CN106012971A - Vegetation concrete protection slope and construction method thereof - Google Patents

Vegetation concrete protection slope and construction method thereof Download PDF

Info

Publication number
CN106012971A
CN106012971A CN201610405661.1A CN201610405661A CN106012971A CN 106012971 A CN106012971 A CN 106012971A CN 201610405661 A CN201610405661 A CN 201610405661A CN 106012971 A CN106012971 A CN 106012971A
Authority
CN
China
Prior art keywords
slope
concrete
vegetation
protection
slight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610405661.1A
Other languages
Chinese (zh)
Inventor
刘辉
宋功业
陶祥令
宋生志
鲍英基
黄勇
刘聘
高忠英
李勇
付杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Institute of Architectural Technology
Jiangsu Jianzhu Institute
Original Assignee
Jiangsu Institute of Architectural Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Institute of Architectural Technology filed Critical Jiangsu Institute of Architectural Technology
Priority to CN201610405661.1A priority Critical patent/CN106012971A/en
Publication of CN106012971A publication Critical patent/CN106012971A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/128Coherent linings made on the spot, e.g. cast in situ, extruded on the spot
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/202Securing of slopes or inclines with flexible securing means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Botany (AREA)
  • Environmental Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a vegetation concrete protection slope and a construction method thereof designed for preventing a side slope or mountain landslide, and belongs to the field of environmental protection. The vegetation concrete protection slope consists of vegetation protection slope concrete, anchoring nails, a drainage ditch, vegetation, an earth slope, a reinforcing mesh and a slope top concrete terrace; the vegetation protection slope concrete covers the surface of the earth slope; the anchoring nails are deeply embedded in the vegetation protection slope concrete and the earth slope; the drainage ditch is formed in the top of the slope; the vegetation is rooted in the surface of the vegetation protection slope concrete; the reinforcing mesh is buried in the vegetation protection slope concrete; and the slope top concrete terrace is arranged on the slope top side of the drainage ditch. The vegetation concrete protection slope has the following beneficial effects: a river channel earth slope or mountain is stable, and is unlikely to slide due to rain wash.

Description

A kind of plant cover concrete bank protection and construction method thereof
Technical field
The present invention is a kind of plant cover concrete bank protection and construction method thereof, is for preventing Channel slope or landslide and to set Meter, belong to field of environment protection.
Background technology
River course or massif side slope, as massif, the important component part of river ecosystem, are massif, river and environment life Intermediate zone between state system, conserving water and soil, the aspect such as purifying water body, flood control flood passage has important function;The biography of bank protection System version has pitched work, rock facing, cast-in-place or precast slab bank protection etc.;Traditional Channel slope safeguard structure Being primarily upon slope stability and flood passage, water drainage function, massif, river channel ecology system generation are born by less consideration protective slope structure Face rings, and the demand that people are to water system beautification of landscape.During long-term use, create destruction ecological environment, add The deterioration of speed human settlement, does not meets the problems such as harmonious co-existence between man and nature;A kind of plant cover concrete bank protection that the present invention provides, These problems can be solved.
Summary of the invention
The specific practice of this programme is: plant cover concrete bank protection by slope vegetation protection concrete 1, anchor studs 2, gutter 3, plant By 4, slight slope 5, bar-mat reinforcement 6 form with top, slope concrete floor 7;Slope vegetation protection concrete 1 covers the surface at slight slope 5;Anchor Admittedly nail 2 gos deep in slope vegetation protection concrete 1 and slight slope 5;Gutter 3 is arranged on top, slope;Vegetation 4 is rooted in slope vegetation protection concrete The surface of 1;Bar-mat reinforcement 6 is embedded in slope vegetation protection concrete 1;Top, slope concrete floor 7 is arranged on the top, slope one in gutter 3 Side.
Slope vegetation protection concrete 1 is formed by by hole concrete and vegetation Nutrition Soil;Vegetation Nutrition Soil has been dispersed in In the hole of hole concrete;Slope vegetation protection concrete 1 covers on hillside or the surface of slight slope 5;By slope vegetation protection concrete 1 With frictional force and the drawknot of anchor studs 2 of slight slope 5, slope vegetation protection concrete 1 and slight slope 5 is made to form entirety;Slope vegetation protection mixes The solidifying soil top of 1 is consolidated into entirety with the edge in gutter 3.
Anchor studs 2 is the drawknot parts connecting slope vegetation protection concrete 1 with slight slope 5;Preferential recommendation uses diameter 12-20 milli The reinforcement fabrication of a length of 200-500 millimeter of rice;The upper end of anchor studs 2 and bar-mat reinforcement 6 ligation in slope vegetation protection concrete 1, Lower end hammers in slight slope 5.
Gutter 3 is the pumping equipment being horizontally set on top, slope, and preferential recommendation uses brick gutter, and cement bonded sand is smeared on surface Slurry makes;Gutter 3 is made up of furrow bank and bottom of trench, and enough wide 400-600 mm depths are 400-600 millimeter, along top, hillside Parallel top with slope is arranged;One side in gutter 3 consolidates with slope vegetation protection concrete 1, and opposite side is connected with bank protection top concrete.
Vegetation 4 is extraordinary Artemisia straw or like vegetable, take root in in the Nutrition Soil in the hole of slope vegetation protection concrete 1.
Slight slope 5 is the native stoneledge in closely knit hillside or river course, is positioned at the lower section of slope vegetation protection concrete 1.
The bank protection drawknot parts that bar-mat reinforcement 6 is made up of reinforced mesh, preferential recommendation uses the reinforcing bar of diameter 10-12 millimeter Make;Bar-mat reinforcement 6 is formed by vertical and horizontal reinforcing bar ligation, and vertically and horizontally bar spacing is 150-200 millimeter, and joining is used No. 22 iron wire colligations;Bar-mat reinforcement 6 is parallel to slight slope direction and lays, and the gap between slight slope is not less than 70 millimeters, with bank protection table The distance portion in face is less than 50 millimeters;When bar-mat reinforcement 6 and anchor studs 2, with No. 22 iron wires by bar-mat reinforcement 6 and anchor studs 2 ligation.
Top, slope concrete floor 7 is the protecting component at slight slope top, and preferential recommendation uses the C20-of 200-300 millimeters thick C30 water-proof concrete makes;Concrete floor 7 side, top, slope is consolidated into entirety with gutter 3.
The construction method of a kind of plant cover concrete bank protection, including to domatic and the process of Po Ding basic unit, gutter construction, slope Top concrete floor, hang reinforced mesh, pour slope vegetation protection concrete and top, slope concrete floor and slope vegetation protection concrete Maintenance;
To the domatic and process of Po Ding basic unit, it is with 10-14 ton road roller layered rolling, every layer of stone roller when the slight slope cubic metre of earth and stone backfills Press 6-8 time, every all over steel wheel pressure half range, gait of march 1.5-2 m/min, make each backfill layer grinding compacting;Finally to Po Ding basic unit Grinding compacting;To slight slope impact shock compacting, compacting factor is not less than 0.93;
Gutter construction is to carry out after base treatment acceptance(check), and when using brick gutter, the grooving width in gutter is 650-850 millimeter, the degree of depth is 500-700 millimeter, use fired common brick, 1;3 masonry of cement mortar, use thickness after having built by laying bricks or stones Degree is the 1:2.5 cement sand plaster of 20 millimeters;Carry out top, slope concrete terrace construction simultaneously;
Top, slope concrete terrace construction, is to pour common water-proof concrete on the blotter of 100 millimeters thick;Metalling is constructed Time, it is desirable to metalling is pressed in the soil body;During concreting with pour after, note arranging partitioning slot, it is to avoid concrete floor Cracking;
Hang reinforced mesh, be by reinforcing bar in length and breadth after intersection ligation reticulates, anchor studs ordered to be connected on slight slope, reinforcing bar in length and breadth Spacing be 150-200 millimeter, bar-mat reinforcement is hung in anchor studs, bar-mat reinforcement is connected with anchor studs intersection ligation;Bar-mat reinforcement Minimum range between sheet and hillside is not less than 70 millimeters.
Pour slope vegetation protection concrete, be to carry out after reinforced mesh is installed and checked and accepted, slope vegetation protection concrete preferential recommendation Employing spurt method is constructed, it would however also be possible to employ casting casting method construction.
Carrying out maintenance immediately after slope top concrete floor and slope vegetation protection concreting complete, preferential recommendation uses spray The method spilling curing fluid maintenance.
After slope vegetation protection concrete reaches requirement of strength, Nutrition Soil is configured according to match ratio requirement, ferment, pulverizes, spills Sweep in the space of slope vegetation protection concrete, sow vegetation seed moistening, cover.
The invention has the beneficial effects as follows and can make river course slight slope or Rock mass stability, be unlikely to come down because of rain drop erosion.
Accompanying drawing explanation
Fig. 1 one plant cover concrete bank protection schematic diagram;
In figure: 1-slope vegetation protection concrete;2-anchor studs;3-gutter;4-vegetation;5-slight slope;6-bar-mat reinforcement;Top, 7-slope coagulation Level ground, soil.
Detailed description of the invention
Embodiment
Certain river engineering a kind of plant cover concrete bank protection as shown in Figure 1, plant cover concrete bank protection is by slope vegetation protection coagulation Soil 1, anchor studs 2, gutter 3, vegetation 4, slight slope 5, bar-mat reinforcement 6 and top, slope concrete floor 7 composition;Slope vegetation protection concrete 1 covers on the surface of slight slope 5;Anchor studs 2 is goed deep in slope vegetation protection concrete 1 and slight slope 5;Gutter 3 is arranged on top, slope;Vegetation 4 surfaces being rooted in slope vegetation protection concrete 1;Bar-mat reinforcement 6 is embedded in slope vegetation protection concrete 1;Top, slope concrete floor 7 sets Put the Po Ding side in gutter 3.
Slope vegetation protection concrete 1 is formed by by hole concrete and vegetation Nutrition Soil;Vegetation Nutrition Soil has been dispersed in In the hole of hole concrete;Slope vegetation protection concrete 1 covers on hillside or the surface of slight slope 5;By slope vegetation protection concrete 1 With frictional force and the drawknot of anchor studs 2 of slight slope 5, slope vegetation protection concrete 1 and slight slope 5 is made to form entirety;Slope vegetation protection mixes The solidifying soil top of 1 is consolidated into entirety with the edge in gutter 3.
Anchor studs 2 is the drawknot parts connecting slope vegetation protection concrete 1 with slight slope 5;Using diameter 18 mm length is 300 The reinforcement fabrication of millimeter;The upper end of anchor studs 2 and bar-mat reinforcement 6 ligation in slope vegetation protection concrete 1, lower end hammers in slight slope 5.
Gutter 3 is the pumping equipment being horizontally set on top, slope, uses brick gutter, and surface is smeared cement mortar and made; Gutter 3 is made up of furrow bank and bottom of trench, and enough wide 500 mm depths are 500 millimeters, and along top, hillside, parallel top with slope is arranged; One side in gutter 3 consolidates with slope vegetation protection concrete 1, and opposite side is connected with bank protection top concrete.
Vegetation 4 is extraordinary Artemisia straw or like vegetable, take root in in the Nutrition Soil in the hole of slope vegetation protection concrete 1.
Slight slope 5 is the native stoneledge in closely knit hillside or river course, is positioned at the lower section of slope vegetation protection concrete 1.
The bank protection drawknot parts that bar-mat reinforcement 6 is made up of reinforced mesh, use the reinforcement fabrication of diameter 10 millimeters;Bar-mat reinforcement 6 are formed by vertical and horizontal reinforcing bar ligation, and vertically and horizontally bar spacing is 150-200 millimeter, and joining is tied up with No. 22 iron wires Prick;Bar-mat reinforcement 6 is parallel to slight slope direction and lays, and the gap between slight slope is not less than 70 millimeters, with the distance portion on bank protection surface Less than 50 millimeters;When bar-mat reinforcement 6 and anchor studs 2, with No. 22 iron wires by bar-mat reinforcement 6 and anchor studs 2 ligation.
Top, slope concrete floor 7 is the protecting component at slight slope top, uses the C20 water-proof concrete of 200 millimeters thick to make; The side of top, slope concrete floor 7 is consolidated into entirety with gutter 3.
The construction method of a kind of plant cover concrete bank protection, including to domatic and the process of Po Ding basic unit, gutter construction, slope Top concrete floor, hang reinforced mesh, pour slope vegetation protection concrete and top, slope concrete floor and slope vegetation protection concrete Maintenance;
To the domatic and process of Po Ding basic unit, it is that every layer is rolled 8 with 12 tons of road roller layered rollings when the slight slope cubic metre of earth and stone backfills Time, every all over steel wheel pressure half range, gait of march 2 ms/min, make each backfill layer grinding compacting;Finally to Po Ding basic unit grinding compacting; To slight slope impact shock compacting, compacting factor is not less than 0.93;
Gutter construction is to carry out after base treatment acceptance(check), and when using brick gutter, the grooving width in gutter is 750 millimeters, the degree of depth is 600 millimeters, use fired common brick, 1;3 masonry of cement mortar, using thickness after having built by laying bricks or stones is 20 millis The 1:2.5 cement sand plaster of rice;Carry out top, slope concrete terrace construction simultaneously;
Top, slope concrete terrace construction, is to pour common water-proof concrete on the blotter of 100 millimeters thick;Metalling is constructed Time, it is desirable to metalling is pressed in the soil body;During concreting with pour after, note arranging partitioning slot, it is to avoid concrete floor Cracking;
Hang reinforced mesh, be by reinforcing bar in length and breadth after intersection ligation reticulates, anchor studs ordered to be connected on slight slope, reinforcing bar in length and breadth Spacing be 200 millimeters, bar-mat reinforcement is hung in anchor studs, bar-mat reinforcement is connected with anchor studs intersection ligation;Reinforced mesh with Minimum range between hillside is not less than 70 millimeters.
Pour slope vegetation protection concrete, be to carry out after reinforced mesh is installed and checked and accepted, slope vegetation protection concrete preferential recommendation Employing spurt method is constructed, it would however also be possible to employ casting casting method construction.
After slope top concrete floor and slope vegetation protection concreting complete, carry out maintenance immediately, use and spray curing fluid The method of maintenance.
After slope vegetation protection concrete reaches requirement of strength, Nutrition Soil is configured according to match ratio requirement, ferment, pulverizes, spills Sweep in the space of slope vegetation protection concrete, sow vegetation seed moistening, cover.

Claims (9)

1. a plant cover concrete bank protection, is characterized in that, plant cover concrete bank protection is by slope vegetation protection concrete (1), anchor studs (2), gutter (3), vegetation (4), slight slope (5), bar-mat reinforcement (6) form with top concrete floor, slope (7);Slope vegetation protection coagulation Soil (1) covers the surface in slight slope (5);Anchor studs (2) is goed deep in slope vegetation protection concrete (1) and slight slope (5);Gutter (3) It is arranged on top, slope;Vegetation (4) is rooted in the surface of slope vegetation protection concrete (1);Bar-mat reinforcement (6) is embedded in slope vegetation protection concrete (1) in;Top concrete floor, slope (7) is arranged on the Po Ding side in gutter (3).
A kind of plant cover concrete bank protection the most according to claim 1, is characterized in that, slope vegetation protection concrete (1) is by having Hole concrete and vegetation Nutrition Soil form;Vegetation Nutrition Soil is dispersed in the hole of hole concrete;Slope vegetation protection mixes Solidifying soil (1) covers on hillside or the surface of slight slope (5);By slope vegetation protection concrete (1) and the frictional force of slight slope (5) and anchor Gu the drawknot of nail (2), slope vegetation protection concrete (1) is made to form entirety with slight slope (5);The top of slope vegetation protection concrete (1) with The edge in gutter (3) is consolidated into entirety.
A kind of plant cover concrete bank protection the most according to claim 1, is characterized in that, anchor studs (2) is to connect slope vegetation protection Concrete (1) and the drawknot parts of slight slope (5);The upper end of anchor studs (2) and the bar-mat reinforcement (6) in slope vegetation protection concrete (1) Ligation, lower end hammers in slight slope (5).
A kind of plant cover concrete bank protection the most according to claim 1, is characterized in that, gutter (3) are to be horizontally set on slope The pumping equipment on top;Gutter (3) is made up of furrow bank and bottom of trench, and along top, hillside, parallel top with slope is arranged;Gutter (3) One side consolidates with slope vegetation protection concrete (1), and opposite side is connected with bank protection top concrete floor.
A kind of plant cover concrete bank protection the most according to claim 1, is characterized in that, vegetation (4) is extraordinary Artemisia straw or like vegetable, Take root in in slope vegetation protection concrete (1).
A kind of plant cover concrete bank protection the most according to claim 1, is characterized in that, slight slope (5) is closely knit hillside or soil Slope, is positioned at the lower section of slope vegetation protection concrete (1).
A kind of plant cover concrete bank protection the most according to claim 1, is characterized in that, bar-mat reinforcement (6) is by reinforced mesh system The bank protection drawknot parts become;Bar-mat reinforcement (6) is formed by vertical and horizontal reinforcing bar ligation, is parallel to slight slope direction and lays;Vertical When being laterally provided with anchor studs (2) at interface point, with anchor studs (2) ligation.
A kind of plant cover concrete bank protection the most according to claim 1, is characterized in that, top concrete floor, slope (7) is slight slope The protecting component at top, side consolidates with gutter (3).
9. a construction method for plant cover concrete bank protection, is characterized in that, comprises the following steps:
(1) to the domatic and process of Po Ding basic unit: when the slight slope cubic metre of earth and stone backfills, layered rolling makes each backfill layer roll close Real;Finally to Po Ding basic unit grinding compacting, slight slope is tamped;
(2) gutter construction: after base treatment acceptance(check), grooving construction drainage ditch;Carry out top, slope concrete floor to execute simultaneously Work;
(3) top, slope concrete terrace construction: pour common water-proof concrete, do not make concrete floor ftracture;
(4) reinforced mesh is hung: after intersection ligation reticulates, anchor studs will be ordered to be connected on slight slope, by reinforcing bar by reinforcing bar in length and breadth Net hangs in anchor studs, and intersection ligation connects;
(5) slope vegetation protection concrete is poured: by slope vegetation protection concrete material mixing molding, be cast in slight slope surface, with slight slope Surface gradient flattens;
(6) slope top concrete floor and slope vegetation protection concrete curing: when slope top concrete floor and slope vegetation protection concrete water Maintenance is carried out immediately after having built;
(7) Nutrition Soil is configured according to match ratio requirement, ferment, pulverizes, sweep in the space of slope vegetation protection concrete, sow Vegetation seed moistening, cover.
CN201610405661.1A 2016-06-12 2016-06-12 Vegetation concrete protection slope and construction method thereof Pending CN106012971A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610405661.1A CN106012971A (en) 2016-06-12 2016-06-12 Vegetation concrete protection slope and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610405661.1A CN106012971A (en) 2016-06-12 2016-06-12 Vegetation concrete protection slope and construction method thereof

Publications (1)

Publication Number Publication Date
CN106012971A true CN106012971A (en) 2016-10-12

Family

ID=57090971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610405661.1A Pending CN106012971A (en) 2016-06-12 2016-06-12 Vegetation concrete protection slope and construction method thereof

Country Status (1)

Country Link
CN (1) CN106012971A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108570993A (en) * 2018-04-26 2018-09-25 熊远 A kind of ecological vegetation concrete revetment structure and its construction method
CN110939103A (en) * 2019-11-14 2020-03-31 冀利民 Ecological bank protection of hydraulic engineering
CN111139842A (en) * 2019-12-30 2020-05-12 河北建太工程设计有限公司 Protective structure for mountain road slope and construction method thereof
CN112442996A (en) * 2020-11-06 2021-03-05 上海建工七建集团有限公司 Slope protection structure and method applied to hilly area

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0489919A (en) * 1990-07-31 1992-03-24 Jiyagurasu:Kk Foundation for vegetation
CN201473958U (en) * 2009-06-09 2010-05-19 朱奎 Greening concrete protective slope
CN103122641A (en) * 2012-12-21 2013-05-29 陕西红叶园林绿化设计工程集团有限公司 Slope reinforced structure and reinforcing method thereof
CN104863164A (en) * 2015-04-30 2015-08-26 广西富林景观建设有限公司 Method for ecologic re-greening of exposed rock mass slope
CN205088628U (en) * 2015-10-20 2016-03-16 江西三禾生态混凝土有限公司 Plant and give birth to ecological concrete slope protection structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0489919A (en) * 1990-07-31 1992-03-24 Jiyagurasu:Kk Foundation for vegetation
CN201473958U (en) * 2009-06-09 2010-05-19 朱奎 Greening concrete protective slope
CN103122641A (en) * 2012-12-21 2013-05-29 陕西红叶园林绿化设计工程集团有限公司 Slope reinforced structure and reinforcing method thereof
CN104863164A (en) * 2015-04-30 2015-08-26 广西富林景观建设有限公司 Method for ecologic re-greening of exposed rock mass slope
CN205088628U (en) * 2015-10-20 2016-03-16 江西三禾生态混凝土有限公司 Plant and give birth to ecological concrete slope protection structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108570993A (en) * 2018-04-26 2018-09-25 熊远 A kind of ecological vegetation concrete revetment structure and its construction method
CN110939103A (en) * 2019-11-14 2020-03-31 冀利民 Ecological bank protection of hydraulic engineering
CN110939103B (en) * 2019-11-14 2021-09-14 冀利民 Ecological bank protection of hydraulic engineering
CN111139842A (en) * 2019-12-30 2020-05-12 河北建太工程设计有限公司 Protective structure for mountain road slope and construction method thereof
CN111139842B (en) * 2019-12-30 2021-07-02 河北建太工程设计有限公司 Protective structure for mountain road slope and construction method thereof
CN112442996A (en) * 2020-11-06 2021-03-05 上海建工七建集团有限公司 Slope protection structure and method applied to hilly area

Similar Documents

Publication Publication Date Title
CN204059124U (en) A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure
CN105544460B (en) Cast-in-place plant growing type eco-concrete slope protection construction method
CN106013191B (en) Environment-friendly type grass planting Concrete Highway protective slope structure and construction method
CN101298782B (en) Method and system for basement engineering water proof and water drain
CN203320549U (en) Reinforced gabion retaining wall of high slope in airport engineering
CN106320120B (en) A kind of peg board formula is without dirt road base construction of the highway technique
CN106193066B (en) A kind of Loess landslide administering method based on restoration of the ecosystem
CN205999903U (en) Environment-friendly type grass planting Concrete Highway protective slope structure
CN105569071B (en) A kind of slip casting under water of cement-based material or mud jacking block ground mass foundation construction
CN101634143A (en) Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay
CN104674802B (en) Prestressing force rubble anchorage pile and landslide control construction method thereof
CN107190602A (en) A kind of river degradation section pile formula foam concrete light road bank structure and construction method
CN102080381B (en) Method for managing landslip of side slope landslide for transformer substation
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN106012971A (en) Vegetation concrete protection slope and construction method thereof
CN111074844A (en) Construction method of ecological interlocking revetment of river channel
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN204125814U (en) A kind of garden path structure
CN107152012A (en) Sluice construction technique
CN104480956B (en) A kind of minor diameter mold-bagged concrete pile composite foundation
CN106087880B (en) A kind of dam that 300 meter level is high and its construction technology
CN214574037U (en) Comprehensive treatment system for up-down landslides of highway
CN204356788U (en) Flexibility subtracts swollen ecological revetment structure
CN108589747A (en) EPS light road banks are widened in conjunction with plant biological bag protective slope structure and construction method
KR20020022446A (en) Repairing method of earth-fill dam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161012

RJ01 Rejection of invention patent application after publication