CN204023549U - 一种se组合钢板桩 - Google Patents
一种se组合钢板桩 Download PDFInfo
- Publication number
- CN204023549U CN204023549U CN201420116161.2U CN201420116161U CN204023549U CN 204023549 U CN204023549 U CN 204023549U CN 201420116161 U CN201420116161 U CN 201420116161U CN 204023549 U CN204023549 U CN 204023549U
- Authority
- CN
- China
- Prior art keywords
- steel
- steel sheet
- sheet pile
- shaped
- shaped steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 116
- 239000010959 steel Substances 0.000 title claims abstract description 116
- 238000005452 bending Methods 0.000 claims abstract description 6
- 238000000034 method Methods 0.000 abstract description 4
- 238000003466 welding Methods 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 10
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000284 extract Substances 0.000 description 2
- 238000010923 batch production Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本实用新型公开了一种组合钢板桩,包括钢板桩本体和与其通过设置在钢板桩本体腹板宽度方向的扣件连接的H型钢;所述钢板桩本体与H型钢为活动式连接;所述扣件为角钢或钢板直弯件;所述钢板桩本体为U型热轧钢板桩或冷弯钢板桩。H型钢通过锁扣和钢板桩形成一种SE组合钢板桩,钢板桩与H型钢之间密贴,刚度大,控制变形能力强,H型钢可以置于基坑内侧,也可以置于基坑外侧,比较灵活方便。采用成熟的U型钢板桩、槽钢和焊接工艺,质量稳定,成本可控。
Description
技术领域
本实用新型涉及工程材料技术领域,具体涉及一种新型钢板桩。
背景技术
为充分发挥钢板桩和H型钢的优点,采用H型钢桩与钢板桩组合,可以较大幅度提高组合体的抗弯模量及截面模数,能承担较大荷载,从而有效控制变形。由于钢板桩和H型钢之间没有专用连接构件,如何使钢板桩和H型钢之间形成一个整体,一直是个没有解决的难题。
公开 (公告) 号为CN203200758U的专利公开了一种采用螺栓连接的钢板桩和H型钢组合基坑支护结构,钢板桩和H型钢用高强螺栓连接,钢板桩和H型钢一体施工,拔除后,钢板桩和H型钢可以拆除分开,整体刚度大,缺点是:结构几何尺寸大,组合桩体打入和拔出都比较困难,且打入和拔出对周围环境影响大。
CN202559359U专利公开一种钢板桩与H型钢组合基坑支护结构,在钢板桩上设置U型扣件,H型钢沿着U型扣件打入,该组合基坑支护结构刚度大,可以充分发挥钢板桩、H型钢的优点。两者通过扣件连接,钢板桩和H型钢分开施工,施工中土体阻力小、操作灵活,方便回收,缺点是:U型扣件内侧和钢板桩焊接在一起,H型钢和钢板桩之间无法密贴,留有一定的缝隙,对组合体强度有一定影响。
发明内容
本实用新型的目的是克服现有技术的不足,提供了一种新型钢板桩(简称SE钢板桩),矩形锁扣可以定制,工厂化加工,H型钢可以通过矩形锁扣和钢板桩组合新型组合基坑支护结构,适用于大型深基坑工程。
为了解决上述技术问题,本实用新型是通过以下技术方案实现的:
一种组合钢板桩,包括钢板桩本体和与其通过设置在钢板桩本体腹板宽度方向的扣件连接的H型钢。
本实用新型所述钢板桩本体与H型钢为活动式连接。
本实用新型所述扣件为角钢或钢板直弯件。
本实用新型所述钢板桩本体为U型热轧钢板桩或冷弯钢板桩。
本实用新型采用上述技术方案,与现有技术相比具有如下优点:
H型钢通过锁扣和钢板桩形成一种SE组合钢板桩,钢板桩与H型钢之间密贴,刚度大,控制变形能力强,H型钢可以置于基坑内侧,也可以置于基坑外侧,比较灵活方便。采用成熟的U型钢板桩、槽钢和焊接工艺,质量稳定,成本可控。
附图说明
图1是本实用新型的一种结构示意图,其中扣件设置于腹板外表面。
图2是本实用新型的另一种结构示意图,其中扣件设置于腹板内表面。
图3为SE钢板桩工程应用的墙体结构示意图,H型钢置于基坑外侧。
图4为SE钢板桩工程应用的墙体结构示意图,H型钢置于基坑内侧。
图5为SE钢板桩工程应用剖面示意图。
具体实施方式
下面结合附图对本实用新型的技术方案进行详细说明:
如图1所示,作为本实用新型的一个优选实施例,所述的钢板桩本体1为U型钢板桩,可以为热轧钢板桩,也可以为冷弯钢板桩,所述扣件2优选为角钢,或由钢板直弯形成,焊接于钢板桩本体1腹板宽度方向。
如图3所示,在工程中SE钢板桩通过锁扣13连接形成钢板桩墙,H型钢通过扣件2和钢板桩形成组合钢板桩基坑支护结构。
如图5所示,本具体实施方式,钢板桩与H型钢之间密贴,H型钢置于钢板桩的外侧,结构宽度大,刚度大,控制变形能力强,钢板桩和H型钢分别打入和拔除,施工比较方便,对周围环境影响小。采用成熟的U型钢板桩、槽钢和焊接工艺,质量稳定,成本可控。
如图2所示,作为本实用新型的另一个优选实施例,扣件2设置于腹板11内表面。
如图4所示,在工程中SE钢板桩通过锁扣13连接形成钢板桩墙,H型钢通过扣件2和钢板桩1形成组合钢板桩基坑支护结构,本组合结构宽度小,刚度略低,占用空间小。
Claims (4)
1.一种SE组合钢板桩,其特征在于,包括钢板桩本体(1)和与其通过设置在钢板桩本体(1)腹板宽度方向的扣件(2)连接的H型钢(3)。
2.根据权利要求1所述的组合钢板桩,其特征在于,所述钢板桩本体(1)与H型钢(3)为活动式连接。
3.根据权利要求1所述的组合钢板桩,其特征在于,所述扣件(2)为角钢或钢板直弯件。
4.根据权利要求1所述的组合钢板桩,其特征在于,所述钢板桩本体1为U型热轧钢板桩或冷弯钢板桩。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420116161.2U CN204023549U (zh) | 2014-03-14 | 2014-03-14 | 一种se组合钢板桩 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420116161.2U CN204023549U (zh) | 2014-03-14 | 2014-03-14 | 一种se组合钢板桩 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204023549U true CN204023549U (zh) | 2014-12-17 |
Family
ID=52063436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420116161.2U Expired - Lifetime CN204023549U (zh) | 2014-03-14 | 2014-03-14 | 一种se组合钢板桩 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204023549U (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120710A (zh) * | 2016-06-28 | 2016-11-16 | 河海大学 | 一种工字型复合钢板桩 |
CN106368208A (zh) * | 2015-07-20 | 2017-02-01 | 上海思珂润机电有限公司 | 一种钢板桩的防水方法 |
CN105064379B (zh) * | 2015-08-29 | 2017-02-22 | 青岛蓝天创先科技服务有限公司 | 一种h型钢基坑支护装置及方法 |
CN107513993A (zh) * | 2017-08-22 | 2017-12-26 | 中交第四公路工程局有限公司 | 超长直线组合钢板桩施工方法 |
-
2014
- 2014-03-14 CN CN201420116161.2U patent/CN204023549U/zh not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106368208A (zh) * | 2015-07-20 | 2017-02-01 | 上海思珂润机电有限公司 | 一种钢板桩的防水方法 |
CN105064379B (zh) * | 2015-08-29 | 2017-02-22 | 青岛蓝天创先科技服务有限公司 | 一种h型钢基坑支护装置及方法 |
CN106120710A (zh) * | 2016-06-28 | 2016-11-16 | 河海大学 | 一种工字型复合钢板桩 |
CN107513993A (zh) * | 2017-08-22 | 2017-12-26 | 中交第四公路工程局有限公司 | 超长直线组合钢板桩施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204023549U (zh) | 一种se组合钢板桩 | |
CN202559362U (zh) | 一种双排钢板桩与h型钢组合基坑支护结构 | |
CN203200762U (zh) | 一种hsw工法桩基坑支护结构 | |
CN103821262B (zh) | 一种装配式钢板剪力墙 | |
CN207109795U (zh) | 一种可回收hc工法钢质地下连续墙 | |
CN201962684U (zh) | 一种内支撑腰梁加固装置 | |
CN202787248U (zh) | 预应力混凝土管桩抱箍式机械快速接头 | |
CN203866845U (zh) | 一种y型+u型组合钢板桩基坑支护结构 | |
CN203846403U (zh) | 一种装配式岸上临时支墩装置 | |
CN106284371A (zh) | 一种组合式基坑支护结构 | |
CN204023550U (zh) | 一种锁扣h型钢及组合式钢板桩墙 | |
CN201279536Y (zh) | 立式焊缝棱角校正架 | |
CN203452053U (zh) | 一种用于潜孔弧门的转角防射流水封装置 | |
CN202324202U (zh) | 用于连接钢制竖向构件与钢制水平构件的可调节装置 | |
CN210597271U (zh) | 一种h型钢板桩 | |
CN204003293U (zh) | 一种抗打桩冲击的法兰结构 | |
CN204850046U (zh) | 双肩多吊柱与行车梁连接结构 | |
CN204876194U (zh) | 接触式防屈曲钢板剪力墙 | |
CN210636420U (zh) | 一种采用冷弯锁口条的h型钢板桩 | |
CN204139577U (zh) | 一种后埋置工具式连墙件 | |
CN207934041U (zh) | 一种双排拉森钢板桩刚架梁 | |
CN208666868U (zh) | 大型灯泡贯流式机组水轮机尾水管快速安装工具 | |
CN203270561U (zh) | 抗拔预应力管桩 | |
CN202730754U (zh) | 一种h型支护桩 | |
CN203373748U (zh) | H型钢桩起拔锁紧装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 210000, room 4, building 18, 904 Jiangdong Street, Jialing District, Nanjing, Jiangsu, Jianye Patentee after: JIANGSU SOUTH & EAST GEOTECHNICAL TECHNOLOGY Co.,Ltd. Address before: 210000, room 4, building 18, 904 Jiangdong Street, Jialing District, Nanjing, Jiangsu, Jianye Patentee before: JIANGSU SOUTH & EAST GEOTECHNICAL ENGINEERING Co.,Ltd. |
|
CX01 | Expiry of patent term |
Granted publication date: 20141217 |
|
CX01 | Expiry of patent term |