CN206873727U - A kind of accomodation ground backfills structure - Google Patents

A kind of accomodation ground backfills structure Download PDF

Info

Publication number
CN206873727U
CN206873727U CN201720635747.3U CN201720635747U CN206873727U CN 206873727 U CN206873727 U CN 206873727U CN 201720635747 U CN201720635747 U CN 201720635747U CN 206873727 U CN206873727 U CN 206873727U
Authority
CN
China
Prior art keywords
layer
load
bearing
haydite
accomodation ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720635747.3U
Other languages
Chinese (zh)
Inventor
何建林
刘小章
李国华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Mingjiang Decoration Engineering Co.,Ltd.
Original Assignee
Hunan Mingjiang Decoration Design Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Mingjiang Decoration Design Engineering Co Ltd filed Critical Hunan Mingjiang Decoration Design Engineering Co Ltd
Priority to CN201720635747.3U priority Critical patent/CN206873727U/en
Application granted granted Critical
Publication of CN206873727U publication Critical patent/CN206873727U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides a kind of accomodation ground backfill structure; include basic unit, the first waterproof layer, haydite backfill layer, concrete bearing layer, the second waterproof layer, binder course and decorative layer successively from bottom to up; a kind of described accomodation ground backfill structure also includes load-bearing pillar; the load-bearing pillar is arranged in the basic unit; set height identical with the height of haydite backfill layer, the concrete bearing layer is arranged on the load-bearing pillar.The utility model is using haydite as accomodation ground backfilling material; with the advantages of in light weight, impermeability is good; by setting the concrete bearing post being spaced apart in the basic unit in caisson of toilet; connect the concrete bearing layer on haydite backfill layer top; so as to which the gravity on toilet top is distributed on concrete bearing post; the stress of haydite backfill layer is avoided, meanwhile, the design of column remains the packing space of haydite backfill layer as far as possible.

Description

A kind of accomodation ground backfills structure
Technical field
Construction and decoration technical field is the utility model is related to, specially a kind of accomodation ground backfill structure.
Background technology
With the quickening of urban construction process, the number for inhabiting building increases, because upstairs the leak of user toilet is led Cause user's life to be downstairs affected, and trigger the phenomenon of neighbourhood's dispute to happen occasionally.In interior decoration, how toilet is entered Row effectively water-proofing treatment, the problem of construction and decoration industry urgent need to resolve.
In order to avoid the seepage in toilet, building trade would generally improve the impervious of toilet by the way of backfill Performance.Ground backfill structure is used as backfilling material using building waste, rubble etc. between conventional sanitation, and weight is big.The outward appearance of haydite Feature is largely rounded or oval-shaped ball, the features such as because of its lightweight, high compressive strength, the rubble that has been phased out falling behind, The water discharge methods such as cinder.Colleague also explores different toilet structures, as ZL201010151368.X proposes a kind of toilet Waterproof construction, by setting class concrete skeleton layer in toilet waterproofing structure bottom, solve the problems, such as that waterproof construction easily caves in. But this structure, because class concrete skeleton layer occupies space more in caisson of toilet, returned so as to reduce haydite The thickness of packing course, it is unfavorable for keeping the preferable anti-permeability performance in toilet.
Utility model content
In view of the problem of being proposed in background technology, the purpose of this utility model are:It is proposed a kind of accomodation ground waterproof knot Structure, to overcome above mentioned problem.
To reach above-mentioned purpose, technical scheme is used by the utility model:A kind of accomodation ground waterproof construction, from Under it is supreme successively include basic unit (1), the first waterproof layer (2), haydite backfill layer (3), concrete bearing layer (5), the second waterproof layer (7), binder course (8) and decorative layer (9), a kind of described accomodation ground waterproof construction also include load-bearing pillar (4), the load-bearing Post (4) is arranged in the basic unit (1), sets height identical with the height of haydite backfill layer (3), the concrete bearing layer (5) it is arranged on the load-bearing pillar (4).
Further, the setting of the load-bearing pillar (4) is at intervals of 500~800mm.
Further, the load-bearing pillar (4) is concrete bearing post.
Further, the decorative layer (9) is ceramic tile.
Further, the concrete bearing layer (5) is precast slab, is additionally provided with steel bar layer (6) in it.
Beneficial effect is possessed by the utility model:The utility model backfills material using haydite as accomodation ground Material, there is the advantages of in light weight, impervious good, by setting the concrete being spaced apart to hold in the basic unit in caisson of toilet Weight post, the concrete bearing layer on connection haydite backfill layer top, so as to which the gravity on toilet top is distributed into concrete bearing On post, the stress of haydite backfill layer is avoided, meanwhile, the design of column remains the filling sky of haydite backfill layer as far as possible Between.
Brief description of the drawings
Fig. 1 is a kind of accomodation ground waterproof construction schematic diagram of the utility model;
Marked in figure:Basic unit (1), the first waterproof layer (2), haydite backfill layer (3), load-bearing pillar (4), concrete bearing layer (5), steel bar layer (6), the second waterproof layer (7), binder course (8) and decorative layer (9).
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, with reference to specific embodiment And accompanying drawing, the utility model is expanded on further.
It is as shown in Figure 1 a kind of accomodation ground waterproof construction schematic diagram of the utility model, a kind of described toilet Face waterproof construction, include basic unit (1), the first waterproof layer (2), haydite backfill layer (3), concrete bearing layer successively from bottom to up (5), the second waterproof layer (7), binder course (8) and decorative layer (9), a kind of described accomodation ground waterproof construction also include load-bearing Post (4), the load-bearing pillar (4) are concrete bearing post, and the setting of the load-bearing pillar (4) specifically may be used at intervals of 500~800mm It is distributed according to the length and width of caisson of toilet, the load-bearing pillar (4) is arranged in the basic unit (1), sets height and haydite The height of backfill layer (3) is identical, and the concrete bearing layer (5) is arranged on the load-bearing pillar (4), the concrete bearing layer (5) steel bar layer (6) is additionally provided with, the concrete bearing layer (5) uses precast slab, and the decorative layer (9) is porcelain Brick.
The utility model sets up precast slab conduct by building the load-bearing pillar (4) of regular distribution by laying bricks or stones after filling haydite Concrete bearing layer (5), a kind of accomodation ground backfill formed is simple in construction, easy for construction, in addition, load-bearing pillar (4) accounts for According to less space, more space is reserved so as to backfill layer (3) for haydite, and the design of pillar will not destroy haydite backfill layer (3) globality.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms Type.Above example be only it is exemplary, it is restricted without that should regard as, the scope of the utility model by appended claims and It is not that described above limits.

Claims (5)

1. a kind of accomodation ground waterproof construction, include basic unit (1), the first waterproof layer (2), haydite backfill layer successively from bottom to up (3), concrete bearing layer (5), the second waterproof layer (7), binder course (8) and decorative layer (9), it is characterised in that described one kind Accomodation ground waterproof construction also includes load-bearing pillar (4), and the load-bearing pillar (4) is arranged in the basic unit (1), set height with The height of haydite backfill layer (3) is identical, and the concrete bearing layer (5) is arranged on the load-bearing pillar (4).
2. a kind of accomodation ground waterproof construction according to claim 1, it is characterised in that load-bearing pillar (4) are set Put at intervals of 500~800mm.
3. a kind of accomodation ground waterproof construction according to claim 1, it is characterised in that the load-bearing pillar (4) is mixed Coagulate native load-bearing pillar.
4. a kind of accomodation ground waterproof construction according to claim 1, it is characterised in that the decorative layer (9) is porcelain Brick.
A kind of 5. accomodation ground waterproof construction according to claim 1, it is characterised in that the concrete bearing layer (5) it is precast slab, is additionally provided with steel bar layer (6) in it.
CN201720635747.3U 2017-06-03 2017-06-03 A kind of accomodation ground backfills structure Active CN206873727U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720635747.3U CN206873727U (en) 2017-06-03 2017-06-03 A kind of accomodation ground backfills structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720635747.3U CN206873727U (en) 2017-06-03 2017-06-03 A kind of accomodation ground backfills structure

Publications (1)

Publication Number Publication Date
CN206873727U true CN206873727U (en) 2018-01-12

Family

ID=61338135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720635747.3U Active CN206873727U (en) 2017-06-03 2017-06-03 A kind of accomodation ground backfills structure

Country Status (1)

Country Link
CN (1) CN206873727U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612345A (en) * 2018-05-14 2018-10-02 重庆宜府住工科技有限公司 A kind of prefabricated mixed structure assembled lavatory and its manufacturing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612345A (en) * 2018-05-14 2018-10-02 重庆宜府住工科技有限公司 A kind of prefabricated mixed structure assembled lavatory and its manufacturing method

Similar Documents

Publication Publication Date Title
CN206143951U (en) Connected node of rammed earth wall and blockwork
CN107268834B (en) Constructional column-free combined hollow-out bare brick wall and construction method thereof
CN207130930U (en) Without construction column combination hollow out plain brick wall
CN102817375A (en) Assembly type precast reinforced concrete inspection well system
CN108331198A (en) A kind of novel fabricated reinforced concrete circle beam-constructional column method of construction
CN203891251U (en) Single-row hole self-insulating reinforced building block masonry shear wall system
CN201495651U (en) Composite wall construction tie node of antique bricks and insulation blocks
CN103195190A (en) Recycled concrete brick and insulating layer composite wall with tie reinforcing steel bars and manufacturing method thereof
CN206873727U (en) A kind of accomodation ground backfills structure
CN207846835U (en) Novel composite thermal insulation decorative block wall
CN201424740Y (en) Insert bar type masonry with sod brick bearing high-density straws
CN201224941Y (en) Environment protection type structure thermal insulation concrete building block, masonry and anti-vibration residential building
CN106013229A (en) Free standing brick setting aseismatic cave dwelling and construction method thereof
CN202689240U (en) Stone wall body
CN201874121U (en) Multi-row bore heat insulating building block reinforcing bar masonry wall system
CN101451358A (en) Basement composite external wall
CN102535847B (en) Method for constructing gypsum self-insulation outer wall block masonry
CN207959202U (en) A kind of CFG bracing means
CN211286317U (en) Ridge wall basic unit structure of roofing is decorated to overhead stone material
CN204059659U (en) A kind of building slab wall construction
CN203247750U (en) Assembled type cement brick
CN202969686U (en) Fire-proof clay brick
CN207829216U (en) A kind of light steel ecological wall of low/multilayer assembled
CN102409798A (en) Self-insulating brick
CN206916995U (en) A kind of masonry structure of new ribs building block

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220111

Address after: 410000 room 1005, floor 10, block a, No. 618, Heping Road, Longping high tech park, Furong district, Changsha, Hunan Province

Patentee after: Hunan Mingjiang Decoration Engineering Co.,Ltd.

Address before: 410000 Building 1, building 5, business, basement, room 326, room 327, room 328 on the third floor, Hengtai Commercial Plaza, No. 516, Fenglin Third Road, high tech Development Zone, Changsha, Hunan

Patentee before: HUNAN MINGJIANG DECORATION DESIGN ENGINEERING Co.,Ltd.