CN204039927U - A kind of bridge emergency first-aid repair connects bracing or strutting arrangement - Google Patents

A kind of bridge emergency first-aid repair connects bracing or strutting arrangement Download PDF

Info

Publication number
CN204039927U
CN204039927U CN201420465886.2U CN201420465886U CN204039927U CN 204039927 U CN204039927 U CN 204039927U CN 201420465886 U CN201420465886 U CN 201420465886U CN 204039927 U CN204039927 U CN 204039927U
Authority
CN
China
Prior art keywords
notch
support platform
bridge
strutting arrangement
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420465886.2U
Other languages
Chinese (zh)
Inventor
娄亮
于鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Shuzhijiaoyuan Technology Co Ltd
Original Assignee
ZHEJIANG PROVINCE BESTWAY TRANSPORTATION HIGH-TECH Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG PROVINCE BESTWAY TRANSPORTATION HIGH-TECH Co Ltd filed Critical ZHEJIANG PROVINCE BESTWAY TRANSPORTATION HIGH-TECH Co Ltd
Priority to CN201420465886.2U priority Critical patent/CN204039927U/en
Application granted granted Critical
Publication of CN204039927U publication Critical patent/CN204039927U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a kind of bridge emergency first-aid repair and connects bracing or strutting arrangement.Solve the problem of the construction of existing highway bridge urgent consolidation device and dismounting inconvenience.Bracing or strutting arrangement comprises the fixed strip be horizontally installed on bottom bridge, the some support columns be connected with fixed strip, fixed by bracing frame between support column and fixed strip, bracing frame comprises support platform and lower support platform, be connected to a fixed by intermediate plate between upper and lower support platform, the upper end of described support column has notch, and lower support platform embeds and is fixed in notch, and the upper support platform of bracing frame is fixed on connection strap.The utility model has the advantages that: carry out emergency first-aid repair or temperature pier to the bridge affected by disaster, structure is simple, convenient and quick construction, convenient disassembly.

Description

A kind of bridge emergency first-aid repair connects bracing or strutting arrangement
Technical field
The utility model relates to a kind of supporting bridge technical field, particularly relates to a kind of bridge emergency first-aid repair and connects bracing or strutting arrangement.
Background technology
At present, China's exist curves is due to reasons such as disaster-stricken impact, Over-size transport, and structure or the material of bridge sustain damage, reduce load carrying capacity of bridge, need to take emergency first-aid repair or temperature pier to bridge, to guarantee the safety of bridge construction, ensure the temporary traffic of bridge.And the bridge of convenient and quick construction, convenient disassembly temperature pier technology of meeting an urgent need is little in prior art.If application number is 201110181918.7, name is called the Chinese invention application of the inverted method for bridge construction of a kind of operation, its directly with concrete or concrete filled steel tube by bus Temporary Piers bear the weight of superstructure.But this Temporary Piers adopts concrete to make, and constructs not very convenient, and there is inconvenience dismounting, the problem of dismounting difficulty.
Summary of the invention
The utility model mainly solves the problem of the construction of existing highway bridge urgent consolidation device and dismounting inconvenience, provides the bridge emergency first-aid repair connection bracing or strutting arrangement of a kind of convenient and quick construction, convenient disassembly.
The utility model solves the technical scheme that its technical problem adopts: a kind of bridge emergency first-aid repair connects bracing or strutting arrangement and comprises the fixed strip be horizontally installed on bottom bridge, and the some support columns to be connected with fixed strip, fixed by bracing frame between described support column and fixed strip, support frame as described above comprises support platform and lower support platform, be connected to a fixed by intermediate plate between upper and lower support platform, the upper end of described support column has notch, lower support platform embeds and is fixed in notch, and the upper support platform of bracing frame is fixed on connection strap.The utility model can carry out emergency first-aid repair or temperature pier to the bridge affected by disaster, guarantees the safety of bridge construction, ensures the temporary traffic of bridge.The utility model structure is simple, convenient and quick construction, convenient disassembly.In the utility model, fixed strip is used for being connected with support column, what fixed strip was smooth is connected to bottom bridge, if the out-of-flatness of bridge bottom connecting surfaces, need to carry out leveling by polishing and viscose glue to joint face, fixed strip is set and also temperature pier is carried out to bridge simultaneously.Support column is all be connected with fixed strip, then support column is transversely arranged, and the knot of bracing frame forms I-shaped, the lower support platform of bracing frame and the notch clamping of support column.By being welded to connect between upper support platform and fixed strip.
As a kind of preferred version of such scheme, described notch horizontally set, notch two ends are in the upper shed of support post jamb, and the length of described lower support platform is greater than the length of notch, and lower support platform is embedded in two ends after in notch and exposes outside notch.
As a kind of preferred version of such scheme, expose in the part outside notch at lower support platform two ends, the position of notch is provided with caging bolt.Caging bolt limits support platform and slides in notch, bracing frame is connected more firm with notch.
As a kind of preferred version of such scheme, described fixed strip is arranged in bridge bottom surface surface thereof, and fixed strip cross section is concave structure, and the upper support platform of support frame as described above is fixedly connected in fixed strip spill.Fixed strip is not arranged in the width direction on bridge bottom surface, but is obliquely installed, and the length of fixed strip is longer than bridge bottom width, and such fixed strip better can be fixed bridge.
As a kind of preferred version of such scheme, support column lower end is provided with base, described base comprises main body steel plate, main body steel plate bottom surface is provided with bracket, described bracket is strip, and two ends bend down and extend, and termination, two ends again bent outward be converted into hook-shaped.Bracket forms a few font, and intermediate lateral part is connected with main body Interal fixation.This base is embedded in the concrete basis of building, and bracket makes base can be connected to more closely in concrete basis, not easily separated.
As a kind of preferred version of such scheme, between described main body steel plate and support column lower end sidewall, be connected with ribs.Make to be connected between base with support column more fastening.
As a kind of preferred version of such scheme, described pocket bottom is provided with billet, and billet welds mutually with pocket bottom, and billet is provided with rubber sheet gasket, and the lower support platform of support frame as described above is arranged on rubber sheet gasket.This structure makes installing/dismounting convenient, also makes bracing frame be connected with support column more firm simultaneously.
The utility model has the advantages that: carry out emergency first-aid repair or temperature pier to the bridge affected by disaster, structure is simple, convenient and quick construction, convenient disassembly.
Accompanying drawing explanation
Fig. 1 is that the utility model is arranged on a kind of structural representation after on bridge;
Fig. 2 is a kind of structural representation of lateral cross section after the utility model is installed;
Fig. 3 is the structure for amplifying schematic diagram at A place in Fig. 1;
Fig. 4 is the structure for amplifying schematic diagram at B place in Fig. 2;
Fig. 5 is the part-structure schematic diagram that in the utility model, fixed strip is installed on bridge bottom surface;
Fig. 6 is a kind of structural representation of base in the utility model.
Support platform 6-lower support platform 7-intermediate plate 8-rubber sheet gasket 9-billet 10-notch 11-caging bolt 12-base 13-main body steel plate 14-bracket 15-ribs on 1-bridge 2-support column 3-fixed strip 4-bracing frame 5-.
Detailed description of the invention
Below by embodiment, and by reference to the accompanying drawings, the technical solution of the utility model is further described.
Embodiment:
A kind of bridge emergency first-aid repair of the present embodiment connects bracing or strutting arrangement, as depicted in figs. 1 and 2, is respectively arranged with connection bracing or strutting arrangement in this enforcement in the both sides of bridge 1.Connect bracing or strutting arrangement and include support column 1 and fixed strip 2, fixed strip 2 is laterally arranged on the bottom surface of bridge 1, and fixed strip cross section is concave structure, and fixed strip develops mutually with bridge bottom surface, is bolted.As shown in Figure 5, fixed strip is arranged in bridge bottom surface surface thereof.Support column has multiple, evenly arranges respectively along fixed strip, and support column is connected with fixed strip by bracing frame 4.
As shown in Figure 3 and Figure 4, this bracing frame 4 includes support platform 5 and lower support platform 6, is linked into an integrated entity between upper support platform and lower support platform by intermediate plate 7, becomes an I-shape construction.The upper surface of support column has notch 10, and the two ends of this notch are in the wall upper shed of support column, and namely notch runs through support column.Pocket bottom is provided with billet 9, billet welds mutually with pocket bottom, and billet is provided with rubber sheet gasket 8.The length of bracing frame is greater than the length of notch, namely upper and lower support platform length is all greater than notch length, lower support platform is entrapped in notch and is arranged on rubber sheet gasket, lower support platform two ends are stretched out outside notch, and expose in the part outside notch at lower support platform two ends, the position of notch is provided with caging bolt 11.Upper support platform is then be embedded in the concave structure of fixed strip, and upper support platform is welded mutually with fixed strip.
As shown in Figure 6, support column 2 lower end is provided with base 12, base comprises main body steel plate 13, main body Plate Welding, in support column lower end, main body steel plate bottom surface is provided with bracket 14, and bracket is strip, two ends bend down and extend, and termination, two ends again bent outward be converted into hook-shaped, form a few font, the part of bracket intermediate lateral is welded on main body steel plate.Bracket has two, and symmetry is fixed on two side positions on main body steel plate bottom surface.Ribs 15 is connected with between main body steel plate 13 and support column 2 lower end sidewall.
Specific embodiment described herein is only to the explanation for example of the present invention's spirit.Those skilled in the art can make various amendment or supplement or adopt similar mode to substitute to described specific embodiment, but can't depart from spirit of the present invention or surmount the scope that appended claims defines.
Although more employ the terms such as bridge, support column, fixed strip, bracing frame, upper support platform herein, do not get rid of the possibility using other term.These terms are used to be only used to describe and explain essence of the present invention more easily; The restriction that they are construed to any one additional is all contrary with spirit of the present invention.

Claims (7)

1. a bridge emergency first-aid repair connects bracing or strutting arrangement, it is characterized in that: comprise the fixed strip (3) be horizontally installed on bottom bridge, and the some support columns (2) to be connected with fixed strip, fixed by bracing frame (4) between described support column and fixed strip, support frame as described above comprises support platform (5) and lower support platform (6), be connected to a fixed by intermediate plate (7) between upper and lower support platform, the upper end of described support column has notch (10), lower support platform embeds and is fixed in notch, the upper support platform of bracing frame is fixed on connection strap.
2. a kind of bridge emergency first-aid repair according to claim 1 connects bracing or strutting arrangement, it is characterized in that described notch (10) horizontally set, notch two ends are in support column (2) wall upper shed, the length of described lower support platform (6) is greater than the length of notch (10), and lower support platform is embedded in two ends after in notch and exposes outside notch.
3. a kind of bridge emergency first-aid repair according to claim 2 connects bracing or strutting arrangement, it is characterized in that exposing in the part outside notch at lower support platform (6) two ends, and the position of notch is provided with caging bolt (11).
4. a kind of bridge emergency first-aid repair according to claim 1 connects bracing or strutting arrangement, it is characterized in that described fixed strip (3) is arranged in bridge bottom surface surface thereof, fixed strip cross section is concave structure, and the upper support platform (5) of support frame as described above (4) is fixedly connected in fixed strip spill.
5. a kind of bridge emergency first-aid repair according to claim 1 or 2 or 3 or 4 connects bracing or strutting arrangement, it is characterized in that being provided with base (12) on support column (2) lower end, described base comprises main body steel plate (13), main body steel plate bottom surface is provided with bracket (14), described bracket is strip, two ends bend down and extend, and termination, two ends again bent outward be converted into hook-shaped.
6. a kind of bridge emergency first-aid repair according to claim 5 connects bracing or strutting arrangement, it is characterized in that being connected with ribs (15) between described main body steel plate (13) and support column (2) lower end sidewall.
7. a kind of bridge emergency first-aid repair according to claim 1 or 2 or 3 or 4 connects bracing or strutting arrangement, it is characterized in that being provided with billet (9) on described notch (10) bottom, billet welds mutually with pocket bottom, billet is provided with rubber sheet gasket (8), and the lower support platform (6) of support frame as described above (4) is arranged on rubber sheet gasket.
CN201420465886.2U 2014-08-18 2014-08-18 A kind of bridge emergency first-aid repair connects bracing or strutting arrangement Active CN204039927U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420465886.2U CN204039927U (en) 2014-08-18 2014-08-18 A kind of bridge emergency first-aid repair connects bracing or strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420465886.2U CN204039927U (en) 2014-08-18 2014-08-18 A kind of bridge emergency first-aid repair connects bracing or strutting arrangement

Publications (1)

Publication Number Publication Date
CN204039927U true CN204039927U (en) 2014-12-24

Family

ID=52240612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420465886.2U Active CN204039927U (en) 2014-08-18 2014-08-18 A kind of bridge emergency first-aid repair connects bracing or strutting arrangement

Country Status (1)

Country Link
CN (1) CN204039927U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104727235A (en) * 2015-03-31 2015-06-24 吴本刚 Bridge overall strengthening device
CN105755968A (en) * 2016-03-23 2016-07-13 韦积分 Reinforcement device for simply supported girder bridge
CN110700118A (en) * 2019-09-20 2020-01-17 山东中铁路桥工程有限公司 Translation thrustor for rush repair of railway pier
CN112144384A (en) * 2020-10-30 2020-12-29 北京中交桥宇科技有限公司 Permanent standby supporting device for overpass bridge and application method
CN113293992A (en) * 2021-06-18 2021-08-24 中冶天工集团有限公司 Temporary supporting device for horizontal concrete
CN113699900A (en) * 2021-09-10 2021-11-26 中铁第五勘察设计院集团有限公司 Beam pier structure for bridge emergency repair and application thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104727235A (en) * 2015-03-31 2015-06-24 吴本刚 Bridge overall strengthening device
CN105755968A (en) * 2016-03-23 2016-07-13 韦积分 Reinforcement device for simply supported girder bridge
CN110700118A (en) * 2019-09-20 2020-01-17 山东中铁路桥工程有限公司 Translation thrustor for rush repair of railway pier
CN112144384A (en) * 2020-10-30 2020-12-29 北京中交桥宇科技有限公司 Permanent standby supporting device for overpass bridge and application method
CN112144384B (en) * 2020-10-30 2022-03-25 北京中交桥宇科技有限公司 Permanent standby supporting device for overpass bridge and application method
CN113293992A (en) * 2021-06-18 2021-08-24 中冶天工集团有限公司 Temporary supporting device for horizontal concrete
CN113699900A (en) * 2021-09-10 2021-11-26 中铁第五勘察设计院集团有限公司 Beam pier structure for bridge emergency repair and application thereof
CN113699900B (en) * 2021-09-10 2023-01-03 中铁第五勘察设计院集团有限公司 Beam pier structure for bridge emergency repair and application thereof

Similar Documents

Publication Publication Date Title
CN204039927U (en) A kind of bridge emergency first-aid repair connects bracing or strutting arrangement
CN106906736B (en) A kind of clad steel case performance of concrete column confined and girder steel rigid connection structural form and construction method
CN205711776U (en) A kind of supporting bracket of bridge construction
KR101305347B1 (en) Pedestrian bridge for expanding road
CN106978777A (en) A kind of make-shift bridge device
CN202718127U (en) Scaffold tube support for underground foundation pit
CN106988228A (en) Prestressed concrete continuous beam girder construction process
CN202176343U (en) Self-propelled multifunctional template trolley combining device
CN206418788U (en) A kind of novel bridge construction safety protective separation device
CN209584813U (en) Frame bridge system
CN103835238A (en) High-pier cable-stayed bridge zero-number block non-bracket construction method and structure in construction process
CN205397946U (en) Tower crane attaches wall truss of encorbelmenting
CN108547224A (en) Short platform box beam push construction method
CN209779518U (en) Safety protective guard is used in road bridge construction
CN105625177A (en) Steel truss suspending support construction method
CN205557292U (en) Assembled sloping leg steel suspension bridge
CN209741674U (en) Civil engineering cement pouring device
CN211395382U (en) Vehicle-mounted bridge telescopic support for bridge support
CN107386117A (en) A kind of device of double rod iron method construction bridges bent caps
CN203451109U (en) I-shaped steel truss device for tower crane attachment
CN208136705U (en) A kind of make-shift bridge device
CN209260544U (en) A kind of road and bridge seamless connection structure for large and medium-sized bridge
CN206693039U (en) The attachment means of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap
CN207739482U (en) A kind of haunch contignation for garage
RU142853U1 (en) TRANSPORTATION Trestle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190515

Address after: No. 89 round City West Road, Hangzhou, Zhejiang Province

Patentee after: Zhejiang transportation planning and Design Research Institute Co., Ltd.

Address before: 310005 No. 3 Kushuwan Lane, Gongshu District, Hangzhou City, Zhejiang Province

Patentee before: ZHEJIANG PROVINCE BESTWAY TRANSPORTATION HIGH-TECH CO., LTD.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 928, yuhangtang Road, Xihu District, Hangzhou City, Zhejiang Province 310011

Patentee after: Zhejiang shuzhijiaoyuan Technology Co.,Ltd.

Address before: 310006 No. 89 West Ring Road, Zhejiang, Hangzhou

Patentee before: ZHEJIANG PROVINCIAL INSTITUTE OF COMMUNICATIONS PLANNING DESIGN & RESEARCH Co.,Ltd.