CN104372923A - Scaffold - Google Patents

Scaffold Download PDF

Info

Publication number
CN104372923A
CN104372923A CN201410601071.7A CN201410601071A CN104372923A CN 104372923 A CN104372923 A CN 104372923A CN 201410601071 A CN201410601071 A CN 201410601071A CN 104372923 A CN104372923 A CN 104372923A
Authority
CN
China
Prior art keywords
scaffold
long transverse
hinge structure
connection fastener
stand columns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410601071.7A
Other languages
Chinese (zh)
Other versions
CN104372923B (en
Inventor
黄国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Anjie Scaffold Co Ltd
Original Assignee
Wuxi Anjie Scaffold Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Anjie Scaffold Co Ltd filed Critical Wuxi Anjie Scaffold Co Ltd
Priority to CN201410601071.7A priority Critical patent/CN104372923B/en
Publication of CN104372923A publication Critical patent/CN104372923A/en
Application granted granted Critical
Publication of CN104372923B publication Critical patent/CN104372923B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a scaffold which comprises stand columns, long transverse pipes, first connecting fasteners, second connecting fasteners and a bearing plate. The stand columns and the long transverse pipes are all seamless square pipes. The two ends of each long transverse pipe are provided with through holes. The first connecting fasteners are of a coaxial dual-hinge structure. Each second connecting fastener is of a dual-bole connection hinge structure. A base is fixed to the side edge of each hinge structure, wherein the base extends in the axial direction of the hinge structure to form a protrusion. The protrusions are matched with the through holes in size. The bearing plate is of a flat plate structure, and the upper portions of the two side edges of the bearing plate extend and protrude downwards to form hooks. According to the scaffold, each first connecting fastener is used for connecting two corresponding stand columns conveniently and rapidly, and materials are saved; then the second connecting fasteners are utilized for fixing the long transverse pipes to the stand columns; the bearing plate is used for being hung on the long transverse pipes to play a bearing role and a connection role for the scaffold as well, and therefore scaffold construction is convenient and easy.

Description

Scaffold
Technical field
The present invention relates to building implement technical field, especially a kind of scaffold.
Background technology
Scaffold is at the construction field (site) for operative and high-rise working and the various supports set up, and is the generic term of building field, is mainly used in the higher place that cannot directly construct of exterior wall, interior decoration or floor height on building sites.Scaffold makes material bamboo and wood, steel pipe or synthetic materials etc. usually; Also used as template by scaffold in part engineering at present, it is also widely used in the fields such as advertising, municipal administration, traffic road and bridge, mine in addition.And get back in building field, the scaffold used at present mainly adopts steel pipe, connection card and miscellaneous part to set up according to predetermined specification, required fixed structure cannot be set up on existing support body in the process set up temporarily, and the different parts for support body needs the steel pipe using different size, cause scaffolding kind more, and frame structure is complicated, all need to expend too much artificial in the process of assembling and dismounting, with regard to single constructor, labour intensity is large; During assembling, the uniformity of support body different parts syndeton is low simultaneously, and then the uncertainty produced by human factor in an assembling process also increases thereupon, easily causes support body to there is many potential safety hazards; Therefore based on foregoing problems, be necessary to do further improvement for the structure of existing building scaffold.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, propose a kind of scaffold, structure is ingenious, use safety.
In order to realize foregoing invention object, the invention provides following technical scheme: a kind of scaffold, comprising column, long transverse tube, the first connection fastener, the second connection fastener and loaded plate, column and long transverse tube are seamless square tube, and long transverse tube two ends are equipped with through hole; First connection fastener is coaxial pairing page structure, second connection fastener is a two bolted hinge structure of band, this hinge structure side is fixed with pedestal, and this pedestal axially extends a projection along this hinge structure, and this projection is mated with this clear size of opening; This loaded plate is slabbed construction, and its dual-side upper part extends lower prominent formation and links up with.
Further, the size of this hook is mated with seamless square tube.
Further, be provided with triangle gusset below this pedestal, a side is fixed on this hinge structure, and another side is fixed on base bottom surface.
Compared with prior art, the present invention has the following advantages: utilize the first connection fastener to connect two columns, convenient and swift, saves material; Recycling the second connection fastener is fixed on column by long transverse tube; Recycling loaded plate, is hung on long transverse tube, had both played load-carrying effect, play again the connection function in scaffold, scaffolds erecting easily convenient.
Accompanying drawing explanation
Fig. 1 is the structural representation of scaffold of the present invention;
Fig. 2 is the structural representation of the first connection fastener and column;
Fig. 3 is the second connection fastener structural representation;
Fig. 4 is the structural representation of long transverse tube.
Detailed description of the invention
Describe the present invention below in conjunction with accompanying drawing, the description of this part is only exemplary and explanatory, should not have any restriction to protection scope of the present invention.
A kind of scaffold as shown in Figure 1, comprise column 1, long transverse tube 3, first connection fastener 4, second connection fastener 2 and loaded plate 5, column 1 and long transverse tube 3 are seamless square tube, and long transverse tube 3 two ends are equipped with through hole 31, as in Figure 2-4; First connection fastener 4 is coaxial pairing page structure, second connection fastener 2 is a two bolted hinge structure 21 of band, this hinge structure 21 side is fixed with pedestal 22, and this pedestal 22 axially extends a projection 23 along this hinge structure 21, and this projection 23 is mated with this through hole 31 size; This loaded plate 5 is slabbed construction, and its dual-side upper part extends lower prominent formation and links up with.
The size of this hook is mated with long transverse tube 3, facilitates loaded plate 5 to be hung on long transverse tube 3, in installation foot hand cradle process, hangs up loaded plate 5 in time, can play the effect of stable scaffold, conveniently scaffold erecting again; After scaffold installation, loaded plate 5 is indispensable instruments in construction.
Being provided with triangle gusset 24, side below this pedestal 22 is fixed on this hinge structure 2, and another side is fixed on pedestal 22 bottom surface, improves holding capacity.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (3)

1. a scaffold, is characterized in that: comprise column, long transverse tube, the first connection fastener, the second connection fastener and loaded plate, and column and long transverse tube are seamless square tube, and long transverse tube two ends are equipped with through hole; First connection fastener is coaxial pairing page structure, second connection fastener is a two bolted hinge structure of band, this hinge structure side is fixed with pedestal, and this pedestal axially extends a projection along this hinge structure, and this projection is mated with this clear size of opening; This loaded plate is slabbed construction, and its dual-side upper part extends lower prominent formation and links up with.
2. scaffold as claimed in claim 1, is characterized in that: the size of this hook is mated with seamless square tube.
3. scaffold as claimed in claim 1, it is characterized in that: be provided with triangle gusset below this pedestal, a side is fixed on this hinge structure, and another side is fixed on base bottom surface.
CN201410601071.7A 2014-10-31 2014-10-31 Scaffolding Active CN104372923B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410601071.7A CN104372923B (en) 2014-10-31 2014-10-31 Scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410601071.7A CN104372923B (en) 2014-10-31 2014-10-31 Scaffolding

Publications (2)

Publication Number Publication Date
CN104372923A true CN104372923A (en) 2015-02-25
CN104372923B CN104372923B (en) 2016-06-08

Family

ID=52552089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410601071.7A Active CN104372923B (en) 2014-10-31 2014-10-31 Scaffolding

Country Status (1)

Country Link
CN (1) CN104372923B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152158A (en) * 2017-06-21 2017-09-12 上海森大机械制造有限公司 A kind of fixed scaffold
CN108166767A (en) * 2018-01-18 2018-06-15 北京崇建工程有限公司 A kind of construction method and outer climbing frame protective device
CN109025245A (en) * 2018-09-10 2018-12-18 严晓安 A kind of square tube scaffold connector and square tube scaffold
JP2021055514A (en) * 2019-09-28 2021-04-08 楽 康Le, Kang Scaffold for wall paintings production with ruler function and compass function

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2419374A1 (en) * 1978-03-07 1979-10-05 Pons Punti Juan Extendable working platform for scaffolding - uses two coplanar inter-sliding panels of parallel interspaced tubes connected by end straps with hooks and stops to prevent over-extension
CN101372864A (en) * 2007-08-22 2009-02-25 卢兴明 Multi-direction centralized connection type composed scaffold
JP2009263906A (en) * 2008-04-23 2009-11-12 Japan Steels Group Kk Movable working table
CN203086058U (en) * 2013-02-05 2013-07-24 彭自力 Multidirectional combined-type crossing frame
CN204163358U (en) * 2014-10-31 2015-02-18 无锡市安捷脚手架有限公司 Scaffold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2419374A1 (en) * 1978-03-07 1979-10-05 Pons Punti Juan Extendable working platform for scaffolding - uses two coplanar inter-sliding panels of parallel interspaced tubes connected by end straps with hooks and stops to prevent over-extension
CN101372864A (en) * 2007-08-22 2009-02-25 卢兴明 Multi-direction centralized connection type composed scaffold
JP2009263906A (en) * 2008-04-23 2009-11-12 Japan Steels Group Kk Movable working table
CN203086058U (en) * 2013-02-05 2013-07-24 彭自力 Multidirectional combined-type crossing frame
CN204163358U (en) * 2014-10-31 2015-02-18 无锡市安捷脚手架有限公司 Scaffold

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152158A (en) * 2017-06-21 2017-09-12 上海森大机械制造有限公司 A kind of fixed scaffold
CN108166767A (en) * 2018-01-18 2018-06-15 北京崇建工程有限公司 A kind of construction method and outer climbing frame protective device
CN109025245A (en) * 2018-09-10 2018-12-18 严晓安 A kind of square tube scaffold connector and square tube scaffold
JP2021055514A (en) * 2019-09-28 2021-04-08 楽 康Le, Kang Scaffold for wall paintings production with ruler function and compass function

Also Published As

Publication number Publication date
CN104372923B (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN104372923A (en) Scaffold
CN205421940U (en) Concrete spreader
CN204826593U (en) A portable supplementary operation platform for steel construction support body
CN103821136B (en) Hang single-row of scaffold and construction method thereof
CN204163358U (en) Scaffold
CN204174902U (en) Scaffold
CN211447715U (en) Bearing stores pylon for civil engineering
CN104372939A (en) Scaffold
CN204174915U (en) Scaffold
CN204174903U (en) Scaffold
CN104372935A (en) Scaffold
CN105421734A (en) Scaffold
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN202227714U (en) Height-adjustable temporary support frame for construction
CN203878563U (en) Suspended single-row scaffold
CN204466421U (en) For the support bar of agricultural booth
CN204174904U (en) Scaffold
CN204531362U (en) Scaffold
CN104372922A (en) Scaffold
CN204174919U (en) Scaffold
CN204163359U (en) Scaffold
CN205637524U (en) Novel safety scaffold
CN104372931A (en) Scaffold
CN205476444U (en) Light -duty support post based on low level jacking die carrier system
CN205224556U (en) Scaffold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Scaffolding

Effective date of registration: 20220401

Granted publication date: 20160608

Pledgee: Agricultural Bank of China Limited by Share Ltd. Wuxi science and Technology Branch

Pledgor: WUXI SAFETY-SCAFFOLDING Co.,Ltd.

Registration number: Y2022320000154

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230707

Granted publication date: 20160608

Pledgee: Agricultural Bank of China Limited by Share Ltd. Wuxi science and Technology Branch

Pledgor: WUXI SAFETY-SCAFFOLDING Co.,Ltd.

Registration number: Y2022320000154