CN204074371U - Dry hanging production line treated by a kind of priming paint - Google Patents

Dry hanging production line treated by a kind of priming paint Download PDF

Info

Publication number
CN204074371U
CN204074371U CN201420560941.6U CN201420560941U CN204074371U CN 204074371 U CN204074371 U CN 204074371U CN 201420560941 U CN201420560941 U CN 201420560941U CN 204074371 U CN204074371 U CN 204074371U
Authority
CN
China
Prior art keywords
hanging
production line
track
priming paint
hanging basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420560941.6U
Other languages
Chinese (zh)
Inventor
霍成基
黄鸿祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FOSHAN LANGJING SANITARY WARE CO LTD
Original Assignee
FOSHAN LANGJING SANITARY WARE CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOSHAN LANGJING SANITARY WARE CO LTD filed Critical FOSHAN LANGJING SANITARY WARE CO LTD
Priority to CN201420560941.6U priority Critical patent/CN204074371U/en
Application granted granted Critical
Publication of CN204074371U publication Critical patent/CN204074371U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Dry hanging production line treated by a kind of priming paint, comprise the operation interval for spraying paint, multiple hanging basket for taking up workpiece, for hang conveying carrier chain, for providing the drive motors of power and the framework for the whole production line of support; Described hanging basket is hung on described carrier chain by hanging parts space, and described carrier chain is installed on the described hanging basket of orbital cycle running conveying arranged along described hanging rail by described drive motors driving in the hanging rail of described framework; Described hanging basket along described hanging rail transport the time of turning around be no less than workpiece spray paint after required flash-off time.Dry hanging production line treated by the priming paint that the utility model proposes a kind of Appropriate application factory building internal upper part space, and workpiece enters upper space and automatically transports and dry after having sprayed paint in ground, and save factory building, save artificial, shorten flash-off time, efficiency is high.

Description

Dry hanging production line treated by a kind of priming paint
Technical field
The utility model relates to the manufacture field that sprays paint, and particularly relates to a kind of priming paint and treats dry hanging production line.
Background technology
Priming paint, refer to and be directly coated onto the coating of body surface as finish paint solid foundation, require adhesion-tight on object plane, to increase the adhesive force of upper coating, improve the ornamental of finish paint, especially in Furniture manufacturing manufacturing, in the production process of furniture workpiece, spray-applied primer is absolutely necessary operation, after Workpiece painting priming paint completes, needs placement is dried, required time is generally 100-180min, in existing factory building, workpiece by workman after painting workshop has sprayed paint, can be transported to and carry out arrangement in the workshop for drying workpiece and put and wait to do, next operation is transported to again after drying, the carrying of workpiece in process, putting and wait to do all needs to expend the larger labour of workman and time, and the floor space that needs take is large, production cost is difficult to reduce.
Utility model content
Dry hanging production line treated by the priming paint that the purpose of this utility model is to propose a kind of Appropriate application factory building internal upper part space, and workpiece enters upper space and automatically transports and dry after having sprayed paint in ground, and save factory building, save artificial, shorten flash-off time, efficiency is high.
For reaching this object, the utility model by the following technical solutions:
Dry hanging production line treated by a kind of priming paint, comprise the operation interval for spraying paint, multiple hanging basket for taking up workpiece, for hang conveying carrier chain, for providing the drive motors of power and the framework for the whole production line of support;
The multistory frame structure that described framework is made up of hanging rail and support, described hanging rail by loading and unloading track, upper climbing track, broken line type track and lower part climb track in order head and the tail connect to form, described fold-line-shaped track is arranged at the upper strata level of described framework, described handling track is positioned at lower floor's level of described framework and is arranged at the side of described operation interval, and the opposite side of described handling track is inloading part district;
Described hanging basket is hung on described carrier chain by hanging parts space, and described carrier chain is installed on the described hanging basket of orbital cycle running conveying arranged along described hanging rail by described drive motors driving in the hanging rail of described framework;
The workpiece sprayed paint in described operation interval moves up on the platform of the hanging basket being positioned at described handling track, the superjacent air space of production line installation region is risen to through described upper climbing track, dry in described superjacent air space transhipment through described broken line type track, roll back described handling track finally by under described lower part climbing track;
Described hanging basket along described hanging rail transport the time of turning around be no less than workpiece spray paint after required flash-off time.
Preferably, also comprise protecting wire net, described protecting wire net is arranged at the interface of the upper and lower layer of described framework.
Preferably, described drive motors arranges and is no less than 2.
Preferably, described operation interval is independently spray booth, and described operation interval at least arranges 1.
Preferably, described spray booth is provided with the spray zone that two have opposite face, the opposite face of the spray zone described in two is provided with coating cloud cut-off equipment, and the top of described spray booth is provided with emission-control equipment and refrigerating plant, and the top of the Way in of described spray zone is provided with air outlet.
Preferably, described hanging basket is the frame structure of triangular prism, wherein for carrying one of them parallelogram face that the bottom of workpiece is described triangular prism.
Preferably, described upper climbing track and the described lower part climbing incline direction of track and the angle of vertical direction are no less than 60 °.
Preferably, the speed of service of described carrier chain is 2m/min.
Preferably, described hanging parts comprise installs lacing film and arm, and one end of described installation lacing film is rotating is installed on described carrier chain, and the other end is connected with described hanging basket by two described arms.
Preferably, described carrier chain is arranged at intervals with multiple installation lacing film, and described interval is less than the spacing distance between each described hanging basket.
The beneficial effects of the utility model: the workpiece 1, sprayed paint is positioned on hanging production line on one side, factory building upper space can be transported to carry out rotating back and forth drying, facility floor space can be used as other purposes, Appropriate application factory building upper space, reduces the carrying operation of workman; 2, dry required time consistency treated by a time of enclosing and workpiece priming paint back and forth, enhances productivity.
Accompanying drawing explanation
Fig. 1 is the framework of an embodiment of the present utility model and the schematic top plan view of spray booth;
Fig. 2 is the schematic top plan view that the protecting wire net of an embodiment of the present utility model is arranged;
Fig. 3 is the structural representation of upper climbing track of an embodiment of the present utility model;
Fig. 4 is the structural representation that the hanging basket of an embodiment of the present utility model is installed;
Fig. 5 is the structural representation of the spray booth of an embodiment of the present utility model.
Wherein, operation interval 1, hanging basket 2, carrier chain 3, drive motors 4, framework 5, protecting wire net 6, hanging rail 51, support 52, handling track 511, upper climbing track 512, broken line type track 513, lower part climbing track 514, hanging parts 231, install lacing film 232, arm 233, spray zone 11, air outlet 111, coating cloud cut-off equipment 12, emission-control equipment 13, refrigerating plant 14.
Detailed description of the invention
The technical solution of the utility model is further illustrated by detailed description of the invention below in conjunction with accompanying drawing.
Dry hanging production line treated by a kind of priming paint, comprise the operation interval 1 for spraying paint, multiple hanging basket 2 for taking up workpiece, for hang conveying carrier chain 3, for providing the drive motors 4 of power and the framework 5 for the whole production line of support;
The multistory frame structure that described framework 5 is made up of hanging rail 51 and support 52, described hanging rail 51 is connected to form in order from beginning to end by handling track 511, upper climbing track 512, broken line type track 513 and lower part climbing track 514, as shown in Figure 3, described fold-line-shaped track 513 is arranged at the upper strata level of described framework 5, described handling track 511 is positioned at lower floor's level of described framework 5 and is arranged at the side of described operation interval 1, and the opposite side of described handling track 511 is inloading part district;
Described hanging basket 2 is hung on described carrier chain 3 by hanging parts 231 interval, drives the orbital cycle arranged along described hanging rail 51 to operate the described hanging basket 2 of conveying in the hanging rail 51 that described carrier chain 3 is installed on described framework 5 by described drive motors 4;
The workpiece sprayed paint in described operation interval 1 moves up on the platform of the hanging basket 2 being positioned at described handling track 511, the superjacent air space of production line installation region is risen to through described upper climbing track 512, dry in described superjacent air space transhipment through described broken line type track 513, roll back described handling track 511 for 514 times finally by described lower part climbing track;
Described hanging basket 2 along described hanging rail 51 transport the time of turning around be no less than workpiece spray paint after required flash-off time.
Priming paint treats that dry hanging production line is applicable in woodwork industry, is installed in the factory building of basecoat paint operation, the multistory frame structure that the framework 5 of main body is made up of hanging rail 51 and support 52.Hanging basket 2 is hung on carrier chain 3 by the firm of hanging parts 231 interval, and carrier chain 3 provides power to operate along hanging rail 51 by drive motors 4, and hanging basket 2 operates stably with carrier chain 3.As shown in Figure 1, the handling track 511 being arranged on operation interval 1 side can be moved up after workpiece completes the spraying of priming paint in operation interval 1, be placed on the platform of the hanging basket 2 through loading and unloading track 511, rise climbing in the upper strata level of framework 5 through upper climbing track 512, carry out transhipment at the broken line type track 513 being positioned at factory building superjacent air space to dry, priming paint workpiece to be done is positioned at factory building superjacent air space and dries, thus vacated the space of facility floor, the space vacated can be used for the freight house putting workpiece to be painted or become finished product or processing operating area etc., rationally and effectively utilize the upper space of factory building, save the land area of factory building, the workpiece simultaneously sprayed paint can directly move up on the hanging basket 2 of the side being positioned at operation interval 1, transhipment is driven by carrier chain 3 and drive motors 4, be placed on shelf dry without the need to the artificial factory building that dries of specifying that workpiece to be done moved up, save the labour intensity of carrying operation and workman, in addition, workpiece after spraying paint rotates back and forth upper the flowing accelerating surrounding air in the air, priming paint is dried faster, shorten workpiece priming paint and treat the dry required time.
Workpiece gets back to by lower part track 514 descending that declines of climbing the handling track 511 being positioned at lower floor after having transported in space up along broken line type track 513, and the workpiece that priming paint has dried is removed by transporting in the inloading part district of the opposite side of handling track 511 by workman.Hanging basket 2 along hanging rail 51 transport the time of turning around be no less than workpiece spray paint after required flash-off time, so workpiece in overhead back and forth distribution cycle one enclose priming paint and dries, and can be unloaded by workman, effectively to improve production and operating efficiency.
Manufacturing procedure and placement are dried operation and are treated that dry hanging production line is reasonably distributed in the ground space of factory building and the aerial space on top by the utility model priming paint, floor space needed for saving, and the operation of workman midway being carried by workpiece can be saved, save artificial, raise the efficiency.
Preferably, also comprise protecting wire net 6, described protecting wire net 6 is arranged at the interface of the upper and lower layer of described framework 5.
As shown in Figure 2, if workpiece or hanging basket 2 are hung on upper strata in the transport process dried because putting bad or ectocine or installing error and drop, the interface of the upper and lower layer of framework 5 is provided with protecting wire net 6, the workpiece that drops or hanging basket 2 can be avoided from overhead to pound the workman fallen to the ground or the object put, improve the security of production line, also can reducing the difference in height that workpiece or hanging basket 2 drop simultaneously, reducing the damaged degree that workpiece or hanging basket 2 cause because dropping.
Preferably, described drive motors 4 arranges and is no less than 2.The length of the transhipment distance of quantity needed for workpiece of drive motors 4 is arranged, and guarantees that carrier chain 3 has enough power to drive hanging basket 2 and workpiece along hanging rail 51 circulation rotating back and forth.
Preferably, described operation interval 1 is independently spray booth, and described operation interval 1 at least arranges 1.Independently spray booth can provide independent operating area to spray paint to priming paint gunman, the quantity arranged can be arranged according to job requirements, once can to hold in conjunction with production line and the quantity of transporting work pieces and speed are arranged, once can hold the many production lines of piece count and multiple independent spray booth can be set.
Preferably, described spray booth is provided with the spray zone 11 that two have opposite face, the opposite face of the spray zone 11 described in two is provided with coating cloud cut-off equipment 12, the top of described spray booth is provided with emission-control equipment 13 and refrigerating plant 14, and the top of the Way in of described spray zone 11 is provided with air outlet 111.
As shown in Figure 5, a spray booth is provided with the spray zone 11 that two have opposite face, can independently operating area be provided separately to respectively two priming paint gunmans, there is arranging of opposite face and jointly can use same emission-control equipment 13 and refrigerating plant 14, the ranking of better space can be had.Air outlet 111 is arranged on the top of the Way in of spray zone 11, wind-force is provided to blow to spray zone 11 inside by refrigerating plant 14, the coating cloud of surface of the work is not fallen under the impact of wind direction when spray gun is sprayed paint on workpiece, drop into and be positioned on the coating cloud device for trapping 12 of opposite face, effectively coating cloud is dammed, improve in spray booth and the air purity of whole factory building.
Preferably, as shown in Figure 4, described hanging basket 2 is the frame structure of triangular prism, wherein for carrying one of them parallelogram face that the bottom of workpiece is described triangular prism.The frame structure of triangular prism can make hanging basket 2 steadily be hung on carrier chain 3 by hanging parts 231 by carrying out hanging to wherein two equalization points of an incline, the space that the frame structure of triangular prism takies is few, the space that can hold workpiece is large, is the preferred structure of hanging basket 2.
Preferably, described upper climbing track 512 and the described lower part climbing incline direction of track 514 and the angle of vertical direction are no less than 60 °.If angle is too small, the gradient of upper climbing track 512 and lower part climbing track 514 is large, and be unfavorable for that hanging basket 2 rises climbing stably, hanging basket 2 is easily rocked, and workpiece is easily toppled over or dropped.Therefore, upper incline direction of climbing track 512 and the angle of vertical direction are preferably no less than 60 °.
Preferably, the speed of service of described carrier chain 3 is 2m/min.The speed of service affects the stationarity of course of conveying hanging basket 2, and too fast meeting makes hanging basket 2 rock, and crosses the production efficiency that can affect again production line slowly.Therefore, the preferred speed of service is 2m/min.
Preferably, described hanging parts 231 comprise installs lacing film 232 and arm 233, and one end of described installation lacing film is rotating is installed on described carrier chain 3, and the other end is connected with described hanging basket 2 by two described arms 233.Hanging parts 231 adopt two arms 232 to be connected with hanging basket 2, the setting up of arm 232 production line is brought into operation or out of service time hanging basket 2 can be more stable transport along carrier chain 3 or stop.
Preferably, as shown in Figure 4, described carrier chain 3 is arranged at intervals with multiple installation lacing film 232, and described interval is less than the spacing distance between each described hanging basket 2.Be provided with multiple installation lacing film 232, the interval of installing between lacing film 232 is less than the spacing distance between each hanging basket 2, and can adjust arbitrarily the spacing between each hanging basket 2, mounting and adjusting is high.
Below know-why of the present utility model is described in conjunction with specific embodiments.These describe just in order to explain principle of the present utility model, and can not be interpreted as the restriction to the utility model protection domain by any way.Based on explanation herein, those skilled in the art does not need to pay performing creative labour can associate other detailed description of the invention of the present utility model, and these modes all will fall within protection domain of the present utility model.

Claims (10)

1. a dry hanging production line treated by priming paint, it is characterized in that: comprise the operation interval for spraying paint, multiple hanging basket for taking up workpiece, for hang conveying carrier chain, for providing the drive motors of power and the framework for the whole production line of support;
The multistory frame structure that described framework is made up of hanging rail and support, described hanging rail by loading and unloading track, upper climbing track, broken line type track and lower part climb track in order head and the tail connect to form, described fold-line-shaped track is arranged at the upper strata level of described framework, described handling track is positioned at lower floor's level of described framework and is arranged at the side of described operation interval, and the opposite side of described handling track is inloading part district;
Described hanging basket is hung on described carrier chain by hanging parts space, and described carrier chain is installed on the described hanging basket of orbital cycle running conveying arranged along described hanging rail by described drive motors driving in the hanging rail of described framework;
The workpiece sprayed paint in described operation interval moves up on the platform of the hanging basket being positioned at described handling track, the superjacent air space of production line installation region is risen to through described upper climbing track, dry in described superjacent air space transhipment through described broken line type track, roll back described handling track finally by under described lower part climbing track;
Described hanging basket along described hanging rail transport the time of turning around be no less than workpiece spray paint after required flash-off time.
2. dry hanging production line treated by priming paint according to claim 1, and it is characterized in that: also comprise protecting wire net, described protecting wire net is arranged at the interface of the upper and lower layer of described framework.
3. dry hanging production line treated by priming paint according to claim 1, it is characterized in that: described drive motors arranges and is no less than 2.
4. dry hanging production line treated by priming paint according to claim 1, it is characterized in that: described operation interval is independently spray booth, and described operation interval at least arranges 1.
5. dry hanging production line treated by priming paint according to claim 4, it is characterized in that: described spray booth is provided with the spray zone that two have opposite face, the opposite face of the spray zone described in two is provided with coating cloud cut-off equipment, the top of described spray booth is provided with emission-control equipment and refrigerating plant, and the top of the Way in of described spray zone is provided with air outlet.
6. dry hanging production line treated by priming paint according to claim 1, it is characterized in that: described hanging basket is the frame structure of triangular prism, wherein for carrying one of them parallelogram face that the bottom of workpiece is described triangular prism.
7. dry hanging production line treated by priming paint according to claim 1, it is characterized in that: described upper climbing track and the described lower part climbing incline direction of track and the angle of vertical direction are no less than 60 °.
8. dry hanging production line treated by priming paint according to claim 1, it is characterized in that: the speed of service of described carrier chain is 2m/min.
9. dry hanging production line treated by priming paint according to claim 1, it is characterized in that: described hanging parts comprise installs lacing film and arm, one end of described installation lacing film is rotating is installed on described carrier chain, and the other end is connected with described hanging basket by two described arms.
10. dry hanging production line treated by priming paint according to claim 9, and it is characterized in that: described carrier chain is arranged at intervals with multiple installation lacing film, described interval is less than the spacing distance between each described hanging basket.
CN201420560941.6U 2014-09-26 2014-09-26 Dry hanging production line treated by a kind of priming paint Active CN204074371U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420560941.6U CN204074371U (en) 2014-09-26 2014-09-26 Dry hanging production line treated by a kind of priming paint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420560941.6U CN204074371U (en) 2014-09-26 2014-09-26 Dry hanging production line treated by a kind of priming paint

Publications (1)

Publication Number Publication Date
CN204074371U true CN204074371U (en) 2015-01-07

Family

ID=52167137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420560941.6U Active CN204074371U (en) 2014-09-26 2014-09-26 Dry hanging production line treated by a kind of priming paint

Country Status (1)

Country Link
CN (1) CN204074371U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104289353A (en) * 2014-09-26 2015-01-21 佛山市浪鲸洁具有限公司 Hanging production line for primer to be dried

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104289353A (en) * 2014-09-26 2015-01-21 佛山市浪鲸洁具有限公司 Hanging production line for primer to be dried

Similar Documents

Publication Publication Date Title
US11440041B2 (en) Stations for treating motor-vehicle bodies and/or motor-vehicle components
CN203991194U (en) A kind of full-automatic spraying production line
CN209476555U (en) A kind of double-speed chain conveying paint line
EP1033176A2 (en) Method and plant for the painting of wooden doors and windows or the like
CN105252526B (en) Robot painting's production line
CN205659845U (en) Rock wool automatic spraying production line
KR101185074B1 (en) Hoist facilities are equipped with the traverse-type paint coating equipment
CN105921347A (en) Plywood production line with paint spraying device and control method
CN104289353B (en) Dry hanging production line treated by a kind of priming paint
CN204074371U (en) Dry hanging production line treated by a kind of priming paint
EP3184179A1 (en) Plant for the horizontal painting of shaped doors
CN100425351C (en) Dip-coating assembly line
CN106269444A (en) Woodwork outer surface spraying method
CN206075126U (en) The control system of flexible paint line
CN106563622A (en) Multi-track powder spraying method and device
CN104437938B (en) One is fluorocarbon-sprayed gets plate automatic spraying equipment ready
CN205761897U (en) Electrostatic Spraying of powder Coatings coating line
CN103480531A (en) Soundbox paint spraying production line
EP1624970A1 (en) Electrostatic-painting system for metallic manufactured articles and associated method
CN210312212U (en) Full-automatic production system with high space utilization rate for manufacturing wooden furniture
CN210496928U (en) Spraying equipment applied to cable bridge anticorrosive coating
CN208449708U (en) A kind of spray-painting production line product hanger
CN219313740U (en) Suspension type storage structure and coating production line comprising same
CN218655053U (en) Spraying drying device is used in insulation material processing
JPH11319655A (en) Small member coating line equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant