CN204125814U - A kind of garden path structure - Google Patents

A kind of garden path structure Download PDF

Info

Publication number
CN204125814U
CN204125814U CN201420587997.0U CN201420587997U CN204125814U CN 204125814 U CN204125814 U CN 204125814U CN 201420587997 U CN201420587997 U CN 201420587997U CN 204125814 U CN204125814 U CN 204125814U
Authority
CN
China
Prior art keywords
cement mortar
mortar setting
setting course
course
concrete cushion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420587997.0U
Other languages
Chinese (zh)
Inventor
李春燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420587997.0U priority Critical patent/CN204125814U/en
Application granted granted Critical
Publication of CN204125814U publication Critical patent/CN204125814U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of garden path structure, be followed successively by rammed earth layer from the bottom up, pool slag bed course, rubble leveling layer and concrete cushion, the both sides shoulder of described concrete cushion is provided with ledge structure, the step surface of described ledge structure is provided with the first cement mortar setting course, described first cement mortar setting course is provided with floor file blue bricks, concrete cushion between described floor file blue bricks is provided with the second cement mortar setting course, described second cement mortar setting course is provided with hair side granite, the end face of described hair side granite flushes with the end face of floor file blue bricks, gap is provided with between described hair side granite, lawn is provided with in gap.The utility model structure is simple, easy construction, and drainage is good with structural strength, not easily arches upward and sedimentation, long service life, and work progress is very simply, easy to utilize.

Description

A kind of garden path structure
Technical field
The utility model relates to landscape hardwork technical field of construction, especially relates to a kind of garden path structure.
Background technology
Garden path is the important component part in Garden Greenland, as the train of thought in gardens, it is as the arteries and veins arm of human body, through each scenic spot, main garden sight spot between, be the tie at each scenic spot of contact and sight spot, play a part larger in gardens, be mainly manifested in two aspects: first, the effect that garden road is played the guiding stream of people and relieved traffic congestion, it organizes the expansion of garden landscape and visitor to view and admire program; Secondly, garden road has the effect of structure scape, and Garden Greenland space has been divided into difformity, different size, a series of spaces of difference in functionality.Now general garden path structure is all at rammed earth layer (earth namely tamped) upper directly laying lawn brick or first fluid concrete layer, then building stones (as blue bricks, granite etc.) are laid above, existing garden path is when rainy day, and draining and permeable smooth, is easy to cause surface easily ponding, be unfavorable for the walking of rainy day pedestrian, in addition, existing garden path working strength is poor, and road surface is easy to arch upward or sedimentation, cause road surface uneven, be unfavorable for that pedestrian walks.
The Chinese patent of Authorization Notice No. CN202881792U, authorized announcement date 2013.04.17 discloses a kind of garden line structure, is followed successively by rammed earth layer, hardcore bed, concrete cushion, setting course and surface layer from the bottom up; The ballast grain sizes that described hardcore bed adopts at 3 to 6 centimetres, the rubble gap medium coarse sand cementation of fissures, thickness is at 10 to 16 centimetres; Described concrete cushion inside is provided with steel bar layer, and its top is provided with joint-cutting; Described setting course is mortar; Described surface layer is marble plate, and its surface is provided with protective agent topping.The weak point of this garden line structure is, rammed earth layer directly arranges hardcore bed, the particle of rubble is less, not easily pile up, easy dispersion, structural strength and weight capacity poor, therefore make garden road be easy to sedimentation, cause road surface uneven, garden road surfaces is marble plate in addition, and marble plate smooth surface, easily skidded on rainy day, and it is very close to each other between marble plate, when heat, mutually extrude because heat expansion can cause between marble plate, marble plate is arched upward, when raining, infiltration of rainwater is poor, easy ponding.
Utility model content
The utility model is the above-mentioned problem existing for the garden path in order to solve prior art, provides a kind of structure simple, easy construction, drainage and structural strength good, not easily arch upward and sedimentation, the garden path structure of long service life.
To achieve these goals, the utility model is by the following technical solutions:
A kind of garden path structure, be followed successively by rammed earth layer from the bottom up, pool slag bed course, rubble leveling layer and concrete cushion, the both sides shoulder of described concrete cushion is provided with ledge structure, the step surface of described ledge structure is provided with the first cement mortar setting course, described first cement mortar setting course is provided with floor file blue bricks, concrete cushion between described floor file blue bricks is provided with the second cement mortar setting course, described second cement mortar setting course is provided with hair side granite, the end face of described hair side granite flushes with the end face of floor file blue bricks, gap is provided with between described hair side granite, lawn is provided with in gap.The utility model arranges pool slag bed course on rammed earth layer, pool clinker is large, connect larger with the contact surface of rammed earth layer, not easily roll, pool slag cushion layer structure stability and the intensity of formation after its accumulation are good, can play the effect of support frame, effectively can avoid the sinking sedimentation on road surface, the space between the slag of the pool can be filled by rubble leveling layer; Rubble leveling layer is to ensure building of the smooth of road surface and slow setting soil padding, and rubble leveling layer medium stone can be filled in the space between the slag of the pool simultaneously, improves pool slag cushion layer structure stability and intensity further; Be provided with gap between described hair side granite, be provided with lawn in gap, this gap can provide expansion space during hair side granite expanded by heating, avoid arching upward of road surface, the effect that lawn had both been played decoration, beautified, can improve the aesthetics on road surface, can improve again the seepage of water on road surface.The utility model structural stability and intensity good, not easily there is sedimentation or arch upward in road surface, and drainage is good, long service life.
As preferably, described floor file blue bricks is provided with rhone, the rectangular in cross-section of described rhone.Floor file blue bricks is provided with rhone, and the ponding be convenient on road surface is discharged smoothly.
As preferably, the thickness of described pool slag bed course is 30 ~ 40mm.
As preferably, the thickness of described rubble leveling layer is 10 ~ 20mm.
As preferably, the thickness of described concrete cushion is 80 ~ 100mm.
As preferably, the thickness of described first cement mortar setting course and the second cement mortar setting course is 10 ~ 30mm.
As preferably, described lawn width is 5 ~ 15cm, is apart 1 ~ 1.5m between adjacent lawn.
Therefore, the beneficial effect that the utility model has is:
(1) rammed earth layer is arranged pool slag bed course, pool slag cushion layer structure stability and intensity good, the effect of support frame can be played, effectively can avoid the sedimentation on road surface;
(2) rubble leveling layer can ensure building of the smooth of road surface and slow setting soil padding, and rubble leveling layer medium stone can be filled in the space between the slag of the pool simultaneously, improves pool slag cushion layer structure stability and intensity further;
(3) be provided with gap between hair side granite, be provided with lawn in gap, this gap can provide expansion space during hair side granite expanded by heating, avoid arching upward of road surface, the effect that lawn had both been played decoration, beautified, can improve the aesthetics on road surface, can improve again the seepage of water on road surface;
(4) structure is simple, easy construction, drainage and structural strength good, not easily arch upward and sedimentation, long service life.
Accompanying drawing explanation
Fig. 1 is a kind of profile of the present utility model.
Fig. 2 is the sectional view along A-A direction in Fig. 1.
Fig. 3 is a kind of top view of Fig. 1.
In figure: rammed earth layer 1, pool slag bed course 2, rubble leveling layer 3, concrete cushion 4, the first cement mortar setting course 5, floor file blue bricks 6, second cement mortar setting course 7, hair side granite 8, lawn 9, rhone 10.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is further described.
A kind of garden path structure as shown in Figure 1, be followed successively by rammed earth layer 1 from the bottom up, thickness is the pool slag bed course 2 of 30mm, the concrete cushion 4 of thickness to be the rubble leveling layer 3 of 10mm and thickness be 80mm, the both sides shoulder of concrete cushion has ledge structure, the step surface of ledge structure waters the first cement mortar setting course 5 that thickness is 30mm, first cement mortar setting course is covered with floor file blue bricks 6, rhone 10(floor file blue bricks having rectangular in cross-section is shown in Fig. 2), concrete cushion between floor file blue bricks waters the second cement mortar setting course 7 that thickness is 30mm, there is hair side granite 8 on second cement mortar setting course upper berth, the end face of hair side granite flushes with the end face of floor file blue bricks, gap is left between hair side granite, be covered with lawn 9(in gap and see Fig. 3), lawn width is 5cm, be apart 1.5m between adjacent lawn.
Work progress of the present utility model is: after line setting, excavation foundation trench, using after the soil compaction bottom foundation trench as rammed earth layer, rammed earth layer is spread pool slag and forms pool slag bed course, then on the slag bed course of the pool, rubble is piled, rubble leveling layer is formed after flattening, place template again, penetration concrete is must arrive the concrete cushion that both sides have ledge structure, then spread cement mortar on concrete cushion surface and form the first cement mortar setting course and the second cement mortar setting course respectively, floor file blue bricks on the first cement mortar setting course upper berth, on the second cement mortar setting course, hair side granite is spread at interval, and floor file blue bricks and hair side granite are flattened, last gap between hair side granite is embedded in lawn, namely the construction of whole garden path is completed.
The utility model structure is simple, easy construction, and drainage is good with structural strength, not easily arches upward and sedimentation, long service life, and work progress is very simply, easy to utilize.
Above-described embodiment is one of the present utility model preferably scheme, not does any pro forma restriction to the utility model, also has other variant and remodeling under the prerequisite not exceeding the technical scheme described in claim.

Claims (7)

1. a garden path structure, it is characterized in that, be followed successively by rammed earth layer (1) from the bottom up, pool slag bed course (2), rubble leveling layer (3) and concrete cushion (4), the both sides shoulder of described concrete cushion is provided with ledge structure, the step surface of described ledge structure is provided with the first cement mortar setting course (5), described first cement mortar setting course is provided with floor file blue bricks (6), concrete cushion between described floor file blue bricks is provided with the second cement mortar setting course (7), described second cement mortar setting course is provided with hair side granite (8), the end face of described hair side granite flushes with the end face of floor file blue bricks, gap is provided with between described hair side granite, lawn (9) is provided with in gap.
2. a kind of garden path structure according to claim 1, is characterized in that, described floor file blue bricks is provided with rhone (10), the rectangular in cross-section of described rhone.
3. a kind of garden path structure according to claim 1, is characterized in that, the thickness of described pool slag bed course is 30 ~ 40mm.
4. a kind of garden path structure according to claim 1, is characterized in that, the thickness of described rubble leveling layer is 10 ~ 20mm.
5. a kind of garden path structure according to claim 1, is characterized in that, the thickness of described concrete cushion is 80 ~ 100mm.
6. a kind of garden path structure according to claim 1, is characterized in that, the thickness of described first cement mortar setting course and the second cement mortar setting course is 10 ~ 30mm.
7. a kind of garden path structure according to claim 1, is characterized in that, described lawn width is 5 ~ 15cm, is apart 1 ~ 1.5m between adjacent lawn.
CN201420587997.0U 2014-10-13 2014-10-13 A kind of garden path structure Expired - Fee Related CN204125814U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420587997.0U CN204125814U (en) 2014-10-13 2014-10-13 A kind of garden path structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420587997.0U CN204125814U (en) 2014-10-13 2014-10-13 A kind of garden path structure

Publications (1)

Publication Number Publication Date
CN204125814U true CN204125814U (en) 2015-01-28

Family

ID=52382185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420587997.0U Expired - Fee Related CN204125814U (en) 2014-10-13 2014-10-13 A kind of garden path structure

Country Status (1)

Country Link
CN (1) CN204125814U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155387A (en) * 2015-06-23 2015-12-16 滁州市瑞景园林建设有限公司 Garden road structure
CN106012755A (en) * 2016-06-15 2016-10-12 苏州园林营造产业股份有限公司 Garden road surface paving method
CN106120524A (en) * 2016-07-02 2016-11-16 天鸿建设集团有限公司 A kind of road construction method
CN108824126A (en) * 2018-07-05 2018-11-16 广州市花木公司 Environment friendly pervious slow runway
CN110499682A (en) * 2019-08-02 2019-11-26 广州市绿化公司 A kind of two pass formula jogging track and construction method
CN113605171A (en) * 2021-06-30 2021-11-05 中铁第四勘察设计院集团有限公司 Drainage and integrated structure who mats formation

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155387A (en) * 2015-06-23 2015-12-16 滁州市瑞景园林建设有限公司 Garden road structure
CN106012755A (en) * 2016-06-15 2016-10-12 苏州园林营造产业股份有限公司 Garden road surface paving method
CN106120524A (en) * 2016-07-02 2016-11-16 天鸿建设集团有限公司 A kind of road construction method
CN106120524B (en) * 2016-07-02 2018-07-17 天鸿建设集团有限公司 A kind of road construction method on pavement and non-motorized lane intersection
CN108824126A (en) * 2018-07-05 2018-11-16 广州市花木公司 Environment friendly pervious slow runway
CN110499682A (en) * 2019-08-02 2019-11-26 广州市绿化公司 A kind of two pass formula jogging track and construction method
CN113605171A (en) * 2021-06-30 2021-11-05 中铁第四勘察设计院集团有限公司 Drainage and integrated structure who mats formation

Similar Documents

Publication Publication Date Title
CN204125814U (en) A kind of garden path structure
CN107201908B (en) Construction method for deep-buried central ditch of tunnel in severe cold region
CN104313967B (en) Row's water-seepage type is mated formation combining structure
CN203295913U (en) Novel ecological permeable road structure
CN105040554A (en) Garden path structure and paving construction technology thereof
CN107386047B (en) Water permeable brick pavement structure and construction method thereof
CN204940030U (en) Reconstruction and extension project new-old concrete bond Pavement mosaic structure
CN106758638A (en) A kind of city sponge brick and its construction technology
US20170362779A1 (en) Hard pavement construction method for natural groundwater recharge
CN202300419U (en) Tunnel supporting structure of ultra-shallow-buried underpass rail long pipe shed
CN105484132B (en) A kind of construction method that novel water permeable pavement is mated formation
CN202627166U (en) Novel water-discharging ecological zone for town road
CN106012971A (en) Vegetation concrete protection slope and construction method thereof
CN103790170A (en) Prefabricated concrete hollow framework slope protection structure
CN105507104A (en) Novel water-permeable sidewalk pavement
CN104594155A (en) Permeable pavement laying method
CN202830673U (en) Existing embankment heightening structure for limited using land area
CN106337346A (en) City landscape architecture pavement construction structure
CN107724201A (en) A kind of novel water permeable brick structure and method for paving
CN204608556U (en) A kind of water permeable pavement
CN204608544U (en) A kind of water conservation layer of water permeable pavement
CN206545257U (en) A kind of novel greening band water storage structure
CN105155387A (en) Garden road structure
CN206721596U (en) A kind of pavement structure of permeable road
CN102561161A (en) Method for paving water-permeable brick-paved ground and water permeation locator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150128

Termination date: 20151013

EXPY Termination of patent right or utility model