CN204001327U - A kind of settling tank washroom backfill earth construction - Google Patents

A kind of settling tank washroom backfill earth construction Download PDF

Info

Publication number
CN204001327U
CN204001327U CN201420492162.7U CN201420492162U CN204001327U CN 204001327 U CN204001327 U CN 204001327U CN 201420492162 U CN201420492162 U CN 201420492162U CN 204001327 U CN204001327 U CN 204001327U
Authority
CN
China
Prior art keywords
washroom
settling tank
layer
waterproofing course
backfill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420492162.7U
Other languages
Chinese (zh)
Inventor
朱燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DONGYI RISHENG DECORATION CORP
Original Assignee
DONGYI RISHENG DECORATION CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGYI RISHENG DECORATION CORP filed Critical DONGYI RISHENG DECORATION CORP
Priority to CN201420492162.7U priority Critical patent/CN204001327U/en
Application granted granted Critical
Publication of CN204001327U publication Critical patent/CN204001327U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model relates to a kind of settling tank washroom backfill earth construction, comprises concrete floor and body of wall, and the first leveling layer is laid on concrete floor; The first waterproofing course is located on the first leveling layer; On the first waterproofing course, evenly lay the equal sand lime brick masonry in interval; Between sand lime brick masonry, fill backfilling material and form backfill layer; The second leveling layer is laid on backfill layer; The second waterproofing course is located on the second leveling layer; Washroom floor tile is by washroom floor tile adhesive layer second waterproofing course that bonds; The stone of moving into one's husband's household upon marriage is located at the junction, ground outside washroom floor tile and washroom.This structure can be best at settling tank bottom brushing waterproofing course play waterproofing protection effect, and on the first waterproofing course in settling tank, evenly lay the equal sand lime brick masonry in interval and can avoid backfill layer to sink to causing second layer waterproof to break as the bearing structure of earth construction load.

Description

A kind of settling tank washroom backfill earth construction
Technical field
The utility model relates to a kind of backfill earth construction, is specifically related to a kind of settling tank washroom backfill earth construction, belongs to toilet decoration field.
Background technology
Existing washroom settling tank earth-filling method generally adopts slag backfill and does not do carrying partition wall, the load of earth construction is entirely by backfill layer carrying, often because backfilling material is along with the time sinks to causing to look for slope leveling layer to sink to causing the problem that waterproof is broken, accomodation ground is out of shape gradually.Sometimes waterproofing work is not done in settling tank bottom yet, once backfilling material sinks to causing waterproof to be broken to there will be the hidden danger of leaking.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of settling tank washroom backfill earth construction, overcome in prior art because backfilling material is along with the time sinks to causing to look for slope leveling layer to sink to causing that waterproof is broken, the defect of accomodation ground distortion gradually the toilet warterproof effect of playing that simultaneously can be best.
The technical scheme that the utility model solves the problems of the technologies described above is as follows: a kind of settling tank washroom backfill earth construction, comprise concrete floor and body of wall, also comprise the first leveling layer, the first waterproofing course, sand lime brick masonry, backfill layer, the second leveling layer, the second waterproofing course, washroom floor tile adhesive layer, washroom floor tile and the stone of moving into one's husband's household upon marriage, described the first leveling layer is laid on described concrete floor; Described the first waterproofing course is located on described the first leveling layer; On described the first waterproofing course, evenly lay the equal sand lime brick masonry in interval; Between described sand lime brick masonry, fill backfilling material and form backfill layer; Described the second leveling layer is laid on described backfill layer; Described the second waterproofing course is located on described the second leveling layer; Described washroom floor tile is by washroom floor tile adhesive layer described the second waterproofing course that bonds; The described stone of moving into one's husband's household upon marriage is located at the junction, ground outside washroom floor tile and washroom.
Concrete floor described in the utility model is washroom prototype structure, and described the first leveling layer and concrete floor are bonded as the construction basic unit of the first waterproofing course, and described the first waterproofing course is positioned at settling tank bottom.Described sand lime brick masonry is the bearing structure of earth construction; Described light aggregate backfill layer consists of settling tank backfilling material; Described the second leveling layer is accomodation ground the second construction of waterproof layer basic unit; The main waterproofing course that described the second waterproofing course is accomodation ground; Described floor tile adhesive layer is floor tile adhesive material; Described washroom floor tile is the final finish material in washroom; The described stone of moving into one's husband's household upon marriage is the ground separating materials in washroom and other rooms, the final finish material that described indoor floor tile is other rooms.
The beneficial effects of the utility model are: can be best at settling tank bottom brushing waterproofing course play waterproofing protection effect, and on the first waterproofing course in settling tank, evenly lay the equal sand lime brick masonry in interval and can avoid backfill layer to sink to causing second layer waterproof to break as the bearing structure of earth construction load.
On the basis of technique scheme, the utility model can also be done following improvement.
A settling tank washroom backfill earth construction, further as mentioned above, and described the first levelling side of looking for layer adopts a cement mortar to make, and thinnest part thickness is not less than 3 centimetres.
A settling tank washroom backfill earth construction as mentioned above, further, the thickness of described the first waterproofing course is not less than 1.5mm.
A settling tank washroom backfill earth construction as mentioned above, further, described the first waterproofing course on metope leveling layer on turn over highly for settling tank height adds 30cm.
A settling tank washroom backfill earth construction, further, also brushes the waterproofing course topping that has plain-water slurry to make on described the first waterproofing course as mentioned above.
A kind of settling tank washroom backfill earth construction as mentioned above, further, sand lime brick masonry is that sand lime brick is built the intersecting parallels partition wall that spacing is 400mm X 400mm in settling tank, and the height of described sand lime brick masonry is: settling tank height deducts the thickness of the first leveling layer and the second leveling layer.Sand lime brick masonry thickness is 120mm.
Adopt the beneficial effect of above-mentioned further scheme to be: in settling tank, to build intersecting parallels partition wall by laying bricks or stones and can avoid backfill layer to sink to causing the second waterproofing course to break as the bearing structure of earth construction load.
A kind of settling tank washroom backfill earth construction as mentioned above, further, described the second leveling layer adopts cement mortar to make, and is placed with reinforced mesh or/and steel fabric sheet in described the second leveling layer, the gradient of the second leveling layer is not less than 3%, and thinnest part thickness is not less than 3cm.The gradient of the first leveling layer is to cross crossdrift to a downward-sloping inclined-plane inside washroom from door opening.
A settling tank washroom backfill earth construction as mentioned above, further, described the second waterproofing layer thickness is not less than 1.5mm, its with the first waterproofing course overlap joint and on metope leveling layer on to turn over be highly 30cmm, and extend to outside the stone of moving into one's husband's household upon marriage.
A settling tank washroom backfill earth construction as mentioned above, further, described in move into one's husband's household upon marriage stone higher than washroom floor tile 15mm.
Adopt the beneficial effect of above-mentioned further scheme to be: the water that better prevents washroom enters outside washroom.
A settling tank washroom backfill earth construction, further as mentioned above, and the backfilling material of described backfill layer adopts haydite concrete, autoclaved aerated block fragment to make.
The utility model by can be best at settling tank bottom brushing waterproofing course play waterproofing protection effect; in settling tank, build intersecting parallels partition wall by laying bricks or stones and as the bearing structure of earth construction load, can avoid backfill layer to sink causing breaking of the second waterproofing course, and in the second leveling layer, add reinforced mesh/steel fabric sheet and can prevent that leveling layer from breaking and cause ground deformation.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of a kind of settling tank of the utility model washroom backfill earth construction;
Fig. 2 is the structural representation of sand lime brick masonry in settling tank in a kind of settling tank of the utility model washroom backfill earth construction;
Fig. 3 is the second waterproofing course and the position relationship schematic diagram of crossing crossdrift in a kind of settling tank of the utility model washroom backfill earth construction.
In accompanying drawing, the list of parts of each label representative is as follows:
1, concrete floor, the 2, first leveling layer, the 3, first waterproofing course, 4, sand lime brick masonry, 5, backfill layer, the 6, second leveling layer, the 7, second waterproofing course, 8, floor tile adhesive layer, 9, washroom floor tile, 10, the stone of moving into one's husband's household upon marriage, 11, metope leveling layer, 12, body of wall.
The specific embodiment
Below in conjunction with accompanying drawing, principle of the present utility model and feature are described, example, only for explaining the utility model, is not intended to limit scope of the present utility model.
As shown in Figures 1 to 3, a kind of settling tank of the utility model washroom backfill earth construction, comprise concrete floor and body of wall 12, also comprise the first leveling layer 2, the first waterproofing course 3, sand lime brick masonry 4, backfill layer 5, the second leveling layer 6, the second waterproofing course 7, washroom floor tile adhesive layer 8, washroom floor tile 9 and the stone 10 of moving into one's husband's household upon marriage, described the first leveling layer 2 is laid on described concrete floor 1; Described the first waterproofing course 3 is located on described the first leveling layer 1; On described the first waterproofing course 3, evenly lay the equal sand lime brick masonry 4 in interval; Between described sand lime brick masonry 4, fill backfilling material and form backfill layer 5, the upper surface of backfill layer is concordant with described sand lime brick masonry upper end; Described the second leveling layer 7 is laid on described backfill layer 5; Described the second waterproofing course 7 is located on described the second leveling layer 6; Described washroom floor tile 9 connects described the second waterproofing course 7 by washroom floor tile adhesive layer 8; The described stone 10 of moving into one's husband's household upon marriage is located at the junction, ground outside washroom floor tile 9 and washroom.
Described the first leveling layer 2 adopts cement mortar to make, and thinnest part thickness is not less than 3 centimetres.The thickness of described the first waterproofing course 3 is not less than 1.5mm.Described the first waterproofing course 3 on metope leveling layer 11 on turn over highly for settling tank height adds 30cm.The waterproofing course topping that on described the first waterproofing course, also brushing has plain-water slurry to make.
Sand lime brick masonry 4 builds for sand lime brick the intersecting parallels partition wall that spacing is 400mm X 400mm in settling tank.In partition wall with haydite concrete or autoclaved aerated block fragment by the intersecting parallels space backfill in settling tank, be backfilled to the height of partition wall, in backfilling process, filling compaction is formed to backfill layer.The height of described sand lime brick masonry is: settling tank height deducts the thickness of the first leveling layer 2 and the second leveling layer 6; Sand lime brick masonry thickness is 120mm.
Described the second leveling layer 6 adopts cement mortar to make, and in described the second leveling layer 6, is placed with reinforced mesh or/and steel fabric sheet, and the gradient of the second leveling layer 6 is not less than 3%, and thinnest part thickness is not less than 3cm.The gradient of the second leveling layer 6 is to cross crossdrift to a downward-sloping inclined-plane inside washroom from door opening.Described the second waterproofing course 6 thickness are not less than 1.5mm, on itself and the first waterproofing course 2 overlap joint and metope leveling layer on to turn over be highly 30cmm, and extend to stone 10 outsides of moving into one's husband's household upon marriage; Move into one's husband's household upon marriage stone 10 higher than washroom floor tile 15mm.
The foregoing is only preferred embodiment of the present utility model, not in order to limit the utility model, all within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.

Claims (10)

1. a settling tank washroom backfill earth construction, comprise concrete floor and body of wall, it is characterized in that, also comprise the first leveling layer, the first waterproofing course, sand lime brick masonry, backfill layer, the second leveling layer, the second waterproofing course, washroom floor tile adhesive layer, washroom floor tile and the stone of moving into one's husband's household upon marriage, described the first leveling layer is laid on described concrete floor; Described the first waterproofing course is located on described the first leveling layer; On described the first waterproofing course, evenly lay the equal sand lime brick masonry in interval; Between described sand lime brick masonry, fill backfilling material and form backfill layer; Described the second leveling layer is laid on described backfill layer; Described the second waterproofing course is located on described the second leveling layer; Described washroom floor tile is by washroom floor tile adhesive layer described the second waterproofing course that bonds; The described stone of moving into one's husband's household upon marriage is located at washroom floor tile and indoor floor tile junction.
2. a kind of settling tank washroom backfill earth construction according to claim 1, is characterized in that, described the first leveling layer adopts cement mortar to make, and thinnest part thickness is not less than 3 centimetres.
3. a kind of settling tank washroom backfill earth construction according to claim 1, is characterized in that, the thickness of described the first waterproofing course is not less than 1.5mm.
4. a kind of settling tank washroom backfill earth construction according to claim 3, is characterized in that, described the first waterproofing course on metope leveling layer on turn over highly for settling tank height adds 30cm.
5. a kind of settling tank washroom backfill earth construction according to claim 3, is characterized in that, the waterproofing course topping that on described the first waterproofing course, also brushing has plain-water slurry to make.
6. according to a kind of settling tank washroom backfill earth construction described in claim 1 to 5 any one, it is characterized in that, sand lime brick masonry is that sand lime brick is built the intersecting parallels partition wall that spacing is 400mm X 400mm in settling tank, and the height of described sand lime brick masonry is: settling tank height deducts the thickness of the first leveling layer and the second leveling layer.
7. according to a kind of settling tank washroom backfill earth construction described in claim 1 to 5 any one, it is characterized in that, described the second leveling layer adopts cement mortar to make, and be placed with reinforced mesh or/and steel fabric sheet in described the second leveling layer, the gradient of the second leveling layer is not less than 3%, and thinnest part thickness is not less than 3cm.
8. according to a kind of settling tank washroom backfill earth construction described in claim 1 to 5 any one, it is characterized in that, described the second waterproofing layer thickness is not less than 1.5mm, itself and the first waterproofing course overlap joint and on metope leveling layer on to turn over be highly 30cmm, and extend to outside the stone of moving into one's husband's household upon marriage.
9. according to a kind of settling tank washroom backfill earth construction described in claim 1 to 5 any one, it is characterized in that, described in move into one's husband's household upon marriage stone higher than washroom floor tile 15mm.
10. according to a kind of settling tank washroom backfill earth construction described in claim 1 to 5 any one, it is characterized in that, the backfilling material of described backfill layer adopts haydite concrete, autoclaved aerated block fragment to make.
CN201420492162.7U 2014-08-28 2014-08-28 A kind of settling tank washroom backfill earth construction Active CN204001327U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420492162.7U CN204001327U (en) 2014-08-28 2014-08-28 A kind of settling tank washroom backfill earth construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420492162.7U CN204001327U (en) 2014-08-28 2014-08-28 A kind of settling tank washroom backfill earth construction

Publications (1)

Publication Number Publication Date
CN204001327U true CN204001327U (en) 2014-12-10

Family

ID=52041350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420492162.7U Active CN204001327U (en) 2014-08-28 2014-08-28 A kind of settling tank washroom backfill earth construction

Country Status (1)

Country Link
CN (1) CN204001327U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522514A (en) * 2015-09-10 2017-03-22 当代节能置业股份有限公司 Waterproof structure applied to toilet and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522514A (en) * 2015-09-10 2017-03-22 当代节能置业股份有限公司 Waterproof structure applied to toilet and construction method

Similar Documents

Publication Publication Date Title
CN102587416B (en) Construction method of basement attached lane structure
CN204728160U (en) The ecological granitic plaster road surface of a kind of crack resistence
CN107989243A (en) A kind of construction method for caisson of toilet backfill
CN208777468U (en) A kind of kitchen and bath's water-proofing anticracking structure
CN103572786B (en) A kind of pile crown node waterproof treating apparatus and construction method thereof
CN204001327U (en) A kind of settling tank washroom backfill earth construction
CN205063052U (en) Newly build a wall to personally experience sth. part of body and end water bar structure in bathroom
CN204825969U (en) Inspection shaft subsides prevents and treats structure
CN207672616U (en) A kind of outdoor cable penetration pipe is passed by one's way laying structure
CN106498981A (en) A kind of brick type municipal administration comprehensive pipeline passage and its construction method
CN204081064U (en) A kind of basement sandwich
CN104234425B (en) A kind of shear wall structure trowel free process
CN102852160B (en) Composite-structured retaining wall for artistic wall painting and construction method thereof
CN202466991U (en) Waterproof ground beam
CN209585309U (en) Subsided rest room waterproof construction
CN203924106U (en) A kind of reinforced soil retaining wall is used from embedded dust block
CN203603173U (en) Pile head joint waterproof processing device
CN202492828U (en) Ecological water mass revetment structure capable of improving water resistance and bearing performance
CN206873727U (en) A kind of accomodation ground backfills structure
CN204780777U (en) Geogrid concrete structure
CN203007767U (en) Bicycle ramp
CN204112427U (en) A kind of subsided rest room guarded drainage structure
CN204098068U (en) Prefabricated assembled concrete drainage inspection well
CN221118813U (en) Toilet caisson water-proof structure
CN212956895U (en) Upright revetment connection structure of pond stone facing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant