CN205557292U - Assembled sloping leg steel suspension bridge - Google Patents

Assembled sloping leg steel suspension bridge Download PDF

Info

Publication number
CN205557292U
CN205557292U CN201620174416.XU CN201620174416U CN205557292U CN 205557292 U CN205557292 U CN 205557292U CN 201620174416 U CN201620174416 U CN 201620174416U CN 205557292 U CN205557292 U CN 205557292U
Authority
CN
China
Prior art keywords
steel
bridge
suspension bridge
assembled
steel suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620174416.XU
Other languages
Chinese (zh)
Inventor
符强
吕芝林
王福铭
骆大新
孙向楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 5 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 5 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 5 Engineering Co Ltd filed Critical China Gezhouba Group No 5 Engineering Co Ltd
Priority to CN201620174416.XU priority Critical patent/CN205557292U/en
Application granted granted Critical
Publication of CN205557292U publication Critical patent/CN205557292U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides an assembled sloping leg steel suspension bridge, it includes pier basis has pour the abutment pier stud on the pier basis, the top step mount of abutment pier stud has vertical distribution roof beam, vertically distribute the roof beam on fixed mounting have the steel bridge face, the bottom fixed mounting that vertically distributes the roof beam has a transverse distribution roof beam, transverse distribution breast portion installs the backup pad, backup pad fixed mounting is at the top that the shaped steel bearing diagonal allies oneself with, the bottom fixed mounting of shaped steel bearing diagonal antithetical couplet is on the pier basis. Through adopting assembled sloping leg steel suspension bridge structural style can realize that the required equipment of interim steel suspension bridge construction is few, structure demand such as slim and graceful. The utility model discloses can onshore process the component in advance, assemble at the scene, and the construction is simple and convenient, has greatly improved construction speed, especially to the steel suspension bridge of little span, can greatly reduce construction cost.

Description

Assembled battered leg steel suspension bridge
Technical field
This utility model belongs to Construction of Civil Engineering field, particularly relates to a kind of assembled battered leg steel suspension bridge, is a kind of temporary steel suspension bridge structure.
Background technology
Temporary steel suspension bridge structure uses the version composition of beret truss support beam and tube fraction stake mostly.During construction, need to arrange the make-shift bridge that span is little, beret truss materials microstructure cost of transportation is higher, this structure is required to vibration hammer coordinative construction at steel pipe column pile with when removing pile pulling, and steel-pipe pile pile evaluation criterion has certain uncertainty, beret truss structure is 3m standard element in addition, and lower support point must be placed at montant position, bridge length is necessary for the multiple of 3m, and this most necessarily causes certain waste.Traditional shellfish thunder steel suspension bridge structure bulky, deadweight are relatively big, and speed of application is slow.
Therefore, need a kind of Novel steel suspension bridge of exploitation design based on above-mentioned analysis, reduce construction cost, improve efficiency of construction, reduce operation intensity.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of novel fabricated battered leg steel suspension bridge device, few by using assembled battered leg steel suspension bridge version can realize temporary steel suspension bridge construction equipment needed thereby, the demands such as structure is slim and graceful.Component can be processed by this utility model in advance on the coast, on-site consolidation, and easy construction drastically increases speed of application, in particular for the steel suspension bridge of little span, can greatly reduce construction cost.
In order to realize above-mentioned technical characteristic, the purpose of this utility model is achieved in that assembled battered leg steel suspension bridge, it includes pier footing, abutment pier stud has been poured on pier footing, the top stage of abutment pier stud is provided with longitudinal distribution beam, it is installed with Steel Bridge Deck in longitudinal distribution beam, the bottom of longitudinal distribution beam is installed with transverse distribution beam, bottom transverse distribution beam, gripper shoe is installed, gripper shoe is fixedly mounted on the top of shaped steel bearing diagonal connection, and the bottom of shaped steel bearing diagonal connection is fixedly mounted on pier footing.
Being fixedly connected with horizontal section steel by a flanged plate on the medial wall of described abutment pier stud and support connection, horizontal section steel supports the other end of connection and is connected with shaped steel bearing diagonal connection.
Bridging is had by high strength exploitation between described shaped steel bearing diagonal connection.
The bottom of described shaped steel bearing diagonal connection is connected with pier footing by No. two flanged plates.
Described No. two flanged plates are connected with pier footing by high-strength bolt.
A described flanged plate is connected with abutment pier stud by high-strength bolt.
Described longitudinal distribution beam and transverse distribution beam all use H profile steel material.
The both sides of described Steel Bridge Deck are welded with bridge floor and erect hurdle, and bridge floor erects and is welded with bridge floor horizontal bar between hurdle, and bridge floor erects hurdle and bridge floor horizontal bar collectively forms bridge floor guardrail.
This utility model has the advantages that:
1, the assembled battered leg steel suspension bridge constructional device that this utility model provides, by bolt between structure and repeatedly assembled form a kind of temporary steel suspension bridge structure for little span, this utility model make simple, easy for installation, speed fast, can be recycled;
2, provide support force by pier footing for whole bridge floor, and then ensure that the safety of whole steel suspension bridge.
3, joined by shaped steel bearing diagonal and horizontal section steel supports connection and can improve longitudinal distribution beam and the support strength of transverse distribution beam, and then improve the structural stability of whole bridge floor.
4, the bonding strength supported between connection can be improved by the high strength exploitation between each support beam, and then improve the safety of whole bridge.
5, the bonding strength of shaped steel bearing diagonal connection can be improved by bridging.
Accompanying drawing explanation
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings.
Fig. 1 is that this utility model facade arranges schematic diagram.
Fig. 2 is that this utility model section arranges schematic diagram.
In figure: bridge floor erects hurdle 1, bridge floor horizontal bar 2, Steel Bridge Deck 3, longitudinal distribution beam 4,5, flanged plate 6 of abutment pier stud, horizontal section steel support connection 7,8, No. two flanged plates 9 of pier footing, shaped steel bearing diagonal connection 10, gripper shoe 11, transverse distribution beam 12, bridging 13.
Detailed description of the invention
Below in conjunction with the accompanying drawings embodiment of the present utility model is described further.
See Fig. 1-2, assembled battered leg steel suspension bridge, it includes pier footing 8, having poured abutment pier stud 5 on pier footing 8, the top stage of abutment pier stud 5 is provided with longitudinal distribution beam 4, and longitudinal distribution beam 4 is installed with Steel Bridge Deck 3, the bottom of longitudinal distribution beam 4 is installed with transverse distribution beam 12, being provided with gripper shoe 11 bottom transverse distribution beam 12, gripper shoe 11 is fixedly mounted on the top of shaped steel bearing diagonal connection 10, and the bottom of shaped steel bearing diagonal connection 10 is fixedly mounted on pier footing 8.Above-mentioned steel suspension bridge simple in construction, easy to assembly, easy to use, and also the installation process of each parts is simple, and structural strength is high.
Further, the medial wall of described abutment pier stud 5 being fixedly connected with horizontal section steel by a flanged plate 6 and supports connection 7, horizontal section steel supports the other end of connection 7 and is connected with shaped steel bearing diagonal connection 10.Joint efficiency can be improved by a flanged plate 6, ensure that bonding strength simultaneously.
Further, there is bridging 13 by high strength exploitation between described shaped steel bearing diagonal connection 10.The support between shaped steel bearing diagonal connection 10 and bonding strength is improve by the bridging 13 of arranged crosswise.
Further, the bottom of described shaped steel bearing diagonal connection 10 is connected with pier footing 8 by No. two flanged plates 9.The bonding strength between shaped steel bearing diagonal connection 10 and pier footing 8 can be improved by No. two flanged plates 9.
Further, described No. two flanged plates 9 are connected with pier footing 8 by high-strength bolt.
Further, a described flanged plate 6 is connected with abutment pier stud 5 by high-strength bolt.
Further, described longitudinal distribution beam 4 and transverse distribution beam 12 all use H profile steel material.Improve the counter-bending and anti-shear ability between each distribution beam by H profile steel, and then improve the intensity of whole bridge.
Further, the both sides of described Steel Bridge Deck 3 are welded with bridge floor and erect hurdle 1, and bridge floor erects and is welded with bridge floor horizontal bar 2 between hurdle 1, and bridge floor erects hurdle 1 and bridge floor horizontal bar 2 collectively forms bridge floor guardrail.The safety that staff walks is improve at bridge floor by guard bar structure.
The above embodiments are only optimal technical scheme of the present utility model; and it is not construed as restriction of the present utility model; the technical scheme that protection domain of the present utility model should be recorded with claim, is protection domain including the equivalents of technical characteristic in the technical scheme that claim is recorded.Equivalent the most in this range is improved, also within protection domain of the present utility model.

Claims (8)

1. assembled battered leg steel suspension bridge, it is characterized in that: it includes pier footing (8), abutment pier stud (5) has been poured on pier footing (8), the top stage of abutment pier stud (5) is provided with longitudinal distribution beam (4), it is installed with Steel Bridge Deck (3) on longitudinal distribution beam (4), the bottom of longitudinal distribution beam (4) is installed with transverse distribution beam (12), transverse distribution beam (12) bottom is provided with gripper shoe (11), gripper shoe (11) is fixedly mounted on the top of shaped steel bearing diagonal connection (10), the bottom of shaped steel bearing diagonal connection (10) is fixedly mounted on pier footing (8).
Assembled battered leg steel suspension bridge the most according to claim 1, it is characterized in that: be fixedly connected with horizontal section steel by a flanged plate (6) on the medial wall of described abutment pier stud (5) and support connection (7), horizontal section steel supports the other end of connection (7) and is connected with shaped steel bearing diagonal connection (10).
Assembled battered leg steel suspension bridge the most according to claim 1, it is characterised in that: there is bridging (13) by high strength exploitation between described shaped steel bearing diagonal connection (10).
Assembled battered leg steel suspension bridge the most according to claim 1, it is characterised in that: the bottom of described shaped steel bearing diagonal connection (10) is connected with pier footing (8) by No. two flanged plates (9).
Assembled battered leg steel suspension bridge the most according to claim 4, it is characterised in that: described No. two flanged plates (9) are connected with pier footing (8) by high-strength bolt.
Assembled battered leg steel suspension bridge the most according to claim 2, it is characterised in that: a described flanged plate (6) is connected with abutment pier stud (5) by high-strength bolt.
Assembled battered leg steel suspension bridge the most according to claim 1, it is characterised in that: described longitudinal distribution beam (4) and transverse distribution beam (12) all use H profile steel material.
Assembled battered leg steel suspension bridge the most according to claim 1, it is characterized in that: the both sides of described Steel Bridge Deck (3) are welded with bridge floor and erect hurdle (1), bridge floor erects and is welded with bridge floor horizontal bar (2) between hurdle (1), and bridge floor erects hurdle (1) and bridge floor horizontal bar (2) collectively forms bridge floor guardrail.
CN201620174416.XU 2016-03-08 2016-03-08 Assembled sloping leg steel suspension bridge Expired - Fee Related CN205557292U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620174416.XU CN205557292U (en) 2016-03-08 2016-03-08 Assembled sloping leg steel suspension bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620174416.XU CN205557292U (en) 2016-03-08 2016-03-08 Assembled sloping leg steel suspension bridge

Publications (1)

Publication Number Publication Date
CN205557292U true CN205557292U (en) 2016-09-07

Family

ID=56817258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620174416.XU Expired - Fee Related CN205557292U (en) 2016-03-08 2016-03-08 Assembled sloping leg steel suspension bridge

Country Status (1)

Country Link
CN (1) CN205557292U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778660A (en) * 2019-03-18 2019-05-21 浙江兴土桥梁专用装备制造有限公司 Steel bridges installed with fabricated abutments
CN112267369A (en) * 2020-10-20 2021-01-26 中交二公局第三工程有限公司 Non-span upright post steel trestle structure, pushing installation device and construction method
CN112813793A (en) * 2020-12-31 2021-05-18 薛芹 Assembled bridge

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778660A (en) * 2019-03-18 2019-05-21 浙江兴土桥梁专用装备制造有限公司 Steel bridges installed with fabricated abutments
CN112267369A (en) * 2020-10-20 2021-01-26 中交二公局第三工程有限公司 Non-span upright post steel trestle structure, pushing installation device and construction method
CN112813793A (en) * 2020-12-31 2021-05-18 薛芹 Assembled bridge

Similar Documents

Publication Publication Date Title
CN103195170B (en) Prefabricated reinforced concrete frame structure system
CN113356551B (en) Cantilever frame structure
KR101995496B1 (en) the rigid connection structure between the upper precast concrete column and the lower precast concrete column and the rigid connection structure of the precast concrete girder using the same
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN201762663U (en) Reinforced concrete superposed beam wing board support
CN102733606A (en) Construction method of high large cantilever structure
JP2022031233A (en) Novel precast assembly bridge pier
CN102061742B (en) Anti-seismic reinforced concrete antique building structure system
CN103469735B (en) The installation method of the formwork of the solid section of the pier top of the hollow column and slab pier with curved superelevation
CN105421748A (en) Anchoring device of cantilever scaffold
CN209523198U (en) A kind of underpinning structure supporting lattice column
CN103334580B (en) Section steel tripod in a kind of overhanging scaffold and connection system for guide rail
CN104652661A (en) Semirigid frame-external recycled concrete wall panel and fabrication method
CN207700746U (en) The upper buttress of existing building base isolation reinforcement constructs
CN216109354U (en) A transfer layer steel column installation structure
CN203213137U (en) Steel raft foundation for installing steel structure roof
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN205294673U (en) Change basic connection structure
CN204252573U (en) Adjustable quick basement roof reinforcement support system
CN206109965U (en) Steel plank road in water and electricity building site
CN205224571U (en) Anchor of builder's jack
CN101158227B (en) Externally-hanging type exterior wall scaffold
CN217579811U (en) A seismic reinforcement structure of bridge three-column piers with dual energy dissipation measures
CN204000639U (en) A kind of large-scale pier stud concrete reinforcement integral hoisting mechanical splice device
KR101548215B1 (en) the deep composite precast beam, the connection structure between composite precast column and the deep composite precast beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907

Termination date: 20210308