CN104289353B - Dry hanging production line treated by a kind of priming paint - Google Patents

Dry hanging production line treated by a kind of priming paint Download PDF

Info

Publication number
CN104289353B
CN104289353B CN201410503851.8A CN201410503851A CN104289353B CN 104289353 B CN104289353 B CN 104289353B CN 201410503851 A CN201410503851 A CN 201410503851A CN 104289353 B CN104289353 B CN 104289353B
Authority
CN
China
Prior art keywords
hanging
production line
track
priming paint
dry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410503851.8A
Other languages
Chinese (zh)
Other versions
CN104289353A (en
Inventor
霍成基
黄鸿祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FOSHAN LANGJING SANITARY WARE CO LTD
Original Assignee
FOSHAN LANGJING SANITARY WARE CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOSHAN LANGJING SANITARY WARE CO LTD filed Critical FOSHAN LANGJING SANITARY WARE CO LTD
Priority to CN201410503851.8A priority Critical patent/CN104289353B/en
Publication of CN104289353A publication Critical patent/CN104289353A/en
Application granted granted Critical
Publication of CN104289353B publication Critical patent/CN104289353B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D3/00Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
    • B05D3/04Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases
    • B05D3/0433Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases the gas being a reactive gas
    • B05D3/0453After-treatment
    • B05D3/046Curing or evaporating the solvent
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0221Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
    • B05B13/0264Overhead conveying means, i.e. the object or other work being suspended from the conveying means; Details thereof, e.g. hanging hooks

Landscapes

  • Coating Apparatus (AREA)
  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

Dry hanging production line treated by a kind of priming paint, including the operation interval for spraying paint, multiple hanging basket for taking up workpiece, for hanging the carrier chain of conveying, for providing the drive motor of power and for the framework of the whole production line of support; Described hanging basket is hung on described carrier chain by hanging parts space, and described carrier chain is installed in the hanging rail of described framework and is driven the orbital cycle operating arranged along described hanging rail to carry described hanging basket by described drive motor; The flash-off time that described hanging basket is required after spraying paint along the time that described hanging rail fortune turns around no less than workpiece. The present invention proposes the priming paint in a kind of Appropriate application Factory Building internal upper part space and treats dry hanging production line, and workpiece enters upper space after having sprayed paint in ground and automatically transports and dry, and saves Factory Building, saves artificial, shorten flash-off time, efficiency height.

Description

Dry hanging production line treated by a kind of priming paint
Technical field
The present invention relates to the manufacture field that sprays paint, particularly relate to a kind of priming paint and treat dry hanging production line.
Background technology
Priming paint, refer to the coating being directly applied to body surface as finish paint solid foundation, require adhesion-tight on object plane, to increase the adhesive force of upper coating, improve the dicoration of finish paint, especially in Furniture manufacturing manufacturing, in the production process of furniture workpiece, spray-applied primer is requisite operation, Workpiece painting priming paint needs placement to dry after completing, required time is generally 100-180min, in existing Factory Building, workpiece by workman after painting workshop has sprayed paint, can be transported in the workshop for drying workpiece to carry out arrangement to put and wait to do, next operation it is transported to again after drying, the carrying of workpiece in process, put and treat that dry being required for expends the bigger labour force of workman and time, and need the floor space taken big, production cost is difficult to reduce.
Summary of the invention
Dry hanging production line treated by the priming paint that it is an object of the invention to propose a kind of Appropriate application Factory Building internal upper part space, and workpiece enters upper space after having sprayed paint in ground and automatically transports and dry, and saves Factory Building, saves artificial, shorten flash-off time, efficiency height.
For reaching this purpose, the present invention by the following technical solutions:
Dry hanging production line treated by a kind of priming paint, including the operation interval for spraying paint, multiple hanging basket for taking up workpiece, for hanging the carrier chain of conveying, for providing the drive motor of power and for the framework of the whole production line of support;
The multistory frame structure that described framework is made up of hanging rail and support, described hanging rail is connected to form by loading and unloading track, upper part climbing track, broken line type track and lower part climbing track head and the tail in order, described fold-line-shaped track is arranged at the upper strata level of described framework, described handling track is positioned at lower floor's level of described framework and is arranged at the side of described operation interval, and the opposite side of described handling track is inloading part district;
Described hanging basket is hung on described carrier chain by hanging parts space, and described carrier chain is installed in the hanging rail of described framework and is driven the orbital cycle operating arranged along described hanging rail to carry described hanging basket by described drive motor;
The workpiece sprayed paint in described operation interval is removed on the platform of the hanging basket being put on described handling track, the superjacent air space of production line installation region is risen to through described upper part climbing track, dry in the transhipment of described superjacent air space through described broken line type track, decline return to described handling track through described lower part track of climbing after;
The flash-off time that described hanging basket is required after spraying paint along the time that described hanging rail fortune turns around no less than workpiece.
Preferably, also including protecting wire net, described protecting wire net is arranged at the separating surface of the upper and lower layer of described framework.
Preferably, described drive motor is arranged no less than 2.
Preferably, described operation interval is independent spray booth, and described operation interval is at least provided with 1.
Preferably, described spray booth is provided with two spray zones with opposite face, the opposite face of two described spray zones is provided with coating cloud cut-off equipment, described spray booth be provided above emission-control equipment and refrigerating plant, the Way in of described spray zone be provided above air outlet.
Preferably, described hanging basket is the frame structure of triangular prism, wherein for carrying one of them parallelogram face that bottom is described triangular prism of workpiece.
Preferably, the incline direction of described upper part climbing track and described lower part climbing track and the angle of vertical direction are no less than 60 °.
Preferably, the speed of service of described carrier chain is 2m/min.
Preferably, described hanging parts include installing lacing film and arm, and one end of described installation lacing film is rotating is installed on described carrier chain, and the other end is connected to described hanging basket by two described arms.
Preferably, described carrier chain is arranged at intervals with multiple installation lacing film, and described interval is less than the spacing distance between each described hanging basket.
Beneficial effects of the present invention: the workpiece 1, sprayed paint is positioned on hanging production line on one side, Factory Building upper space can be transported to carry out rotating back and forth drying, facility floor space can be used as other purposes, Appropriate application Factory Building upper space, reduces the carrying operation of workman; 2, the time of a circle treats dry required time consistency with workpiece priming paint back and forth, improves production efficiency.
Accompanying drawing explanation
Fig. 1 is the schematic top plan view of the framework of one embodiment of the present of invention and spray booth;
Fig. 2 is the schematic top plan view of the protecting wire net setting of one embodiment of the present of invention;
Fig. 3 is the structural representation of the upper part climbing track of one embodiment of the present of invention;
Fig. 4 is the structural representation of the hanging basket installation of one embodiment of the present of invention;
Fig. 5 is the structural representation of the spray booth of one embodiment of the present of invention.
Wherein, operation interval 1, hanging basket 2, carrier chain 3, drive motor 4, framework 5, protecting wire net 6, hanging rail 51, support 52, loads and unloads track 511, upper part climbing track 512, broken line type track 513, lower part climbing track 514, hangs parts 231, installs lacing film 232, arm 233, spray zone 11, air outlet 111, coating cloud cut-off equipment 12, emission-control equipment 13, refrigerating plant 14.
Detailed description of the invention
Technical scheme is further illustrated below in conjunction with accompanying drawing and by detailed description of the invention.
Dry hanging production line treated by a kind of priming paint, including the operation interval 1 for spraying paint, multiple hanging basket 2 for taking up workpiece, for hanging the carrier chain 3 of conveying, for providing the drive motor 4 of power and for the framework 5 of the whole production line of support;
The multistory frame structure that described framework 5 is made up of hanging rail 51 and support 52, described hanging rail 51 is connected to form by handling track 511, upper part climbing track 512, broken line type track 513 and lower part climbing track 514 head and the tail in order, as shown in Figure 3, described fold-line-shaped track 513 is arranged at the upper strata level of described framework 5, described handling track 511 is positioned at lower floor's level of described framework 5 and is arranged at the side of described operation interval 1, and the opposite side of described handling track 511 is inloading part district;
Described hanging basket 2 is hung on described carrier chain 3 by hanging parts 231 interval, and described carrier chain 3 is installed in the hanging rail 51 of described framework 5 and is driven the orbital cycle operating arranged along described hanging rail 51 to carry described hanging basket 2 by described drive motor 4;
The workpiece sprayed paint in described operation interval 1 is removed on the platform of the hanging basket 2 being put on described handling track 511, the superjacent air space of production line installation region is risen to through described upper part climbing track 512, dry in the transhipment of described superjacent air space through described broken line type track 513, decline return to described handling track 511 through described lower part track 514 of climbing after;
The flash-off time that described hanging basket 2 is required after spraying paint along the time that described hanging rail 51 fortune turns around no less than workpiece.
Priming paint treats that dry hanging production line is suitable in woodwork industry, is installed in the Factory Building of basecoat paint operation, the multistory frame structure that the framework 5 of main body is made up of hanging rail 51 and support 52. hanging basket 2 is hung on carrier chain 3 by the firm of hanging parts 231 interval, and carrier chain 3 is provided power to operate along hanging rail 51 by drive motor 4, and hanging basket 2 operates smoothly with carrier chain 3. as shown in Figure 1, workpiece can be moved up the handling track 511 being arranged on operation interval 1 side after completing the spraying of priming paint in operation interval 1, it is placed on the platform of the hanging basket 2 through loading and unloading track 511, rise through upper part climbing track 512 and climb in the upper strata level of framework 5, it is transported through drying at the broken line type track 513 being positioned at Factory Building superjacent air space, priming paint workpiece to be done is positioned at Factory Building superjacent air space and dries, thus having vacated the space of facility floor, the space vacated can be used for putting workpiece to be painted or becoming freight house or the processing operating area etc. of finished product, rationally and effectively utilize the upper space of Factory Building, save the land area of Factory Building, the workpiece simultaneously sprayed paint can directly be removed on the hanging basket 2 of the side being put on operation interval 1, transhipment is driven by carrier chain 3 and drive motor 4, it is placed on shelf dries without manually workpiece to be done being moved up the Factory Building that dries specified, save the labor intensity of carrying operation and workman, in addition, workpiece after spraying paint is in the upper flowing rotating back and forth in the air and accelerating surrounding air, priming paint is made to dry faster, shorten workpiece priming paint and treat the dry required time.
Workpiece is returned to, by lower part track 514 descending that declines of climbing, the handling track 511 being positioned at lower floor after having transported along broken line type track 513 space up, and the workpiece that priming paint has dried is removed to take in the inloading part district of the opposite side of handling track 511 by workman and transported. The flash-off time that hanging basket 2 is required after spraying paint along hanging rail 51 time of turning around of fortune no less than workpiece, thus workpiece in overhead back and forth distribution cycle one enclose priming paint and dries, and can be unloaded by workman, effective improve production and work efficiency.
Manufacturing procedure and placement are dried operation and are treated that dry hanging production line is reasonably distributed in the ground space of Factory Building and the aerial space on top by priming paint of the present invention, save required floor space, and the operation that workpiece is carried by workman midway can be saved, save artificial, improve efficiency.
Preferably, also including protecting wire net 6, described protecting wire net 6 is arranged at the separating surface of the upper and lower layer of described framework 5.
As shown in Figure 2, if workpiece or hanging basket 2 drop because putting bad or ectocine or installation error in the transport process that upper strata hanging is dried, separating surface at the upper and lower layer of framework 5 is provided with protecting wire net 6, the workpiece dropped or hanging basket 2 can be avoided from overhead to pound the workman fallen to the ground or the object put, improve the safety of production line, workpiece can also be reduced or difference in height that hanging basket 2 drops simultaneously, reduce workpiece or damaged degree that hanging basket 2 causes because dropping.
Preferably, described drive motor 4 is arranged no less than 2. The quantity of drive motor 4 is arranged according to the length of the transhipment distance needed for workpiece, it is ensured that carrier chain 3 has enough power to drive hanging basket 2 and workpiece along hanging rail 51 circulation rotating back and forth.
Preferably, described operation interval 1 is independent spray booth, and described operation interval 1 is at least provided with 1. Independent spray booth can provide independent operating area to spray paint to priming paint gunman, the quantity arranged can be arranged according to job requirements, once can hold in conjunction with production line and the quantity of transporting work pieces is arranged with speed, once can hold the many production lines of piece count and multiple independent spray booth can be set.
Preferably, described spray booth is provided with two spray zones 11 with opposite face, the opposite face of two described spray zones 11 is provided with coating cloud cut-off equipment 12, described spray booth be provided above emission-control equipment 13 and refrigerating plant 14, the Way in of described spray zone 11 be provided above air outlet 111.
As shown in Figure 5, one spray booth is provided with two spray zones 11 with opposite face, the operating area that two base coat gun handss offers are each independent can be given respectively, there is arranging of opposite face and can be used in conjunction with same emission-control equipment 13 and refrigerating plant 14, can have the ranking of better space. Air outlet 111 is arranged on the top of the Way in of spray zone 11, wind-force is provided to blow to spray zone 11 is internal by refrigerating plant 14, the coating cloud of surface of the work is not fallen under the impact of wind direction when making spray gun that workpiece to be sprayed paint, drop on the coating cloud device for trapping 12 being positioned at opposite face, effectively coating cloud is dammed, improve in spray booth and the air purity of whole Factory Building.
Preferably, as shown in Figure 4, described hanging basket 2 is the frame structure of triangular prism, wherein for carrying one of them parallelogram face that bottom is described triangular prism of workpiece. The frame structure of triangular prism can make hanging basket 2 steadily be hung on carrier chain 3 by hanging parts 231 by two equilibrium points of a wherein incline carry out hanging, the space that the frame structure of triangular prism takies is few, the space that can hold workpiece is big, is the preferred structure of hanging basket 2.
Preferably, the incline direction of described upper part climbing track 512 and described lower part climbing track 514 and the angle of vertical direction are no less than 60 °. If angle is too small, the gradient of upper part climbing track 512 and lower part climbing track 514 is big, is unfavorable for that hanging basket 2 rises climbing smoothly, makes hanging basket 2 be susceptible to rock, and workpiece is easily toppled over or drops. Therefore, the incline direction of upper part climbing track 512 and the angle of vertical direction are preferably no less than 60 °.
Preferably, the speed of service of described carrier chain 3 is 2m/min. The speed of service affects the stationarity of course of conveying hanging basket 2, and too fast meeting makes hanging basket 2 rock, and crosses the production efficiency that can affect again production line slowly. It is therefore preferable that the speed of service is 2m/min.
Preferably, described hanging parts 231 include installing lacing film 232 and arm 233, and one end of described installation lacing film is rotating is installed on described carrier chain 3, and the other end is connected to described hanging basket 2 by two described arms 233. Hanging parts 231 adopt two arms 232 to be connected with hanging basket 2, arm 232 set up that hanging basket 2 when making production line bring into operation or be out of service can be more stable transport along carrier chain 3 or stop.
Preferably, as shown in Figure 4, described carrier chain 3 is arranged at intervals with multiple installation lacing film 232, and described interval is less than the spacing distance between each described hanging basket 2.Being provided with multiple installation lacing film 232, install the interval between lacing film 232 less than the spacing distance between each hanging basket 2, can arbitrarily adjust the spacing between each hanging basket 2, mounting and adjusting is high.
The know-why of the present invention is described above in association with specific embodiment. These descriptions are intended merely to explanation principles of the invention, and can not be construed to limiting the scope of the invention by any way. Based on explanation herein, those skilled in the art need not pay performing creative labour can associate other detailed description of the invention of the present invention, and these modes fall within protection scope of the present invention.

Claims (10)

1. dry hanging production line treated by a priming paint, it is characterised in that: include the operation interval for spraying paint, multiple hanging basket for taking up workpiece, for hanging the carrier chain of conveying, for providing the drive motor of power and for the framework of the whole production line of support;
The multistory frame structure that described framework is made up of hanging rail and support, described hanging rail is connected to form by loading and unloading track, upper part climbing track, broken line type track and lower part climbing track head and the tail in order, described fold-line-shaped track is arranged at the upper strata level of described framework, described handling track is positioned at lower floor's level of described framework and is arranged at the side of described operation interval, and the opposite side of described handling track is inloading part district;
Described hanging basket is hung on described carrier chain by hanging parts space, and described carrier chain is installed in the hanging rail of described framework and is driven the orbital cycle operating arranged along described hanging rail to carry described hanging basket by described drive motor;
The workpiece sprayed paint in described operation interval is removed on the platform of the hanging basket being put on described handling track, the superjacent air space of production line installation region is risen to through described upper part climbing track, dry in the transhipment of described superjacent air space through described broken line type track, decline return to described handling track through described lower part track of climbing after;
The flash-off time that described hanging basket is required after spraying paint along the time that described hanging rail fortune turns around no less than workpiece.
2. dry hanging production line treated by priming paint according to claim 1, it is characterised in that: also including protecting wire net, described protecting wire net is arranged at the separating surface of the upper and lower layer of described framework.
3. dry hanging production line treated by priming paint according to claim 1, it is characterised in that: described drive motor is arranged no less than 2.
4. dry hanging production line treated by priming paint according to claim 1, it is characterised in that: described operation interval is independent spray booth, and described operation interval is at least provided with 1.
5. dry hanging production line treated by priming paint according to claim 4, it is characterized in that: described spray booth is provided with two spray zones with opposite face, the opposite face of two described spray zones is provided with coating cloud cut-off equipment, described spray booth be provided above emission-control equipment and refrigerating plant, the Way in of described spray zone be provided above air outlet.
6. dry hanging production line treated by priming paint according to claim 1, it is characterised in that: described hanging basket is the frame structure of triangular prism, wherein for carrying one of them parallelogram face that bottom is described triangular prism of workpiece.
7. dry hanging production line treated by priming paint according to claim 1, it is characterised in that: the incline direction of described upper part climbing track and described lower part climbing track and the angle of vertical direction are no less than 60 °.
8. dry hanging production line treated by priming paint according to claim 1, it is characterised in that: the speed of service of described carrier chain is 2m/min.
9. dry hanging production line treated by priming paint according to claim 1, it is characterized in that: described hanging parts include installing lacing film and arm, one end of described installation lacing film is rotating is installed on described carrier chain, and the other end is connected to described hanging basket by two described arms.
10. dry hanging production line treated by priming paint according to claim 9, it is characterised in that: described carrier chain is arranged at intervals with multiple installation lacing film, and described interval is less than the spacing distance between each described hanging basket.
CN201410503851.8A 2014-09-26 2014-09-26 Dry hanging production line treated by a kind of priming paint Active CN104289353B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410503851.8A CN104289353B (en) 2014-09-26 2014-09-26 Dry hanging production line treated by a kind of priming paint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410503851.8A CN104289353B (en) 2014-09-26 2014-09-26 Dry hanging production line treated by a kind of priming paint

Publications (2)

Publication Number Publication Date
CN104289353A CN104289353A (en) 2015-01-21
CN104289353B true CN104289353B (en) 2016-06-15

Family

ID=52309438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410503851.8A Active CN104289353B (en) 2014-09-26 2014-09-26 Dry hanging production line treated by a kind of priming paint

Country Status (1)

Country Link
CN (1) CN104289353B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112642627A (en) * 2020-12-16 2021-04-13 江西永洁科技集团有限公司 Aluminum veneer goods sprays paint and dries integrated device
CN114453181B (en) * 2022-02-21 2022-11-15 江苏龙净科杰环保技术有限公司 Novel catalyst iron box spray booth

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11319655A (en) * 1998-05-11 1999-11-24 Mitsubishi Heavy Ind Ltd Small member coating line equipment
CN102407202A (en) * 2011-08-31 2012-04-11 无锡先锋电机有限公司 Assembly line for spraying paint on surface of motor
CN202516729U (en) * 2012-04-10 2012-11-07 易星烁 Full-automatic spraying mechanism
CN203184138U (en) * 2013-05-02 2013-09-11 乌海市弘日电力环境技术有限责任公司 Device used for cage skeleton electrostatic spraying
CN204074371U (en) * 2014-09-26 2015-01-07 佛山市浪鲸洁具有限公司 Dry hanging production line treated by a kind of priming paint

Also Published As

Publication number Publication date
CN104289353A (en) 2015-01-21

Similar Documents

Publication Publication Date Title
US11440041B2 (en) Stations for treating motor-vehicle bodies and/or motor-vehicle components
CN203991194U (en) A kind of full-automatic spraying production line
KR101646502B1 (en) Painting system for painting objects to be painted
EP1033176A2 (en) Method and plant for the painting of wooden doors and windows or the like
CN104289353B (en) Dry hanging production line treated by a kind of priming paint
CN202238445U (en) Coating line configuration structure of bogie parts
ES2638688T3 (en) Powder coating system for elements of considerable length to be coated
CN105252526B (en) Robot painting's production line
KR101585493B1 (en) Powder coating method, powder coating device and guardrail manufactured by using same
CN205659845U (en) Rock wool automatic spraying production line
CN105921347A (en) Plywood production line with paint spraying device and control method
KR101185074B1 (en) Hoist facilities are equipped with the traverse-type paint coating equipment
CN107486353A (en) A kind of paint line for wheel and axletree
ES2340728T3 (en) METHOD AND SPRAY COATING SYSTEM FOR CAN BODIES.
CN204074371U (en) Dry hanging production line treated by a kind of priming paint
CN206075126U (en) The control system of flexible paint line
CN104437938B (en) One is fluorocarbon-sprayed gets plate automatic spraying equipment ready
CN210935707U (en) Gumming device is used in PLASTIC LAMINATED production
WO2004103573A1 (en) Electrostatic-painting system for metallic manufactured articles and associated method
CN219313740U (en) Suspension type storage structure and coating production line comprising same
CN210496928U (en) Spraying equipment applied to cable bridge anticorrosive coating
CN210312212U (en) Full-automatic production system with high space utilization rate for manufacturing wooden furniture
JPH11319655A (en) Small member coating line equipment
CN218655053U (en) Spraying drying device is used in insulation material processing
CN104128288B (en) Three layers of water curtain spray room

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant