CN205397946U - Tower crane attaches wall truss of encorbelmenting - Google Patents

Tower crane attaches wall truss of encorbelmenting Download PDF

Info

Publication number
CN205397946U
CN205397946U CN201620258570.5U CN201620258570U CN205397946U CN 205397946 U CN205397946 U CN 205397946U CN 201620258570 U CN201620258570 U CN 201620258570U CN 205397946 U CN205397946 U CN 205397946U
Authority
CN
China
Prior art keywords
truss
wall
otic placode
tower crane
metope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620258570.5U
Other languages
Chinese (zh)
Inventor
范水清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Pangyuan Construction Machinery Leasing Co Ltd
Original Assignee
Hainan Pangyuan Construction Machinery Leasing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan Pangyuan Construction Machinery Leasing Co Ltd filed Critical Hainan Pangyuan Construction Machinery Leasing Co Ltd
Priority to CN201620258570.5U priority Critical patent/CN205397946U/en
Application granted granted Critical
Publication of CN205397946U publication Critical patent/CN205397946U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a tower crane attaches wall truss of encorbelmenting, one end vertical fixation in the second wall of truss pipe, the other end of truss pipe is unsettled form, the below of every truss pipe is equipped with the supporting beam that a slant distributes, it upwards supports truss pipe lower part and manages fixed connection with the truss to prop up supporting beam's upper end, prop up supporting beam's lower extreme and second wall fixed connection, the outside of first wall vertically is equipped with the tower crane standard festival, the both sides of this tower crane standard festival are equipped with first connection otic placode and second connection otic placode respectively, wherein, first connection otic placode attaches the wall pull rod and is connected with the built -in fitting on the first wall through first, second connection otic placode attaches the wall pull rod through the second and is connected with the built -in fitting on the first wall, second connection otic placode attaches the wall pull rod through the third and is connected with the free end of truss pipe. To construct stability strong with attaching the wall telephone for the whole truss of encorbelmenting, and the structure is firm, has fine practicality.

Description

Tower crane attached wall cantilever frame
Technical field
This utility model relates to the technical field of construction, specifically tower crane attached wall cantilever frame, particularly to its mechanical connecting structure.
Background technology
Derrick crane can carry out the location of tower crane according to the requirement of project construction, and the contrast locating of some tower crane is more special, causes cannot be carried out the construction of normal attached wall, therefore needs existing tower crane attached wall structure is further improved.
Summary of the invention
The purpose of this utility model is in that to provide tower crane attached wall cantilever frame, efficiently solves derrick crane attached wall construction under specific position, overcomes the shortcoming and defect existed in prior art.
nullTo achieve these goals: the technical solution of the utility model is: tower crane attached wall cantilever frame,It includes shear wall,It is characterized in that: described shear wall is made up of two orthogonal first metopes and the second metope,Wherein,Second metope place is provided with the truss pipe of two horizontal distribution,One end of truss pipe is perpendicularly fixed at the second metope,The other end of truss pipe is hanging shape,It is provided with at least three connecting tubes between two truss pipes,It is parallel to each other between connecting tube,Two truss pipes are parallel to each other,The lower section of every truss pipe is respectively provided with a support beam diagonally distributed,Support the upper end of beam upwards prop up truss pipe bottom and fixing with truss pipe be connected,The lower end of support beam is fixing with the second metope to be connected,The outside of the first metope is longitudinally provided with standard section of tower crane,The first connection otic placode and second that is respectively provided on two sides with of this standard section of tower crane connects otic placode,Wherein,First connects otic placode is connected by the built-in fitting on the first attached wall pull bar and the first metope,Second connects otic placode is connected by the built-in fitting on the second attached wall pull bar and the first metope,Second connects otic placode is connected with the free end of truss pipe by the 3rd attached wall pull bar.
The utility model discloses tower crane attached wall cantilever frame, this attached wall cantilever frame can effectively solve the attached wall construction of derrick crane under specific position, this truss is crossed and is fixed with wall body built-in fitting welding, forms unsettled attached wall truss, and recycling attached wall pull bar is connected with derrick crane.Whole cantilever frame and engaged mechanism stability are strong, and stabilized structure has good practicality.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation.
Fig. 2 is shackle structure schematic diagram.
Wherein:
1, shear wall;
2, the first metope;
3, the second metope;
4, truss pipe;
5, connecting tube;
6, standard section of tower crane;
7, first connects otic placode;
8, second connects otic placode;
9, the first attached wall pull bar;
10, built-in fitting;
11, the second attached wall pull bar;
12, the 3rd attached wall pull bar;
13, assistant connecting pipe;
14, beam is supported.
Detailed description of the invention
With reference to the accompanying drawings, this utility model is further described below.
nullThe utility model discloses tower crane attached wall cantilever frame,It includes shear wall 1,It is different from prior art and is in that: described shear wall 1 is made up of two orthogonal first metopes 2 and the second metope 3,Wherein,Second metope 3 place is provided with the truss pipe 4 of two horizontal distribution,One end of truss pipe 4 is perpendicularly fixed at the second metope 3,The other end of truss pipe 4 is hanging shape,It is provided with at least three connecting tubes 5 between two truss pipes 4,It is parallel to each other between connecting tube 5,Two truss pipes 4 are parallel to each other,The lower section of every truss pipe 4 is respectively provided with a support beam 14 diagonally distributed,Support the upper end of beam 14 upwards prop up truss pipe 4 bottom and fixing with truss pipe 4 be connected,The lower end of support beam 14 is fixing with the second metope 3 to be connected,The outside of the first metope 2 is longitudinally provided with standard section of tower crane 6,The first connection otic placode 7 and second that is respectively provided on two sides with of this standard section of tower crane 6 connects otic placode 8,Wherein,First connects otic placode 7 is connected with the built-in fitting 10 on the first metope 2 by the first attached wall pull bar 9,Second connects otic placode 8 is connected with the built-in fitting 10 on the first metope 2 by the second attached wall pull bar 11,Second connects otic placode 8 is connected with the free end of truss pipe 4 by the 3rd attached wall pull bar 12.
In the specific implementation, diagonally distributed between described two adjacent connecting tubes 5 assistant connecting pipe 13.
Above content is in conjunction with concrete preferred implementation further detailed description of the utility model, it is impossible to assert that this utility model is embodied as being confined to these explanations above-mentioned.For this utility model person of an ordinary skill in the technical field, without departing from the concept of the premise utility, it is also possible to make some simple deduction or replace, protection domain of the present utility model all should be considered as belonging to.

Claims (2)

  1. null1. tower crane attached wall cantilever frame,It includes shear wall (1),It is characterized in that: described shear wall (1) is made up of two orthogonal first metopes (2) and the second metope (3),Wherein,Second metope (3) place is provided with the truss pipe (4) of two horizontal distribution,One end of truss pipe (4) is perpendicularly fixed at the second metope (3),The other end of truss pipe (4) is hanging shape,It is provided with at least three connecting tubes (5) between two truss pipes (4),Connecting tube is parallel to each other between (5),Two truss pipes (4) are parallel to each other,The lower section of every truss pipe (4) is respectively provided with a support beam (14) diagonally distributed,Support the upper end of beam (14) upwards prop up truss pipe (4) bottom and fixing with truss pipe (4) be connected,The lower end of support beam (14) is fixing with the second metope (3) to be connected,The outside of the first metope (2) is longitudinally provided with standard section of tower crane (6),The first connection otic placode (7) and second that is respectively provided on two sides with of this standard section of tower crane (6) connects otic placode (8),Wherein,First connects otic placode (7) is connected with the built-in fitting (10) on the first metope (2) by the first attached wall pull bar (9),Second connects otic placode (8) is connected with the built-in fitting (10) on the first metope (2) by the second attached wall pull bar (11),Second connects otic placode (8) is connected with the free end of truss pipe (4) by the 3rd attached wall pull bar (12).
  2. 2. tower crane attached wall cantilever frame according to claim 1, it is characterised in that: diagonally distributed between described two adjacent connecting tubes (5) assistant connecting pipe (13).
CN201620258570.5U 2016-03-31 2016-03-31 Tower crane attaches wall truss of encorbelmenting Active CN205397946U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620258570.5U CN205397946U (en) 2016-03-31 2016-03-31 Tower crane attaches wall truss of encorbelmenting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620258570.5U CN205397946U (en) 2016-03-31 2016-03-31 Tower crane attaches wall truss of encorbelmenting

Publications (1)

Publication Number Publication Date
CN205397946U true CN205397946U (en) 2016-07-27

Family

ID=56418977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620258570.5U Active CN205397946U (en) 2016-03-31 2016-03-31 Tower crane attaches wall truss of encorbelmenting

Country Status (1)

Country Link
CN (1) CN205397946U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106829753A (en) * 2017-01-18 2017-06-13 成张佳宁 Tower crane attachment anchor structure and anchoring process based on fabricated shear wall framework
CN108483247A (en) * 2018-04-08 2018-09-04 中建三局安装工程有限公司 A kind of townhouse carrying pole type hoisting frame being mounted laterally based on concrete isolated beam

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106829753A (en) * 2017-01-18 2017-06-13 成张佳宁 Tower crane attachment anchor structure and anchoring process based on fabricated shear wall framework
CN108483247A (en) * 2018-04-08 2018-09-04 中建三局安装工程有限公司 A kind of townhouse carrying pole type hoisting frame being mounted laterally based on concrete isolated beam

Similar Documents

Publication Publication Date Title
CN203430059U (en) Temporary fixing device used for installing large-span steel structure roof primary truss
CN205397946U (en) Tower crane attaches wall truss of encorbelmenting
CN107327097A (en) A kind of guardrail
CN206346118U (en) A kind of large-span steel pipe truss beam falsework
CN211255054U (en) Tower crane attaches wall bearing structure
CN104372923A (en) Scaffold
CN209025417U (en) A kind of integrated form attached lifting scaffold interim drawknot device
CN106337529A (en) Spliced herringbone beam
CN207700662U (en) Steel-structure factory building scaffold
CN203066591U (en) Tent
CN215168026U (en) Template supporting structure of post-cast suspended beam plate
CN205089028U (en) Weight type four -column communication base station tower
CN212953981U (en) Detachable portal frame
CN205444889U (en) Support arrangement for horizontal prefabricated component
CN106672743A (en) Temporary supporting device for large-space structure construction elevator wall attaching frame
CN203552637U (en) Support
CN207862965U (en) The hanging foundation structure of derrick crane
CN207245046U (en) A kind of guardrail
CN207442773U (en) A kind of easy-disassembling-assembling photovoltaic board mount
CN201686405U (en) Rail supporting device of building
CN204781317U (en) Steel construction beam column sliding connection node
CN204163358U (en) Scaffold
CN205426464U (en) Fixing device is connected to ancient building knaur point anti -seismic testing's column cap
CN205617565U (en) Upper assembling type steel corbel of thermal power factory structure
CN210289063U (en) Overhanging type scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 571924 station 050, 1st floor, building a25, Hainan Ecological Software Park, Chengmai County, Haikou City, Hainan Province

Patentee after: Hainan pangyuan Mechanical Engineering Co., Ltd

Address before: 1-1-302, East District, government service center building, No. 8, Yantian Road, Yangpu Economic Development Zone, Hainan Province

Patentee before: HAINAN PANGYUAN CONSTRUCTION MACHINERY LEASING Co.,Ltd.

CP03 Change of name, title or address