-ring seals (32), inner tube (33), grouting port (34), grouting port (34) is welded on inner tube (33) upper port, and inner tube (33) is inserted outer tube (31) sealing grafting by O-ring seals (32) and coordinated.
CN201320679986.0U 2013-10-31 2013-10-31 Cement stirring slip casting raised joint pile Withdrawn - After Issue CN203821422U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320679986.0U CN203821422U (en) 2013-10-31 2013-10-31 Cement stirring slip casting raised joint pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320679986.0U CN203821422U (en) 2013-10-31 2013-10-31 Cement stirring slip casting raised joint pile

Publications (1)

Publication Number Publication Date
CN203821422U true CN203821422U (en) 2014-09-10

Family

ID=51476939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320679986.0U Withdrawn - After Issue CN203821422U (en) 2013-10-31 2013-10-31 Cement stirring slip casting raised joint pile

Country Status (1)

Country Link
CN (1) CN203821422U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603363A (en) * 2013-10-31 2014-02-26 周兆弟 Cement mixing grouting protruding sectional pile foundations and forming method
CN113136754A (en) * 2021-04-19 2021-07-20 湖南筑达建筑工程有限公司 Grouting machine and composite roadbed reinforcing construction method applying grouting machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603363A (en) * 2013-10-31 2014-02-26 周兆弟 Cement mixing grouting protruding sectional pile foundations and forming method
CN113136754A (en) * 2021-04-19 2021-07-20 湖南筑达建筑工程有限公司 Grouting machine and composite roadbed reinforcing construction method applying grouting machine

Similar Documents

Publication Publication Date Title
CN110230309B (en) Karst area bridge karst cave pile foundation construction method
CN101532290B (en) Granule grouting pile of ripple plastic sleeve with hole for strengthening soft soil foundation and strengthening method
CN1193141C (en) Combined grouting construction process of reinforcing foundation
CN105780763B (en) Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile
CN104612134A (en) Cast-in place pile post-grouting construction method for pouring construction
CN104631480B (en) Adopt the method that jet grouting pile driving machine carries out water seal for deep foundation pit curtain construction
CN103806479A (en) Pile foundation combined grouting reinforcement construction method combining waterproof curtain
CN204175177U (en) The embedding rock construction equipment of a kind of reinforced long spire
CN101260669A (en) Drilling, spraying, injection integral enlarging anchor rod construction method
CN110438998B (en) Structure and method for improving pile bearing capacity through external drilling grouting
CN107653889B (en) Construction method of section steel pressure-grouting cement soil curtain support pile
CN103572764A (en) Ultra-deep manual hole digging pile dado water stop structure and construction method thereof
CN107587502B (en) Construction method for rotary drilling hole-forming pressure-grouting cement soil occlusion curtain pile
CN103603345B (en) Cement mixing grouting pile foundations and forming method
CN203213101U (en) Embedding grouting combined pile
CN103603363B (en) Cement mixing-filling convex joint pile foundation and manufacturing process
CN203821422U (en) Cement stirring slip casting raised joint pile
CN102174818A (en) Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system
CN101586341B (en) Water sealing method for civil engineering groundwork
CN103603341B (en) Waste-residue fill ultrahigh strength pile foundation manufacturing process
CN105672329B (en) The large size prefabricated building enclosure of deep basal pit and construction method
CN205421258U (en) High water spray mud is pressed and is irritated concrete composite set
CN201411687Y (en) Corrugated plastic sleeve pipe granule grouting pile with hole
CN204282295U (en) Pile formula case cylinder breakwater structure
CN100374657C (en) Construction method employing threaded stirring shaft to decrease ambient foundation deformation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140910

Effective date of abandoning: 20160928

C25 Abandonment of patent right or utility model to avoid double patenting