CN105113639A - Connector with prefabricated steel pipe concrete beam segment and connecting method thereof - Google Patents
Connector with prefabricated steel pipe concrete beam segment and connecting method thereof Download PDFInfo
- Publication number
- CN105113639A CN105113639A CN201510390433.7A CN201510390433A CN105113639A CN 105113639 A CN105113639 A CN 105113639A CN 201510390433 A CN201510390433 A CN 201510390433A CN 105113639 A CN105113639 A CN 105113639A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- concrete
- connector
- segment
- prefabricated
- Prior art date
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 78
- 239000010959 steel Substances 0.000 title claims abstract description 78
- 239000004567 concrete Substances 0.000 title claims abstract description 40
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 9
- 239000011440 grout Substances 0.000 claims description 11
- 210000004080 Milk Anatomy 0.000 claims description 3
- 239000008267 milk Substances 0.000 claims description 3
- 235000013336 milk Nutrition 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 3
- 241000196435 Prunus domestica subsp. insititia Species 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 19
- 230000005540 biological transmission Effects 0.000 abstract description 5
- 239000011499 joint compounds Substances 0.000 abstract description 2
- 238000000034 methods Methods 0.000 abstract description 2
- 210000001503 Joints Anatomy 0.000 abstract 1
- 239000000463 materials Substances 0.000 abstract 1
- 238000003466 welding Methods 0.000 abstract 1
- 238000009417 prefabrication Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 3
- 238000005516 engineering processes Methods 0.000 description 2
- 238000007906 compression Methods 0.000 description 1
- 238000010586 diagrams Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Abstract
Description
Technical field
The present invention relates to connector of a kind of Prefabricated concrete-filled steel tube girder segment and attaching method thereof, belong to technical field of structural engineering.
Background technology
Along with construction scale of projects grows with each passing day, development structure prefabrication and assembly construction technology makes Prefabricated concrete-filled steel tube adapt to industrialization construction, and reduce situ wet workload, lifting construction efficiency and economy, also can promote that concrete filled steel tube is applied in bridge field as longeron.And Prefabricated concrete-filled steel tube joint is key position, it is comparatively large to bear axial compression and moment of flexure, will ensure that concrete axial is to close contact especially.Steel pipe is directly spliced after-pouring inner concrete by common prefabrication and assembly construction method cannot ensure that inner concrete is closely knit, and splice region power transmission is not direct, and globality is poor, or adopts complicated splice region structure, adds difficulty of construction, extends the duration, less economical.
Summary of the invention
The present invention is directed to deficiency of the prior art, propose connector of a kind of Prefabricated concrete-filled steel tube girder segment and attaching method thereof, made by steel tube concrete beam and all complete in the factory, the on-the-spot sections that only need complete connects.Simple structure of the present invention, rolled steel dosage is few, easy construction, and in-site installation speed is fast, and wet trade amount is little, little to surrounding environment influence, and stress performance is good simultaneously, the joint connection in site method between the reliable Prefabricated concrete-filled steel tube beam of power transmission.
Technical scheme of the present invention is as follows:
A connector for Prefabricated concrete-filled steel tube girder segment, is characterized in that, this connector is a taper lined steel pipe, and it is welded in one end of outer steel pipe.
The connector of Prefabricated concrete-filled steel tube girder segment of the present invention, the length that taper lined steel pipe stretches out outer steel pipe meets steel pipe build-in and passes curved requirement.
A method of attachment for Prefabricated concrete-filled steel tube girder segment, comprises the steps:
1) Prefabricated concrete-filled steel tube girder segment, one section of taper lined steel pipe is welded in one end of outer steel pipe, under the vertical state of steel pipe, build pipe inner concrete, ensure two ends concordant and outside steel pipe pre-set groove;
2) job site is spliced after two segment centering, connects outer steel pipe by butt weld, pours into high-strength mortar or high-strength grout afterwards from grouting mouth, will to be in the milk mouth and grout outlet sealing after grout outlet has mortar spilling.
4, method of attachment according to claim 3, is characterized in that, described taper lined steel pipe extension elongation meets steel pipe build-in and passes curved requirement.
The present invention has following beneficial effect relative to prior art:
(1) adopt the mode of prefabrication scene splicing, ensure that the closely knit of steel pipe inner concrete, good integrity, improve construction quality and anti-seismic performance; (2) the method for attachment simple structure of Prefabricated concrete-filled steel tube beam, easy construction, in-site installation speed is fast, concrete wet trade amount is little, little to surrounding environment influence, meets the requirement of green construction; (3) connecting structure stress performance is good, and power transmission is reliable; (4) adopt embedded sleeve pipe to make to there is space between sections, can do and necessarily regulate to correct structure misalignment of axe in scene.
Accompanying drawing explanation
Fig. 1 is that splicing of the present invention completes schematic diagram.
Fig. 2 is butt jointing structure of the present invention and schematic cross-section.
Fig. 3 is the overall schematic of steel pipe concrete segment of the present invention.
In figure: the outer steel pipe of 1-Prefabricated concrete-filled steel tube beam; 2-taper lined steel pipe; 3-pre-concreting; 4-high-strength mortar or high-strength grout; 5-grouting mouth; 6-grout outlet; 7-butt weld.
Detailed description of the invention
Below in conjunction with accompanying drawing, structure of the present invention, processing and use procedure are further described.
The connector of a kind of Prefabricated concrete-filled steel tube girder segment of the present invention, this connector is a taper lined steel pipe 2, and it is welded in one end of outer steel pipe, as shown in Figure 3.The length that described taper lined steel pipe stretches out outer steel pipe meets steel pipe build-in and passes curved requirement.
Figure 1 shows that overall schematic of the present invention.
The method of attachment Specific construction step of Prefabricated concrete-filled steel tube girder segment of the present invention is as follows:
1) be prefabricated in the factory concrete filled steel tube girder segment (as shown in Figure 3), described sections comprises prefabricated reinforced concrete outer steel pipe 1, taper lined steel pipe 2, one section of taper lined steel pipe 2 is welded in one end of outer steel pipe 1, under the vertical state of steel pipe, build pipe inner concrete 3, ensure two ends concordant and outside steel pipe 1 pre-set groove.
2) (as shown in Figure 1) is spliced by after two segment centering in job site, connects outer steel pipe 1 by butt weld 7.Pour into high-strength mortar or high-strength grout 4 from grouting mouth 5 afterwards, will to be in the milk mouth and grout outlet sealing after grout outlet 6 has mortar to overflow.
Step 1) taper lined steel pipe extension elongation should meet steel pipe build-in and pass curved requirement, adopts taper lined steel pipe to make step 2) splicing can correct structure misalignment of axe; Step 2) mud jacking operation can ensure two segment concrete filled between closely knit contact.
Connector of Prefabricated concrete-filled steel tube girder segment of the present invention and attaching method thereof, is applicable to Loads of Long-span Bridges bridge deck, is conducive to the prefabrication and assembly construction mode of construction realizing encased structures.The present invention adopts the mode of prefabrication scene splicing, ensure that the closely knit of steel pipe inner concrete, good integrity, improves construction quality and anti-seismic performance; The method of attachment simple structure of Prefabricated concrete-filled steel tube beam, easy construction, in-site installation speed is fast, concrete wet trade amount is little, little to surrounding environment influence, meets the requirement of green construction; Connecting structure stress performance is good, and power transmission is reliable; Adopt embedded sleeve pipe to make to there is space between sections, can do and necessarily regulate to correct structure misalignment of axe in scene.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510390433.7A CN105113639A (en) | 2015-07-06 | 2015-07-06 | Connector with prefabricated steel pipe concrete beam segment and connecting method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510390433.7A CN105113639A (en) | 2015-07-06 | 2015-07-06 | Connector with prefabricated steel pipe concrete beam segment and connecting method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105113639A true CN105113639A (en) | 2015-12-02 |
Family
ID=54661731
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510390433.7A CN105113639A (en) | 2015-07-06 | 2015-07-06 | Connector with prefabricated steel pipe concrete beam segment and connecting method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105113639A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1113139A (en) * | 1997-06-26 | 1999-01-19 | East Japan Railway Co | Corner angle joint between reinforced bar or steel framed reinforced concrete structure and various columnar structure, and joining method therefor |
CN101713219A (en) * | 2009-11-06 | 2010-05-26 | 沈阳建筑大学 | Precast reinforced concrete frame structure system |
CN102269136A (en) * | 2011-08-15 | 2011-12-07 | 上海交通大学 | Tower frame of large wind driven generator |
CN102966185A (en) * | 2012-12-06 | 2013-03-13 | 河北联合大学 | Novel concrete-filled steel tube connection joint and construction method thereof |
CN204059345U (en) * | 2014-09-10 | 2014-12-31 | 安徽省交通建设有限责任公司 | Preformed pile casing method syndeton |
CN104278800A (en) * | 2013-07-05 | 2015-01-14 | 长江大学 | Assembly type steel pipe concrete column connection structure |
-
2015
- 2015-07-06 CN CN201510390433.7A patent/CN105113639A/en not_active Application Discontinuation
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1113139A (en) * | 1997-06-26 | 1999-01-19 | East Japan Railway Co | Corner angle joint between reinforced bar or steel framed reinforced concrete structure and various columnar structure, and joining method therefor |
CN101713219A (en) * | 2009-11-06 | 2010-05-26 | 沈阳建筑大学 | Precast reinforced concrete frame structure system |
CN102269136A (en) * | 2011-08-15 | 2011-12-07 | 上海交通大学 | Tower frame of large wind driven generator |
CN102966185A (en) * | 2012-12-06 | 2013-03-13 | 河北联合大学 | Novel concrete-filled steel tube connection joint and construction method thereof |
CN104278800A (en) * | 2013-07-05 | 2015-01-14 | 长江大学 | Assembly type steel pipe concrete column connection structure |
CN204059345U (en) * | 2014-09-10 | 2014-12-31 | 安徽省交通建设有限责任公司 | Preformed pile casing method syndeton |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204112604U (en) | The slip casting rebar connector of band cone tail | |
CN102561553B (en) | Prefabricated concrete-filled steel tube frame-shear wall and construction method thereof | |
CN102425310B (en) | Assembly-type residential shear wall structural wall body vertical connection construction method | |
CN103758291B (en) | A kind of shearing enhancement mode half grout sleeve | |
CN102154992B (en) | Dislocation installation method of corrugated steel web | |
CN105735112B (en) | Bolt connection-based rapid assembling precast rectangular concrete filled steel tube bridge pier | |
US9951513B2 (en) | Method for erecting a structure made of prefabricated concrete elements and associated structure | |
CN103899043B (en) | Embedded pyramidal half grout sleeve | |
CN103643966B (en) | A kind of assembling tunnel lining segment | |
CN101839074B (en) | Steel frame reinforced column and reinforcing method thereof | |
CN107299683B (en) | Compound concrete-filled tubular column assembled docks node and connection method | |
CN202176063U (en) | Cement grout rebar connecting joint | |
CN105386405B (en) | Based on bolted Precast Concrete Segmental Bridges concrete pier of steel tube | |
CN103074890A (en) | Plastic sleeve and steel pipe combined cast-in-place concrete hollow pipe pile and construction method thereof | |
CN103924674A (en) | High-strength bolt shear key structure and constructing method thereof | |
CN201217890Y (en) | Nested grouting reinforced steel coupling sleeve | |
CN101215855A (en) | Combination beam | |
CN101831875A (en) | Precast assembly process of prestressed concrete cylindrical hollow pier | |
CN102086677A (en) | Prefabricated reinforced concrete beam and connection joint of reinforced concrete column and beam | |
CN204225283U (en) | The assembled syndeton of assembly concrete frame structure Shear-wall Connecting Beam Used | |
CN105201530A (en) | Repairing and strengthening method for large cracks on rock tunnel lining | |
CN203097017U (en) | Connecting structure between prefabricated infilled wall and prefabricated column or prefabricated shear wall | |
CN104153287A (en) | Segmental assembled concrete frame pier system with self-reset function and method | |
CN106284655B (en) | Precast concrete beam stud connects connecting node and connection method | |
CN204662247U (en) | A kind of Flange joint Concrete Filled double-walled steel pipe precast assembly bridge pier of additional power consumption reinforcing bar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C06 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151202 |
|
RJ01 | Rejection of invention patent application after publication |