CN204063253U - Extremely frigid zones coal mining machine repair shop large workshop heating system - Google Patents
Extremely frigid zones coal mining machine repair shop large workshop heating system Download PDFInfo
- Publication number
- CN204063253U CN204063253U CN201420493774.8U CN201420493774U CN204063253U CN 204063253 U CN204063253 U CN 204063253U CN 201420493774 U CN201420493774 U CN 201420493774U CN 204063253 U CN204063253 U CN 204063253U
- Authority
- CN
- China
- Prior art keywords
- mining machine
- coal mining
- repair shop
- heating system
- machine repair
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Curtains And Furnishings For Windows Or Doors (AREA)
Abstract
The utility model discloses a kind of extremely frigid zones coal mining machine repair shop large workshop heating system, comprise hot-water radiant's plate (1), warm air curtain (2) and radiator (3); Described hot-water radiant's plate (1) is in a row lifted on the end face of factory building, by the surface of object in heat radiation heating factory building; Described radiator (3) is arranged on the below of each plant window (4) respectively, the cold wind that barrier window extravasates into; Described warm air curtain (2) wall hanging directly over plant gate (5), with plant gate (5) Simultaneous Switching, the cold wind entered outside barrier door.Do not causing air agitation and under the prerequisite of factory building top heat accumulation, met the heating requirement of coal mining machine repair shop factory building large space by the intrusion and heat radiation heating body surface stoping factory building building enclosure place cold wind.
Description
Technical field
The utility model relates to a kind of large workshop heating system, is particularly useful for the coal mining machine repair shop of extremely frigid zones.
Background technology
At present, the factory building of extremely frigid zones coal mining machine repair shop has the large and high feature in space, and its heat supply in winter problem is a difficult problem for industry always, as: 1, building enclosure is poor, and daylighting window is more, and gate area is large, unlatching is frequent; 2, freeze district, maintenance area, maintenance shop has flue dust to produce, and should not have distinguished and admirable disturbance; Maintenance shop is for often to have people workspace, and temperature should maintain 15 degree Celsius, and person works interval does not have the uncomfortable situations such as wind disturbance.
The heating system that existing large workshop adopts is various, but all there is certain shortcoming, can not meet the requirement used completely.As: 1, radiator cross-ventilation heating system, heat accumulation factory building top/bottom part, factory building bottom temp is difficult to satisfied temperature requirement, causes energy dissipation; 2, thermal cycle heating system forced by warm-air drier, is not suitable for flue dust district; 3, gas-fired radiation plate limits by coal field gas supply and cost, and newly-increased gas storage dangerous matter sources management cost increases, and is difficult to promote the use of; 4, electric heating air curtain stops cold wind, often opens electricity large; As instantaneous starting air-out is not hot, poor effect.
Summary of the invention
For above-mentioned existing technical problem, the utility model provides a kind of extremely frigid zones coal mining machine repair shop large workshop heating system, the heating system of the hot water-warming air curtain linked by radiator and Electrically operated gate under furred ceiling low temperature hot water radiation plate, window, to meet the heating requirement of factory building regional.
A kind of extremely frigid zones coal mining machine repair shop large workshop heating system that the utility model provides, comprises hot-water radiant's plate, warm air curtain and radiator.
Described hot-water radiant's plate is in a row lifted on the end face of factory building, a lot of heating curtain wall is established as at factory building end face, the problem that the heat caused to solve cross-ventilation heating system is assembled on factory building top, body surface in factory building is heated when not disturbance air by heat radiation, make empty calory accumulation regions, factory building top, and the temperature that improve bottom factory building, avoid the waste of energy.During further installation, described hot-water radiant's plate adopts reversed return type or DRS formula link system; And be positioned at the top of indoor purlin car, run not affect purlin car; And stagger with indoor illumination light fitting, to avoid roof lighting plate, light fixture etc., do not affect the daylighting in factory building.
Described radiator fin is arranged on the below of each plant window respectively, as the curtain wall setting up heating in factory building surrounding, more mainly for extremely frigid zones coal mining machine repair shop factory building daylighting window, gate area is large, open feature frequently, stops the cold wind that each plant window extravasates into respectively.Further, described radiator is hot-water heating or steam heating radiator; Adopt reversed return type or direct return system wall hanging or installation of landing.Achieve without air agitation in factory building district, adapt to exhaust gas dust environment, and avoid the high cost of combustion gas resource, be applicable to coal mining machine repair shop have freeze, the feature in dust district.
Described warm air curtain wall hanging is directly over plant gate, and start when plant gate is opened, the cold wind entered outside barrier door, avoids electric heating air curtain and often open the large problem of electricity.Further, plant gate is Electrically operated gate, is electrically connected by linked switch with warm air curtain.Warm air curtain also starts with plant gate electric shaft, the cold wind entered during to stop that plant gate is opened.Further, described warm air curtain is hot-water heating or steam heating warm air curtain.
Described hot-water radiant's plate, warm air curtain and radiator can adopt different thermals source respectively, also can wherein two share thermals source.Preferably, three shares same thermal source, so, just can utilize mining area heating boiler, makes full use of existing hot water heating thermal source, and does not need separately to build gasholder station to provide thermal source.
In sum, this heating system is under the prerequisite not causing air agitation, factory building top heat accumulation, and by stoping, factory building building enclosure cold wind invades, heat radiation heating body surface meets coal mining machine repair shop factory building large space heating requirement.Because not causing air agitation in heating process, meeting large workshop workspace flue dust, dust produces district's heating, not because heating causes exhaust gas dust to spread.And radiator fin is arranged on the below of each plant window respectively, the outer cold wind of barrier window invades, and factory building Electrically operated gate united opening closes warm air curtain, stops that gate cold wind invades.More can meet coal mining machine repair shop factory building large space heating requirement than existing heating system, and be easy to implement, remarkably productive.
Accompanying drawing explanation
Fig. 1 is the front view of the utility model in factory building mounting arrangement;
Fig. 2 is the side view of the utility model in factory building mounting arrangement;
Fig. 3 be in the utility model furred ceiling low temperature hot water radiation plate at the top view of factory building mounting arrangement;
Fig. 4 be in the utility model hot-water heating warm air curtain and hot water radiation at the top view of factory building mounting arrangement;
In figure: 1, hot-water radiant's plate, 2, warm air curtain, 3, radiator, 4, plant window, 5, plant gate.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model will be further described.
As depicted in figs. 1 and 2, this heating system comprises hot-water radiant's plate 1, warm air curtain 2 and radiator 3, can install during use by following embodiment.
As shown in Figure 3, hot-water radiant's plate 1 adopts reversed return type or DRS formula link system installation of ceiling in a row at factory building end face, is positioned at the top of indoor purlin car, does not so just affect the operation of purlin car; Further, lighting will be arranged between two blocks of hot-water radiant's plates 1, lamp holder or higher than hot-water radiant's plate 1 or lower than hot-water radiant's plate 1, does not affect plant lamp illumination just.
As shown in Figure 4, radiator 3 adopts hot-water heating or steam heating radiator, is arranged on the below of each plant window 4 respectively, with reversed return type or direct return system wall hanging or installation of landing.
As shown in Figure 1 and Figure 4, warm air curtain 2 adopts hot-water heating or steam heating warm air curtain, is arranged on directly over plant gate 5, is connected the electric pull/push door of factory building by linked switch.
About the thermal source of heating, first consider mining area heating boiler, hot-water radiant's plate 1, hot-water heating warm air curtain 2 and hot water radiation 3 share this thermal source, and now the Inlet and outlet water temperature of three is 110-90 DEG C.Also according to actual conditions, can select different thermals source, the Inlet and outlet water temperature of each parts adjusts according to actual conditions.Such as hot-water radiant's plate 1 boiler heat source, hot-water heating warm air curtain 2 and hot water radiation 3 share another thermal source, and as heat exchange station, both Inlet and outlet water temperature can be designed as 95 DEG C of water inlets, the backwater of 75 DEG C.If there is steam source, radiator 3 and warm air curtain 2 also can be designed to steam heating type.
During use, the radiator 3 installed below each plant window 4, can not only invade by the outer cold wind of barrier window, and due to the mode of convection heating, heat can assemble factory building top, now hot-water radiant's plate 1 heats body surface in factory building by heat radiation when not disturbance air, the temperature of balance factory building inner top and bottom, increases the comfortableness of workman.Meanwhile, if there is workman to pass in and out factory building, when plant gate 5 is opened, then warm air curtain 2 can be opened instantaneously, sends warm braw and stops that gate enters cold wind.So, the heating effect bottom plant gate 5, plant window 4 and factory building just can be strengthened, simultaneously can not disturbance air, be applicable to the Production Regional of coal mining machine repair shop.
Claims (9)
1. an extremely frigid zones coal mining machine repair shop large workshop heating system, is characterized in that, comprises hot-water radiant's plate (1), warm air curtain (2) and radiator (3); Described hot-water radiant's plate (1) is in a row lifted on the end face of factory building, by the surface of object in heat radiation heating factory building; Described radiator (3) is arranged on the below of each plant window (4) respectively, the cold wind that barrier window extravasates into; Described warm air curtain (2) wall hanging directly over plant gate (5), with plant gate (5) Simultaneous Switching, the cold wind entered outside barrier door.
2. a kind of extremely frigid zones coal mining machine repair shop large workshop heating system according to claim 1, is characterized in that, described hot-water radiant's plate (1) adopts reversed return type or DRS formula link system.
3. a kind of extremely frigid zones coal mining machine repair shop large workshop heating system according to claim 2, it is characterized in that, described hot-water radiant's plate (1) is positioned at the top of indoor purlin car, and staggers with indoor illumination light fitting.
4. a kind of extremely frigid zones coal mining machine repair shop large workshop heating system according to claim 1 and 2, it is characterized in that, described plant gate (5) is Electrically operated gate, is electrically connected by linked switch with warm air curtain (2).
5. a kind of extremely frigid zones coal mining machine repair shop large workshop heating system according to claim 4, it is characterized in that, described warm air curtain (2) is hot-water heating or steam heating warm air curtain.
6. a kind of extremely frigid zones coal mining machine repair shop large workshop heating system according to claim 1 and 2, it is characterized in that, described radiator (3) is hot-water heating or steam heating radiator.
7. a kind of extremely frigid zones coal mining machine repair shop large workshop heating system according to claim 6, is characterized in that, described radiator (3) adopts reversed return type or direct return system wall hanging or installation of landing.
8. a kind of extremely frigid zones coal mining machine repair shop large workshop heating system according to claim 1 and 2, it is characterized in that, described hot-water radiant's plate (1), warm air curtain (2) and radiator (3) share same thermal source.
9. a kind of extremely frigid zones coal mining machine repair shop large workshop heating system according to claim 1 and 2, it is characterized in that, a thermal source used by described hot-water radiant's plate (1), and warm air curtain (2) and radiator (3) share another thermal source.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420493774.8U CN204063253U (en) | 2014-08-29 | 2014-08-29 | Extremely frigid zones coal mining machine repair shop large workshop heating system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420493774.8U CN204063253U (en) | 2014-08-29 | 2014-08-29 | Extremely frigid zones coal mining machine repair shop large workshop heating system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204063253U true CN204063253U (en) | 2014-12-31 |
Family
ID=52204754
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420493774.8U Expired - Fee Related CN204063253U (en) | 2014-08-29 | 2014-08-29 | Extremely frigid zones coal mining machine repair shop large workshop heating system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204063253U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111780213A (en) * | 2020-07-31 | 2020-10-16 | 山西得然环境科技有限公司 | Heating system for tall factory building |
-
2014
- 2014-08-29 CN CN201420493774.8U patent/CN204063253U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111780213A (en) * | 2020-07-31 | 2020-10-16 | 山西得然环境科技有限公司 | Heating system for tall factory building |
CN111780213B (en) * | 2020-07-31 | 2024-01-02 | 山西得然环境科技有限公司 | Heating system for large factory building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205174787U (en) | Gas heating water heater of formula of burning by stage | |
CN204063253U (en) | Extremely frigid zones coal mining machine repair shop large workshop heating system | |
CN105865042A (en) | Solar air heating device and heating method | |
CN201636967U (en) | Far-infrared radiation convection heater | |
CN204693673U (en) | Semiconductor refrigerating module and smoke exhaust ventilator | |
RU144388U1 (en) | INSTALLATION FOR HOT WATER SUPPLY SYSTEM | |
CN106016421A (en) | Conduction oil roof radiation heating system with fresh air preheating function | |
CN202757185U (en) | Device for decreasing vertical temperature gradient difference of high raising-of-truss industrial factory building | |
CN204268626U (en) | A kind of cold district central air-conditioning VMC | |
CN202660734U (en) | Mining heater unit | |
CN205619407U (en) | Radiant heating system | |
CN105805798A (en) | Bottom mounting method of semiconductor refrigeration module | |
CN203798021U (en) | Non-electric refrigerating and heating fire emergency system | |
CN204693887U (en) | Semiconductor refrigerating module and smoke exhaust ventilator | |
CN204285585U (en) | A kind of separation-type and modularized heat-preserving equipment | |
CN204268642U (en) | The ventilation unit of intelligent building | |
CN201259262Y (en) | Indoor temperature regulator | |
CN107990642A (en) | A kind of heat conducting oil type solar energy drying kiln | |
CN203869142U (en) | Solar air collector type heating system | |
CN203629260U (en) | Straight-through type drying furnace with air curtain system | |
CN202973544U (en) | Heat exchanger of electric boiler | |
CN201569106U (en) | Mining door warm air curtain | |
CN202066194U (en) | Radiating pan type hot air boiler | |
CN204388193U (en) | A kind of warmer with spring leaf | |
CN201083438Y (en) | Highly effective energy-saving horizontal type warm air furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141231 Termination date: 20170829 |
|
CF01 | Termination of patent right due to non-payment of annual fee |