CN205557292U - Assembled sloping leg steel suspension bridge - Google Patents
Assembled sloping leg steel suspension bridge Download PDFInfo
- Publication number
- CN205557292U CN205557292U CN201620174416.XU CN201620174416U CN205557292U CN 205557292 U CN205557292 U CN 205557292U CN 201620174416 U CN201620174416 U CN 201620174416U CN 205557292 U CN205557292 U CN 205557292U
- Authority
- CN
- China
- Prior art keywords
- steel
- bridge
- suspension bridge
- assembled
- steel suspension
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 65
- 239000010959 steel Substances 0.000 title claims abstract description 65
- 239000000725 suspension Substances 0.000 title claims abstract description 29
- 239000000463 material Substances 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 13
- 210000000481 breast Anatomy 0.000 abstract 1
- 238000000034 method Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 235000015170 shellfish Nutrition 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides an assembled sloping leg steel suspension bridge, it includes pier basis has pour the abutment pier stud on the pier basis, the top step mount of abutment pier stud has vertical distribution roof beam, vertically distribute the roof beam on fixed mounting have the steel bridge face, the bottom fixed mounting that vertically distributes the roof beam has a transverse distribution roof beam, transverse distribution breast portion installs the backup pad, backup pad fixed mounting is at the top that the shaped steel bearing diagonal allies oneself with, the bottom fixed mounting of shaped steel bearing diagonal antithetical couplet is on the pier basis. Through adopting assembled sloping leg steel suspension bridge structural style can realize that the required equipment of interim steel suspension bridge construction is few, structure demand such as slim and graceful. The utility model discloses can onshore process the component in advance, assemble at the scene, and the construction is simple and convenient, has greatly improved construction speed, especially to the steel suspension bridge of little span, can greatly reduce construction cost.
Description
Technical field
This utility model belongs to Construction of Civil Engineering field, particularly relates to a kind of assembled battered leg steel suspension bridge, is a kind of temporary steel suspension bridge structure.
Background technology
Temporary steel suspension bridge structure uses the version composition of beret truss support beam and tube fraction stake mostly.During construction, need to arrange the make-shift bridge that span is little, beret truss materials microstructure cost of transportation is higher, this structure is required to vibration hammer coordinative construction at steel pipe column pile with when removing pile pulling, and steel-pipe pile pile evaluation criterion has certain uncertainty, beret truss structure is 3m standard element in addition, and lower support point must be placed at montant position, bridge length is necessary for the multiple of 3m, and this most necessarily causes certain waste.Traditional shellfish thunder steel suspension bridge structure bulky, deadweight are relatively big, and speed of application is slow.
Therefore, need a kind of Novel steel suspension bridge of exploitation design based on above-mentioned analysis, reduce construction cost, improve efficiency of construction, reduce operation intensity.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of novel fabricated battered leg steel suspension bridge device, few by using assembled battered leg steel suspension bridge version can realize temporary steel suspension bridge construction equipment needed thereby, the demands such as structure is slim and graceful.Component can be processed by this utility model in advance on the coast, on-site consolidation, and easy construction drastically increases speed of application, in particular for the steel suspension bridge of little span, can greatly reduce construction cost.
In order to realize above-mentioned technical characteristic, the purpose of this utility model is achieved in that assembled battered leg steel suspension bridge, it includes pier footing, abutment pier stud has been poured on pier footing, the top stage of abutment pier stud is provided with longitudinal distribution beam, it is installed with Steel Bridge Deck in longitudinal distribution beam, the bottom of longitudinal distribution beam is installed with transverse distribution beam, bottom transverse distribution beam, gripper shoe is installed, gripper shoe is fixedly mounted on the top of shaped steel bearing diagonal connection, and the bottom of shaped steel bearing diagonal connection is fixedly mounted on pier footing.
Being fixedly connected with horizontal section steel by a flanged plate on the medial wall of described abutment pier stud and support connection, horizontal section steel supports the other end of connection and is connected with shaped steel bearing diagonal connection.
Bridging is had by high strength exploitation between described shaped steel bearing diagonal connection.
The bottom of described shaped steel bearing diagonal connection is connected with pier footing by No. two flanged plates.
Described No. two flanged plates are connected with pier footing by high-strength bolt.
A described flanged plate is connected with abutment pier stud by high-strength bolt.
Described longitudinal distribution beam and transverse distribution beam all use H profile steel material.
The both sides of described Steel Bridge Deck are welded with bridge floor and erect hurdle, and bridge floor erects and is welded with bridge floor horizontal bar between hurdle, and bridge floor erects hurdle and bridge floor horizontal bar collectively forms bridge floor guardrail.
This utility model has the advantages that:
1, the assembled battered leg steel suspension bridge constructional device that this utility model provides, by bolt between structure and repeatedly assembled form a kind of temporary steel suspension bridge structure for little span, this utility model make simple, easy for installation, speed fast, can be recycled;
2, provide support force by pier footing for whole bridge floor, and then ensure that the safety of whole steel suspension bridge.
3, joined by shaped steel bearing diagonal and horizontal section steel supports connection and can improve longitudinal distribution beam and the support strength of transverse distribution beam, and then improve the structural stability of whole bridge floor.
4, the bonding strength supported between connection can be improved by the high strength exploitation between each support beam, and then improve the safety of whole bridge.
5, the bonding strength of shaped steel bearing diagonal connection can be improved by bridging.
Accompanying drawing explanation
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings.
Fig. 1 is that this utility model facade arranges schematic diagram.
Fig. 2 is that this utility model section arranges schematic diagram.
In figure: bridge floor erects hurdle 1, bridge floor horizontal bar 2, Steel Bridge Deck 3, longitudinal distribution beam 4,5, flanged plate 6 of abutment pier stud, horizontal section steel support connection 7,8, No. two flanged plates 9 of pier footing, shaped steel bearing diagonal connection 10, gripper shoe 11, transverse distribution beam 12, bridging 13.
Detailed description of the invention
Below in conjunction with the accompanying drawings embodiment of the present utility model is described further.
See Fig. 1-2, assembled battered leg steel suspension bridge, it includes pier footing 8, having poured abutment pier stud 5 on pier footing 8, the top stage of abutment pier stud 5 is provided with longitudinal distribution beam 4, and longitudinal distribution beam 4 is installed with Steel Bridge Deck 3, the bottom of longitudinal distribution beam 4 is installed with transverse distribution beam 12, being provided with gripper shoe 11 bottom transverse distribution beam 12, gripper shoe 11 is fixedly mounted on the top of shaped steel bearing diagonal connection 10, and the bottom of shaped steel bearing diagonal connection 10 is fixedly mounted on pier footing 8.Above-mentioned steel suspension bridge simple in construction, easy to assembly, easy to use, and also the installation process of each parts is simple, and structural strength is high.
Further, the medial wall of described abutment pier stud 5 being fixedly connected with horizontal section steel by a flanged plate 6 and supports connection 7, horizontal section steel supports the other end of connection 7 and is connected with shaped steel bearing diagonal connection 10.Joint efficiency can be improved by a flanged plate 6, ensure that bonding strength simultaneously.
Further, there is bridging 13 by high strength exploitation between described shaped steel bearing diagonal connection 10.The support between shaped steel bearing diagonal connection 10 and bonding strength is improve by the bridging 13 of arranged crosswise.
Further, the bottom of described shaped steel bearing diagonal connection 10 is connected with pier footing 8 by No. two flanged plates 9.The bonding strength between shaped steel bearing diagonal connection 10 and pier footing 8 can be improved by No. two flanged plates 9.
Further, described No. two flanged plates 9 are connected with pier footing 8 by high-strength bolt.
Further, a described flanged plate 6 is connected with abutment pier stud 5 by high-strength bolt.
Further, described longitudinal distribution beam 4 and transverse distribution beam 12 all use H profile steel material.Improve the counter-bending and anti-shear ability between each distribution beam by H profile steel, and then improve the intensity of whole bridge.
Further, the both sides of described Steel Bridge Deck 3 are welded with bridge floor and erect hurdle 1, and bridge floor erects and is welded with bridge floor horizontal bar 2 between hurdle 1, and bridge floor erects hurdle 1 and bridge floor horizontal bar 2 collectively forms bridge floor guardrail.The safety that staff walks is improve at bridge floor by guard bar structure.
The above embodiments are only optimal technical scheme of the present utility model; and it is not construed as restriction of the present utility model; the technical scheme that protection domain of the present utility model should be recorded with claim, is protection domain including the equivalents of technical characteristic in the technical scheme that claim is recorded.Equivalent the most in this range is improved, also within protection domain of the present utility model.
Claims (8)
1. assembled battered leg steel suspension bridge, it is characterized in that: it includes pier footing (8), abutment pier stud (5) has been poured on pier footing (8), the top stage of abutment pier stud (5) is provided with longitudinal distribution beam (4), it is installed with Steel Bridge Deck (3) on longitudinal distribution beam (4), the bottom of longitudinal distribution beam (4) is installed with transverse distribution beam (12), transverse distribution beam (12) bottom is provided with gripper shoe (11), gripper shoe (11) is fixedly mounted on the top of shaped steel bearing diagonal connection (10), the bottom of shaped steel bearing diagonal connection (10) is fixedly mounted on pier footing (8).
Assembled battered leg steel suspension bridge the most according to claim 1, it is characterized in that: be fixedly connected with horizontal section steel by a flanged plate (6) on the medial wall of described abutment pier stud (5) and support connection (7), horizontal section steel supports the other end of connection (7) and is connected with shaped steel bearing diagonal connection (10).
Assembled battered leg steel suspension bridge the most according to claim 1, it is characterised in that: there is bridging (13) by high strength exploitation between described shaped steel bearing diagonal connection (10).
Assembled battered leg steel suspension bridge the most according to claim 1, it is characterised in that: the bottom of described shaped steel bearing diagonal connection (10) is connected with pier footing (8) by No. two flanged plates (9).
Assembled battered leg steel suspension bridge the most according to claim 4, it is characterised in that: described No. two flanged plates (9) are connected with pier footing (8) by high-strength bolt.
Assembled battered leg steel suspension bridge the most according to claim 2, it is characterised in that: a described flanged plate (6) is connected with abutment pier stud (5) by high-strength bolt.
Assembled battered leg steel suspension bridge the most according to claim 1, it is characterised in that: described longitudinal distribution beam (4) and transverse distribution beam (12) all use H profile steel material.
Assembled battered leg steel suspension bridge the most according to claim 1, it is characterized in that: the both sides of described Steel Bridge Deck (3) are welded with bridge floor and erect hurdle (1), bridge floor erects and is welded with bridge floor horizontal bar (2) between hurdle (1), and bridge floor erects hurdle (1) and bridge floor horizontal bar (2) collectively forms bridge floor guardrail.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620174416.XU CN205557292U (en) | 2016-03-08 | 2016-03-08 | Assembled sloping leg steel suspension bridge |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620174416.XU CN205557292U (en) | 2016-03-08 | 2016-03-08 | Assembled sloping leg steel suspension bridge |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205557292U true CN205557292U (en) | 2016-09-07 |
Family
ID=56817258
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620174416.XU Expired - Fee Related CN205557292U (en) | 2016-03-08 | 2016-03-08 | Assembled sloping leg steel suspension bridge |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205557292U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109778660A (en) * | 2019-03-18 | 2019-05-21 | 浙江兴土桥梁专用装备制造有限公司 | Steel bridges installed with fabricated abutments |
| CN112267369A (en) * | 2020-10-20 | 2021-01-26 | 中交二公局第三工程有限公司 | Non-span upright post steel trestle structure, pushing installation device and construction method |
| CN112813793A (en) * | 2020-12-31 | 2021-05-18 | 薛芹 | Assembled bridge |
-
2016
- 2016-03-08 CN CN201620174416.XU patent/CN205557292U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109778660A (en) * | 2019-03-18 | 2019-05-21 | 浙江兴土桥梁专用装备制造有限公司 | Steel bridges installed with fabricated abutments |
| CN112267369A (en) * | 2020-10-20 | 2021-01-26 | 中交二公局第三工程有限公司 | Non-span upright post steel trestle structure, pushing installation device and construction method |
| CN112813793A (en) * | 2020-12-31 | 2021-05-18 | 薛芹 | Assembled bridge |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103195170B (en) | Prefabricated reinforced concrete frame structure system | |
| CN113356551B (en) | Cantilever frame structure | |
| KR101995496B1 (en) | the rigid connection structure between the upper precast concrete column and the lower precast concrete column and the rigid connection structure of the precast concrete girder using the same | |
| CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
| CN201762663U (en) | Reinforced concrete superposed beam wing board support | |
| CN102733606A (en) | Construction method of high large cantilever structure | |
| JP2022031233A (en) | Novel precast assembly bridge pier | |
| CN102061742B (en) | Anti-seismic reinforced concrete antique building structure system | |
| CN103469735B (en) | The installation method of the formwork of the solid section of the pier top of the hollow column and slab pier with curved superelevation | |
| CN105421748A (en) | Anchoring device of cantilever scaffold | |
| CN209523198U (en) | A kind of underpinning structure supporting lattice column | |
| CN103334580B (en) | Section steel tripod in a kind of overhanging scaffold and connection system for guide rail | |
| CN104652661A (en) | Semirigid frame-external recycled concrete wall panel and fabrication method | |
| CN207700746U (en) | The upper buttress of existing building base isolation reinforcement constructs | |
| CN216109354U (en) | A transfer layer steel column installation structure | |
| CN203213137U (en) | Steel raft foundation for installing steel structure roof | |
| CN203034799U (en) | Tower hoist standard knot bearing overhead support formwork steel platform structure | |
| CN205294673U (en) | Change basic connection structure | |
| CN204252573U (en) | Adjustable quick basement roof reinforcement support system | |
| CN206109965U (en) | Steel plank road in water and electricity building site | |
| CN205224571U (en) | Anchor of builder's jack | |
| CN101158227B (en) | Externally-hanging type exterior wall scaffold | |
| CN217579811U (en) | A seismic reinforcement structure of bridge three-column piers with dual energy dissipation measures | |
| CN204000639U (en) | A kind of large-scale pier stud concrete reinforcement integral hoisting mechanical splice device | |
| KR101548215B1 (en) | the deep composite precast beam, the connection structure between composite precast column and the deep composite precast beam |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160907 Termination date: 20210308 |