CN104372931A - Scaffold - Google Patents

Scaffold Download PDF

Info

Publication number
CN104372931A
CN104372931A CN201410601080.6A CN201410601080A CN104372931A CN 104372931 A CN104372931 A CN 104372931A CN 201410601080 A CN201410601080 A CN 201410601080A CN 104372931 A CN104372931 A CN 104372931A
Authority
CN
China
Prior art keywords
hinge
scaffold
fastener
pipe fittings
pipe fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410601080.6A
Other languages
Chinese (zh)
Inventor
黄国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Anjie Scaffold Co Ltd
Original Assignee
Wuxi Anjie Scaffold Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Anjie Scaffold Co Ltd filed Critical Wuxi Anjie Scaffold Co Ltd
Priority to CN201410601080.6A priority Critical patent/CN104372931A/en
Publication of CN104372931A publication Critical patent/CN104372931A/en
Pending legal-status Critical Current

Links

Landscapes

  • Ladders (AREA)

Abstract

The invention discloses a scaffold which is formed by connecting pipe fittings through a fastener. The pipe fittings are of a seamless square pipe structure. The two ends of each pipe fitting are provided with through holes. The fastener is of a dual-bolt connection hinge structure. A base is fixed to the side edge of the hinge. The base extends in the axial direction of the hinge to form a protrusion. The protrusion is matched with the through holes in the pipe fittings in size. According to the scaffold, traditional circular pipe fittings are changed into the square pipe structure, so that carrying and placement are convenient, and the scaffold is easy to install; a traditional dual-hinge structure of the fastener is changed into the long single-hinge structure, and a simple structure fastened to the pipe fittings is arranged on the side edge of the hinge, so that the scaffold is easy and convenient to operate, simple in structure and high in efficiency; due to the fact that the dual-bolt hinge structure is adopted, the pipe fittings needing to be lengthened in the same direction can be directly connected in a butting mode, the effect is good, and materials are saved.

Description

Scaffold
Technical field
The present invention relates to building implement technical field, especially a kind of scaffold.
Background technology
Scaffold is at the construction field (site) for operative and high-rise working and the various supports set up, and is the generic term of building field, is mainly used in the higher place that cannot directly construct of exterior wall, interior decoration or floor height on building sites.Scaffold makes material bamboo and wood, steel pipe or synthetic materials etc. usually; Also used as template by scaffold in part engineering at present, it is also widely used in the fields such as advertising, municipal administration, traffic road and bridge, mine in addition.And get back in building field, the scaffold used at present mainly adopts steel pipe, connection card and miscellaneous part to set up according to predetermined specification, required fixed structure cannot be set up on existing support body in the process set up temporarily, and the different parts for support body needs the steel pipe using different size, cause scaffolding kind more, and frame structure is complicated, all need to expend too much artificial in the process of assembling and dismounting, with regard to single constructor, labour intensity is large; During assembling, the uniformity of support body different parts syndeton is low simultaneously, and then the uncertainty produced by human factor in an assembling process also increases thereupon, easily causes support body to there is many potential safety hazards; Therefore based on foregoing problems, be necessary to do further improvement for the structure of existing building scaffold.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, propose a kind of scaffold, structure is ingenious, use safety.
In order to realize foregoing invention object, the invention provides following technical scheme: a kind of scaffold, is connected and composed through fastener by pipe fitting, this pipe fitting is seamless rhs-structure, and two ends are equipped with through hole; Fastener is a two bolted hinge structure of band, and this hinge side is fixed with pedestal, and raised to extending one along hinge axis on this pedestal, this projection is mated with the clear size of opening of this pipe fitting.
Further, be provided with triangle gusset below this pedestal, a side is fixed on hinge, and another side is fixed on base bottom surface.
Further, this hinge two active page is equipped with the base construction of band projection.
Compared with prior art, the present invention has the following advantages: traditional pipe pipe fitting is set as rhs-structure, and carry and put conveniently, installation foot hand cradle is easy; And the fastener of traditional double hinge structure is set as longer single hinge structure, arrange the easy structure with pipe fitting hasp at hinge side, easy and simple to handle, structure is simple, and efficiency is high; Adopt two bolt hinge structure, can directly dock can connect the equidirectional pipe fitting that need lengthen, effective, save material.
Accompanying drawing explanation
Fig. 1 is the structural representation of scaffold of the present invention.
Detailed description of the invention
Describe the present invention below in conjunction with accompanying drawing, the description of this part is only exemplary and explanatory, should not have any restriction to protection scope of the present invention.
A kind of scaffold as shown in Figure 1, is connected and composed through fastener 2 by pipe fitting 1, and this pipe fitting 1 is seamless rhs-structure, and two ends are equipped with through hole 11, this through hole 11 be pipe fitting 1 radial direction on arrange.
Fastener 2 is the hinge structure that a two bolt 21 of band connects, and this hinge side is fixed with pedestal 22, and along hinge axis to extending one raised 23 on this pedestal 22, this projection 23 is mated with through hole 11 size of this pipe fitting 1, and projection 23 can be inserted in through hole 11.
When installation foot hand cradle, can as shown in Figure 1, by the upper and lower of fastener 2 each grafting pipe fitting 1, two bolt 21 be utilized to connect; And on side, keep flat a pipe fitting 1, through hole 11 is directly set in projection 23, utilizes pipe fitting 1 own wt and other building implement, pipe fitting 1 will be kept flat and snap on fastener 2.
Being provided with triangle gusset 24, side below this pedestal 22 is fixed on hinge, and another side is fixed on pedestal 22 bottom surface, guarantees the supporting capacity of pedestal.
This hinge two active page is equipped with pedestal 22 structure of band projection 23, can at the equal hasp pipe fitting 1 in these fastener both sides.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (3)

1. a scaffold, is connected and composed through fastener by pipe fitting, it is characterized in that: this pipe fitting is seamless rhs-structure, and two ends are equipped with through hole; Fastener is a two bolted hinge structure of band, and this hinge side is fixed with pedestal, and raised to extending one along hinge axis on this pedestal, this projection is mated with the clear size of opening of this pipe fitting.
2. scaffold as claimed in claim 1, it is characterized in that: be provided with triangle gusset below this pedestal, a side is fixed on hinge, and another side is fixed on base bottom surface.
3. scaffold as claimed in claim 1 or 2, is characterized in that: the base construction this hinge two active page being equipped with band projection.
CN201410601080.6A 2014-10-31 2014-10-31 Scaffold Pending CN104372931A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410601080.6A CN104372931A (en) 2014-10-31 2014-10-31 Scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410601080.6A CN104372931A (en) 2014-10-31 2014-10-31 Scaffold

Publications (1)

Publication Number Publication Date
CN104372931A true CN104372931A (en) 2015-02-25

Family

ID=52552097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410601080.6A Pending CN104372931A (en) 2014-10-31 2014-10-31 Scaffold

Country Status (1)

Country Link
CN (1) CN104372931A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08135175A (en) * 1994-11-08 1996-05-28 Nikko Co Ltd Bracket for temporary scaffold
CN2523855Y (en) * 2001-05-18 2002-12-04 葛择瑶 Anti-folding butt-jointed buckles
CN2637630Y (en) * 2003-06-14 2004-09-01 李跃明 Mortise and tenon type scaffold connecting unit and mortise and tenon type scaffold
GB2415225A (en) * 2004-06-18 2005-12-21 Safestand Ltd Kickboard bracket and telescopic rail for builders' trestle
CN202810182U (en) * 2012-10-10 2013-03-20 王新宏 Fastener for fast assembly and disassembly of scaffold
CN204174903U (en) * 2014-10-31 2015-02-25 无锡市安捷脚手架有限公司 Scaffold

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08135175A (en) * 1994-11-08 1996-05-28 Nikko Co Ltd Bracket for temporary scaffold
CN2523855Y (en) * 2001-05-18 2002-12-04 葛择瑶 Anti-folding butt-jointed buckles
CN2637630Y (en) * 2003-06-14 2004-09-01 李跃明 Mortise and tenon type scaffold connecting unit and mortise and tenon type scaffold
GB2415225A (en) * 2004-06-18 2005-12-21 Safestand Ltd Kickboard bracket and telescopic rail for builders' trestle
CN202810182U (en) * 2012-10-10 2013-03-20 王新宏 Fastener for fast assembly and disassembly of scaffold
CN204174903U (en) * 2014-10-31 2015-02-25 无锡市安捷脚手架有限公司 Scaffold

Similar Documents

Publication Publication Date Title
CN104372923A (en) Scaffold
CN203794504U (en) Internal-climbing plug-in tower crane support structure
CN204174903U (en) Scaffold
CN204174902U (en) Scaffold
CN204299157U (en) The mounted lifting device in attached lifting scaffold side
CN204238537U (en) A kind of elevated hoistway operation platform
CN203531345U (en) Movable cantilever frame
CN204174915U (en) Scaffold
CN104372931A (en) Scaffold
CN207436481U (en) A kind of Novel high-rise construction external scaffolding
CN204163358U (en) Scaffold
CN205089028U (en) Weight type four -column communication base station tower
CN204174919U (en) Scaffold
CN104372935A (en) Scaffold
CN205617772U (en) Gallows structure under lifting foot hand rack special use
CN205046830U (en) Formula steel pipe scaffold is detained to bowl
CN204531362U (en) Scaffold
CN104372922A (en) Scaffold
CN203878563U (en) Suspended single-row scaffold
CN104372921A (en) Scaffold
CN206917061U (en) A kind of steel construction assembled wallboard
CN204163359U (en) Scaffold
CN205822779U (en) A kind of dish buckle type scaffold floor side bar template install structure
CN205584939U (en) A support frame for afforestation
CN204163365U (en) A kind of overhanging scaffold assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150225

RJ01 Rejection of invention patent application after publication