CN204059345U - Preformed pile casing method syndeton - Google Patents

Preformed pile casing method syndeton Download PDF

Info

Publication number
CN204059345U
CN204059345U CN201420517768.1U CN201420517768U CN204059345U CN 204059345 U CN204059345 U CN 204059345U CN 201420517768 U CN201420517768 U CN 201420517768U CN 204059345 U CN204059345 U CN 204059345U
Authority
CN
China
Prior art keywords
pile
tube
thin wall
casing
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420517768.1U
Other languages
Chinese (zh)
Inventor
荣海生
葛锦玲
纪雷
丰星化
陈文新
李凡刚
胡浩
朱志华
李慧荣
王子龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Traffic Construction Ltd By Share Ltd
Original Assignee
Anhui Gourgen Traffic Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Gourgen Traffic Construction Co Ltd filed Critical Anhui Gourgen Traffic Construction Co Ltd
Priority to CN201420517768.1U priority Critical patent/CN204059345U/en
Application granted granted Critical
Publication of CN204059345U publication Critical patent/CN204059345U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of preformed pile casing method syndeton, comprise thin wall steel tube concrete pile tube, prestressed concrete pipe pile, for connecting the separated steel casing of thin wall steel tube concrete pile tube and prestressed concrete pipe pile; Reserve connecting hole in the end of prestressed concrete pipe pile, reserve steel column in the end of thin wall steel tube concrete pile tube, the size of connecting hole and steel column, quantity, size are all mated; Described separated steel casing comprise two closed after rounded annulus, arrange median septum at separated steel casing inner vertical, reserved through hole on median septum, aperture, the quantity of through hole and connecting hole are consistent; At the upper and lower of separated steel casing sidewall, median septum, evenly bolt hole is set, at thin wall steel tube concrete pile tube, prestressed concrete pipe pile sidewall, the bolt hole consistent with the bolt hole distribution mode of separated steel casing sidewall and aperture is all set near the position of end.The utility model has that connection speed is fast, intensity advantages of higher.

Description

Preformed pile casing method syndeton
Technical field
The utility model relates to a kind of preformed pile casing method syndeton, the particularly syndeton of a kind of prestressed concrete pipe pile and thin wall steel tube concrete pile tube.
Background technology
At present, in many work progresss, pile tube is prefabricated and construction splicing at the scene, pile extension technology affects larger on the bending resistance at its pile extension position and breakout capacity, in production and transport and construction, because single stake is long shorter, design and construction need pile for prestressed pipe more piece pile driving construction, on-the-spot pile extension, and this just produces the problem of tubular pile splicing.The quality of pile extension technology, pile extension type and pile extension quality also have impact on its bearing capacity level and overall lateral resistance to a certain extent.
Pile extension in China's present stage foundation pile construction mainly welding and slurry anchor method, welding is owing to being site operation, can not meet that end plate end face needs to clear up, stitching portion groove groove electric welding needs that three layers of symmetry are carried out, pile joint that weld seam needs full, welding to complete could the regulation such as pile sinking continuously after needing nature to cool, thus cause welding quality not ensure, pile extension is insecure, causes preformed pile junction to become the weakest link of foundation pile.Dowel is inserted reserving rib hole by slurry anchor method, mention joint pile body again, install clamp of constructing, and in muscle hole, pour into the sulphide mastic dissolved, then upper joint stake is fallen, when sulphide mastic cooling also Demolition Construction clamp, when using slurry anchor method to connect, connecting portion intensity often can not meet design requirement, and shear resistance is poor, also can become the comparison weak link of foundation pile.
In order to solve the problem, need a kind of bonding strength of invention at present badly high, bearing capacity is high, and stability is strong, easy for installation, the preformed pile casing method syndeton of reliable in quality, to meet the pile extension requirement of strength improved constantly.
Summary of the invention
In order to improve integrated carrying ability and the shear resistance of preformed pile syndeton, the utility model provides a kind of pile body syndeton with median septum separated steel casing, good connecting effect, and shear resistance is strong, and structural safety is reliable.
In order to realize above-mentioned technical purpose, the utility model have employed following technical scheme:
Preformed pile casing method syndeton, mainly comprise thin wall steel tube concrete pile tube, prestressed concrete pipe pile, for connecting the separated steel casing of thin wall steel tube concrete pile tube and prestressed concrete pipe pile;
Reserve connecting hole in the end of prestressed concrete pipe pile, reserve steel column in the end of thin wall steel tube concrete pile tube, the size of connecting hole and steel column, quantity, size are all mated;
Described separated steel casing comprise two closed after rounded annulus, arrange median septum at separated steel casing inner vertical, reserved through hole on median septum, aperture, the quantity of through hole and connecting hole are consistent;
At the upper and lower of separated steel casing sidewall, median septum, evenly bolt hole is set, at thin wall steel tube concrete pile tube, prestressed concrete pipe pile sidewall, the bolt hole consistent with the bolt hole distribution mode of separated steel casing sidewall and aperture is all set near the position of end;
Then thin wall steel tube concrete pile tube, prestressed concrete pipe pile insert prestressed concrete pipe pile by the through hole steel column of thin wall steel tube concrete pipe pile end portion being passed separated steel casing median septum and carry out being fixedly connected with of horizontal direction, and carry out being fixedly connected with of vertical direction by the bolt hole of bolt insertion thin wall steel tube concrete pile tube, prestressed concrete pipe pile, separated steel casing sidewall.
Aforesaid preformed pile casing method syndeton, is also socketed with cuff in the periphery of separated steel casing;
Aforesaid preformed pile casing method syndeton, the caliber of the width that described median septum extends in the horizontal direction and prestressed concrete pipe pile or thin wall steel tube concrete pile tube is close;
Aforesaid preformed pile casing method syndeton, described cuff quantity is two, is separately positioned on the outside of prestressed concrete pipe pile and thin wall steel tube concrete pile tube during layout;
Described separated steel casing comprise two closed after the rounded and semicircular ring of symmetrical configuration.
The utility model has following feature and beneficial effect:
(1) give prominence to steel column by top pile body and bottom pile body reserves being connected of connecting hole, recycle appropriate cementing agent and assisted bonding, effectively enhance the shear resistance of pile body.
(2) median septum of separated steel casing arranges through hole, and top pile body is given prominence to steel column and run through through hole, enhances the globality between pile body and steel pile casting and stability.
(3) side is by the fixedly separated formula steel pile casting of dormant bolt and pile body, and recycling cuff, by separated steel casing banding, effectively improves the intensity of pile body connecting portion.
(4) the utility model structure is simple, easy for installation.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the utility model preformed pile casing method syndeton;
Fig. 2 is the profile of the utility model preformed pile casing method syndeton;
Fig. 3 is the structural representation of separated steel casing;
Fig. 4 is the decomposing schematic representation of the utility model preformed pile casing method syndeton.
In figure: 1-thin wall steel tube concrete pile tube, 2-bolt hole, 3-steel column, 4-separated steel casing, 5-through hole, 6-bolt hole, 7-median septum, 8-connecting hole, 9-bolt hole, 10-prestressed concrete pipe pile, 11-cuff, 12-bolt.
Detailed description of the invention
Concrete tubular pile design parameters and construction technical requirement, the welding procedure etc. of steel pile casting, repeats no more in present embodiment, and emphasis sets forth the embodiment that the utility model relates to structure.
Fig. 1 is the schematic diagram of the utility model preformed pile casing method syndeton; Fig. 2 is the profile of the utility model preformed pile casing method syndeton; Fig. 3 is the structural representation of separated steel casing; Fig. 4 is the decomposing schematic representation of the utility model preformed pile casing method syndeton.Shown in figure 1, Fig. 2, Fig. 3 and Fig. 4, preformed pile casing method syndeton, mainly comprising thin wall steel tube concrete pile tube 1, prestressed concrete pipe pile 10, for connecting the separated steel casing 4 of thin wall steel tube concrete pile tube 1 and prestressed concrete pipe pile 10, and being enclosed within the cuff 11 of separated steel casing 4 periphery.
Connecting hole 8 is reserved in the end of prestressed concrete pipe pile 10, steel column 3 is reserved in the end of thin wall steel tube concrete pile tube 1, the size of connecting hole 8 and steel column 3, quantity, size are all mated, and mode steel column 3 being inserted connecting hole 8 can be adopted to strengthen fixing when connecting prestressed concrete pipe pile 10 and thin wall steel tube concrete pile tube 1.When needs thin wall steel tube concrete pile tube 1 two ends all connect prestressed concrete pipe pile 10, steel column 3 can be all set at the two ends of thin wall steel tube concrete pile tube 1.
Separated steel casing 4 is the semicircular ring of two symmetrical configuration, at separated steel casing 4 inner vertical, median septum 7 is set, the caliber of the width that median septum extends in the horizontal direction and prestressed concrete pipe pile 10 or thin wall steel tube concrete pile tube 1 is close, reserved through hole 5 on median septum 7, aperture, the quantity of through hole 5 and connecting hole 8 are consistent.At the upper and lower of separated steel casing 4 sidewall, median septum, bolt hole 6 is evenly set.At thin wall steel tube concrete pile tube 1, prestressed concrete pipe pile 10 sidewall, bolt hole 2 and bolt hole 9 are set respectively near the position of end.Bolt hole 6, bolt hole 2 are consistent with aperture with the distribution mode of bolt hole 9.Three's bolt is convenient to fix.
During connection, first the through hole 5 of separated steel casing 4 can be overlapped with the connecting hole 8 of prestressed concrete pipe pile 10, then the steel column 3 of thin wall steel tube concrete pile tube 1 end is inserted in connecting hole 8 through after through hole 5, after bolt hole 6, bolt hole 2 and bolt hole 9 being alignd, adopt screw bolt reinforcing.
embodiment 1
Prestressed concrete pipe pile 10 external diameter 400mm, wall thickness 90mm, concrete strength C80, save long 12m; Separated steel casing employing Q345 steel are prefabricated to be formed, and internal diameter is slightly larger than the external diameter of prestressed concrete pipe pile 10; Top thin wall steel tube concrete pile tube 1 skin is the Q345B thin-wall steel tube that 6mm is thick, internal layer is external diameter 394mm, wall thickness 87mm, intensity are the concrete of C80, save long 12m, steel column 3 is reserved for long 80mm in bottom, diameter is about the Q345 steel of 20mm, use is hung stake machinery and is vertically hung above prestressed concrete pipe pile 10, appropriate cementing agent is added in connecting hole 8, steel column 3 and connecting hole 8 are aimed at, and after reaching concentricity and verticality requirement, make the through hole 5 that reserved steel column 3 runs through on median septum 7 insert connecting hole 8.Pile body vertically connects the fixedly separated formula steel pile casting of mode, prestressed concrete pipe pile 10, the thin wall steel tube concrete pile tube 1 that rear employing dormant bolt inserting bolt hole reinforces, and then uses cuff 12 from steel pile casting about 4 both direction banding.

Claims (5)

1. preformed pile casing method syndeton, it is characterized in that mainly comprising thin wall steel tube concrete pile tube, prestressed concrete pipe pile, for connecting the separated steel casing of thin wall steel tube concrete pile tube and prestressed concrete pipe pile;
Reserve connecting hole in the end of prestressed concrete pipe pile, reserve steel column in the end of thin wall steel tube concrete pile tube, the size of connecting hole and steel column, quantity, size are all mated;
Described separated steel casing comprise two closed after rounded annulus, arrange median septum at separated steel casing inner vertical, reserved through hole on median septum, aperture, the quantity of through hole and connecting hole are consistent;
At the upper and lower of separated steel casing sidewall, median septum, evenly bolt hole is set, at thin wall steel tube concrete pile tube, prestressed concrete pipe pile sidewall, the bolt hole consistent with the bolt hole distribution mode of separated steel casing sidewall and aperture is all set near the position of end;
Then thin wall steel tube concrete pile tube, prestressed concrete pipe pile insert prestressed concrete pipe pile by the through hole steel column of thin wall steel tube concrete pipe pile end portion being passed separated steel casing median septum and carry out being fixedly connected with of horizontal direction, and carry out being fixedly connected with of vertical direction by the bolt hole of bolt insertion thin wall steel tube concrete pile tube, prestressed concrete pipe pile, separated steel casing sidewall.
2. preformed pile casing method syndeton according to claim 1, is characterized in that also being socketed with cuff in the periphery of separated steel casing.
3. preformed pile casing method syndeton according to claim 1, is characterized in that the caliber of the width that described median septum extends in the horizontal direction and prestressed concrete pipe pile or thin wall steel tube concrete pile tube is close.
4. preformed pile casing method syndeton according to claim 1, is characterized in that described cuff quantity is two, is separately positioned on the outside of prestressed concrete pipe pile and thin wall steel tube concrete pile tube during layout.
5. preformed pile casing method syndeton according to claim 1, it is characterized in that described separated steel casing comprise two closed after the rounded and semicircular ring of symmetrical configuration.
CN201420517768.1U 2014-09-10 2014-09-10 Preformed pile casing method syndeton Active CN204059345U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420517768.1U CN204059345U (en) 2014-09-10 2014-09-10 Preformed pile casing method syndeton

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420517768.1U CN204059345U (en) 2014-09-10 2014-09-10 Preformed pile casing method syndeton

Publications (1)

Publication Number Publication Date
CN204059345U true CN204059345U (en) 2014-12-31

Family

ID=52200889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420517768.1U Active CN204059345U (en) 2014-09-10 2014-09-10 Preformed pile casing method syndeton

Country Status (1)

Country Link
CN (1) CN204059345U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113639A (en) * 2015-07-06 2015-12-02 清华大学 Connector with prefabricated steel pipe concrete beam segment and connecting method thereof
CN106759304A (en) * 2017-03-23 2017-05-31 广州市建筑科学研究院新技术开发中心有限公司 A kind of new Quick Connect Kit and method for drilling follow pile tube
CN108661045A (en) * 2018-07-20 2018-10-16 东北大学 A kind of prefabricated GFRP pipe concretes spliced pile
CN108867636A (en) * 2018-07-09 2018-11-23 贵州新联爆破工程集团有限公司 A kind of prefabricated retaining wall device for manual hole digging pile
CN111395326A (en) * 2020-03-31 2020-07-10 安徽建筑大学 Connecting structure between adjacent pile sections of thin-walled tubular pile
CN111639733A (en) * 2020-04-10 2020-09-08 宁波子晨网络科技有限公司 Installation method of prestressed concrete pipe pile electronic identity tag and management method of prestressed concrete pipe pile electronic identity
CN112459052A (en) * 2020-10-21 2021-03-09 中国一冶集团有限公司 Pile extension device for prestressed concrete solid square pile
CN115324036A (en) * 2022-09-01 2022-11-11 建华建材(中国)有限公司 Pile end plate manufacturing method, pile end plate, pile and pile connecting structure

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113639A (en) * 2015-07-06 2015-12-02 清华大学 Connector with prefabricated steel pipe concrete beam segment and connecting method thereof
CN106759304A (en) * 2017-03-23 2017-05-31 广州市建筑科学研究院新技术开发中心有限公司 A kind of new Quick Connect Kit and method for drilling follow pile tube
CN108867636A (en) * 2018-07-09 2018-11-23 贵州新联爆破工程集团有限公司 A kind of prefabricated retaining wall device for manual hole digging pile
CN108661045A (en) * 2018-07-20 2018-10-16 东北大学 A kind of prefabricated GFRP pipe concretes spliced pile
CN108661045B (en) * 2018-07-20 2023-11-24 东北大学 Precast GFRP pipe concrete spliced pile
CN111395326A (en) * 2020-03-31 2020-07-10 安徽建筑大学 Connecting structure between adjacent pile sections of thin-walled tubular pile
CN111639733A (en) * 2020-04-10 2020-09-08 宁波子晨网络科技有限公司 Installation method of prestressed concrete pipe pile electronic identity tag and management method of prestressed concrete pipe pile electronic identity
CN111639733B (en) * 2020-04-10 2024-03-19 宁波子晨网络科技有限公司 Installation method and management method of electronic identity tag of prestressed concrete pipe pile
CN112459052A (en) * 2020-10-21 2021-03-09 中国一冶集团有限公司 Pile extension device for prestressed concrete solid square pile
CN115324036A (en) * 2022-09-01 2022-11-11 建华建材(中国)有限公司 Pile end plate manufacturing method, pile end plate, pile and pile connecting structure

Similar Documents

Publication Publication Date Title
CN204059345U (en) Preformed pile casing method syndeton
CN204112604U (en) The slip casting rebar connector of band cone tail
CN103452246B (en) The grouting deformed steel pipe box cylinder that the slurry anchor docking of a kind of reinforcing bar connects
CN107905455A (en) A kind of precast concrete bar connecting grout sleeve and preparation method thereof
CN203729498U (en) Vertical reinforcement-steel sleeve but joint connection structure of assembled wall
CN206769051U (en) A kind of assembled integral column connected node
CN205935417U (en) Take half grout sleeve of threaded connection spare
CN205617661U (en) Short sleeve grout steel bar connection connects and connecting sleeve and pressure -bearing ring that have thereof
CN203701436U (en) Lap joint structure of vertical reinforcements and steel sleeve of assembled wall
CN204644863U (en) A kind of Steel Tubes For Bridge Application performance of concrete column confined construction steel pipe welding bushing pipe device
CN104594343B (en) A kind of assembled stake and its construction method
CN108677934A (en) The construction method of uplift pile and uplift pile
CN204456670U (en) Fabricated construction straight screw sleeve connection joint
CN102912928A (en) Structural member for restraining grouting anchoring connection by using two ends of steel bar and connection method
CN203066063U (en) Plastic sleeve and steel tube combined cast-in-situ concrete hollow pipe pile
CN206530344U (en) A kind of jacking pipe joints antifriction injected hole construction
CN203361142U (en) Variable cross-section concrete tube pile adapter substitute
CN206408758U (en) A kind of concrete-filled circular steel tube column connecting node construction
CN210482760U (en) A steel bar sleeve grout connects overlap joint for assembled structure
CN104153461A (en) Precast concrete structural member and method for building construction longitudinal connection between structural members
CN104562923B (en) A kind of construction method of the semi-rigid joint Integral Abutment Bridge of concrete-pile supporting
CN209569012U (en) A kind of pipe-plate lining ring suitable for vertical shaft
CN207092386U (en) Steel bar connecting structure
CN203247697U (en) Pre-cast concrete structural member capable of being longitudinally connected
CN202954578U (en) Structure for connecting tilted stair with rest platform of prefabricated assembled detachable type foundation pit ladder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 230041 Suixi Road, Anhui, China, No. 310, No.

Patentee after: Anhui traffic construction Limited by Share Ltd

Address before: 230041, No. 310, Suixi Road, Luyang District, Anhui, Hefei, Hefei

Patentee before: ANHUI GOURGEN TRAFFIC CONSTRUCTION CO., LTD.

CP03 Change of name, title or address